Insurer's liability for remaining water escape damage to paving, tiles, render and timber flooring after partial repairs
Text of the determination
Determination
Case number 601518
Financial firm AAI Limited
Determination | Case number: 601518 Page 1 of 12
Case number: 601518 19 November 2019
1 Determination overview
1.1 Complaint
The complainant holds a strata insurance policy with the financial firm (insurer). He
lodged a claim after finding water damage in several units and outside areas in the
insured development.
The insurer repaired most of the damage. However, the parties do not agree about
the extent of the insurer ‟s liability for certain remaining damage. The insurer believes
it has indemnified the complainant in line with its obligations, and says exclusions
apply to the remainder.
The complainant disagrees. He maintains all the claimed damage was caused by the
escape of water and should be covered.
1.2 Issues and key findings
What is the extent of the insurer ’s liability for remaining damage?
The insurer is liable for repair of the paving, since that damage was, on balance,
caused by a combination of the accidental escape of water, poor workmanship by the
insu rer‟s contractor in attempting earlier repairs, and possible unknown defects in
initial installation.
The insurer is also liable for repair of the timber flooring it installed in units 1 and 2 as
part of the original response to the claim. That is because, under the policy, the
insurer has guaranteed that the material and standard of workmanship of repairs it
undertakes will be free of defects, and the evidence shows there are issues with it.
As well, the insurer is liable for cracked pathway tiles and cracked render/movement
damage in units 2, 3 and 5 because, on balance, the evidence indicates the
proximate cause of that relatively localised damage was the escape of water and
resulting movement/deflection of the supporting structure.
It is also fair in the circumstances that the insurer be liable for the reasonable costs of
the complainant‟s expert‟s report which assisted in resolving this complaint.
1.3 Determination
This determination is in favour of the complainant.
The insurer is required to settle the claim as outlined in section 2 of this
determination.
Determination | Case number: 601518 Page 2 of 12
2 Reasons for determination
I have decided this case on the basis of what I consider fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous AFCA decisions.
I have taken into account all the material submitted by the parties, both before and
after the recommendation. I am satisfied that the documentation I have relied on has
been provided to both parties. For the purposes of this determination, I will deal with
only those points considered relevant.
2.1 What is the extent of the insurer ’s liability for remaining damage?
No dispute policy covers the claimed event
The policy covers „ accidental loss or damage ‟ at the insured address, subject to
certain exclusions. That is defined as „loss or damage that was not intentional‟, and it
includes cover for loss or damage caused by an escape of liquid.
It is not in dispute the complainant has established a valid claim for accidental
damage, after a laundry trough in unit two overfilled overnight and flooded the ground
floors of units one, two, three and four. Nor has the insurer disputed the complainant‟s
estimate that 20,000 – 22,000 litres of water escaped. The completed building was
less than six months old in June 2016 when the claim arose.
The insurer accepted and covered most of the claimed damage. However, the
complainant believes the insurer is also liable for the following issues:
damaged paved pathway in front of units two and three
cracking damage to the pathway tiles in front of unit three
render and cracking damage in unit three (ground floor wall), unit five (upstairs
window, which is allowing water in) and unit 2 (cracked ceiling joint)
jamming of the window in unit three.
He says the damage is all within three metres of where the water entered the ground
and is from the escaped water washing away the soil beneath the structures
(including the supporting columns).
He is also claiming for defective workmanship by the insurer in repairs it has already
carried out to timber flooring in units one and two.
Several causes of paving damage identified
The affected pathway is made of pavers and tiles.
Determination | Case number: 601518 Page 3 of 12
The insurer engaged a forensic engineer (SG) to establish the cause of damage to
the area. SG says the movement joint between the pavers and tiles did not contain
continuous flexible caulking; the missing caulking allowed surface water to enter
under the pathway into the supporting soil and partially washed out the packing sand,
contributing to the settling of the pavers.
It is relevant to note that the pavers are supported on a base which is partly concrete
backfill, part timber piles and part compacted natural materials. The floor tiles are
supported by the suspended ground floor concrete.
SG said this range of different support materials is responsible for the loss. He said a
properly constructed and sealed paver pathway should be able to cope with the
escaped water coming from the leaking trough by directing the water away from the
dwelling and into the basement drainage system or adjoining garden area.
SG concluded the construction of the paving was defective and not fit for purpose.
The insurer had replaced part of the paving before engaging SG, and the evidence
indicates work by the insurer was defective, as well as there being other movement
damage to the rest of the pavers. The insurer has acknowledged its contractor re-laid
some of the paving incorrectly.
After SG‟s report, the complainant engaged an engineer (NE). NE says the pavers
settled as a result of the escaped water which caused the soil underneath to subside.
NE but did not comment on whether or not the paving had in fact been fit for purpose
when initially installed, but said flexible grout should be used when reinstating the
paving so that any further movement of the concrete slab could be tolerated without
causing any cracks to the new pavers.
On the available evidence, I am satisfied the pavers settled and cracked due to the
subsidence of the soil underneath, which was caused by the accidental escape of an
extreme volume of water from the overflowing laundry trough.
I consider a further contributing factor to the damage was, on balance, the absence of
the caulking and the variation in the bases on which the paving was installed, which
might reasonably represent a defect.
Similarly, the work undertaken by the insurer‟s repairer after the claim was first made
was not of an acceptable standard, and requires rectification at the insurer‟s cost .
Insurer is liable for repair of paving
The policy covers unknown defects which are the cause or part of the cause of
damage. That provides cover for the repair of the unknown defective part and the
resulting damage. There is no evidence to suggest the complainant was aware of any
defect in the paving as originally laid; in fact, he maintains there were no issues with it
originally.
Determination | Case number: 601518 Page 4 of 12
Even if the original paving was not defective, I am satisfied the insurer is liable for the
damage to the paving which was from the accidental escape of water and the poor
workmanship of the insurer‟s contractor.
The insurer is to cash settle this part of the claim (to the extent that has not already
been paid).
Parties disagree on the cause of cracking of tiles and render
After the escape of water, cracking was observed in the tiles adjacent to the pavers
and to the rendering of the walls in units three and five. The complainant
subsequently also found cracking in unit two (at the ceiling/wall junction of the
bedroom). He stresses that the pattern of cracking damage is only in the area within
close proximity to the water flow.
With regard to the tiles, SG noted the water escape had not caused any structural
damage to the suspended reinforced concrete construction, and because the tiles
outside unit three were supported by that concrete base, the leak was not the cause
of the tiles cracking.
Instead, SG believes the pattern of the tile damage indicates it was due to „ minor
deflections in the supporting suspended concrete structure and concrete shrinkage
cracking which have reflected through to the attached brittle floor tiles ‟ . SG also
considered the tiling joints had not been installed with the appropriate control joints
needed to allow movement in the supporting structure.
NE too noted the tiles outside unit three were installed on a section of concrete beam
supporting the ground floor slab over the basement. NE says there is no noticeable
cracking in the mortar joints between tiles, but comments the cracking within the tiles
suggests that „ some hogging [deflection] across the width of the beams has occurred
and the cracks are caused by tension in the pavers as they bow with the concrete …‟.
That reasonably indicates the accepted effect of the water escape on the pa vers has
also impacted the tiles, even if indirectly.
NE said it was not the weight of the water on the tiled slab area that was the cause of
the tiles cracking, but rather the significant amount of water had caused the soil under
the footings to subside and cause movement of the building in a localised area. By
way of clarification, the complainant provided a diagram showing the possible path
the water travelled to the relevant supporting column under units two, three and five
causing deflection of the slab.
On the issue of the cracked render in units three and five (including around the
window in unit five), SG says those units are supported by the same undamaged
reinforced concrete structure where the tile cracking damage has been caused by
minor deflection. SG concluded these sorts of issues commonly occur soon after the
construction of a new dwelling as sections of the building settle, shrink and move until
they reach their equilibrium conditions.
Determination | Case number: 601518 Page 5 of 12
However, the complainant has pointed out that the ground floor slab of the unit
development was constructed about 15 months before the building was occupied, and
about 21 months before the escape of water and the appearance of cracking in the
vicinity of that event; the suggestion being that any post-construction settlement,
movement and general adjustment should have already occurred.
NE specifically attributes the cracked render in units three and five to shrinking and
minor movement of the concrete beams and slab d ue to the escape of water.
NE did not report any cracking in unit two in January 2018. The complainant points
out that the cracking in unit two had only happened about a month after one of SG‟s
inspections, and that the suggestion by the insurer that it was pre-existing was
incorrect (as evidenced by the pre- tenancy condition report, and SG‟s comments in
April 2018 that they had not found cracking damage in unit two at that time).
Insurer is liable for the movement damage to the tiles and render
I accept the evidence does not show any specific structural damage in the concrete
floor slab itself. However, I do not accept that means there was no movement in that
slab or in the supporting column that underpinned the affected units as a result of the
significant escape of water; nor does it necessarily mean further movement, or
evidence of the affect of the original movement, might not have manifested slightly
later (as in the case of unit two).
The evidence does not show other similar render/cracking or tile damage in other
areas of the development. Unit five is above unit three and so it is likely to have been
affected for that reason. NE is a consultancy of structural and civil engineers and well-
qualified to report on this matter. I consider it is more likely than not that the damage
was the result of the escape of water affecting the soil and supporting structures.
I am satisfied the insurer is liable for the damage to the tiles and render and
associated cracking/movement in units two, three and five. The complainant is
required to provide an itemised quote for that work (or invoice, if it has already been
completed), and the insurer is required to pay the reasonable costs of repair in
accordance with the quote.
Complainant says timber flooring in units one and two is defective
After the claim was first made, the insurer replaced the timber flooring in the affected
units. However, the newly re-laid floors showed signs of cupping and peaking, so the
insurer cash settled the complainant for the new flooring, except in units one and two.
The complainant says the new timber flooring had not been allowed to properly dry
out before it was installed, and that caused the cupping in units one and two, which is
visible and represents a defect.
Determination | Case number: 601518 Page 6 of 12
The insurer‟s accredited timber flooring expert (BS) reported that peaking and
cupping was evident in both units, with unit two „significantly affected visually‟ . BS
attributes the peaking to relative humidity, but said it did not exceed the tolerance
level set out in the relevant industry code. BS concluded the variance was unlikely to
be related to the water escape.
BS says the issue was an aesthetic or visual concern, and the structural integrity of
the floor appeared to be intact. Even though BS said the moisture test results
suggested a „reasonably well equalised timber moisture content‟, he went on to say
„this condition does suggest that a likely increase in timber moisture content has
occurred since installation which has facilitated the minor peaking of the timber
observed‟.
The policy provides lifetime guarantee for repairs undertaken by the insurer. The
guarantee is that the materials used and the standard of workmanship are free of
defects. The policy expressly states if the insurer carries out the repairs, it will do so
on a new for old basis or repair to a similar condition to that of the building before the
loss or damage occurred.
Visual cupping and peaking constitute a defect under the policy
It is not in dispute the newly re-laid floor is visually impaired by the cupping and
peaking effect. Even if the cupping and peaking effects are within the industry
tolerance range, in the particular circumstances of this case, I consider it should
reasonably be regarded as a „ defect ‟ (that is, a deficiency or imperfection) for which
the insurer is liable.
That is because the insurer accepted there had been an unacceptable standard of
work to the flooring in unit 3 and replaced that, the floors in units one and two are also
already sho wing signs suggesting the replacement is not „as new‟, and the insurer‟s
own claim file notes record that „repairs were carried out swiftly as the properties are
tenanted and we are paying for loss of rent‟ (which appears to support the
complainant‟s sugge stion that the wood had not been allowed to properly dry out
before installation in the first place).
The property was still quite newly completed at the time of the loss.
Insurer liable for replacing damaged/defective flooring in units one and two
The complainant has provided a quote for $10,381.80 (dated November 2018) for that
work. He says his flooring contractor identified (from tapping on the floor) that many
areas were hollow underneath where it had delaminated from the concrete below; and
he poi nts out the insurer‟s floorer did not test that. He says that means the flooring is
no longer structurally intact. The insurer has not responded to that point.
BS had assessed the floors on 2 May 2018 and said the floor appeared to be intact
and in good structural condition on that occasion. He suggested there might be further
Determination | Case number: 601518 Page 7 of 12
improvement over time by allowing the flooring to acclimatise. The insurer, however,
had also allowed for the possibility that it might deteriorate by saying that if the
cupping became worse, it would arrange for a re-assessment.
It is not clear what the current state of the flooring in units one and two is, although I
consider it possible that within the May to November 2018 period, further deterioration
of the flooring may have happened (which would account for the apparent
delamination).
The complainant has pointed out that there are no issues with flooring in the other
units. There has been no suggestion, for example, that the cupping and peaking seen
in the flooring in units one and two since the insurer replaced it has also occurred
elsewhere. I consider that reasonably suggests that the environmental/humidity
issues to which BS attributed that deformation (and to which the flooring in all units
was presumably subject) were not the operative cause of the damage.
On the available evidence, I am satisfied it is more likely than not that the cupping and
peaking (and possible further deterioration) is the result of the insurer‟s
repair/replacement work. I consider it fair in the circumstances that the insurer be
liable for replacement of the unit one and two flooring which is „defective‟ in that the
work undertaken by the insurer did not return the complainant to the position he had
been in when the damage first occurred : namely, with „ as new ‟ flooring with no visual
signs of cupping and peaking.
The insurer is required to cash settle the complainant $10,381.80 for the replacement
flooring.
Complainant’s report fees should also be covered
The complainant also believes he should be reimbursed the cost of NE‟s report. As
this assisted in the resolution of the complaint, I consider it fair and appropriate that
the insurer cover the reasonable cost of that expert‟s report. The complainant is
required to provide an invoice to confirm the cost incurred so the insurer can arrange
for payment.
Determination | Case number: 601518 Page 8 of 12
3 Supporting information
3.1 Policy Wording
We choose how we settle building claims
If we agree to pay a claim for loss, theft or damage to your building, we will decide if we will:
• repair damage to your building;
• rebuild your building;
• pay you what it would cost us to repair or rebuild your building;
If we repair (or pay you what it would cost us to repair), we will at our option repair on a „new
for old‟ basis or repair to a similar condition to what your building was in before the loss or
damage occurred.
Lifetime guarantee on building repairs
When we repair or rebuild your building, we guarantee the quality of materials and
workmanship of that work for the lifetime of your building if we:
• authorise;
• arrange; and
• pay the builder or repairer directly for this work.
What we guarantee
We guarantee the material used and standard of the workmanship to be free of defects. If a
defect
arises in the lifetime of your building as a result of poor quality workmanship or use of
incorrect materials, then we will rectify the problem.
Dealing with defects
If a known defect is the cause of the damage
We do not pay for loss or damage caused by a defect, structural fault or design fault at your
building that you knew about (or should reasonably have known about) and did not fix before
the loss or damage occurred.
If an unknown defect is the cause of the damage
If an incident covered by your policy damages your building and an unknown defect was the
cause or part of the cause, we will pay for the resulting damage. If the unknown defective part
of your building is also damaged by the same incident, we will fix this as well.
3.2 Key documents
Record Key points
Financial Firm’s engineer
(SG)
14 - 09 - 2017
The subject pathway consists partly of pavers (which are partially
supported on no fines concrete backfill, partially supported on
timber piles and partially supported on natural material) while the
remaining width of the pathway consists of flo or tiles whic h are
supported directly on the suspended ground floor concrete
structure.
We further note that bet ween the pavers and the floor tiles there
is a movement joint which allows for movement bet ween bot h
different floor types.
Based on the site observations the pathway movement joint did
Determination | Case number: 601518 Page 9 of 12
Record Key points
not contain continuous flexible caulking (i.e. there were significant
sections of missing caulking), which would allow surface water to
enter under the pathway into the supporting soil below the
pavers.
Furthermo re a small amount of packing sand had been washed
out from below the pavers onto the garden bed tanbark adjoining
a section of the settled pathway.
It is therefore our opinion that the defective movement joint
caulking (i.e. defective construction of the a pproximately 13
month old structure) has caused surface water to enter below the
pavers and partly wash out some of the packing sand,
contributing to the observed settlement of the pavers.
It is our opinion that the inconsistent paver support conditions
wh ich includes the pavers being supported partly by no fines
concrete backfill, partly by the temporary timber piles and partly
by the retained natural soils, is also contributing to the differential
settlements.
Furthermore given the above noted variation i n support conditions
for the pavers it is our opinion that the current paver construction
detail is poor/ inadequate construction for the long term support of
the pavers.
Given that it has been 13 months since the claimed event (from
the date of inspection ), we are not able to conclusively determine
if the leak event had caused the observed packing sand wash out
to the defectively constructed pavement path or whet her the was h
out has been caused by rain events and/or garden watering.
However, based on the f unction of the subject pathway as an
external access route, it is reasonably expected that the design
and construction of the pathway pavers should be sufficiently
robust to be able to deal wit h most weather conditions over the
intended life time of the pa t hway partly including rainfall and
garden watering activities i.e. it must be fit for purpose.
Based on the observed crack patterns to the floor tiles outside
unit 3 and the observed structural support conditions below this
region, it is our opinion that the largely hairline floor tile cracks
have occurred due to minor deflections in the supporting
suspended conc rete structure and concret e shrinkage cracking
which have reflected through to the attached brittle floor tiles
The cause of the alleged cracked w indow sill to unit 5 is due to
minor deflections in the supporting conc rete ground floor structure
and conc rete shrinkage cracking which have reflected through the
attached brittle floor tiles
Complainant’s engineer
(NE)
14 - 01 - 2018
The cracking and movement as observed during our inspection
has occurred to the external tiling and paving outside of units one,
two and three.
The cracking and movement of the tiles and pavers was noticed
Determination | Case number: 601518 Page 10 of 12
Record Key points
after a significant flood event that caused flooding of units one,
two and three.
The cracking wit hin the tiles suggests that some hogging across
the widths of the beams has occurred and the cracks are caused
by tension in the pavers as they bow with the concrete under.
The movement of the pavers in front of units one an d two has
occurred to the area of paving beyond the basement retaining
wall structure.
The pavers have dropped approximately 20mm due to
subsidence of the soils they have been laid upon after being
washed away from under the pavers during the flooding even t.
The soils under this area of the pavers has been modified in
levels as part of the landscaping but was washed away during the
flood event.
The installation of the new tiles should be undertaken with the
use of flexible grout so that any fut ure movement of the concrete
slab can be tolerated without causing any cracking of the new
pavers.
The sunken pavers will also need to be removed so that they can
be replaced at the same level as the remainder of the paving. So
that the new pavers will not subside it w ill require for the removal
of the soil down to the required level to allow for the soils to be
compacted back into place to a suitable level of compaction.
Some minor cracking was also obs erved in the rendered walls of
units three and five. Unit five has been built above unit three and
the minor cracking has occurred at the corners of the windows of
both these units. The cracking has most likely been caused by
the shrinking and minor movement of the concret e beams and
slab over the basement area as caused by the flood event.
Financial Firm’s engineer
(SG)
11 - 04 - 2018
We note the Insured‟s engineer has not substantiated his claim
that substance to the pavers has been caused by the claimed one
off event. we conclude that the Insured‟s engineer considers the
backfilling / compaction of the soils below the pavers to be an
issue, causing differential settlements of the pavers. We note the
Insured‟s engineer does not provide any justifications to
substantiate their claim that the escaped water that originated
fro m unit two, has sufficiently built up over the suspended ground
floor concrete structure to caus e excessive deflections (i.e.
deflections in excess of those allowed for in the original design),
in the supporting concret e structure, leading to cracks occurr ing
to the rendered external walls and window corners within units
three and unit five only.
We note that if water had built up onto the suspended floor to
such an extent to have caus ed the above noted cracking
(overloading), we would reasonably expect to find crack damage
concentrated throughout unit 2 which contained the overflowing
Determination | Case number: 601518 Page 11 of 12
Record Key points
laundry trough, rather than only finding cracking limited /
concentrated wit hin the adjoining unit 3 and unit 5 above.
no resulting water marks were obs erved, to indicate that wat er
had built up to any sufficient height to have caused high water
loading.
We note that the newly built reinforced concrete structure will
continue to slowly shrink /creep and settle which will cause
ongoing minor building movements / deflections in t he suspended
reinforced concrete structure, as currently evidenced by the
pattern of cracking noted to the ground floor walkway tiles located
outside unit 3.
We did not observe any discernible cracks to the laundry region
(reported area of leak) or were an y advised by the Insured we
expect to find different deflections (and due to the typical
behaviour of reinforced concrete), shrinkage related cracks of
different degrees to have both occurred throughout the
suspended reinforced concrete structure
As substa ntiated above and within our original report, we do not
consider that the escaped water event has caused overloading to
the subject suspended slab, therefore the above external unit 3
tile cracks are considered to be unrelat ed to this event.
we believe tha t the tiling has not been installed with appropriate
control joints. While not a structural issue as such, control joints in
tiling are necessary to allow for movement in the supporting
structure as well as movement of the tiling due to expansion and
contr action. The failure to allow for controlling such factors will
cause cracking in the tiles.
Financial Firm’s loss
adjuster (CL)
20 - 06 - 2018
The tenant in Unit 2 advised the crack in the plaster ceiling was
apparent prior to their report ed loss
During our recent inspections conducted on 2nd May and 15th
June 2018, we observed the rear paved and landscaped areas,
which were isolated and not affected by the reported original
event, have obvious signs of subsidenc e where the concrete has
dropped significantly, as depicted in the photos.
The driveway and surrounding concrete paths are also cracked
due to settling or ground movement.
Financial Firm’s engineer
(SG)
04 - 12 - 2018
With regard to the (minor) building crack damage, the length of
time that the water was escaping for (i.e. overnight vs a week end)
is inconsequential structurally given that the escaped water from
the laundry trough was able to escape, and not build up
sufficiently on the suspended ground floor reinforc ed concrete
structure, (refer quote belo w from our Forensic Engineering
Supplement ary Report 2 Revision 2, dated 11th April 2018). We
note our det ermination is also consistent with comments from the
Insured‟s Engineer: “the flooding of the units had water flowing
Determination | Case number: 601518 Page 12 of 12
Record Key points
out of the units and across the tiles, paving and landscaped areas
in front of the units”.
Complainant’s engineer
(NE)
12 - 12 - 2018
The tiled are should be grouted as it is over a concrete slab area
over the basement. The paving area beyond the ground floor slab
over the basement is to be pervious as required by the Planning
Permit conditions. As advised by the owner of the property, from
water meter readings undertaken, the amount of water from the
leak was approximately 20,000 litres. Due to the paving outside
the slab are over the bas ement being pervious and the large
amount of water from the leak being within a limited area we
believe that there has been some subsidence of the soils the
pavers have been constructed on which has caused the
differenc e in level bet ween the tiled area and the paver area
where they abut.
It would be expected that some compaction of the backfill be
undertaken behind the retaining wall so that subsidence of the
paving area would not occur. As advised by the owner of the
property compaction was undertaken with a vibrating plate
compactor for the backfill where the pavers have been installed.
The tiled and paved areas would be ex pected to perform
adequately under normal rain events or when was hed or cleaned
but the amount of water from this leak was more than wo uld be
expected from any of the normal events.
Our report did not claim that it was the weight of water on the tiled
slab area that was the cause of the cracking. The report notes
that we believe that the significant amount of water has caused
the soils un der the footings to subside and cause movement of
the building in a localized area. Currently the only area of the
building that has any visible movement or damage is around the
front area where the leak has occurred.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.