The complainants hold home insurance with the financial firm (the insurer) and lodged
a claim for damage to their carport in November 2017. They say the damage arose
because of water runoff from their neighbour's storm water drain or a vehicle
impacting the wall.
The insurer declined the claim because it says an insured event did not cause the
damage. It also says the policy does not cover damage due to earth movement, roots
from trees or faulty workmanship.
The case analyst provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the insurer. A copy of the
recommendation is attached to this determination
As the complainants did not accept the recommendation, the complaint has been
referred to me for determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered but do not affect the outcome.
1.3 Determination
This determination is in favour of the insurer.
I agree with the case analyst’s reasons for the recommendation and the
recommended outcome.
The insurer is not required to take any further action in relation to the claim or the
complaint.
Determination | Case number: 604029 Page 2 of 5
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
Findings in the recommendation were correct
I have decided this case on its merits, having regard to the relevant law, good industry
practice, codes of practice and previous AFCA decisions. I have taken into account all
the material submitted by the parties, both before and after the recommendation. I am
satisfied the documentation I have relied on has been provided to both parties.
I am satisfied the case analyst’s recommendation contains an accurate summary of
the complaint, the issues to be determined, any applicable paragraphs of the Rules
and any relevant law.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
Material provided after the recommendation
After the recommendation was rejected, the complainants made further submissions
in which they essentially reiterated its position. Some new material was provided.
Where relevant, the submissions and new material will be referred to in the
determination.
The complainants must establish on the balance of probabilities they have suffered a
loss caused by an event to which the policy responds. This is known as a prima facie
claim.
Damage probably not caused by storm
The complainants noticed cracking damage to the carport when removing contents
from under the carport. It is not in dispute there is damage to the carport.
When making the claim, the complainants said the damage arose because of storm
water drainpipe run-off from a neighbou r’s property.
The insurer’s policy provides cover for damage to the home caused by certain events.
The insurer’s policy covers damage caused by storm but does not cover damage
caused by rain after it reaches the ground.
Therefore, the complainants have not established a prima facie claim under the
insured event of storm.
Determination | Case number: 604029 Page 3 of 5
Damage probably not caused by water run-off within 72 hours of the first
damage to the home
The policy provides cover where there is damage caused by flood or water run-off.
However, the policy does not respond if there is loss or damage caused by
subsidence no matter how it is caused. There is an exception. The insurer covers
damage caused by subsidence which occurs within 72 hours of the first damage to
the home caused by the flood or water run-off and is solely caused by the flood or
water run-off.
The cracking damage was discovered in 2017. The insurer engaged a builder to
advise on the cause of the cracking damage.
The builder said the main cause of the cracks and settlement was because of poor
design and workmanship in building the walls and footings. He said the damage was
made worse by other factors including the presence of trees and shrubs near the wall,
the lack of inadequate surface drainage surrounding the wall, and poor construction of
the carport roof structure.
As for the drainage, he observed storm water disperses directly onto the ground along
the length of the wall. Because there is inadequate drainage, the water cannot drain
away from the wall. He indicated this process continues to re-occur throughout the
prolonged wet weather periods increasing the force on the wall resulting in further
movement.
The builder said the damage had been occurring over time. He referred to satellite
images which showed cracking in 2009 and a large vertical crack in 2014.
The complainant engaged an engineer to advise on the cause of the cracking
damage. The engineer said the significant cracking did not occur in the period after
the carport was built but occurred because of more recent events. He did not say
what those events were. However, he said the cracking damage was not because of
poor design or poor workmanship.
The engineer referred to various photographs /images taken by the complainants and
by the insurer’s builder. He concluded the photographs/images showed minimal
cracking and movement.
Having reviewed the photographs/images, I accept there was already cracking
damage in 2009 and 2014. The complainants say they did not notice the damage until
2017.
Having considered the available material, I am satisfied the damage to the carport
was probably caused by poor drainage which occurred over time. I am not satisfied
the subsidence occurred within 72 hours of the first damage to the carport caused by
water run-off.
Determination | Case number: 604029 Page 4 of 5
I am not satisfied the complainants have established a prima facie claim under the
insured event flood or water run-off.
Damage probably not caused by impact
In the alternative, the complainants say the cracking damage to the wall was caused
by impact. They rely on a letter from their neighbour who said it was possible the gas
delivery driver backed into the wall. This was because he would reverse his vehicle
up their driveway to make monthly deliveries.
After the recommendation, the complainant relied on a further letter from the
neighbour. The neighbour recalled his sister visited in 2013 and she was home when
the gas delivery arrived. She told him she heard a loud bang and saw the gas delivery
driver checking the back of his van and the wall. There is no statement from the
neighbour’s sister.
I am not satisfied the available evidence establishes on the balance of probabilities
the damage to the carport was caused by impact from a gas delivery truck. This is
because the photographs/images show the damage to the wall is long-standing and
widespread and not typical of impact from a vehicle.
Further, the available evidence establishes other more probable causes including the
long-term damage caused by inadequate drainage.
As I am satisfied the complainants have not established the damage to the carport
was caused by an insured event, it is redundant to address the policy exclusion relied
on by the insurer that the damage was caused by defective or faulty workmanship.
Having considered all the available material, and for the reasons stated, I agree with
the recommendation. The insurer is entitled to deny the claim and need take no
further action in relation to the claim or the complaint.
Determination | Case number: 604029 Page 5 of 5
3 Supporting information
3.1 Our Approach
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy extracts
The relevant policy extracts are referred to in the correspondence between the
parties, the parties’ submissions , the insurer’s notice of r esponse and in the
recommendation. The documents have been exchanged with the complainants.
Other relevant material considered and relied on
p arties’ submissions and em ails both before and after the recommendation
correspondence between the parties
recommendation 7 March 2019.
Recommendation | Case number: 604029 Page 1 of 7
Recommendation
Case number: 604029 7 March 2019
4 Overview
4.1 Complaint
The complainants hold home insurance with the financial firm (the insurer) and lodged
a claim for damage to their carport on 29 November 2017. They say the damage
arose because of water runoff from their neighbour's storm water drain or a vehicle
impacting the wall.
The insurer declined the claim because it says an insured event did not cause the
damage. It also says the policy does not cover damage due to earth movement, roots
from trees or faulty workmanship.
The complainants dispute this decision and believe the insurer should pay their claim.
4.2 Issues and key findings
Is the insurer entitled to deny the claim?
The insurer is entitled to deny the claim because:
the complainants have not established an insured event covers the loss
there is insufficient evidence to show the carport sustained damage within 72 hours
of a water runoff event
there is insufficient evidence to show a vehicle impacted with the carport.
4.3 Recommendation
This recommendation is in favour of the insurer.
The insurer is not required to take any further action.
Recommendation | Case number: 604029 Page 2 of 7
5 Reasons for recommendation
5.1 Is the insurer entitled to deny the claim?
Complainants must establish a valid claim
The initial onus lies with the complainants to show, on the balance of probabilities,
they suffered a loss caused by a risk insured against under the policy. This is known
as a valid ( prima facie ) claim.
Only if the complainants establish a valid claim, does the onus shift to the insurer to
show, on the balance of probabilities, it is entitled to rely on an exclusion under the
policy to deny the claim.
The complainant ’ s policy provides cover for insured events, subject to conditions and
exclusions. The policy will only cover the claimed property damage if it was caused by
one of the insured events. The list of insured events is outlined in the policy.
Complainants say there was two possible causes for the damage
The complainants lodged the claim after noticing damage to their carport. The
complainants say the damage was caused by their runoff from their neighbour's storm
water drain pipe.
The insurer denied the claim because they say the damage was not caused by an
insured event. The insurer also says the policy only covers damage caused by water
runoff if the damage occurs within 72 hours of the first loss.
The insurer says the water runoff combined with movement of the surrounding and
the poor design and workmanship of the carport caused the damage.
The complainants submitted a report from an engineer JHA. JHA said the damage
was not caused by settlement or poor design and workmanship, however, JHA did not
identify the cause of damage.
The complainants provided a statement from their neighbour suggesting a delivery
vehicle may have backed into the carport wall on his side of the property. The
statement was not conclusive as to whether impact had occurred.
Damage to the carport caused by water runoff
In considering whether the damage was caused by an insured event, I considered
whether the proximate cause of damage could be identified.
It is established at law a proximate cause is not necessarily the first or the last or the
sole cause of the loss. It is the effective or dominant or operative cause of the loss. If
there are several causes operating contemporaneously, then each must be examined
Recommendation | Case number: 604029 Page 3 of 7
for the qualities of predominance and efficiency as the active, efficient cause sets a
relevant train of events in motion.
The complainants lodged the claim after noticing damage to their carport. The
complainants say the damage was caused by runoff from their neighbour's storm
water drain pipe.
The policy is a listed event policy which includes water runoff. The policy will respond
where the damage is caused by water runoff if the damage occurs within 72 hours of
the first loss or damage.
In assessing what the dominant or operative cause of the damage was, I considered
whether water runoff could have caused the damage to the house. I considered the
expert reports provided by the complainant and the insurer.
The complainants say they noticed damaged to the carport upon removal of items
from the carport. They say due to the location of the carport on the property, it is
exposed to water runoff from the neighbour’s property .
The insurer obtained an expert report from builder CRD. The report says the storm
water from the neighbouring property discharges onto the ground adjacent to the wall
and then runs along the length of the wall. CRD says this reoccurs throughout periods
of wet weather progressing the damage to the carport wall, which combined with
other factors, caused the damage. This suggests the damage is long-standing.
The complainant’s obtained a report from JHA. JHA addressed the issues of
settlement and design of the carport, however, did not address the water runoff. JHA
does not provide a proximate cause of damage.
In the absence of any other evidence, I am satisfied the proximate cause of damage
to the carport is water runoff, resulting in settlement of the soil, however, there is no
evidence to indicate the settlement occurred within 72 hours of the initial runoff event.
The policy only responds if the damage from water runoff occurs within 72 hours of
the initial loss. In the absence of an alternative cause of damage, the insurer is
entitled to deny the claim.
Insufficient evidence to show damage caused by poor design and workmanship
The insurer says the water runoff combined with movement of the surrounding and
the poor design and workmanship of the carport caused the damage.
The insurer obtained a report from CRD who says the damage was caused by poor
construction practices during the initial construction of the wall.
Recommendation | Case number: 604029 Page 4 of 7
The complainants provided evidence showing the carport complied with council
requirements and they engaged a team of professionals to ensure the carport was
built properly.
The complainants’ expert report from JHA rebutted the report from CRD with
reasoned statements supported by a thorough assessment. This included the use of a
ground penetrating radar to review the footings of the carport.
In reviewing the evidence, I prefer the opinion of the expert engineer over the opinion
of the builder. This is because the engineer is more qualified to comment on the
structural integrity of a building. The engineer also conducted a more thorough
inspection than the builder.
I am satisfied the insurer has not proven the exclusion for damage caused by poor
design and workmanship applies.
Insufficient evidence to show proximate cause of damage was impact
The complainants say the damage may have been ca used by impact to the carport on
the neighbouring property.
The complainants submitted a statement from their neighbour suggesting a utility
vehicle may have backed into the carport on the neighbour’s side of the property
The policy will respond where damage is caused by a vehicle impacting the property.
I carefully considered the evidence submitted including the statement and
photographs of the damage. It is clear from the photographs there is damage to the
carport, however, the statement provided by the complainant’s neighbour is
inconclusive and does not confirm whether someone backed into the carport.
The complainant has not established the damage to the carport is because of a listed
event. Therefore, the complainant has not established a valid claim under the policy.
As such, the insurer is entitled to deny the claim and is not required to take any
further action.
Recommendation | Case number: 604029 Page 5 of 7
6 Supporting information
6.1 Relevant Policy Wording
Flood – page 22
Flood means the covering of normally dry land by water that has escaped or been released
from the normal confines of any of the following:
• a lake, river, creek or other natural watercourse (whether or not it has been alt ered or
modified)
• a reservoir, canal or dam. Water runoff means water which enters your home as a
result of it running off or overflowing from any origin or cause.
Yes - A flood or water runoff causes loss or damage to your home or contents.
No - Loss or damage caus ed by erosion, landslide, subsidence, vibration, earth shrink age or
expansion or any other earth movement no matter how it is caused. But, we do cover damage
caused by a landslide or subsidence that:
• occurs within 72 hours of the first loss or damage to your home or contents caused
by the flood or water runoff, and
• is solely caused by the flood or water runoff (that is, not caus ed by or contributed to
by erosion over time, structural or design fault or any other factor).
Impact – page 23
When certain items cause loss or damage through impact with or near your home or contents.
Yes - The impact of these items cause loss or damage to your home or contents:
o a motor vehicle or watercraft
o a tree or tree branch
o an aircraft, space debris or debris from a rocket or satellite, a satellite dish, solar hot
water tank or aerial.
General exclusions – page 61
What we don’t cover
This section outlines the general things we don’t cover under your policy. They are known as
general exclusions.
General exclusions
These general exclusions apply to all of the cover we provide under your policy.
We don’t cover you under your policy fo r loss or damage to your home or contents or legal
liability which is caused by or arises in connection with any of the following items, events or
circumstances:
Defective or faulty workmanship
Any inherent or built-in defect or defective or faulty workmanship, design or manufacture. But
we do cover you if you can show you or your tenant did not know or couldn’t reasonably have
been expected to know about the defect or defective or faulty workmanship, design or
manufacture.
Erosi on and landslide
Erosion, landslide, subsidence, vibration, earth shrink age or expansion or any other earth
movement no matter how it is caused (but we do cover earthquake and we cover some
landslide or subsidence that happens within 72 hours of the first loss or damage to y our home
or contents caused by the flood or water runoff – see page 22).
Recommendation | Case number: 604029 Page 6 of 7
Loss not linked to event
Loss to your home or contents which can’t be linked to any identifiable event (but we do cover
you if you have an optional benefit under ‘Items away from home’ – see page 57).
6.2 Relevant Expert Evidence
Re cord Key points
Financial firm’s expert
(CRD)
Report
04 - 01 - 2018
Storm water allowed to disperse water directly onto the ground
along the length of the wall and then int o the garden area along
the front of the wall has further exacerbated the issue by
allowing excessive amounts of water to enter the foundation of
the wall.
There are a number of factors which could locally influence the
foundation settlement along the wall, we believe that the
underlying c ause of the foundation settlement is relat ed to poor
construction practices during the initial construction of the wall.
Primary cause of the large structural cracks and settlement to
various parts of the Carport walls is poor design and
workmanship in con structing the masonry wall and footing
system.
Damage has also been exacerbated by a number of other
factors including:
The presenc e of tall trees and numerous shrubs and
vines at close proximity to the wall.
The lack of and inadequate surface drainage surrounding
the wall, allows stormwater to pass around the wall and
permeates the soils underneath the foundation causing
the movement currently observed.
The construction of the Carport roof structure which has
no provision for bracing allowing extra pressure to be
applied to the external walls.
Satellite imagery shows the damage has been occurring
for an extended period of time. This has been confirmed
with previous repairs being carried out to the concrete
sl ab adjacent the wall.
Financial firm’s expert
(CRD 2)
Report
10 - 01 - 2018
Structural inadequacy in the masonry wall is evident in the
extensive cracking in the non - c ore filled areas of the wall.
Cracking is the result of foundation settlement related to poor
construction during the initial construction of the wall.
Damage is due to poor construction has been exacerbated by the
extent of vegetation in the area, the lack of drainage around the
wall and the addition of the carport roof structure.
Recommendation | Case number: 604029 Page 7 of 7
Re cord Key points
Complainant’s expert
JHA
Report
03 - 03 - 2018
The Hydraulic Level Survey on the bottom chord of trusses show
less fall as per original plans from east to west and show
approximately 40mm fall from the front NW corner to the SW
corner.
This fall lays within engineering tolerances for footing settlement.
Given the construction was built in 1992 and most settlement
occurs in the first 3 - 5 years up to 10 years then it appears
evident that the significant structura l cracking that has occurred is
as a result of more recent events
V ertical bars were in place in every block of the 8 areas inspected
and assumed through the entire wall.
Horiz ontal bars ran along the perimeter of the wall on every
second course in the 8 a reas inspected.
Footings were engineer designed, inspected and passed by
council, the block walls have steel reinforcement and are core
filled.
Although roof structure may not be braced to present day
standards, it is unlikely, given the sheltered as pect o f the carport,
both into the side of the hill and the tree protection that this has
had any impact on the settlement or movement in the carport.
The evidence from our investigation indicates that the large
structural cracks and settlement are from an event subsequent to
the building of the Carport and not owing to a poor design or poor
workmanship.