Home / Financial Firm (Unknown - Insurer) / Determination 550010

Determination 550010

Cyclone-related inundation and road cracking claim partly declined as flood

FirmFinancial Firm (Unknown - Insurer)
Decided2019-04-01
ProductGeneral Insurance · Motor
OutcomeFor the complainant in part
Amount awarded$12,500
Non-financial loss—
Amount claimed$137,147
SourceAFCA PDF

Summary

The caravan park operator claimed for inundation of its amenities block and camp kitchen after Cyclone Nora and for cracked roads. AFCA found some stormwater damage occurred before floodwater arrived and ordered $12,500, but upheld the flood exclusion for the rest and the exclusion for the road cracking.

Damage caused by rainwater or stormwater before floodwater arrived is covered, but damage caused by flood and by wear, tear and design defects is excluded under the policy.

Issues

Subjects and remedies

natural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 550010 Page 1 of 12 Determination Case number: 550010 27 March 2019 1 Determination overview 1.1 Complaint The complainant holds a business insurance policy with the financial firm (insurer) in respect of their caravan park. A claim was lodged under the policy after the caravan park was inundated with water on or about 26 March 2018, following heavy rain from Cyclone Nora. The complainant seeks cover for the amenities block and camp kitchen on the basis that these areas were damaged by initial inundation from stormwater runoff. The insurer maintains the inundation was caused by flood which is excluded from cover under the terms of the insurance policy. The complainant also says there is cracking damage to paved roads at the property resulting from the impact of heavy emergency services vehicles, together with heavy rain on the night of the event. The insurer says the cracking damage is not covered under the policy. 1.2 Issues and key findings Was the initial inundation caused by floodwater or stormwater? Based on the available material, the Panel is satisfied that stormwater/rainwater caused some damage to the insured property before flood water arrived. The insurer is required to cover loss and damage to buildings and contents as set out under section 2.1 of this determination. The insurer is otherwise entitled to decline liability for the remaining damage because on balance it was caused by flood. Is the insurer entitled to deny the claim for cracking damage? While the policy does cover accidental loss or damage, the available evidence indicates that the damage to the cracked roads was caused by a combination of factors including wear and tear, gradual deterioration and wrong design/faulty materials. Determination | Case number: 550010 Page 2 of 12 These factors are excluded under the policy and the insurer is entitled to deny the claim for cracking damage. 1.3 Determination This determination is partially in favour of the complainant. The insurer is liable to meet the complainant’s claim for damage sustained as a result of stormwater/rainwater, as set out under section 2.1 of this determination. The insurer is otherwise entitled to refuse payment of the balance of complainant’s claim for stormwater inundation on the grounds that the damage was caused as a result of flood. The insurer is entitled to deny the claim for cracking damage, because on balance, that damage is excluded under the policy. Determination | Case number: 550010 Page 3 of 12 2 Reasons for determination 2.1 Was the initial inundation caused by floodwater or stormwater? The complainant is not covered for flood The complainant’s policy covers business property against accidental damage to building and contents occurring during the policy period. However, the policy specifically excludes loss or damage caused by flood, unless flood cover is selected as an option. Flood is defined in the product disclosure statement (PDS) as : “Flood” means the covering of normally dry land by water that has escaped or been released from the normal confines of any of the following:  a lake (whether or not it has been altered or modified);  a river (whether or not it has been altered or modified);  a creek (whether or not it has been altered or modified);  another natural watercourse (whether or not it has been altered or modified);  a reservoir;  a canal; or  a dam. The exchanged material confirms the policy was incepted through a broker. The policy schedule does not indicate that the optional extension for flood was taken. The complainant says they were aware there was no flood cover, however, they do not consider this to be a flood event. The Panel is satisfied the documentation clearly informs the complaina nt of the exclusion of cover for flood damage. Circumstances of loss The exchanged material confirms that Tropical Cyclone Nora formed in the Gulf of Carpentaria on 22 March 2018 and reached an intensity of Category 3, prior to making landfall at approximately 10 pm on 24 March 2018. In addition, the exchanged material confirms that a significant amount of rainfall affected the north tropical Queensland coast and the complainant’s property in the latter part of March 2018. The insured property is a caravan park located west of Cairns, covering approximately 8.6ha. The caravan park consists of varying accommodation options including unpowered camp sites and self-contained units. Determination | Case number: 550010 Page 4 of 12 The State Emergency Services were called to the site at approximately 1.00 am on 27 March 2018, to assist with the evacuation and rescue of numerous guests that were stranded due to the high intensity of the rainfall. The complainant seeks cover for the amenities building and camp kitchen on the basis that these areas were damaged by initial inundation from stormwater runoff. The amenities building has a block step to the entrance measuring 110mm. The camp kitchen has a ramp leading down into the entrance, which measures approximately 210mm at its highest point. The exchanged material indicates that the exact time the water started to enter the amenities building is unknown as the complainant was not there at the time. However, the complainant also says: It was well and truly in there at 11.50 pm [on 26 March 2018] and some witnesses are saying that it started to enter the building at 11.25 pm. The complainant says the rain on the night was excessive and unprecedented. In support of its position, the complainant has provided two independent assessment reports dated 13 June 2018 and August 2018 (BM), prepared for the local regional council. The insurer has accepted liability for make-safe and sewerage clean-up works of the amenities block, which were undertaken on 27 March 2018. Insurer says the loss was cause by flood The insurer has provided a report from its hydrologist, WR, dated 16 April 2018. The report was prepared following WR’s attendance on site on 3 April 2018. WR says that the kitchen floor level is approximately 9.4m AHD and was inundated to a depth of about 1.6m above floor level, while the amenities building floor level is approximately 10.5m AHD and was inundated to a depth of 0.5m above floor level. Peak rainfall occurred in the hour to 11.00 pm on 26 March 2018. WR stated the complainant reported inundation occurred at 11.45 pm, which is notably twenty minutes after the time reported in the complainant’s submissions to AFCA. WR concluded the initial and maximum inundation of the buildings and other structures at the property was caused by floodwaters from (F) Creek. WR was of the view that stormwater would not have reached a depth sufficient to inundate the buildings above floor level. Determination | Case number: 550010 Page 5 of 12 Stormwater/rainwater damage before flood water arrived The Panel notes WR’s comments that the Brinsmead Alert station, which is located close to the insured property and recorded 71mm of rain from 9.00 pm to 11.00 pm on 26 March, was not a ‘significant rain event’ close to the time of inundation. The Panel does not accept this view. Stormwater runoff typically occurs at the same time as intense rainfall and the evidence provided by the parties indicates that peak rainfall occurred in close proximity to the time of inundation, being at a range between 11.25 and 11.45 pm on 26 March 2018. The Panel also acknowledges the evidence from WR that the peak water levels recorded in Freshwater Creek was at appro ximately 11.20 pm on 26 March 2018. However, the Panel notes that the property is on a sloped block rising from approximately 8.5mAHD to 18 mAHD. Significantly WR says: The local stormwater catchment reporting to the subject property is approximately 8.6 ha. The local catchment runoff includes stormwater generated on the hill to the south of the subject property. Stormwater generated on the hill would usually flow along the local stormwater network or along the roads. Excess stormwater generated during significant rain events may overtop the roads and flow into the subject property. WR conceded that excess stormwater generated during significant rain events may overtop the roads and flow into the property. The complainant submitted that runoff received from the roads was significant as the drainage systems inside and outside the park could not cope with the volume of rain, and the sewage system had failed. In the circumstances, the Panel accepts that it is likely that some damage to the amenities block and camp kitchen occurred prior to the arrival of floodwaters. Insurer is liable for damage caused by stormwater/rainwater The reports from BMT are not site specific and are of limited value in identifying the damage to the property. In the absence of any eye witness information as to the extent of the damage, it is necessary to form a view based on what is fair in the circumstances. In this regard, it should be noted that the panel has had extensive experience in dealing with hundreds of claims involving stormwater runoff and flood. In the interests of bringing closure to this matter, the panel will use its vast experience to reach a fair and reasonable conclusion. Determination | Case number: 550010 Page 6 of 12 The complainant claimed damage to the amenities block and camp kitchen totalling $137,146.90. Having reviewed all of the exchanged material, the panel is satisfied that the substance of the damage was caused by the excluded event of flood. Noting that there is limited material to make a precise statement as to the extent of the initial damage caused by stormwater, the panel is of the view that the payment of $12,500 by the insurer would meet its obligations to the complainant under the terms of the policy. The insurer is otherwise entitled to decline the balance of the complainant’s claim for stormwater inundation as most likely that damage was caused as a result of flood, which is excluded under the terms of the policy. 2.2 Is the insurer entitled to deny the claim for cracking damage? Complainant says there is cracking damage to roads The complainant says there is cracking damage to paved roads at the property resulting from the impact of heavy emergency services vehicles, together with heavy rain on the night of the event. Cracking damage was reported to seven roads at the property, however, the complainant is only disputing the denial for damage to roads 1, 3 and 7. The insurer relies on the policy exclusions for ‘wear, tear and gradual deterioration’ and ‘wrong design, faulty material or workmanship’ and ‘earth movement’, to decline the complainant’s claim for damage to the paved roads. In support of its position, the insurer has provided an engineering report dated 19 July 2018 (ST) and further commentary from WR in response to the engineering report. The findings of ST are summarised in detail in section 3 of this determination. ST conducted a visual inspection of the property on 13 July 2018. Essentially ST concluded that the cracking damage to the roads was caused by several factors. These include slabs degrading over time due to being overloaded or soft sub-soil conditions caused by prolonged periods of wet weather. In addition, ST found that lack of drainage pits, lack of reinforcement in slabs and unsuitable slab design for the loads imposed were contributing causes. However, ST noted it was difficult to assess the timing of damage in the absence of condition reports or previous photos of the roads, which the complainant has confirmed it is unable to provide. In response to ST’s report, WR confirmed that it observed cracked concrete driveways at the property. However, WT confirmed that aside from road 7 which was partially inundated by floodwaters, roads 1 to 6 were not in the flood affected areas. Determination | Case number: 550010 Page 7 of 12 Cracking damage caused by excluded factors under the policy The Panel acknowledges that ST could not assess the timing of damage in the absence of photos or condition reports prior to the event. However, ST did make the point that excessive moisture co uld occur either in prolonged wet weather or extreme weather events. Given both had occurred in the region since the slab had been poured, the damage was not necessarily from a single rain event. The Panel accepts the insurer’s view that even if the weath er event experienced in the area on 26 and 27 March 2018, saturated the subsoils to an extent to cause new cracking damage, such damage would represent damage caused by expansion in roads and/or earth movement, which is specifically excluded under the policy. The Panel also notes the condition of other roads observed by ST, which are not in dispute, appear to be poor with issues relating to concrete properties, reinforcement, insufficient jointing and older cracking. Given the above and in the absence of any evidence that the damage was caused by emergency vehicles, the Panel is satisfied that the available information establishes the damage to the roads was caused by a combination of factors excluded under the policy. The insurer is entitled to apply the exclusions for wear and tear and gradual deterioration and wrong design/faulty materials, to deny this aspect of the complainant’s claim. Determination | Case number: 550010 Page 8 of 12 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 Complainant represented by a broker During the course of this dispute, the complainant has been represented by a broker. For the purposes of this determination, submissions made by the complainant ’s broker have been treated as if they had been made by the complainant. 3.3 AFCA approach to this complaint This dispute has not been the subject of a recommendation. Due to the nature of the dispute, it has been referred directly to a Panel for determination, in line with the Operational Guidelines to the FOS Terms of Reference. The Panel consists of an Ombudsman and two representatives with consumer and insurance experience. The Panel has decided this case based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS and AFCA decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The Panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, the Panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. Determination | Case number: 550010 Page 9 of 12 3.4 Rainwater that mixes with floodwater is flood The Courts have established that once rainwater mixes with floodwater, it is all considered floodwater. Where rainwater mixes with floodwater and causes damage, a flood exclusion will apply to defeat the claim. Accordingly, when deciding disputes, consideration has been given to whether there was any rainwater runoff damage before the floodwater arrived at the insured property. 3.5 Key policy terms Section 1 Property (page 11 of PDS) … Your insurance under this cover section Provided ‘Business Property’ is shown under ‘What’s Covered’ in the Schedule, We will cover You up to the Sum Insured for accidental loss or damage to Your Property Insured at the Premises during the Period of Cover. … Policy section exclusions (pages 17-19 of PDS) 1. We will not cover You for loss or damage insurable under any other cover section or of this Policy. This exclusion does not apply to any loss or damage which would only be insurable under any other cover section because it fell within an additional benefit or extra cover in that cover section. 2. We will not cover You for loss or damage caused by: a) wear and tear, gradual deterioration, scratching, marring, developing flaws, normal upkeep or any gradual cause … f) creeping, heaving, normal settling, shrinkage, seepage, vibration, expansion in buildings, pavements, roads, car parks and the like g) any: i. error or omission or wrong design; or ii. faulty materials or workmans hip … j) erosion, subsidence, landslip or mudslide or any other earth movement… Determination | Case number: 550010 Page 10 of 12 … m) Flood 3.6 Relevant expert reports Record Key points Insurer’s expert (WR ) Hydrology Report 16 April 2018  The kitchen was inundated to a depth of about 1.6 m above floor level  The amenities building was inundated to a depth of about 0.5 m above floor level  Peak rainfall at the Brinsmead Alert station occurred in the hour to 2300 on Monday 26 March  Peak rainfall at the at the Copperlode Dam Alert station occurred in the hour to 2300 on Monday 26 M arch  The elevation at the subject property rises from approximately 8.5 mAHD on the banks of Freshwater Creek to about 18 mAHD at the subject property entrance  The local stormwater catchment reporting to the subject property is approxi mately 8.6 ha. The local catchment runoff includes stormwat er generated on the hill to the south of the subject property. Stormwater generated on the hill would usually flow along the local stormwater net work or along the roads. Excess stormwat er generated during significant rain events may overtop the roads and flow into the subject property.  The initial and peak inundation of the buildings and ot her struct ures at the subject property was caused by Freshwater Creek floodwaters. The peak water level of appr oximately 11 mAHD was caused by floodwaters from Freshwat er Creek. Insurer’s expert (ST ) Report 19 July 2018  The inspection on 13 July 2018 was a non - destructive vis ual inspection only  Road 1: the crossover of this road onto the service road was found to be cracked in several locations and elements were free floating (i.e. no longer connected). No reinforcement was found to be cast at this location and any movement would lead to damage at this corner. It Is also not ed that pot - holes to the flexible pavemen t have been filled in the past, indicating soft spots in this location have been an i ssue in the past. The concret e to this area also appears to have been patched or repaired in the past, given a saw - cut area appears to have been reinstated.  The next sect ion of cracking to Road 1 is located near the driveway to Cabin 2 (northside). A large crack runs parallel to construction joint, with a star shaped crack pattern visible on the southern joint to the adjoining slab. This again appears to be a weak point, h owever the location of water ingress in this area would be minimal given falls. The age of these cracks also appears to be older than 3 mont hs, however given the high mould growth rates possible in the wet tropics and without further evidence to indicate t ime, the crack timing is unknown…The Determination | Case number: 550010 Page 11 of 12 Record Key points location of cracking indicates this may be a cause of cracking in these slabs given the loc ations of cracks are located beside or very close to construction joints in adjoining slabs.  To the western end of Road 1, the c racking continues the driveway/carpark section in front of the motel style accommodation located on the southern side of this roadway. Concret e type, age or quality also differs in one of the slab panels. No drainage pits were obs erved to take stormwater i nto an underground stormwater system.  Road 3: is located north and parallel to road 2 and has five junctions in total. Cracking at the driveway at this location will generally be caused due to vehicle s needing to climb up onto this slab from pot holed posit ions, which provides additional stress on the slab edge that causes cracking. It is noted that a portion of the slab to the northern side of the crossover appears to have previously been replaced, and has a large crack forming to the edge corner of this sl ab. It is likely traffic on this edge is causing movement and cracking of the slab due to poor subbase preparation or failed subbase due excessive moisture. Excessive moisture can occur in prolonged wet weat her or extreme weather events and given bot h have occurred in the region since this slab has been poured, it is difficult to place a time on this without previous records of condition of the slab. A section of slab to the east of the cross over appears to be suffering degradation of the top surface, kno wn as mortar loss, and is also appearing to have settled to the northern edge.  Road 7: was investigated to the speed bump at approximately ¾ of the way down the hill slope. A stormwater pit is located at the t o p of this road, and about midway down the slo pe…The speedbump was advised to have been located above the wat er line, however emergency services vehicle were indicated to have parked on or near this location.  Discussion: it appears that driveway slabs are 100 mm thick, and this may not provide enough strengt h given the vehicle loads and site soil properties.  Conclusion: It is considered opinion of the writer, that at the time of inspection and without photos or condition reports from closer to the rain event on 27/3/2018, the slabs inspected have degra ded over time, due to being overloaded or soft sub - soil conditions caused by prolonged periods of wet weather. Without condition reports or photos, it is difficult to assess the timing of damage. The cause however is likely due to slabs being overloaded an d not being support [sic ] by soils of adequate strengt h. The damage investigated unless phot os or condition reports from prior to 27/ 3 /18 or close to this date indicating otherwise, appear to be due to overstressing of slabs at joints or edges over prolonged periods. Mortar loss found also appears to be occurring over several years and does not appear to be a new problem based on this si ngle visual inspection. The overloading of slabs however could be due to so f t subsoil below the slabs, however this can occur each year Determination | Case number: 550010 Page 12 of 12 Record Key points or a prolonged wet season and not necessarily from a single rain event. Insurer’s expert (WR ) Memorandum 3 August 2018  Provided in response to engineer’s inspection by ST  Section 2.7 (Road 7) was partially inundated by floodwaters  Section 2.1 (Road 1) to section 2.6 (Road 6) were not inundated by floodwaters.  The cracked driveways were observed during the site inspection .