Insurer refused further liability for defective driveway repairs and failed paint, claiming settlement was full and final
Text of the determination
Determination | Case number: 549128 Page 1 of 14
Determination
Case number: 549128 17 July 2019
1 Determination overview
1.1 Complaint
The complainant holds insurance with the financial firm (insurer) for cover of his home
and contents. In June 2018, damage occurred to the complainant’s driveway when a
courier dropped a refrigerator on it. The courier was delivering the refrigerator for an
electrical company, who was engaged by the insurer pursuant to an i nsurance claim.
The complainant reported the incident to the three companies involved and repairs to
the driveway were enacted. The repair works were defective and caused further
damage to the complainant’s home which the insurer agreed to settle. Subseque nt
rectification works were then completed, but those works also failed.
The complainant now seeks further repairs from the insurer to reinstate the driveway
to its pre-loss condition, however, the insurer says it is not liable for any further costs.
1.2 Issues and key findings
Is the insurer required to rectify the driveway?
Yes. This is because the panel is satisfied on the balance of probabilities:
the complainant established a valid claim under the policy
the insurer failed to rectify damage it was liable for
the insurer failed to adequately assist the complainant
the insurer did not establish settlement terms which it can now rely on
the insurer’s conduct gav e rise to further damage occurring to the driveway.
Is the complainant entitled to compensation?
Yes. This is because the panel is satisfied on balance the insurer mishandled the
claim which caused the complainant an unusual amount of stress and inconvenience.
Determination | Case number: 549128 Page 2 of 14
1.3 Determination
This determination is in favour of the complainant.
The insurer is required to rectify the damage as per the quotation obtained by C. The
insurer is also required to assess the damage to the garage wall and refrigerator and
repair it, if required.
Further to this, the insurer is required to pay the complainant $2,000 in compensation
for stress and inconvenience.
Determination | Case number: 549128 Page 3 of 14
2 Reasons for determination
2.1 Is the insurer required to rectify the driveway?
Complainant established a valid claim
The complainant has the onus to establish, on the balance of probabilities, he has
suffered a loss or damage which is covered by the policy. This is known as a valid
claim.
The policy, subject to conditions and exclusions, covers accidental damage to the
complainant’s home.
It is not in dispute damage occurred to the complainant’s home when a courier
accidentally dropped a refrigerator on the driveway during delivery.
In these circumstances the panel is satisfied the complainant has established a valid
claim under the policy for accidental impact damage to the driveway.
Insurer failed to repair damage it was liable for
In June 2018, a courier (A) caused scratching to the complainant’s driveway when he
accidentally dropped a refrigerator on it. A was delivering the refrigerator for an
electrical company (J), who was authorised by the insurer to replace the item as part
of an insurance claim.
On 2 July 2018, the complainant called the insurer to report the damage to the
driveway. The insurer made further enquiries with J, before calling the complainant
back to advise it was not liable for the damage.
The insurer’s call recordings and claim file notes from 2 July 2018, show:
the complainant was clear and concise in reporting the circumstances of the loss
the complainant was seeking assistance with arranging repairs
the insurer was aware the complainant had already been in contact with A and J to
arrange the repairs, but was having difficulty dealing with both companies
the insurer was aware the complainant and A were in dispute over the repair scope
the complainant advised the insurer it was his opinion the insurer was ultimately
responsible for rectifying the damage to the driveway
the insurer told the complainant it was not responsible for the damage and directed
the complainant back to A to pursue repairs.
It appears from the exchanged information, the complainant continued to liaise
directly with A for a short period, until J took over handling of the matter.
Determination | Case number: 549128 Page 4 of 14
Initial repairs were defective
In August 2018, repairs to the driveway were enacted . The works were defective,
however and caused further damage to the complainant’s home.
While the parties are in dispute over who authorised these repairs, it appears the
parties agree on the resulting defects, which include:
an uneven and excessively thick application of paint to the driveway
application of paint to areas around the driveway which did not require painting
(pavers)
overspray of paint to other parts of the building, including walls and garage door.
Insurer agreed to settle the defective repairs
The exchanged information confirms the complainant notified the insurer of the
defective works sometime in September 2018.
In October 2018, the insurer agreed to settle the complainant for rectification of the
defects and asked the complainant to submit quotations for reinstatement. The
complainant responded to the insurer’s request with several concerns:
the complainant queried if this was the best way to proceed, given the previous
issues that had occurred
the complainant notified the insurer the first three contractors who attended were
unwilling to quote the job due to the existing defects
the complainant advised a fourth contractor had agreed to quote, but was
concerned about enacting repairs due to the nature and extent of the defects
the complainant noted it was his opinion a specialist was required to do the works
the complainant said he was concerned his quotes were excessive in cost
the complainant suggested the insurer arrange the repairs, given the complexity
and urgency of the job.
It appears from the exchanged material the insurer did not address the complainant’s
concerns and so the complainant proceeded with obtaining his own quotes, despite
the concerns raised.
Insurer determined settlement for the defective repairs
Following receipt of the complainant’s quotes the insurer arranged for its assessor
(IA) to inspect the driveway. The assessing notes indicate this was done because the
complainant’s quotes did not include measurements and therefore IA could not
determine if the quoted costs were fair and reasonable.
The available information shows IA:
attended the property to measure the driveway
recommended a panel builder attend to complete a scope of works
Determination | Case number: 549128 Page 5 of 14
used an online repair estimating tool to assess the complainant’s quotes
determined the quoted costs were less expensive than the industry rate
recommended the insurer settle the complainant in line with his quotations.
It is noted IA did not include in its report:
any photographs of the damage
specific information about the initial damage to the driveway (caused by A)
specific information about the resulting repair defects
a repair scope of works
any comments about repair methodology or the scope of works proposed by the
quoting contractor.
In October 2018, the insurer issued two settlement payments to the complainant for a
total amount of $22,978.38.
It appears the insurer determined settlement based on IA’s recommendation the
complainant’s quotes were fair and reasonable, however, it is noted the insurer did
not proceed with engaging a panel builder to complete a scope of works, as
recommended by IA.
Rectification repairs were also defective
In October 2018 the complainant authorised his contractor to complete the
rectification works. These works also failed, however, with the paint blistering and
peeling shortly after application.
The complainant says there was always a possibility this would occur and the insurer
knew the repairer could not guarantee the paint would successfully adhere to the
driveway, given its defective surface. The complainant says this matter was discussed
with both the insurer and IA and the insurer agreed to cover further costs should the
rectification attempt fail.
The insurer strongly disputes this and argues settlement terms were full and final. The
insurer also says the rectification works failed because of poor workmanship by the
complainant’s contractor and any dispute about the quality of the works is entirely a
matter for the complainant and the contractor. The insurer therefore denied any
further liability or involvement in the claim.
The following week the complainant lodged a complaint with AFCA.
As the parties could not agree on the cause of paint failure to the driveway, the
insurer arranged for a technical expert (C) to inspect the damage and determine the
cause of loss.
A detailed review of C’s findings shows:
Determination | Case number: 549128 Page 6 of 14
both coating applications to the driveway were grossly defective and hazardous
the first coating was non-compliant and was applied excessively thick and in a
poorly controlled manner to a surface which was deficiently prepared
the first coating resulted in overspray damage to surrounding areas of the building
the second coating was defectively applied over the first defective coating
the second contractor failed to adequately test adhesion of the previous layer, prior
to overcoating it
the sealer used by the second contractor was unsuitable to apply over the first coat
(which was blistered, excessively thick, and poorly adhered to the substrate)
severe and widespread blistering has now occurred to the entire driveway surface,
especially near joints and paver edgings
the current driveway surface poses a slip hazard and cannot be left as is
the surface cannot be recoated as it is prone to failure due to the underlying issues
the driveway must be grit blasted to provide a new and uniform surface to coat
solutions for new coating are to then be evaluated by specialist manufacturers.
While the evidence supports the insurer’s assertion of poor workmanship, it also
suggests the repair methodology quoted by the complainant’s c ontractor was
incorrect and would never have been successful, given the underlying defects. Given
the insurer’s assessor authorised the scope of works quoted by the complainant’s
contractor, the panel does not accept the insurer’s argument the complainant is
responsible for the defective works.
Further, C reports a manufacturing specialist will need to determine the correct
product and methodology required to coat the driveway. Given the complainant
suggested a specialist be appointed but the insurer disregarded this, the panel does
not accept the insurer’s argument the complainant is responsible for the defective
works.
Parties dispute the terms of settlement
In addition to poor workmanship, the insurer argues it is not liable to settle any further
costs as settlement was made as a goodwill gesture and was full and final.
With respect to that, the insurer says the established terms of settlement were:
the insurer is not liable for the damage caused by the courier
the insurer is not liable for the subsequent defective repairs
payment is offered as a goodwill gesture only
payment is entirely outside of the insurer’s obligations under the policy
payment is made in full and final satisfaction of the claim and all damage.
However, the complainant strongly refutes these terms and says:
the insurer accepted it was liable for the damage
Determination | Case number: 549128 Page 7 of 14
the insurer did not stipulate settlement was full and final
the insurer acknowledged there was a possibility the rectification repairs would fail
and agreed to settle further costs if additional works were required.
At the outset, it is necessary to say that the panel rejects completely the insurer’s
submission, that it is not liable for the damage caused by the courier.
The policy provides coverage in the event of accidental damage.
The fridge being dropped on the driveway was clearly accidental.
The insurer is responsible for the damage.
Evidence does not show settlement terms were established
On review of the exchanged information, the panel does not accept settlement terms
were established as outlined by the insurer. This is because:
the insurer cannot produce the two call recordings in which the terms of settlement
were discussed with the complainant
the insurer did not provide the complainant with a written copy of the terms
the insurer did not acquire a deed of release or liability waiver
the claim notes provided by the insurer are contradictory and do not suggest
settlement was full and final
the complainant provided the insurer with updates during the rectification works
(specifically commenting on how long it would take to ascertain the success of the
repairs), and the insurer did not respond to this affirming no further payments
would be issued, regardless of the outcome.
Given this, the panel is satisfied the insurer cannot rely on the settlement terms it
outlines and deny further payments to the complainant on that basis.
Insurer’s conduct gave rise to further damage
The panel has carefully considered all the material provided by the parties.
While the panel accepts poor workmanship is a factor to the current condition of the
driveway, the panel is satisfied the insurer’s conduct ultimately gave rise to this
occurring.
Once the complainant established a valid claim for accidental damage to the driveway
under the terms of the policy, the obligation shifted to the insurer to adequately
indemnify the complainant.
The panel considers it was the insurer’s responsibility to proactively manage the claim
and:
assess the damage
Determination | Case number: 549128 Page 8 of 14
determine the appropriate method of repair
draft a scope of works
obtain quotations for repair
enact repairs (or reasonably cash settle the complainant for the appropriate
repairs).
However, the exchanged information shows the insurer failed in its obligation to do
this on two separate occasions during the life of the claim.
The panel also accepts the complainant raised legitimate concerns about obtaining
quotations and engaging an expert and this warranted further action and investigation
by the insurer. It is also evident the insurer failed to act on the recommendation of its
assessor to engage a panel builder to draft a scope of works.
Further to this, the exchanged material shows the complainant and insurer have an
extensive history and during their dealings the complainant identified himself as a
vulnerable consumer.
While the panel accepts the policy provides the insurer with the discretion to either
repair or cash settle the damage, the panel is not satisfied the insurer exercised this
discretion fairly, given all the circumstances.
The panel is satisfied the insurer’s conduct consistently fell short of good industry
practice, and the insurer put the complainant in a position he should not have been in.
The panel is also satisfied this conduct by the insurer ultimately gave rise to the
circumstances in which further damage occurred to the driveway. This is because the
insurer:
failed to accept a valid claim
failed to adequately assess the damage
failed to provide a scope of works
failed to obtain repair quotations
failed to engage the appropriate experts
failed to respond to the complainant’s concerns and requests for assistance
failed to ensure the quotes used to establish the cash settlement were accurate
and actionable
failed to provide the complainant with a contingency for hidden damage/costs
failed to establish clear terms of settlement
transferred all responsibility and risk to the complainant.
Determination | Case number: 549128 Page 9 of 14
Insurer is required to reinstate the driveway
Having carefully reviewed the exchanged evidence, the panel is not satisfied the
insurer has established an entitlement to limit its liability for the damage to the
driveway.
On that basis, the insurer is required to reinstate the driveway and surrounding areas
as per the quotation obtained by expert C.
Given the circumstances, the panel does not accept it is fair or appropriate for the
insurer to cash settle the complainant for the damage, unless the complainant agrees
to this.
The insurer is also required to assess the damage to the garage wall and refrigerator
and repair it if required.
2.2 Is the complainant entitled to compensation?
We may award compensation for financial and non-financial loss
The FOS Terms of Reference outlines we can award compensation for non-financial
loss of up to $3,000, where there has been an unusual amount of inconvenience, time
taken to resolve a situation, or interference with a complainant’s expectation of
enjoyment or peace of mind.
AFCA adopts a conservative approach to the award of compensation for non-financial
loss and we expect a complainant to be moderately robust and tolerate a normal
degree of inconvenience when making a claim.
Complainant is entitled to compensation of $2,000
In view o f the insurer’s conduct, the panel accepts the complainant was put in a
difficult and stressful position in which he was required to manage all risk and
responsibility for the claim.
The panel also accepts this occurred over an extended period and caused the
complainant an unusual level of disruption and inconvenience.
On this basis the panel considers it fair the complainant be compensated $2,000
under paragraph 9.4 of the terms of reference.
Determination | Case number: 549128 Page 10 of 14
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Relevant policy provisions
PDS page Relevant Section
41 Options to increase the events we cover
We cover your home and contents when any of the 17 listed events shown in Table
3.1 on page 19 takes place (unless you have chosen to remove Flood, Rainwat er
run - off or Storm Surge - see pages 20 & 21). You can increase the events we cover
by adding option s to your policy to cover you for:
> Accidental damage
> Burn out of electric motors – fusion.
Accidental damage
You can choose to cover your home and contents for accidental damage — that is,
mishaps around your home that are caused unintentionally.
Cover ed under Buildings Insurance
> damage to your home that is caused unintentionally – for example, you’re in
> the roof spac e and accidentally put your foot through the ceiling.
Covered under Contents Insurance
> damage to your General Contents or Specified Items that is caused
unintentionally and happens in your home or at your site – for example, your
child knocks over your TV.
Not covered
> damage caus ed by:
‒ inherent defects and structural defects
‒ mildew and algae
‒ any animals kept at your site
Determination | Case number: 549128 Page 11 of 14
PDS page Relevant Section
‒ water enterin g your home through an opening made for the purpose of
a lterations, additions, renovations or repairs
‒ any proc ess of cleaning involving the use of chemicals
> damage that is covered under a listed event shown in Table 3.1 – see page 19
> damage to:
‒ retaining walls
‒ electronic equipment or data as a result of an electronic malfunction or
failure, a mechanical malfunction or failure, or a virus or processing error
‒ fishing and sporting equipment, musical instruments or firearms while
someone is using them
> loss or damage caus ed by storm surge
‒ see page 74 for the storm surge definition.
53 How we settle your buildings claim
We will choose to settle your claim for loss or damage to your home or 'other cover'
in one of the following ways:
1. Arrange for repairers, b uilders or suppliers to repair or rebuild your home.
If you agree, we can arrange for our preferred repairers, suppliers or builders to
repair or rebuild your home.
2. Pay you the reasonable cost to repair or rebuild your home.
We can choose to:
> pay you
> pay your nominated repairer, supplier or builder, or
> provide you with store credits from one of our nominat ed suppliers.
For example, we may pay you directly when:
> you decide not to repair or rebuild your home, or
> you don’t start repairing or rebuilding your home within 6 months from when the
damage takes place, or within any longer period we agreed to in writing.
3.3 Review of expert evidence
Record Key Points
Repairer #1
Quotation
29 - 07 - 2018
Quote #116 in the amount of $2,300.
Quote is for slate grey paint application.
No proposed paint product details provided.
Quote is for painting of driveway and border (paver edge).
Colour chart attached which includes a colour ―slate grey ‖.
Product sheet also attached, titled ―Sealers and Maintenance‖.
Repairer # 2
Quotation
25 - 09 - 2019
Quote provided in the amount of $4,675.
Job Description: driveway repair and reseal + high - pressure acid
wash (preparation) + 2 x coat Episol curite.
Conc rete type: sealed existing bonding agent.
Other: Non - Slip.
Colour chart attached – colour: Gunmetal Grey.
Determination | Case number: 549128 Page 12 of 14
Record Key Points
Asse ssor (I A )
File Note
05 - 10 - 2018
I’ve reviewed the file (documents, notes and photos).
There is no doubt the damages have occurred, and the repair work
has been done in an unprofessional manner that needs to be
rectifie d.
The insured’s quotes do not include measurements (of the driveway,
garage door or gates), therefore it is recommended a panel builder
attend to complete a scope of works.
Asse ssor (I A )
Assessment Report
08 - 10 - 2018
Attended site and meas ured driveway.
Insured has submitted a new quote for the driveway.
Cordell estimate exceeds $17,500 but insured’s quote totals
$15,976.40.
Recommend cash settlement to the insured for $15,976. 40.
Note : Cordell is an industry guide/standard repair estimating system
Asse s sor (I A )
Assessment Report
08 - 10 - 2018
Repair Estimate for Fence and Gat e
Replace fence (t reat ed pine)
Replace panel gate
Labour
Total estimate = $3,474.54
Building Consultant (C)
Inspection Report
09 - 05 - 2019
Both quot es addressed to the complainant (not insurer or builder).
Works to driveway vary from two quotes provided.
Surface preparation was not done adequat ely (initial repairs), based
on delamination of the sealer from the surface.
A non - slip surface was not provided (rectifi cation repairs).
Surface preparation efforts for both contracts was deficient.
Second cont ractor provided a text to say the second seal application
failed as the sealer was affected by the previous defective sealer
application (applied by the first contrac tor) and it has fulfilled its
obligations and RACV should fund a new driveway as it was RACV’s
contractor who applied the first sealer application.
Observations
Original coat (2009) is a thin build grey concrete sealer applied to
concrete slabs only, and not the adjacent paving and mortar.
First repair application (approx. August 2018) was Avista Slate Grey
concrete sealer (based on hearsay only). The coating was applied
with a pressure spray unit. Surface preparation and other coating
details are unknown. The Avista sealer was applied to the concrete
slabs and adjacent mortared paving bricks.
Second coat (approx. October 2018) was Auseal Curite Gun Metal
Grey concrete sealer a pplied with a roller to the concrete slabs and
the mortared paving bricks. The previously coated surfac e was
reportedly prepared using an acid wash.
Causation and Damage Asse ssment
Initial damage
L ocalised scratch damage to driveway surface.
Determination | Case number: 549128 Page 13 of 14
Record Key Points
L ocalised rec oating required to the scratched slab panel only .
Initial repairs
E xcessive and unnecessary application of sealer to entire driveway
and surrounding areas in response to localised scratching .
D eficient surface preparation causing loss of adhesion near join ts .
U neven appearance of surface sealer .
U neven thickness of sealer application .
O verly thick application resulting in tendency to blister, soften, crack .
O verspray on adjacent walls and garage door surfaces (due to
insufficient masking of surfaces and def icient spray control and
equipment clean up) .
F illed concrete slab joints .
S lippery surfacing (due to trowelled surfaces being covered and lack
of suitable non - slip grip application).
Rectification repairs
S econd recoat of seale r applied over the first recoat.
F ailure to adequately test adhesion of previous layer prior to
overcoating, to ensur e integrity of applied product.
S evere and widespread blistering to entire surface, most prevalent
near joints and decorative paver edging (which is known to occur
because of deficient surface preparation, surface moisture, rapid
drying, excessively thick sealer applications , and presenc e of
contaminants).
N on - slip grit surface not provided .
S ealer was unsuitable for application over the original rec oat which
was bli stered, excessively thick and prone to softness and cracking,
and poorly adhered to the substrat e.
Conclusion
B oth applications to driveway are grossly defective and hazardous .
T he first coating has resulted in overspray dam age to the
surrounding building.
T he first coating was non - compliant and was applied excessively
thick and in a poorly controlled manner to a surfac e that was
deficiently prepared and had p re - existing repair deficiencies.
S econd coating defectively applied over the first defective coat .
S ealer must be removed (s urface to be grit blasted to provide a
coarse surface which will require a thick build coating for cover to
provide a uniform surfac e) .
S ealer cannot be left as is, on the basis it poses a slip hazard .
S urface cannot be recoated as it would be prone to failure due to
underlying issues .
S olutions for new coating to be further evaluated by specialist
manufacturers.
Building Consultant (C)
Inspection Report
Same as Report #1 (9 May 2019), except for the following revisions:
> Revision 1 : A minor change has been made in item e) on page 9
on the Insured’s clarification and photo evidenc e:
e) ―The works vary from the quotes. Surface grinding was not done
Determination | Case number: 549128 Page 14 of 14
Record Key Points
05 - 06 - 2019 as included in the first quote. A non - slip surface was not provide d
in the case of the second quote. Aside from this, the surface
preparation efforts for both cont ractors was deficient.‖
e) ―The works vary from the quotes. Surface preparation was not
done adequately in the case of the first quote based on the
delaminatio n of the sealer from the surface . A non - slip surface
was not provided in the case of the second quote. Aside from this,
the surface preparation efforts for both contractors was deficient.
> Revision 2 : Addition of Auseal Curit e Quot e based on a provisional
q uantity of 110m2 and Auseal comments (Auseal is the
manufacturer and supplier of the second coating sealer repair
system applied by Evolution Concrete).
Repairer (A)
Quotation
30 - 05 - 2019
Quote to reinstate all current damage/defects = $11,990 incl. GST.
Job Description: Removal of existing coating to driveway, pathways
and front entry by diamond grinding of surface and reinstatement of
spray - on coating.
Works cannot be guaranteed due to pre - existing cracks due to earth
movement.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.