Settlement amount for water damage to building (scope of works dispute)
Summary
The insurer accepted the complainant's water damage claim but the parties disputed the scope of repairs. AFCA ordered a cash settlement of $211,250, $16,800 for temporary accommodation and removalist fees, $3,000 for non-financial loss and the cost of the engineering report.
Given the breakdown in the parties' relationship and the delays caused by the insurer, a fair cash settlement reflecting both scopes of works, with a 15% transfer-of-risk allowance, is appropriate.
Issues
- Claim amount dispute primary · upheld
“The panel determines the insurer pay the complainant a cash settlement of $211,250 in final settlement of the complainant's claim.”
- Poor claim handling secondary · upheld
“Insurer rejected the claim twice and accepted it only after the complainant provided an engineer's report.”
- Delay secondary · upheld
“The panel accepts the delays caused by the insurer's handling of the claim have led to significant delays in the repairs commencing.”
Subjects and remedies
pay claimpay compensationpay non financial loss
Text of the determination
Supplementary Determination
Case number 602850
Financial firm Commonwealth Insurance Limited
Determination | Case number: 602850 Page 2 of 9
Case number: 602850 19 June 2020
1 Determination overview
1.1 Complaint
The complainant lodged claim with the Financial firm (Insurer) for movement damage
to his property following an escape of liquid from his neighbour’s pipe.
The insurer assessed and initially denied the claim. However, during the course of
this complaint, it agreed to accept the claim.
The subject of the complaint is now based on a dispute between the parties’
respective scope of works (SOW)/quote as each party is unable to agree with the
SOW.
The insurer says it is willing to cash settle based on its SOW, however it prefers to
engage an engineer to compile an accurate SOW for the repairs.
The complaint disagrees and says his quote is an accurate reflection of the repair
required and seeks the i nsurer to settle the claim on his quote.
1.2 Issues and key findings
Is it fair in the circumstances that this complaint be cash settled?
The Panel is satisfied that given the issues in dispute and time taken to resolve this
complaint that it is fair in the circumstances that this matter be cash settled as set out
under Section 2.1 of this determination.
Is the complainant entitled to compensation for non-financial loss and
professional fees incurred?
The complainant is entitled to compensation for non-financial loss due to the unusual
degree of inconvenience and time taken to resolve this claim. The Insurer is also
required to pay the complainant ’ s costs of obtaining the engineering report if it has not
already done so.
1.3 Determination
This determination is in favour of the Complainant
The insurer is to pay the complainant $211,250 for repairs plus an additional $16,800
for temporary accommodation and removalist fees in settlement of the claim as set
out under Section 2.1. A further $3,000 is to be paid as compensation for non-
financial loss in accordance with the AFCA rules. If it has not already done so the
Insurer is to pay the complainant ’ s cost of obtaining the engineering report.
Determination | Case number: 602850 Page 3 of 9
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
Due to the complexities involved in the issues in dispute in this matter, it has been
referred to a panel to determine. The panel is comprised of the Lead Ombudsman, a
member with significant industry experience and a member with significant consumer
experience.
The panel has had access to all the information and following consideration of the
information, has made this determination based on what is fair in all the
circumstances, having regard to the relevant legal principles, terms of the policy, good
industry practice including codes of practice and prior determinations where
applicable.
2.1 Is it fair in the circumstances that this complaint be cash settled?
Insurer initially declined the claim
The complainant lodged a claim for damage sustained to his house on 29 March
2018. Accordi ng to the complainant, the damage followed a neighbour’s water main
bursting in about August 2015. The complainant had not lodged the claim until March
2018 due to a number of health issues.
The insurer initially rejected the claim in July 2018. That rejec tion appears to have
been sent to the complainant via email. On 5 December 2018, the insurer again
rejected the claim. It was only when the complainant provided a report from an
engineer in April 2019 that the insurer accepted the claim.
On accepting the claim, the insurer obtained a revised SOW through CC.
On 7 June 2019, CC provided the SOW, although made a strong recommendation
that an engineer again attend the site. CC’s assessment was based on 36 years’
experience as a builder. Due to his concerns he indicated that the SOW was a guide
only and approval should be sought from a second engineer.
The insurer subsequently offered to cash settle the complainant’s claim based on the
SOW from builder C for $129,466.56.
The complainant provided his own quote from F for $208,316.62. Although F has also
referred to the need for a further engineer’s report, the complainant has indicated
through his legal representative that due to the time taken to resolve this matter, he
would prefer a cash settlement.
Determination | Case number: 602850 Page 4 of 9
The insurer rejects this view and rather wants to appoint its engineer to inspect the
property to compile an accurate SOW and quote to effect repairs.
The Insurer must settle the claim fairly
The relevant policy terms are set out in section 3 of this recommendation. The Panel
considers the policy terms are clear and unambiguous. Pursuant to the terms of the
policy, it is clear it is at the insurer’s election whether it:
repair or rebuild the damaged part of the building;
replace the building;
provide the reasonable cost of repairing or rebuilding the damaged part of the
building
pay the reasonable cost of repairing or rebuilding the damaged part of the
building.
Notwithstanding its entitlement under the terms of the policy, the insurer must
exercise its discretion on this issue fairly.
When the insurer repairs the building, it guarantees the quality of materials and
workmanship of the work. If a defect arises because of poor quality workmanship or
incorrect materials, then the insurer will rectify the problem.
A cash settlement means the complainant gives up the guarantee provided under the
insurer’s policy. Further, a cash settlement transfers all the risk from the insurer to the
complainant for any unforeseen damage and any additional work required once
repairs commence.
Dispute relates to discrepancies in the scope of works
Both assessment indicate a desire to obtain a further engineering report. CC in its
report has been quite strong in its recommendation that an engineer needs to attend
the site again.
F in its report notes the quote is conditional upon further engineering direction.
The panel accepts that in an ideal world that it would have been appropriate for a
further engineering report to be obtained and a more detailed SOW provided. This
could have occurred, but the panel is satisfied that there has been a breakdown in the
relationship between the complainant and the insurer such that the complainant now
seeks to cash settle the claim.
The insurer has pointed out a number of differences in the SOW as follows:
pour 11-12 piers
removal of lounge, hallway, toilet and laundry
replacement of three internal doors
Determination | Case number: 602850 Page 5 of 9
waterproofing bathroom
remove and replace bath, shower and tiles in bathroom
replacement of eaves linings
demolition of front of house
removal of brick work, roof tiles and concrete footings.
Having reviewed the quote from C, the panel notes that no allowance has been
provided for the kitchen repairs, with the SOW noting that this was to be re-evaluated
on completion of repairs to the sub-floor.
Damage to the laundry, hallway and toilet was identified with existing tiles cracked
and requiring removal as well as the removal to damaged sheets. Contrary to the
insurer’s comments, C has recognised that the bathroom was damaged , and
recognised the need for other repairs.
In the panel’s view, the quote from F covers most of the identified damage, although
the panel accepts that there are some matters included in the scope of works that
have not been clearly explained, such as the replacement of the roof tiles and
reference to demolition of the front of the house. The panel acknowledges however
that there is a significant degree of consistency between the damage identified by
both parties and accepts in the circumstances that both SOWs can be relied upon to
achieve a fair cash settlement figure.
Fair in the circumstances to cash settle the claim
Any cash settlement should reflect the likely cost to an insured of completing the
repairs and being placed in the position they were in prior to the loss. It needs to take
into account the risks of any repair process, the risk of variations and loss the
insurer’s lifetime guarantee on the work.
The Panel accepts that the cost of repairs and quotations provided from various
builders will vary significantly. The fact the co mplainant’s quotes are significantly
higher for the same repairs (than the insurer’s quote) does not of itself establish the
quotation was inadequate.
C provided an interim estimate as to the cost to repairs of $129,466.56. As the panel
has indicated, C did not allow for various items in this quote including things like:
variation for the repairs to the front of the house
no allowance for adjustment of internal floors
limited allowances for repairs to the kitchen, hallway, toilet and bathrooms.
F on the other hand quoted $208,316.62. The quote from F appears to cover the
same areas as the quote from C but makes allowance for a lot of the items not
included in C’s quote. In the panel’s view, a fair starting point to reach a compromise
Determination | Case number: 602850 Page 6 of 9
and cash settlement of this dispute would be to increase the quote provided by C by
approximately $30,000 to allow for an increase in the allowances for things such as:
repairs to the front of the property
adjustment of internal floors and
repairs to the kitchen, hallway, toilet and bathrooms.
This would bring the total quote to approximately $159,000. It would then be fair to
split the quotes that is $159,000 and $208,000 to obtain an average of $183,500. As a
cash settlement entails a transfer of risk to a complainant, then it is appropriate to
make an allowance for the transfer of risk. The panel has considered whether it would
be fair to allow a 15% or 20% figure for the transfer of risk. In the circumstances, the
Panel believes it is fair to allow 15% for the transfer of risk which would increase the
total settlement to $211,250. The panel accepts that given the calculation of the cash
settlement, that it is not appropriate that interest be paid on this amount.
Accordingly, the panel determines the insurer pay the complainant a cash settlement
of $211,250 in final settlement of the complainant’s claim for damage arising from the
insured incident.
Insurer to pay additional amount for temporary accommodation
Both parties have made submissions relating to the temporary accommodation
benefits
There is no dispute the building is currently unfit to be lived in. The complainant says
he moved out of the building shortly after the insurer accepted the claim in April 2019.
There is no dispute the insurer paid temporary accommodation costs. The
complainant in his latest submission indicates he was paid temporary accommodation
benefits from approximately April 2019 until December 2019 when he was forced to
leave his temporary accommodation. He concedes he was this was subsequently
paid and believes this continued until the expiry of the 52-week period for temporary
accommodation under the policy.
It says it paid $23,500 temporary accommodation costs for the period 26 June 2019
until 8 May 2020. It suggests this is more than the 52-week period allowed under the
policy. If the dates are correct the insurer has paid 45 weeks temporary
accommodation.
The complainant seeks an additional $36,200 being 52 weeks temporary
accommodation at $600 per week plus $5,000 for commercial storage. The insurer
has offered and additional $9038.46 for 20 weeks temporary accommodation. The
panel calculates this at a weekly rate of $451.92.
The panel accepts the delays caused by the insures handling of the claim have led to
significant delays in the repairs commencing. The panel accepts that as at 20 June
Determination | Case number: 602850 Page 7 of 9
2020 no repairs have commenced. This is 6 weeks after the insurer ceased payment
of the benefits. If we accept the loss of rent was paid for 45 weeks, then the
complainant is entitled to this benefit under the terms of the policy. In any event the
panel considers it reasonable that this period be covered.
The panel also accepts that it would likely take the complainant at this time of year 4
to 6 weeks to organise the repairs to commence. The panel notes the complainant
may have a builder available earlier than this period.
There is no accurate estimate of the time it would take to repair the property from
commencement. Given the repairs identified in the SOW the panel accepts a further
20 weeks would be fair in the circumstances.
The panel calculates a total period of 32 weeks should be allowed for the temporary
accommodation. The Panel estimates similar accommodation would be available
within the area for $500.00 per week. This would result in additional temporary
accommodation costs of $16,000.
The complainant has also claimed storage costs. Given the complainant would be
moving to similar accommodation the Panel is not persuaded to allow any amount for
storage costs. The panel accepts that removalist fees will be incurred and notes the
claimed amount is $800.00. The panel accepts this is reasonable in the
circumstances and should be paid by the insurer.
2.2 Is the complainant entitled to compensation for non-financial loss or
professional costs?
Insurer is to pay the complainant the cost of the engineering report
Under Rule D.5 of the AFCA rules, AFCA may require a financial firm contribute up to
$5,000 to legal or other professional costs incurred by a complainant in the course of
a complaint.
The complainant has incurred the professional costs related associated with obtaining
a report from engineer F. There is no dispute that the report has been of significant
assistance in resolving this dispute. The panel notes the insurer had agreed to cover
the costs of the report.
Under Rule D.5, if it has not already done so, the insurer should meet the costs
incurred in obtaining the report from F.
Complainant is entitled to payment of non-financial loss
Under Rule D3, AFCA may award compensation of up to $5,000 for non-financial loss
where a person suffers an unusual degree of time taken or physical inconvenience to
resolve a claim.
Determination | Case number: 602850 Page 8 of 9
The complainant initially notified the insurer of the damage to his property in March
2018. According to the claim notes, the insured was notified by phone on 22 May
2018 that the claim had been denied. This is despite the insurer not having all
relevant details of the inundation of the property. It would appear from the information
exchanged that the insurer completed an IDR respo nse on 5 July 2018 sending that
response by email to the complainant. Although the email notes the need for the
insurer to obtain information from the relevant Water Authority, the IDR response
proceeds to deny the claim. It is not until the insurer was provided with the
complainant’s engineering report that the insurer has accepted the claim.
It is clear but for the complainant’s persistence that the complainant’s claim would not
have been accepted.
The panel also notes that the insurer’s engineer appears to have downplayed the
extent of the inundation of the complainant’s property. The water running on to the
complainant’s property was reported on 18 August 2015. The water bill provided as
evidence of inundation of the property was issued on 28 August 2015 and covers
usage until 19 August 2015. It is clear that there was a significant leak that occurred
from 15 August 2015.
In the circumstances, the panel accepts that the complainant has suffered an unusual
degree of physical inconvenience and time taken to resolve this dispute. The panel
believes it is appropriate in these circumstances that the insurer pay the complainant
$3,000 by way of compensation for non-financial loss.
Determination | Case number: 602850 Page 9 of 9
3 Supporting information
3.1 Terms of the policy
Record Key points
How we settle a claim Building claims
If we agree to pay your claim, we will decide whet her to:
repair or rebuild the lost or damaged part of your building ;
replace your building ;
provide you with a store credit or voucher for the amount we
determine .
to be the reasonable cost of repairing or rebuilding the lost or
damaged part of your building up to the sum insured stated on
your Certificate of Insurance ; or
pay you the amount we det ermine to be the reasonable cost of
repairing or rebuilding the lost or damaged part of your building up
to the sum insured stated on your Certificate of Insuranc e
How to make a claim You must :
contact us as soon as possible if you need to make a claim;
take all reasonable steps to prevent any further loss or damage
occurring to your building, contents and/or your portable contents;
be truthful and frank with us at all times, otherwise we may refuse
to pay your claim;
cooperate and assist us with all of our enquiries, even if we have
already paid your claim, otherwise we may refuse to pay your
claim or require you to pay back any amounts we have already
paid to you.
Your re sponsibilities include:
allowing us or anyone appointed by us to:
– take action against an offender;
– interview you in respect of your claim; and
– inspect your building, contents and/or your portable contents;
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.