Text of the determination
Determination | Case number: 550010 Page 1 of 12
Determination
Case number: 550010 27 March 2019
1 Determination overview
1.1 Complaint
The complainant holds a business insurance policy with the financial firm (insurer) in
respect of their caravan park.
A claim was lodged under the policy after the caravan park was inundated with water
on or about 26 March 2018, following heavy rain from Cyclone Nora.
The complainant seeks cover for the amenities block and camp kitchen on the basis
that these areas were damaged by initial inundation from stormwater runoff.
The insurer maintains the inundation was caused by flood which is excluded from
cover under the terms of the insurance policy.
The complainant also says there is cracking damage to paved roads at the property
resulting from the impact of heavy emergency services vehicles, together with heavy
rain on the night of the event.
The insurer says the cracking damage is not covered under the policy.
1.2 Issues and key findings
Was the initial inundation caused by floodwater or stormwater?
Based on the available material, the Panel is satisfied that stormwater/rainwater
caused some damage to the insured property before flood water arrived.
The insurer is required to cover loss and damage to buildings and contents as set out
under section 2.1 of this determination.
The insurer is otherwise entitled to decline liability for the remaining damage because
on balance it was caused by flood.
Is the insurer entitled to deny the claim for cracking damage?
While the policy does cover accidental loss or damage, the available evidence
indicates that the damage to the cracked roads was caused by a combination of
factors including wear and tear, gradual deterioration and wrong design/faulty
materials.
Determination | Case number: 550010 Page 2 of 12
These factors are excluded under the policy and the insurer is entitled to deny the
claim for cracking damage.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is liable to meet the complainant’s claim for damage sustained as a result
of stormwater/rainwater, as set out under section 2.1 of this determination.
The insurer is otherwise entitled to refuse payment of the balance of complainant’s
claim for stormwater inundation on the grounds that the damage was caused as a
result of flood.
The insurer is entitled to deny the claim for cracking damage, because on balance,
that damage is excluded under the policy.
Determination | Case number: 550010 Page 3 of 12
2 Reasons for determination
2.1 Was the initial inundation caused by floodwater or stormwater?
The complainant is not covered for flood
The complainant’s policy covers business property against accidental damage to
building and contents occurring during the policy period.
However, the policy specifically excludes loss or damage caused by flood, unless
flood cover is selected as an option.
Flood is defined in the product disclosure statement (PDS) as :
“Flood” means the covering of normally dry land by water that has escaped or
been released from the normal confines of any of the following:
a lake (whether or not it has been altered or modified);
a river (whether or not it has been altered or modified);
a creek (whether or not it has been altered or modified);
another natural watercourse (whether or not it has been altered or modified);
a reservoir;
a canal; or
a dam.
The exchanged material confirms the policy was incepted through a broker. The
policy schedule does not indicate that the optional extension for flood was taken.
The complainant says they were aware there was no flood cover, however, they do
not consider this to be a flood event.
The Panel is satisfied the documentation clearly informs the complaina nt of the
exclusion of cover for flood damage.
Circumstances of loss
The exchanged material confirms that Tropical Cyclone Nora formed in the Gulf of
Carpentaria on 22 March 2018 and reached an intensity of Category 3, prior to
making landfall at approximately 10 pm on 24 March 2018.
In addition, the exchanged material confirms that a significant amount of rainfall
affected the north tropical Queensland coast and the complainant’s property in the
latter part of March 2018.
The insured property is a caravan park located west of Cairns, covering
approximately 8.6ha. The caravan park consists of varying accommodation options
including unpowered camp sites and self-contained units.
Determination | Case number: 550010 Page 4 of 12
The State Emergency Services were called to the site at approximately 1.00 am on 27
March 2018, to assist with the evacuation and rescue of numerous guests that were
stranded due to the high intensity of the rainfall.
The complainant seeks cover for the amenities building and camp kitchen on the
basis that these areas were damaged by initial inundation from stormwater runoff.
The amenities building has a block step to the entrance measuring 110mm. The camp
kitchen has a ramp leading down into the entrance, which measures approximately
210mm at its highest point.
The exchanged material indicates that the exact time the water started to enter the
amenities building is unknown as the complainant was not there at the time. However,
the complainant also says:
It was well and truly in there at 11.50 pm [on 26 March 2018] and some witnesses
are saying that it started to enter the building at 11.25 pm.
The complainant says the rain on the night was excessive and unprecedented. In
support of its position, the complainant has provided two independent assessment
reports dated 13 June 2018 and August 2018 (BM), prepared for the local regional
council.
The insurer has accepted liability for make-safe and sewerage clean-up works of the
amenities block, which were undertaken on 27 March 2018.
Insurer says the loss was cause by flood
The insurer has provided a report from its hydrologist, WR, dated 16 April 2018. The
report was prepared following WR’s attendance on site on 3 April 2018.
WR says that the kitchen floor level is approximately 9.4m AHD and was inundated to
a depth of about 1.6m above floor level, while the amenities building floor level is
approximately 10.5m AHD and was inundated to a depth of 0.5m above floor level.
Peak rainfall occurred in the hour to 11.00 pm on 26 March 2018.
WR stated the complainant reported inundation occurred at 11.45 pm, which is
notably twenty minutes after the time reported in the complainant’s submissions to
AFCA.
WR concluded the initial and maximum inundation of the buildings and other
structures at the property was caused by floodwaters from (F) Creek. WR was of the
view that stormwater would not have reached a depth sufficient to inundate the
buildings above floor level.
Determination | Case number: 550010 Page 5 of 12
Stormwater/rainwater damage before flood water arrived
The Panel notes WR’s comments that the Brinsmead Alert station, which is located
close to the insured property and recorded 71mm of rain from 9.00 pm to 11.00 pm on
26 March, was not a ‘significant rain event’ close to the time of inundation. The Panel
does not accept this view.
Stormwater runoff typically occurs at the same time as intense rainfall and the
evidence provided by the parties indicates that peak rainfall occurred in close
proximity to the time of inundation, being at a range between 11.25 and 11.45 pm on
26 March 2018.
The Panel also acknowledges the evidence from WR that the peak water levels
recorded in Freshwater Creek was at appro ximately 11.20 pm on 26 March 2018.
However, the Panel notes that the property is on a sloped block rising from
approximately 8.5mAHD to 18 mAHD.
Significantly WR says:
The local stormwater catchment reporting to the subject property is approximately
8.6 ha. The local catchment runoff includes stormwater generated on the hill to
the south of the subject property. Stormwater generated on the hill would usually
flow along the local stormwater network or along the roads. Excess stormwater
generated during significant rain events may overtop the roads and flow into the
subject property.
WR conceded that excess stormwater generated during significant rain events may
overtop the roads and flow into the property. The complainant submitted that runoff
received from the roads was significant as the drainage systems inside and outside
the park could not cope with the volume of rain, and the sewage system had failed.
In the circumstances, the Panel accepts that it is likely that some damage to the
amenities block and camp kitchen occurred prior to the arrival of floodwaters.
Insurer is liable for damage caused by stormwater/rainwater
The reports from BMT are not site specific and are of limited value in identifying the
damage to the property.
In the absence of any eye witness information as to the extent of the damage, it is
necessary to form a view based on what is fair in the circumstances.
In this regard, it should be noted that the panel has had extensive experience in
dealing with hundreds of claims involving stormwater runoff and flood.
In the interests of bringing closure to this matter, the panel will use its vast experience
to reach a fair and reasonable conclusion.
Determination | Case number: 550010 Page 6 of 12
The complainant claimed damage to the amenities block and camp kitchen totalling
$137,146.90.
Having reviewed all of the exchanged material, the panel is satisfied that the
substance of the damage was caused by the excluded event of flood.
Noting that there is limited material to make a precise statement as to the extent of
the initial damage caused by stormwater, the panel is of the view that the payment of
$12,500 by the insurer would meet its obligations to the complainant under the terms
of the policy.
The insurer is otherwise entitled to decline the balance of the complainant’s claim for
stormwater inundation as most likely that damage was caused as a result of flood,
which is excluded under the terms of the policy.
2.2 Is the insurer entitled to deny the claim for cracking damage?
Complainant says there is cracking damage to roads
The complainant says there is cracking damage to paved roads at the property
resulting from the impact of heavy emergency services vehicles, together with heavy
rain on the night of the event. Cracking damage was reported to seven roads at the
property, however, the complainant is only disputing the denial for damage to roads 1,
3 and 7.
The insurer relies on the policy exclusions for ‘wear, tear and gradual deterioration’
and ‘wrong design, faulty material or workmanship’ and ‘earth movement’, to decline
the complainant’s claim for damage to the paved roads.
In support of its position, the insurer has provided an engineering report dated 19 July
2018 (ST) and further commentary from WR in response to the engineering report.
The findings of ST are summarised in detail in section 3 of this determination. ST
conducted a visual inspection of the property on 13 July 2018. Essentially ST
concluded that the cracking damage to the roads was caused by several factors.
These include slabs degrading over time due to being overloaded or soft sub-soil
conditions caused by prolonged periods of wet weather. In addition, ST found that
lack of drainage pits, lack of reinforcement in slabs and unsuitable slab design for the
loads imposed were contributing causes. However, ST noted it was difficult to assess
the timing of damage in the absence of condition reports or previous photos of the
roads, which the complainant has confirmed it is unable to provide.
In response to ST’s report, WR confirmed that it observed cracked concrete
driveways at the property. However, WT confirmed that aside from road 7 which was
partially inundated by floodwaters, roads 1 to 6 were not in the flood affected areas.
Determination | Case number: 550010 Page 7 of 12
Cracking damage caused by excluded factors under the policy
The Panel acknowledges that ST could not assess the timing of damage in the
absence of photos or condition reports prior to the event.
However, ST did make the point that excessive moisture co uld occur either in
prolonged wet weather or extreme weather events. Given both had occurred in the
region since the slab had been poured, the damage was not necessarily from a single
rain event.
The Panel accepts the insurer’s view that even if the weath er event experienced in
the area on 26 and 27 March 2018, saturated the subsoils to an extent to cause new
cracking damage, such damage would represent damage caused by expansion in
roads and/or earth movement, which is specifically excluded under the policy.
The Panel also notes the condition of other roads observed by ST, which are not in
dispute, appear to be poor with issues relating to concrete properties, reinforcement,
insufficient jointing and older cracking.
Given the above and in the absence of any evidence that the damage was caused by
emergency vehicles, the Panel is satisfied that the available information establishes
the damage to the roads was caused by a combination of factors excluded under the
policy.
The insurer is entitled to apply the exclusions for wear and tear and gradual
deterioration and wrong design/faulty materials, to deny this aspect of the
complainant’s claim.
Determination | Case number: 550010 Page 8 of 12
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Complainant represented by a broker
During the course of this dispute, the complainant has been represented by a broker.
For the purposes of this determination, submissions made by the complainant ’s
broker have been treated as if they had been made by the complainant.
3.3 AFCA approach to this complaint
This dispute has not been the subject of a recommendation. Due to the nature of the
dispute, it has been referred directly to a Panel for determination, in line with the
Operational Guidelines to the FOS Terms of Reference. The Panel consists of an
Ombudsman and two representatives with consumer and insurance experience.
The Panel has decided this case based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS and AFCA decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The Panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, the Panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
Determination | Case number: 550010 Page 9 of 12
3.4 Rainwater that mixes with floodwater is flood
The Courts have established that once rainwater mixes with floodwater, it is all
considered floodwater. Where rainwater mixes with floodwater and causes damage, a
flood exclusion will apply to defeat the claim.
Accordingly, when deciding disputes, consideration has been given to whether there
was any rainwater runoff damage before the floodwater arrived at the insured
property.
3.5 Key policy terms
Section 1 Property (page 11 of PDS)
…
Your insurance under this cover section
Provided ‘Business Property’ is shown under ‘What’s Covered’ in the Schedule, We will
cover You up to the Sum Insured for accidental loss or damage to Your Property Insured
at the Premises during the Period of Cover.
…
Policy section exclusions (pages 17-19 of PDS)
1. We will not cover You for loss or damage insurable under any other cover section or
of this Policy. This exclusion does not apply to any loss or damage which would only
be insurable under any other cover section because it fell within an additional benefit
or extra cover in that cover section.
2. We will not cover You for loss or damage caused by:
a) wear and tear, gradual deterioration, scratching, marring, developing flaws, normal
upkeep or any gradual cause
…
f) creeping, heaving, normal settling, shrinkage, seepage, vibration, expansion in
buildings, pavements, roads, car parks and the like
g) any:
i. error or omission or wrong design; or
ii. faulty materials or workmans hip
…
j) erosion, subsidence, landslip or mudslide or any other earth movement…
Determination | Case number: 550010 Page 10 of 12
…
m) Flood
3.6 Relevant expert reports
Record Key points
Insurer’s expert (WR )
Hydrology Report
16 April 2018
The kitchen was inundated to a depth of about 1.6 m above floor
level
The amenities building was inundated to a depth of about 0.5 m
above floor level
Peak rainfall at the Brinsmead Alert station occurred in the hour to
2300 on Monday 26 March
Peak rainfall at the at the Copperlode Dam Alert station occurred
in the hour to 2300 on Monday 26 M arch
The elevation at the subject property rises from approximately 8.5
mAHD on the banks of Freshwater Creek to about 18 mAHD at
the subject property entrance
The local stormwater catchment reporting to the subject property
is approxi mately 8.6 ha. The local catchment runoff includes
stormwat er generated on the hill to the south of the subject
property. Stormwater generated on the hill would usually flow
along the local stormwater net work or along the roads. Excess
stormwat er generated during significant rain events may overtop
the roads and flow into the subject property.
The initial and peak inundation of the buildings and ot her
struct ures at the subject property was caused by Freshwater
Creek floodwaters. The peak water level of appr oximately 11
mAHD was caused by floodwaters from Freshwat er Creek.
Insurer’s expert (ST )
Report
19 July 2018
The inspection on 13 July 2018 was a non - destructive vis ual
inspection only
Road 1: the crossover of this road onto the service road was found
to be cracked in several locations and elements were free floating
(i.e. no longer connected). No reinforcement was found to be cast
at this location and any movement would lead to damage at this
corner. It Is also not ed that pot - holes to the flexible pavemen t have
been filled in the past, indicating soft spots in this location have
been an i ssue in the past. The concret e to this area also appears
to have been patched or repaired in the past, given a saw - cut area
appears to have been reinstated.
The next sect ion of cracking to Road 1 is located near the
driveway to Cabin 2 (northside). A large crack runs parallel to
construction joint, with a star shaped crack pattern visible on the
southern joint to the adjoining slab. This again appears to be a
weak point, h owever the location of water ingress in this area
would be minimal given falls. The age of these cracks also
appears to be older than 3 mont hs, however given the high mould
growth rates possible in the wet tropics and without further
evidence to indicate t ime, the crack timing is unknown…The
Determination | Case number: 550010 Page 11 of 12
Record Key points
location of cracking indicates this may be a cause of cracking in
these slabs given the loc ations of cracks are located beside or
very close to construction joints in adjoining slabs.
To the western end of Road 1, the c racking continues the
driveway/carpark section in front of the motel style accommodation
located on the southern side of this roadway. Concret e type, age
or quality also differs in one of the slab panels. No drainage pits
were obs erved to take stormwater i nto an underground stormwater
system.
Road 3: is located north and parallel to road 2 and has five
junctions in total. Cracking at the driveway at this location will
generally be caused due to vehicle s needing to climb up onto this
slab from pot holed posit ions, which provides additional stress on
the slab edge that causes cracking. It is noted that a portion of the
slab to the northern side of the crossover appears to have
previously been replaced, and has a large crack forming to the
edge corner of this sl ab. It is likely traffic on this edge is causing
movement and cracking of the slab due to poor subbase
preparation or failed subbase due excessive moisture. Excessive
moisture can occur in prolonged wet weat her or extreme weather
events and given bot h have occurred in the region since this slab
has been poured, it is difficult to place a time on this without
previous records of condition of the slab.
A section of slab to the east of the cross over appears to be
suffering degradation of the top surface, kno wn as mortar loss,
and is also appearing to have settled to the northern edge.
Road 7: was investigated to the speed bump at approximately ¾
of the way down the hill slope. A stormwater pit is located at the
t o p of this road, and about midway down the slo pe…The
speedbump was advised to have been located above the wat er
line, however emergency services vehicle were indicated to have
parked on or near this location.
Discussion: it appears that driveway slabs are 100 mm thick, and
this may not provide enough strengt h given the vehicle loads and
site soil properties.
Conclusion: It is considered opinion of the writer, that at the time of
inspection and without photos or condition reports from closer to
the rain event on 27/3/2018, the slabs inspected have degra ded
over time, due to being overloaded or soft sub - soil conditions
caused by prolonged periods of wet weather. Without condition
reports or photos, it is difficult to assess the timing of damage. The
cause however is likely due to slabs being overloaded an d not
being support [sic ] by soils of adequate strengt h. The damage
investigated unless phot os or condition reports from prior to
27/ 3 /18 or close to this date indicating otherwise, appear to be due
to overstressing of slabs at joints or edges over prolonged periods.
Mortar loss found also appears to be occurring over several years
and does not appear to be a new problem based on this si ngle
visual inspection. The overloading of slabs however could be due
to so f t subsoil below the slabs, however this can occur each year
Determination | Case number: 550010 Page 12 of 12
Record Key points
or a prolonged wet season and not necessarily from a single rain
event.
Insurer’s expert (WR )
Memorandum
3 August 2018
Provided in response to engineer’s inspection by ST
Section 2.7 (Road 7) was partially inundated by floodwaters
Section 2.1 (Road 1) to section 2.6 (Road 6) were not inundated
by floodwaters.
The cracked driveways were observed during the site inspection .