Determination 601518

Insurer's liability for remaining water escape damage to paving, tiles, render and timber flooring after partial repairs

FirmSuncorp Group
Decided2019-11-27
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded$10,382
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A strata insurance complainant disputed the insurer's liability for remaining damage after a laundry trough overflow flooded several units. AFCA found the insurer liable for paving, tile and render repairs, replacement of defective timber flooring costing $10,381.80, and the complainant's expert report fees.

Under the policy's unknown defects and lifetime workmanship guarantee, the insurer must cover the resulting damage and rectify defective repairs it arranged.

Issues

Subjects and remedies

home or building damagepay claimpay compensationrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 601518 Financial firm AAI Limited Determination | Case number: 601518 Page 1 of 12 Case number: 601518 19 November 2019 1 Determination overview 1.1 Complaint The complainant holds a strata insurance policy with the financial firm (insurer). He lodged a claim after finding water damage in several units and outside areas in the insured development. The insurer repaired most of the damage. However, the parties do not agree about the extent of the insurer ‟s liability for certain remaining damage. The insurer believes it has indemnified the complainant in line with its obligations, and says exclusions apply to the remainder. The complainant disagrees. He maintains all the claimed damage was caused by the escape of water and should be covered. 1.2 Issues and key findings What is the extent of the insurer ’s liability for remaining damage? The insurer is liable for repair of the paving, since that damage was, on balance, caused by a combination of the accidental escape of water, poor workmanship by the insu rer‟s contractor in attempting earlier repairs, and possible unknown defects in initial installation. The insurer is also liable for repair of the timber flooring it installed in units 1 and 2 as part of the original response to the claim. That is because, under the policy, the insurer has guaranteed that the material and standard of workmanship of repairs it undertakes will be free of defects, and the evidence shows there are issues with it. As well, the insurer is liable for cracked pathway tiles and cracked render/movement damage in units 2, 3 and 5 because, on balance, the evidence indicates the proximate cause of that relatively localised damage was the escape of water and resulting movement/deflection of the supporting structure. It is also fair in the circumstances that the insurer be liable for the reasonable costs of the complainant‟s expert‟s report which assisted in resolving this complaint. 1.3 Determination This determination is in favour of the complainant. The insurer is required to settle the claim as outlined in section 2 of this determination. Determination | Case number: 601518 Page 2 of 12 2 Reasons for determination I have decided this case on the basis of what I consider fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous AFCA decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. For the purposes of this determination, I will deal with only those points considered relevant. 2.1 What is the extent of the insurer ’s liability for remaining damage? No dispute policy covers the claimed event The policy covers „ accidental loss or damage ‟ at the insured address, subject to certain exclusions. That is defined as „loss or damage that was not intentional‟, and it includes cover for loss or damage caused by an escape of liquid. It is not in dispute the complainant has established a valid claim for accidental damage, after a laundry trough in unit two overfilled overnight and flooded the ground floors of units one, two, three and four. Nor has the insurer disputed the complainant‟s estimate that 20,000 – 22,000 litres of water escaped. The completed building was less than six months old in June 2016 when the claim arose. The insurer accepted and covered most of the claimed damage. However, the complainant believes the insurer is also liable for the following issues:  damaged paved pathway in front of units two and three  cracking damage to the pathway tiles in front of unit three  render and cracking damage in unit three (ground floor wall), unit five (upstairs window, which is allowing water in) and unit 2 (cracked ceiling joint)  jamming of the window in unit three. He says the damage is all within three metres of where the water entered the ground and is from the escaped water washing away the soil beneath the structures (including the supporting columns). He is also claiming for defective workmanship by the insurer in repairs it has already carried out to timber flooring in units one and two. Several causes of paving damage identified The affected pathway is made of pavers and tiles. Determination | Case number: 601518 Page 3 of 12 The insurer engaged a forensic engineer (SG) to establish the cause of damage to the area. SG says the movement joint between the pavers and tiles did not contain continuous flexible caulking; the missing caulking allowed surface water to enter under the pathway into the supporting soil and partially washed out the packing sand, contributing to the settling of the pavers. It is relevant to note that the pavers are supported on a base which is partly concrete backfill, part timber piles and part compacted natural materials. The floor tiles are supported by the suspended ground floor concrete. SG said this range of different support materials is responsible for the loss. He said a properly constructed and sealed paver pathway should be able to cope with the escaped water coming from the leaking trough by directing the water away from the dwelling and into the basement drainage system or adjoining garden area. SG concluded the construction of the paving was defective and not fit for purpose. The insurer had replaced part of the paving before engaging SG, and the evidence indicates work by the insurer was defective, as well as there being other movement damage to the rest of the pavers. The insurer has acknowledged its contractor re-laid some of the paving incorrectly. After SG‟s report, the complainant engaged an engineer (NE). NE says the pavers settled as a result of the escaped water which caused the soil underneath to subside. NE but did not comment on whether or not the paving had in fact been fit for purpose when initially installed, but said flexible grout should be used when reinstating the paving so that any further movement of the concrete slab could be tolerated without causing any cracks to the new pavers. On the available evidence, I am satisfied the pavers settled and cracked due to the subsidence of the soil underneath, which was caused by the accidental escape of an extreme volume of water from the overflowing laundry trough. I consider a further contributing factor to the damage was, on balance, the absence of the caulking and the variation in the bases on which the paving was installed, which might reasonably represent a defect. Similarly, the work undertaken by the insurer‟s repairer after the claim was first made was not of an acceptable standard, and requires rectification at the insurer‟s cost . Insurer is liable for repair of paving The policy covers unknown defects which are the cause or part of the cause of damage. That provides cover for the repair of the unknown defective part and the resulting damage. There is no evidence to suggest the complainant was aware of any defect in the paving as originally laid; in fact, he maintains there were no issues with it originally. Determination | Case number: 601518 Page 4 of 12 Even if the original paving was not defective, I am satisfied the insurer is liable for the damage to the paving which was from the accidental escape of water and the poor workmanship of the insurer‟s contractor. The insurer is to cash settle this part of the claim (to the extent that has not already been paid). Parties disagree on the cause of cracking of tiles and render After the escape of water, cracking was observed in the tiles adjacent to the pavers and to the rendering of the walls in units three and five. The complainant subsequently also found cracking in unit two (at the ceiling/wall junction of the bedroom). He stresses that the pattern of cracking damage is only in the area within close proximity to the water flow. With regard to the tiles, SG noted the water escape had not caused any structural damage to the suspended reinforced concrete construction, and because the tiles outside unit three were supported by that concrete base, the leak was not the cause of the tiles cracking. Instead, SG believes the pattern of the tile damage indicates it was due to „ minor deflections in the supporting suspended concrete structure and concrete shrinkage cracking which have reflected through to the attached brittle floor tiles ‟ . SG also considered the tiling joints had not been installed with the appropriate control joints needed to allow movement in the supporting structure. NE too noted the tiles outside unit three were installed on a section of concrete beam supporting the ground floor slab over the basement. NE says there is no noticeable cracking in the mortar joints between tiles, but comments the cracking within the tiles suggests that „ some hogging [deflection] across the width of the beams has occurred and the cracks are caused by tension in the pavers as they bow with the concrete …‟. That reasonably indicates the accepted effect of the water escape on the pa vers has also impacted the tiles, even if indirectly. NE said it was not the weight of the water on the tiled slab area that was the cause of the tiles cracking, but rather the significant amount of water had caused the soil under the footings to subside and cause movement of the building in a localised area. By way of clarification, the complainant provided a diagram showing the possible path the water travelled to the relevant supporting column under units two, three and five causing deflection of the slab. On the issue of the cracked render in units three and five (including around the window in unit five), SG says those units are supported by the same undamaged reinforced concrete structure where the tile cracking damage has been caused by minor deflection. SG concluded these sorts of issues commonly occur soon after the construction of a new dwelling as sections of the building settle, shrink and move until they reach their equilibrium conditions. Determination | Case number: 601518 Page 5 of 12 However, the complainant has pointed out that the ground floor slab of the unit development was constructed about 15 months before the building was occupied, and about 21 months before the escape of water and the appearance of cracking in the vicinity of that event; the suggestion being that any post-construction settlement, movement and general adjustment should have already occurred. NE specifically attributes the cracked render in units three and five to shrinking and minor movement of the concrete beams and slab d ue to the escape of water. NE did not report any cracking in unit two in January 2018. The complainant points out that the cracking in unit two had only happened about a month after one of SG‟s inspections, and that the suggestion by the insurer that it was pre-existing was incorrect (as evidenced by the pre- tenancy condition report, and SG‟s comments in April 2018 that they had not found cracking damage in unit two at that time). Insurer is liable for the movement damage to the tiles and render I accept the evidence does not show any specific structural damage in the concrete floor slab itself. However, I do not accept that means there was no movement in that slab or in the supporting column that underpinned the affected units as a result of the significant escape of water; nor does it necessarily mean further movement, or evidence of the affect of the original movement, might not have manifested slightly later (as in the case of unit two). The evidence does not show other similar render/cracking or tile damage in other areas of the development. Unit five is above unit three and so it is likely to have been affected for that reason. NE is a consultancy of structural and civil engineers and well- qualified to report on this matter. I consider it is more likely than not that the damage was the result of the escape of water affecting the soil and supporting structures. I am satisfied the insurer is liable for the damage to the tiles and render and associated cracking/movement in units two, three and five. The complainant is required to provide an itemised quote for that work (or invoice, if it has already been completed), and the insurer is required to pay the reasonable costs of repair in accordance with the quote. Complainant says timber flooring in units one and two is defective After the claim was first made, the insurer replaced the timber flooring in the affected units. However, the newly re-laid floors showed signs of cupping and peaking, so the insurer cash settled the complainant for the new flooring, except in units one and two. The complainant says the new timber flooring had not been allowed to properly dry out before it was installed, and that caused the cupping in units one and two, which is visible and represents a defect. Determination | Case number: 601518 Page 6 of 12 The insurer‟s accredited timber flooring expert (BS) reported that peaking and cupping was evident in both units, with unit two „significantly affected visually‟ . BS attributes the peaking to relative humidity, but said it did not exceed the tolerance level set out in the relevant industry code. BS concluded the variance was unlikely to be related to the water escape. BS says the issue was an aesthetic or visual concern, and the structural integrity of the floor appeared to be intact. Even though BS said the moisture test results suggested a „reasonably well equalised timber moisture content‟, he went on to say „this condition does suggest that a likely increase in timber moisture content has occurred since installation which has facilitated the minor peaking of the timber observed‟. The policy provides lifetime guarantee for repairs undertaken by the insurer. The guarantee is that the materials used and the standard of workmanship are free of defects. The policy expressly states if the insurer carries out the repairs, it will do so on a new for old basis or repair to a similar condition to that of the building before the loss or damage occurred. Visual cupping and peaking constitute a defect under the policy It is not in dispute the newly re-laid floor is visually impaired by the cupping and peaking effect. Even if the cupping and peaking effects are within the industry tolerance range, in the particular circumstances of this case, I consider it should reasonably be regarded as a „ defect ‟ (that is, a deficiency or imperfection) for which the insurer is liable. That is because the insurer accepted there had been an unacceptable standard of work to the flooring in unit 3 and replaced that, the floors in units one and two are also already sho wing signs suggesting the replacement is not „as new‟, and the insurer‟s own claim file notes record that „repairs were carried out swiftly as the properties are tenanted and we are paying for loss of rent‟ (which appears to support the complainant‟s sugge stion that the wood had not been allowed to properly dry out before installation in the first place). The property was still quite newly completed at the time of the loss. Insurer liable for replacing damaged/defective flooring in units one and two The complainant has provided a quote for $10,381.80 (dated November 2018) for that work. He says his flooring contractor identified (from tapping on the floor) that many areas were hollow underneath where it had delaminated from the concrete below; and he poi nts out the insurer‟s floorer did not test that. He says that means the flooring is no longer structurally intact. The insurer has not responded to that point. BS had assessed the floors on 2 May 2018 and said the floor appeared to be intact and in good structural condition on that occasion. He suggested there might be further Determination | Case number: 601518 Page 7 of 12 improvement over time by allowing the flooring to acclimatise. The insurer, however, had also allowed for the possibility that it might deteriorate by saying that if the cupping became worse, it would arrange for a re-assessment. It is not clear what the current state of the flooring in units one and two is, although I consider it possible that within the May to November 2018 period, further deterioration of the flooring may have happened (which would account for the apparent delamination). The complainant has pointed out that there are no issues with flooring in the other units. There has been no suggestion, for example, that the cupping and peaking seen in the flooring in units one and two since the insurer replaced it has also occurred elsewhere. I consider that reasonably suggests that the environmental/humidity issues to which BS attributed that deformation (and to which the flooring in all units was presumably subject) were not the operative cause of the damage. On the available evidence, I am satisfied it is more likely than not that the cupping and peaking (and possible further deterioration) is the result of the insurer‟s repair/replacement work. I consider it fair in the circumstances that the insurer be liable for replacement of the unit one and two flooring which is „defective‟ in that the work undertaken by the insurer did not return the complainant to the position he had been in when the damage first occurred : namely, with „ as new ‟ flooring with no visual signs of cupping and peaking. The insurer is required to cash settle the complainant $10,381.80 for the replacement flooring. Complainant’s report fees should also be covered The complainant also believes he should be reimbursed the cost of NE‟s report. As this assisted in the resolution of the complaint, I consider it fair and appropriate that the insurer cover the reasonable cost of that expert‟s report. The complainant is required to provide an invoice to confirm the cost incurred so the insurer can arrange for payment. Determination | Case number: 601518 Page 8 of 12 3 Supporting information 3.1 Policy Wording We choose how we settle building claims If we agree to pay a claim for loss, theft or damage to your building, we will decide if we will: • repair damage to your building; • rebuild your building; • pay you what it would cost us to repair or rebuild your building; If we repair (or pay you what it would cost us to repair), we will at our option repair on a „new for old‟ basis or repair to a similar condition to what your building was in before the loss or damage occurred. Lifetime guarantee on building repairs When we repair or rebuild your building, we guarantee the quality of materials and workmanship of that work for the lifetime of your building if we: • authorise; • arrange; and • pay the builder or repairer directly for this work. What we guarantee We guarantee the material used and standard of the workmanship to be free of defects. If a defect arises in the lifetime of your building as a result of poor quality workmanship or use of incorrect materials, then we will rectify the problem. Dealing with defects If a known defect is the cause of the damage We do not pay for loss or damage caused by a defect, structural fault or design fault at your building that you knew about (or should reasonably have known about) and did not fix before the loss or damage occurred. If an unknown defect is the cause of the damage If an incident covered by your policy damages your building and an unknown defect was the cause or part of the cause, we will pay for the resulting damage. If the unknown defective part of your building is also damaged by the same incident, we will fix this as well. 3.2 Key documents Record Key points Financial Firm’s engineer (SG) 14 - 09 - 2017  The subject pathway consists partly of pavers (which are partially supported on no fines concrete backfill, partially supported on timber piles and partially supported on natural material) while the remaining width of the pathway consists of flo or tiles whic h are supported directly on the suspended ground floor concrete structure.  We further note that bet ween the pavers and the floor tiles there is a movement joint which allows for movement bet ween bot h different floor types.  Based on the site observations the pathway movement joint did Determination | Case number: 601518 Page 9 of 12 Record Key points not contain continuous flexible caulking (i.e. there were significant sections of missing caulking), which would allow surface water to enter under the pathway into the supporting soil below the pavers.  Furthermo re a small amount of packing sand had been washed out from below the pavers onto the garden bed tanbark adjoining a section of the settled pathway.  It is therefore our opinion that the defective movement joint caulking (i.e. defective construction of the a pproximately 13 month old structure) has caused surface water to enter below the pavers and partly wash out some of the packing sand, contributing to the observed settlement of the pavers.  It is our opinion that the inconsistent paver support conditions wh ich includes the pavers being supported partly by no fines concrete backfill, partly by the temporary timber piles and partly by the retained natural soils, is also contributing to the differential settlements.  Furthermore given the above noted variation i n support conditions for the pavers it is our opinion that the current paver construction detail is poor/ inadequate construction for the long term support of the pavers.  Given that it has been 13 months since the claimed event (from the date of inspection ), we are not able to conclusively determine if the leak event had caused the observed packing sand wash out to the defectively constructed pavement path or whet her the was h out has been caused by rain events and/or garden watering.  However, based on the f unction of the subject pathway as an external access route, it is reasonably expected that the design and construction of the pathway pavers should be sufficiently robust to be able to deal wit h most weather conditions over the intended life time of the pa t hway partly including rainfall and garden watering activities i.e. it must be fit for purpose.  Based on the observed crack patterns to the floor tiles outside unit 3 and the observed structural support conditions below this region, it is our opinion that the largely hairline floor tile cracks have occurred due to minor deflections in the supporting suspended conc rete structure and concret e shrinkage cracking which have reflected through to the attached brittle floor tiles  The cause of the alleged cracked w indow sill to unit 5 is due to minor deflections in the supporting conc rete ground floor structure and conc rete shrinkage cracking which have reflected through the attached brittle floor tiles Complainant’s engineer (NE) 14 - 01 - 2018  The cracking and movement as observed during our inspection has occurred to the external tiling and paving outside of units one, two and three.  The cracking and movement of the tiles and pavers was noticed Determination | Case number: 601518 Page 10 of 12 Record Key points after a significant flood event that caused flooding of units one, two and three.  The cracking wit hin the tiles suggests that some hogging across the widths of the beams has occurred and the cracks are caused by tension in the pavers as they bow with the concrete under.  The movement of the pavers in front of units one an d two has occurred to the area of paving beyond the basement retaining wall structure.  The pavers have dropped approximately 20mm due to subsidence of the soils they have been laid upon after being washed away from under the pavers during the flooding even t.  The soils under this area of the pavers has been modified in levels as part of the landscaping but was washed away during the flood event.  The installation of the new tiles should be undertaken with the use of flexible grout so that any fut ure movement of the concrete slab can be tolerated without causing any cracking of the new pavers.  The sunken pavers will also need to be removed so that they can be replaced at the same level as the remainder of the paving. So that the new pavers will not subside it w ill require for the removal of the soil down to the required level to allow for the soils to be compacted back into place to a suitable level of compaction.  Some minor cracking was also obs erved in the rendered walls of units three and five. Unit five has been built above unit three and the minor cracking has occurred at the corners of the windows of both these units. The cracking has most likely been caused by the shrinking and minor movement of the concret e beams and slab over the basement area as caused by the flood event. Financial Firm’s engineer (SG) 11 - 04 - 2018  We note the Insured‟s engineer has not substantiated his claim that substance to the pavers has been caused by the claimed one off event. we conclude that the Insured‟s engineer considers the backfilling / compaction of the soils below the pavers to be an issue, causing differential settlements of the pavers. We note the Insured‟s engineer does not provide any justifications to substantiate their claim that the escaped water that originated fro m unit two, has sufficiently built up over the suspended ground floor concrete structure to caus e excessive deflections (i.e. deflections in excess of those allowed for in the original design), in the supporting concret e structure, leading to cracks occurr ing to the rendered external walls and window corners within units three and unit five only.  We note that if water had built up onto the suspended floor to such an extent to have caus ed the above noted cracking (overloading), we would reasonably expect to find crack damage concentrated throughout unit 2 which contained the overflowing Determination | Case number: 601518 Page 11 of 12 Record Key points laundry trough, rather than only finding cracking limited / concentrated wit hin the adjoining unit 3 and unit 5 above.  no resulting water marks were obs erved, to indicate that wat er had built up to any sufficient height to have caused high water loading.  We note that the newly built reinforced concrete structure will continue to slowly shrink /creep and settle which will cause ongoing minor building movements / deflections in t he suspended reinforced concrete structure, as currently evidenced by the pattern of cracking noted to the ground floor walkway tiles located outside unit 3.  We did not observe any discernible cracks to the laundry region (reported area of leak) or were an y advised by the Insured we expect to find different deflections (and due to the typical behaviour of reinforced concrete), shrinkage related cracks of different degrees to have both occurred throughout the suspended reinforced concrete structure  As substa ntiated above and within our original report, we do not consider that the escaped water event has caused overloading to the subject suspended slab, therefore the above external unit 3 tile cracks are considered to be unrelat ed to this event.  we believe tha t the tiling has not been installed with appropriate control joints. While not a structural issue as such, control joints in tiling are necessary to allow for movement in the supporting structure as well as movement of the tiling due to expansion and contr action. The failure to allow for controlling such factors will cause cracking in the tiles. Financial Firm’s loss adjuster (CL) 20 - 06 - 2018  The tenant in Unit 2 advised the crack in the plaster ceiling was apparent prior to their report ed loss  During our recent inspections conducted on 2nd May and 15th June 2018, we observed the rear paved and landscaped areas, which were isolated and not affected by the reported original event, have obvious signs of subsidenc e where the concrete has dropped significantly, as depicted in the photos.  The driveway and surrounding concrete paths are also cracked due to settling or ground movement. Financial Firm’s engineer (SG) 04 - 12 - 2018  With regard to the (minor) building crack damage, the length of time that the water was escaping for (i.e. overnight vs a week end) is inconsequential structurally given that the escaped water from the laundry trough was able to escape, and not build up sufficiently on the suspended ground floor reinforc ed concrete structure, (refer quote belo w from our Forensic Engineering Supplement ary Report 2 Revision 2, dated 11th April 2018). We note our det ermination is also consistent with comments from the Insured‟s Engineer: “the flooding of the units had water flowing Determination | Case number: 601518 Page 12 of 12 Record Key points out of the units and across the tiles, paving and landscaped areas in front of the units”. Complainant’s engineer (NE) 12 - 12 - 2018  The tiled are should be grouted as it is over a concrete slab area over the basement. The paving area beyond the ground floor slab over the basement is to be pervious as required by the Planning Permit conditions. As advised by the owner of the property, from water meter readings undertaken, the amount of water from the leak was approximately 20,000 litres. Due to the paving outside the slab are over the bas ement being pervious and the large amount of water from the leak being within a limited area we believe that there has been some subsidence of the soils the pavers have been constructed on which has caused the differenc e in level bet ween the tiled area and the paver area where they abut.  It would be expected that some compaction of the backfill be undertaken behind the retaining wall so that subsidence of the paving area would not occur. As advised by the owner of the property compaction was undertaken with a vibrating plate compactor for the backfill where the pavers have been installed. The tiled and paved areas would be ex pected to perform adequately under normal rain events or when was hed or cleaned but the amount of water from this leak was more than wo uld be expected from any of the normal events.  Our report did not claim that it was the weight of water on the tiled slab area that was the cause of the cracking. The report notes that we believe that the significant amount of water has caused the soils un der the footings to subside and cause movement of the building in a localized area. Currently the only area of the building that has any visible movement or damage is around the front area where the leak has occurred.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.