Insurer withdrew indemnity for subfloor and footing damage to unit; disputed repair cost and lost rent

FirmFinancial Firm (Unknown - Insurer)
Decided2019-08-26
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded$65,612
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

The complainant's inherited unit suffered subfloor saturation and cracking from a broken storm pipe. The insurer first declined, accepted liability during the AFCA process, then withdrew indemnity citing a prior claim on another unit. AFCA found the policy responds, ordered cash settlement or repair on the insurer's quote plus contingency and interest, and awarded $1,500 non-financial loss.

Accidental damage during the policy period is covered, and the insurer's exclusions for tree roots and pre-existing damage were not established on the evidence.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 549326 Page 1 of 13 Determination Case number: 549326 21 August 2019 1 Determination overview 1.1 Complaint The complainant owns a property which is insured under a residential strata insurance plan with the financial firm (insurer). The complainant’s mother lived in the house for several years, and at the time of her passing the complainant attempted to sell the house. At this time, it was discovered that the subfloor was wet, and movement had affected the house, causing cracking. The complainant lodged a claim with the insurer. The insurer initially declined the claim, but later accepted liability during the AFCA complaint process and made a cash settlement offer. The complainant rejected the insurer’s cash settlement offer. The insurer later withdrew its offer, saying it has discovered a claim with a previous insurer for one of the other units on the same sit e as the complainant’s. The insurer believes this establishes damage to the complainant’s property pre -existed policy inception. To resolve the complaint, the complainant would like the insurer to accept the claim and cash settle her for the amount specified in the most recent quote she obtained from her expert. 1.2 Issues and key findings Is the insurer obliged to cover the damage to the unit? The panel is not persuaded the previous claim for a different unit on the same site establishes damage to the complai nant’s unit was pre -existing. Damage which was unintended and unexpected was caused during the period of insurance and as such that established a prima facie claim. The insurer is therefore obliged to indemnify the complainant for damage to the unit. What will it cost to complete repairs to the complainant’s unit? The insurer’s policy entitles it to choose whether it will repair or pay the amount it would cost to repair. The insurer’s builder (TS) has provided an actionable quote. The Determination | Case number: 549326 Page 2 of 13 insurer is to elect whether it will instruct TS to undertake repairs or cash settle the claim as set out herein. If the insurer cash settles the claim, the insurer is to make the payments plus statutory interest as set out in section 2.2 of this determination. Is the complainant entitled to compensation? The insurer took over two years from the time the complainant lodged the claim to accept liability for the claim, and then the insurer withdrew indemnity again. In recognition of the protracted assessment of the claim, the insurer is to pay the complainant $1,500 compensation for non-financial loss. 1.3 Determination This determination is substantially in favour of the complainant. Should the complainant accept this determination then within seven days of notification of acceptance the insurer is to make its election, and if the insurer elects to cash settle, the insurer is to make the following payments to the complainant:  $33,792.83 including GST (the TS quote for insurable works)  a further allowance of 15% on $33,792.83 to take into account any contingencies which may arise when repairs are undertaken  $26,750 including GST (the amount already paid by the complainant for underpinning)  Interest on these amounts pursuant to section 57 of the Insurance Contracts Act 1984 (the Act) from the time the claim was first denied (15 May 2017) until settlement of the claim  $1,500 compensation If the complainant accepts this determination, then within seven days of acceptance, the complainant is to provide (or cause to be provided) to the insurer evidence of the cost to remove the toilet and lay new storm water drains. Upon being satisfied of these costs, the insurer is to promptly pay for these items. Statutory interest is also to be paid on these items from 15 May 2017 or from the date these items were paid for whichever is the later. Otherwise, the insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 549326 Page 3 of 13 2 Reasons for determination 2.1 Is the insurer obliged to cover the damage to the unit? Complainant’s unit suffered damage The complainant’s elderly mother lived in the unit for approximately 17 years prior to passing away in March 2017. The complainant and her brother inherited the unit at this time. The complainant advertised the unit for sale and a potential buyer commissioned a building inspection. The building inspection revealed that the subfloor under the unit was wet, and the unit had suffered cracking damage due to movement. Expert reports identify various causes of damage The complainant lodged a claim with the insurer. During the claim process multiple experts inspected the damage to the property. Initially, causation was attached to an above ground pipe to the external toilet at the south-eastern corner of the unit. The insurer engaged engineer LG to inspect the damage. LG noted the subfloor was moist in the south-eastern corner of the unit but dry in the north-eastern corner. LG said the floor surface levels in the unit fell towards the eastern side, predominantly the north-eastern corner, in the direction of a group of trees that are in a neighbouring property. LG said this is consistent with these trees’ roots drying out the soil under the unit in the north-eastern corner, causing movement and the c racking damage. As the insurer had not yet agreed to accept liability for the damage to the unit, the complainant engaged her own expert, foundation rehabilitation specialist CB, to commence work to repair the unit. CB commenced underpinning works. During excavations a broken storm water pipe was discovered at the south-western corner of the unit. Subsequent CCTV investigation by a plumber determined that the storm pipe which services units 4, 5 and 6 (unit 6 is the complainant’s unit) was blocked by tree roots further down the line, close to where the pipe meets the street kerb. Therefore, water was backing up in the pipe, flowing back towards the unit and discharging under the unit via breakages at the south-western corner. CB noted the entire subfloor was inundated with water causing significant movement to the unit, which was then exacerbated by the subfloor drying out again. Engineers AR were engaged to provide opinion on the cause of damage. AR noted excessive surface water around the south-western corner of the unit, and damage to the internal and external walls of the unit is more pronounced in the south-western corner. AR said the cracking damage was caused by foundation movement and the Determination | Case number: 549326 Page 4 of 13 unusually large amount of water suggested there was likely a leaking subsurface pipe. Unhappy with the investigations carried out by LG, the complainant requested the insurer engage another engineer. The insurer engaged RB who inspected the damage to the property, and the reports obtained by the insurer and the complainant to date. RB does not agree with LG’s theory about the neighbour’s trees drying out subfloor soils and causing movement. RB considers it unlikely the trees would have sent roots under the house. RB said damage to the unit is consistent with saturation of the subfloor, particularly in the south-western corner, and that earth has heaved under the lounge room area. Regarding tree roots blocking the storm pipe near the street, RB notes that the pipes are made of PVC tubing, and tree roots would not be able to penetrate them unless they were already broken or dislodged. RB notes the pipes are not far below ground level and therefore susceptible to accidental breakage by gardening tools, vehicle weight and other factors. RB said the proximate cause of damage to the unit is the accidental breakages to and blockages of the main storm water drain. Both LG and CB provided further commentary in which they essentially reiterated their positions. Neighbouring trees are not the cause of damage Having considered all relevant material, the panel is satisfied the evidence supports the damage is due to the breakage in the storm pipe, rather than trees from a neighbouring property drying out subfloor soil as hypothesised by LG. The panel also accepts the most probable explanation of the cause of damage is that once the breakage occurred, the water attracted tree roots which in turn blocked the pipe causing the water inundation under the house. Except for LG, the experts agree that saturation of the subfloor soil from the storm pipe is the cause of the damage. The panel considers the available material shows the improbability of the trees on the neighbouring property sending roots into the next property, under the concrete courtyard, and under the unit when they could obtain the moisture they need from their immediate surroundings. The subfloor soil under the unit was noted to be inundated with water by those who inspected it, and the panel accepts the coherent and detailed explanation provided by RB about causation and how the water inundation caused the footings of the unit to move, leading to the damage. LG also said the footings of the unit are inadequate but did not provide any evidence to substantiate this. The unit was built in the 1970s and different building regulations would likely have been in force at the time. In any event, as pointed out by RB, LG Determination | Case number: 549326 Page 5 of 13 provided no evidence to support his various contentions about the other causes of damage. Proximate cause of damage is broken storm water pipe Regarding tree roots blocking the storm pipe near the street kerb, the insurer argued the exclusion for damage caused by tree roots applies. The panel disagrees. The panel is satisfied if not for the breakage in the pipe at the south-western corner of the unit, the backed-up water would not have been able to discharge at this location and saturate the subfloor. Further, as noted by RB, it is unlikely that tree roots would have been able to penetrate the storm pipe unless they had already suffered breakage or separated. Therefore, the panel is satisfied the proximate cause of the damage is breakage of the storm pipe, rather than blockage of the storm pipe by tree roots. Complainant could not have reasonably known about the cause of damage After the complaint was lodged with AFCA, the insurer advised in its email to AFCA dated 4 December 2018 that it accepts views of RB, AR and CB, rather than the view put forward by LG. The insurer accepted the pipe was broken and water discharged under the house. However, the insurer said the damage to the storm pipe is a maintenance issue. It considers there would have been obvious signs of damage to the property, and the blocked drains and backflow would have been evident to the owner and the owners corporation. The insurer refers to pre-existing damage. The insurer argues the damage and the mechanism which caused the damage was long-term and not a sudden and unforeseen event. The panel is not persuaded by this view. The pipe which caused the damage is underground. The complainant is 76 years old. The panel considers it is unreasonable to expect either the complainant or the complainant’s elderly mother would have been aware of the blocked drains. The complainant’s elderly mother was living in the property up until her pa ssing in March 2017. Even if the complainant’s elderly mother noticed some cracking damage, the panel does not accept it is reasonable for the complainant’s elderly mother to have noticed or been aware of water discharging from an underground pipe under the house. Regarding damage to the house, the panel considers the unit’s footings would already have begun to move before significant damage was visible. The unit was built in the 1970’s and typically it would be expected that there would be some hairline c racks to the internal plasterboard. By the time more extensive damage became visible, the panel considers movement to the foundations would have already occurred. Determination | Case number: 549326 Page 6 of 13 The insurer noted that previous repairs appear to have been undertaken to the property, indicating damage to the unit pre-existed the commencement of cover. The complainant says she has not undertaken repairs, and her mother lived in the property for about 17 years. The complainant’s mother was elderly. W hile certain repairs may have been underta ken by the complainant’s mother, the panel does not accept this necessarily establishes the policy does not respond to the claimed damage. As pointed out by RB, there is no persuasive evidence to establish the claimed damage to the building predated the purchase of the unit. Moreover, the policy provides cover for accidental loss or damage to the property which occurs during the period of insurance. Insurance commenced on 28 October 2015. The panel is satisfied the claimed damage was caused accidentally within the period of cover with the insurer. The panel is satisfied the breakage of the storm pipes was accidental. The panel does not accept the complainant, or her mother, could have reasonably been aware of this before significant damage occurred. Therefo re, the panel considers the policy responds to the complainant’s claim. Moreover, the panel considers this outcome is fair in the circumstances. Based on the available material, the insurer made a substantial offer to settle the claim in April 2019. Previous claim is for a different unit and unrelated to the current claim The complainant’s unit is located on a lot of six units. The complainant owns unit 6. After the complaint came to AFCA, the insurer accepted liability for some of the damage to unit 6 and made a substantial offer of settlement in April 2019. The offer was rejected by the complainant. The insurer responded it would not make any further offers until all maintenance records were provided. The insurer subsequently withdrew indemnity because it discovered a claim lodged with the previous insurer in 2014 for damage to unit 1, due to a burst or leaking pipe. The insurer considers this is evidence of damage to unit 6 pre-existing the commencement of cover as unit 6 is located opposite unit 1 on the site. The requested material was not provided. The complainant said the 2014 claim to unit 1 was not relevant. In any event, having considered the available material, the panel is not persuaded the previous claim for unit 1 establishes that damage to unit 6 pre-existed the commencement of cover. The panel notes the plumber’s report shows the storm pipes for unit 1 and unit 6 are not connected. The panel refers to the plumber’s report which shows the damaged storm pipe connected units 4, 5 and 6 only. In the circumstances, the panel accepts it is probable the 2014 claim relating to unit 1 is unrelated to the current claim for unit 6. Determination | Case number: 549326 Page 7 of 13 As set out above, the panel is satisfied an insured event has occurred within the period of cover with the insurer (that is, accidental damage to the storm pipe which services units 4, 5 and 6). Having considered all the available material, and for the reasons stated, the panel is satisfied the insurer is obliged to indemnify the complainant. 2.2 What will it cost to complete rep airs to the complainant’s unit? Differing expert opinions on extent of works required and costs Both the complainant and the insurer obtained quotes for the cost of repairs to the unit. The complainant obtained quotes from CB. The insurer obtained quotes from builders ’ BB and TS. The insurer also arranged for RB to prepare a scope of works and to review the quotes. CB’s quotes vary significantly The complainant obtained a quote from CB in February 2017, and a further quote from CB in February 2019. These quotes vary significantly in terms of the overall amount quoted. In February 2017, CB quoted for the cost of the repairs in the amount of $56,750 plus GST. Other quotations were provided in 2018. In February 2019, CB’s quotation is substantially more. The panel notes CB completed some underpinning works, for which the complainant paid an amount of $26,750 including GST. The panel accepts the unit continued to deteriorate in the intervening two years, but the available material establishes the initial quote included most of the repairs required, including removal of old underpins and installation of new underpins, removal of all old paving and demolition of the outdoor toilet. The panel is not satisfied the complainant has provided an adequate explanation to account for the substantial increase in the cost of repairs. Panel prefers the persuasive and comprehensive opinion of RB The panel prefers the opinion of RB. The panel accepts RB provided a persuasive and comprehensive explanation as to how the damage occurred. Moreover, RB re- attended the property in late March 2019 with the builder TS and provided a scope of works. RB says he was able to ensure TS fully understood every element of the scope and was able to measure every part of the property to assemble an accurate quote. Determination | Case number: 549326 Page 8 of 13 The panel notes RB’s contention the quote has been broken down into its component elements following the same pattern as the scope of works. RB says no element has been omitted. Having reviewed the available information, the panel accepts this. The panel has carefully considered the material from RB and all the quotations provided. The panel accepts some work has been previously completed, and some quoted work is not applicable. The complainant asked TS to quote for other repairs on the property which were not in the scope of works. These items are shown in the quote and amount to $3,849.78 including GST. RB says the BB’s quote is not a serious attempt to assist. Having considered the material from RB and TS, the panel agrees. Offer of $60,542.83 (plus statutory interest) to form basis of settlement RB recommended the insurer pay to the complainant a total of $60,542.83 being:  $33,792.83 including GST (the TS quote for insurable works)  $26,770 including GST (the amount already paid by the complainant for underpinning) This offer was made to the complainant and subsequently withdrawn. Having considered the available material, the panel considers the offer made was reasonable and the insurer was not entitled to withdraw it. In the pa nel’s view this offer should form the basis of settlement. In addition, interest pursuant to section 57 of the Act should be paid from the time the claim was first denied (15 May 2017) until settlement of the claim. The insurer’s policy entitles it to c hoose whether it will repair or pay the amount it would cost to repair. TS has provided an actionable quote. The insurer is to elect whether it will instruct TS to undertake repairs or cash settle the claim as set out herein. If the insurer cash settles the claim, the insurer is to pay a further allowance of 15% on $33,792.83 to take into account any contingencies which may arise when repairs are undertaken. Statutory interest is to be paid on this further amount. Costs of toilet removal and new storm water drains to be provided RB refers to work which was apparently done by CB to the storm lines and downpipes. This was not included in the quotation from TS. Further, the available material shows the toilet was removed. Determination | Case number: 549326 Page 9 of 13 CB provided a quote in March 2018 indicating the cost to demolish the toilet block was $5,995 plus GST. The cost to lay new storm water drains through the front of the unit to the outfall on the road was quoted at $3,172.50 plus GST. The available material indicates this work has been done but has not been paid for. RB also refers to additional consulting fees. The complainant has not referred to or claimed for any further additional consulting fees. If the complainant accepts this determination, then within seven days of acceptance, the complainant is to provide to the insurer (or cause to be provided to the insurer) evidence of the cost to remove the toilet and lay new storm water drains. Upon being satisfied of these costs, the insurer is to make a further payment in relation to these items. Statutory interest is also to be paid on these amounts from 15 May 2017 or from the date these items were paid for, whichever is the later date. Available material does not establish entitlement to lost rent On behalf of the complainant, CB made several further claims including lost rent for two years at $350 per week. The insurer says this claim cannot be established because the complainant has not provided any evidence of loss of rental income. Additionally, the insurer relies on the opinion of RB who says the unit is habitable. The policy provides certain special benefits which include loss of rent. The insurer will pay lost rent when an insured has leased out or can substantiate by means of a signed agreement that he/she would have leased out unit 6. The insurer will pay the actual rent the complainant would have lost if the unit is made unfit to be occupied for its intended purpose by damage which is admitted as a claim. The insurer will pay from the time of the event until the unit is relet following completion of repairs. The available evidence establishes the complainant intended to sell the unit rather than rent it but was unable to sell it because of the identified damage. Having reviewed the expert opinions, the panel considers the unit is damaged but is likely habitable. Moreover, the complainant has not substantiated by means of a signed agreement that she rented the unit or would have rented the unit. Further, the panel considers an allowance of interest from May 2017 which was the approximate time the property was intended to be sold compensates the complainant for her inability to sell due to damage. The panel considers this puts the complainant back in a position she would have been in had the unit been repaired and marketed for sale immediately after the loss. Determination | Case number: 549326 Page 10 of 13 2.3 Is the complainant entitled to compensation? AFCA has a conservative approach to compensation Non-financial loss includes claims for stress or inconvenience caused by an error of the insurer. The maximum amount we can award for non-financial loss is $3,000 for each claim of loss. We will only award this type of compensation if there has been an unusual degree or extent of inconvenience. We will not award compensation for loss that a complainant may incur because of pursuing a complaint or rectifying an insurer’s error. When assessing whether the circumstances are of an unusual nature we will review:  the degree or extent of physical inconvenience suffered  the general time taken to resolve the complaint  the extent to which the insurer’s actions interfered with the complainant’s expectation of enjoyment or peace of mind. Insurer is to pay $1,500 compensation to the complainant The complainant lodged the claim with the insurer on 16 November 2016. The insurer initially declined the claim, but later decided to accept it after the complaint came to AFCA. The insurer then reversed this decision and chose to withdraw indemnity again prior to AFCA issuing its final determination. The panel is not persuaded by the insurer’s reasons for withdrawing indemnity, as outlined in section 2.1. Further, the panel considers that by the time the insurer withdrew indemnity, it had access to information that was supportive of the claim in the form of several reports, particularly those from RB. The panel considers that it would have been distressing to the complainant for the insurer to withdraw indemnity at such a late stage in the process, especially after it finally accepted liability over two years after the claim was originally lodged. For this reason, the panel considers it appropriate that the insurer pays the complainant compensation in the amount of $1,500. Determination | Case number: 549326 Page 11 of 13 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged w ith F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 Our approach to this complaint The determination is made by a panel consisting of the ombudsman together with a consumer representative who has extensive experience in consumer claims and an industry representative who has had extensive experience in the insurance industry. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All the material provided by the parties has been reviewed and considered for the purposes of this determination. This complaint has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to pro ve on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. Determination | Case number: 549326 Page 12 of 13 3.3 Policy wording The relevant extracts are referred to in the notice of response. The notice and policy document has been exchanged with the complainant. What we insurer We insurer You up to the Sum Insured shown for Policy 1 on the Schedule, against ACCIDENTAL LOSS or DAMAGE to Your Insured Property whic h occurs during the Period of Ins urance. Exclusions – what we do not insure 1 We will not pay for loss or damage: … c caused by lack of maintenance, rust, oxidation, corrosion, Wear, Tear, fading, gradual corrosion or gradual deterioration, concrete of brick cancer, developing flows, wet or dry rot, or failure to maintain Your Insured Property in a reasonably good stat of repair. i caused by the invasion of tree or plant roots nor for the cost of clearing pipes or drains blocked by any such invasion m due to normal settling, creeping, heaving, seepage, shrinkage, or expansion in buildings, foundations / footings, walls, bridges, roadways, kerbing, driveways, paths, garden borders and other structural improvements. 2 We will not pay for: b the cost of rectifying faulty or defective materials or faulty or defective workmans hip; … h caused by underground (hydrostatic) water. However, we will pay if the loss or damage is due to bursting, leaking, or overflowing of water tanks, pipes or drains. i caused by the invasion of tree or plant roots nor for the cost of clearing pipes or drains blocked by any such invasion. Special benefits Special Benefits are included in addition to Your Sum Insured for Policy 1 … We will pay: … Rent When You have leas ed out or can substantiat e by means of a signed agreement that You would have leas ed out Your Lot/Unit or Common Area We will pay the actual Rent You lose or would have lost if Your Lot/Unit or Common Area is made unfit to be occupied for its intended purpos e by: loss or damage that is admitted as a claim under Policy 1; or reasonable access to or occupancy of Your Lot/Unit or Common Area being prevented by damage from an Event claimable under Policy 1 happening to other property in the im mediat e vicinity. We will pay: under b i from the time of the Event until the time Your Lot/Unit or Common Area is relet following completing of rebuilding, repairs or replacement provided You demonstrate You have taken all reasonable action to obtain a new tenant; and under b ii from the time of the Event until the time when access to Your Lot/Unit or Common Area is re-established. Determination | Case number: 549326 Page 13 of 13 3.4 Case law and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common-sense approach is taken to determine proximate cause. 3.5 Other relevant material considered and relied on  Parties’ submissions, emails, invoices, reports, photographs and all attachments to all submissions.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.