Refusal to cover keel replacement for corrosion; adequacy of cash settlement and claim delay
Text of the determination
Determination | Case number: 547967 Page 1 of 11
Determination
Case number: 547967 14 February 2019
1 Determination overview
1.1 Complaint
The complainant lodged a claim under her pleasure craft insurance policy with the
financial firm (insurer) after her boat was damaged in an accident in January 2017.
The insurer accepted liability for some of the damage to the boat and offered to cash
settle the complainant for $25,685 for the necessary repairs. However, the insurer
denied liability for corrosion damage to the keel, on the basis that this damage was
not caused by the incident i n January 2017.
The complainant disputes the insurer’ s decision and seeks cover for the cost of a
replacement keel, together with an increase in the settlement amount for the topside
repairs.
The complainant is also dissatisfied with the manner in which the insurer handled the
claim. She says the insurer should be required to reimburse her for hardstand fees
and other expenses incurred during the claim process.
1.2 Issues and key findings
Is the insurer liable for the cost of replacing the keel?
The available information establishes that the corrosion damage which necessitates
the replacement of the keel pre-existed the incident in January 2017 and was caused
by excluded factors. Accordingly, the insurer is not liable for the cost of replacing the
keel .
Is the insurer otherwise required to increase the settlement offer?
The insurer is required to increase the settlement offer to better reflect the cost to the
complainant of carrying out the claim-related repairs.
Determination | Case number: 547967 Page 2 of 11
1.3 Determination
The determination is partly in favour of the complainant.
The insurer is required to increase the cash settlement amount by $5,310.
To the extent the cash settlement has not been paid, the insurer is to pay interest on
the unpaid amount at the interest rate calculated in accordance with section 57 of the
Insurance Contracts Act 1984, from 30 May 2018 until the payment date.
Determination | Case number: 547967 Page 3 of 11
2 Reasons for determination
2.1 Is the insurer liable for the costs of replacing the keel?
Policy provides cover for physical damage subject to exclusions
The complainant is required to show that, on the balance of probabilities, she has
suffered a loss caused by a risk insured against under the policy. This is known as a
valid (or prima facie ) claim.
If the complainant is able to establish a prima facie claim, then the onus shifts to the
insurer to show that, on the balance of probabilities, it is entitled to rely on an
exclusion under the policy to deny the claim.
The complainant’s policy provides cover for physical damage to her boat, subject to
the conditions and exclusions set out in the policy.
However, the policy excludes cover for damage caused by corrosion, oxidation,
gradual deterioration or inherent vice.
The policy also excludes cover for the costs of remedying a fault in design or
construction or rectifying defective workmanship relating to any repair, alteration or
maintenance work.
Insurer has accepted liability for some of the damage to the boat
The insurer accepts that the complainant’s boat was damaged during a storm in early
January 2017, while anchored at a private marina.
During the incident, the boat impacted another vessel (causing damage to its
starboard topside) and grounded on a nearby rock shelf (causing damage to the toe
of the keel).
The complainant lodged a claim shortly after the incident occurred. On receipt of the
claim, the insurer requested additional information, including quotations for the repair
of the damage.
The complainant did not contact the insurer again until April 2018, when she provided
quotations from her repairers totalling approximately $60,000 for the repair of the
damage.
The quotations provided by the complainant’s repairers included $32,850 for a
replacement keel. The existing keel is unable to be repaired because it has suffered
extensive corrosion damage.
Based on reports provided by its consultants, the insurer accepted liability for the
damage to the topside and the impact damage to the keel.
Determination | Case number: 547967 Page 4 of 11
However, the insurer says it is not liable for the additional costs required to replace
(rather than repair) the keel because the corrosion was not caused by the incident in
January 2017. The insurer says the corrosion was long-term and pre-existed the
grounding damage.
The complainant disputes the insurer’s decision. She says the corrosion to the keel
occurred due to saltwater entering through the crack caused by the grounding, both
during the incident and while the boat was awaiting repairs.
Insurer is required to show corrosion is excluded from cover
The insurer has accepted that the toe of the keel was damaged during the incident in
January 2017. Its contractors have also confirmed that water entering through a
damaged section of the keel can give rise to internal corrosion.
On this basis, I am satisfied the complainant has established a valid (or prima facie )
claim under the policy.
Accordingly, the insurer is required to show that, on the balance of probabilities, the
corrosion pre-existed the grounding and/or was caused by excluded factors.
Insurer relies on reports provided by its consultants
The insurer has provided reports from its marine surveyor (IM) and corrosion
specialist (LC), who both concluded that the corrosion to the keel was long-term and
pre-existed the grounding in January 2017.
Following his inspection of the keel, IM confirmed there was significant evidence of
corrosion in the area around the split in the welded joint caused by the grounding.
However, IM also observed evidence of long-term corrosion including:
deep pitting on the vertical section of the port side of the keel
numerous spot welds to both sides of the keel, evidencing past repairs
corrosion damage and evidence of past repairs to the longitudinal floors adjacent
to the keel, and
significant pitting to the alloy plates in the forward quarters below the waterline/
Based on the nature and extent of the corrosion damage to the keel, IM concluded
that this damage pre-existed the incident in January 2017.
A fter the complainants disputed IM’s findings, the insurer appointed a corrosion
specialist (LC) to provide a further report.
In his report, LC concluded that the boat had a long history of corrosion damage,
given the numerous signs of internal and external corrosion and evidence of multiple
past repairs.
Determination | Case number: 547967 Page 5 of 11
In particular, LC advised that the corrosion to the keel appeared to have originated
internally, rather than having been caused by an external event. He considered the
grounding of the boat had merely exposed the pre -existing corrosion damage.
LC identified a number of factors which he considered wo uld have made the boat
susceptible to corrosion damage, including:
the zinc anodes had insufficient mass, given the volume of the boat below the
water line
the physical placement of the anodes was inadequate to provide effective cathodic
protection to the hull and the keel, and
the manner in which the anodes had been installed provided a poor connection to
the hull which was likely to result in high resistance.
The insurer also notes that the insurance risk evaluation report obtained by the
complainant in August 2016 (prior to the purchase of the boat) identified welded
patches on the keel and pitting in the hull plating, which is indicative of corrosion
damage.
Available information establishes corrosion was caused by long-term factors
The complainant disputes the findings in IM and LC’s report. She says the insurer has
failed to show that the corrosion damage to the keel was not caused by water
entering through the crack caused by the grounding incident.
The complainant says the damage was exacerbated by the extended period of time
the boat remained in the water, due to the difficulties encountered in arranging for it to
be lifted.
The complainant has provided extensive information (including extracts from research
journals and industry publications) which establish that corrosion damage can occur
in these circumstances.
However, the complainant has not provided any independent information which
establishes that, as a question of fact, the corrosion damage to the keel of her boat
occurred in this manner.
In particular, the complainant has not provided any reports from her repairers (or
other appropriately qualified consultants) which refute the findings in IM and LC’s
reports.
Having carefully reviewed the available information, I am satisfied that the keel
already had long-term, pre-existing corrosion damage at the time of the incident in
January 2017.
The reports provided by IM and LC provide a logical and rational basis for their
findings that the boat suffered long-term corrosion damage. The evidence of pre-
Determination | Case number: 547967 Page 6 of 11
existing damage and past repairs is clearly apparent from the close-up, colour
photographs included in IM’s report.
Further, LC has provided a detailed explanation as to why the corrosion damage
observed is not consistent with having been caused by the grounding. LC advised
that:
if the keel had been flooded due to major damage from the grounding, then the
anodes would have completely dissipated (rather than remaining intact with only
‘normal’ wear)
alternatively, if the cracking damage had been relatively minor, then the corrosion
would have been localised to the toe area.
While the grounding incident may have exacerbated the corrosion, I am satisfied that
the extent of the pre-existing damage was sufficient to prevent a repairer from being
able to warrant the repairs to the keel.
Insurer is not liable for costs of replacing keel
For the reasons outlined above, I am satisfied that the corrosion damage which
necessitated the replacement of the keel was not caused by the incident in January
2017. Accordingly, the insurer is not liable for the costs of replacing the keel.
The complainant says the insurer should not be entitled to deny liability for the
corrosion damage because she relied on the insurance risk evaluation report when
she purchased the boat.
The risk evaluation report was prepared by a third party shipwright and provided a
general overview of the condition of the boat.
After reviewing the report, the insurer agreed to provide cover for the boat, subject to
the terms and condition of the policy (including the exclusion for corrosion damage).
The fact that the report identified past repairs to the keel does not prevent the insurer
from relying on the relevant policy exclusion.
Cash settlement for keel repairs should be increased
The cash settlement of $25,685 offered by the insurer included an amount of $6,800
for the repair of impact damage to the keel.
This figure reflected an estimate obtained by the insurer from its repairer (AE), on the
basis that the keel could be effectively repaired (that is, assuming there was no
corrosion damage).
The complainant says the amount allowed for the keel repairs is insufficient. She says
it is nonsensical to assume there is no corrosion damage, when such damage clearly
exists.
Determination | Case number: 547967 Page 7 of 11
As outlined above, the keel has suffered impact damage for which the insurer is liable
under the policy. However, the keel cannot be repaired due to the extent of the
corrosion damage, for which the insurer is not liable.
In these circumstances, it is appropriate for the insurer to cash settle the claim for the
estimated cost of repairing the impact damage only. The complainant can then put
this amount towards the costs of the keel replacement.
The complainant also says the estimate is insufficient, as AE does not have the
facilities to undertake the necessary repairs and would have to travel a significant
distance to complete the repairs onsite. The complainant says the settlement amount
should be increased by at least $10,000.
However, it is reasonable for the insurer to cash settle the complainant for the
theoretical cost of the repairs, assuming they were carried out by a repairer local to
the area where the boat is located.
The insurer says the complainant’s repairer (HW) declined to provide a quotation for
the theoretical cost of repairing the impact damage only. In these circumstances, I
consider it was reasonable for the insurer to obtain an alternative quotation to
determine the cash settlement.
I accept that the quotation provided by AE was not actionable and therefore may not
reflect the full cost to the complainant of the relevant repairs. However, in the absence
of an alternative quotation provided by the complainant, I am not satisfied that
settlement amount should be increased by the amount she contends.
I consider it is fair in the circumstances that the settlement amount for the impact
damage to the hull should be increased by 25% ($1,700).
The complainant also seeks reimbursement for the following additional amounts
incurred in relation to the repairs (as outlined in the complainant’s email to the insurer
dated 9 April 2018):
$420 for cleaning and paint stripping to examine the keel
$210 for obtaining measurements to provide to the repairer for estimate purposes
$720 for temporary repairs and assistance to move the boat to HW, who is able to
undertake the keel works.
I am satisfied that the policy provides cover for the above amounts, which appear to
be reasonable. On this basis, the cash settlement should be increased by an
additional amount of $1,350.
Determination | Case number: 547967 Page 8 of 11
2.2 Is the insurer otherwise required to increase the settlement offer?
Insurer is not required to increase settlement amount for topside repairs
The cash settlement offered by the insurer includes the amount of $15,565 for the
repair of the impact damage to the topside of the boat, based on a quotation provided
by the complainant’s repairer (YM).
The complainant initially obtained a quotation from YM for $22,440 for these repairs.
However, this quotation provides for the repair and respray of both sides of the boat.
The insurer rejected this quotation on the basis that only the starboard side was
damaged during the incident in January 2017.
The policy does not require the insurer to repair undamaged parts of the boat,
including for matching purposes. Accordingly, the insurer is not liable for the
additional amount of HW’s original quotation.
The complainant says the method proposed by the insurer for the repair of the dents
to the starboard side is inadequate. She says the dented panels need to be replaced.
The complainant has referred to general information about acceptable repair
methods. However, she has not provided a report from a repairer who has inspected
her boat which indicates that the proposed repair method is inadequate.
Further, the original quotation provided by YM (which the complainant submitted as
part of her claim) does not appear to provide for the replacement of the damaged
panels.
For the reasons outlined above, I am satisfied that the amount of $15,565 allowed for
the repair of the topside damage is appropriate. Accordingly, the insurer is not
required to increase this amount.
Provision for hardstand fees is appropriate
The settlement amount offered by the insurer includes provision for eight weeks of
hard stand fees - four weeks to complete the repairs (based on estimates provided),
plus an additional four weeks on a without prejudice basis.
The complainant says the allowance for hard stand fees is insufficient. She seeks
cover for all of the hard stand fees incurred during the claim process (over $20,000).
As outlined above, the complainant lodged the claim shortly after the incident in
January 2017.
By email dated 12 January 2017, the insurer sought further information, including
whether the complainant had contacted repairers to inspect the damage to the boat.
The insurer had previously invited the complainant to contact it to discuss lifting of the
Determination | Case number: 547967 Page 9 of 11
boat, but had also advised her that the boat remained her responsibility during the
claim process.
It appears from the information provided that the complainant did not contact the
insurer again until 9 April 2018 (almost fifteen months later), when she provided
quotations for the repairs.
The complainant has explained that this delay was due to the difficulty she
experienced in arranging for the boat to be lifted and repair quotations obtained (due
to factors including the size of the boat and the lack of suitable, operational facilities).
The complainant says the insurer failed to assess the damage to the boat and to
provide her with appropriate assistance in facilitating the necessary repairs.
I am satisfied that the insurer clearly outlined the information the complainant was
required to provide in order for the claim to proceed, consistent with her obligations
under the policy. It was reasonable for the insurer to seek this information before
deciding whether an assessment was required.
There is no information to show the complainant contacted the insurer to discuss the
difficulties she was having. Had she done so, the insurer may have been able to
assist in expediting the claim process.
Once the insurer received further information from the complainant, it acted promptly
to arrange an inspection by its marine surveyor (IM), seek revised quotations and
make a settlement offer. Further investigations were subsequently required due to the
complainant disputing the insurer’s decision not to cover the cost of a replacement
keel.
In these circumstances, I do not consider the insurer is required to reimburse the
complainant for all of the hard stand fees incurred during the claim period.
However, I consider the insurer was partly responsible for some of the delay in
resolving the claim, because its initial settlement offer did not sufficiently provide for
the cost of repairing the topside damage and the impact damage to the keel.
I consider it fair in the circumstances that the insurer pay the complainant hard stand
fees for a further four weeks ($2,660), in addition to the eight weeks provided for
under the cash settlement offer.
The insurer is not required to reimburse the complainant for travel and
accommodation expenses incurred in connection with the claim, as the policy does
not provide cover for these expenses.
Determination | Case number: 547967 Page 10 of 11
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with Financial Ombudsman Service (FOS).
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
app licant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 AFCA approach to this complaint
We have considered it appropriate to expedite this complaint in accordance with the
Operational Guidelines to the FOS Terms of Reference, due to the nature of the
complaint. Accordingly, this complaint has not been the subject of a preliminary
assessment and has proceeded directly to determination.
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
3.3 Key policy terms
Subject Terms
Scope of cover Hull and Property insurance provides cover for physical loss or damage to your
vessel, its machinery, gear and equipment, fixtures and fittings, tenders as well
as personal effects.
Additional cover Additional cover under this section … is subject in all respects to the Terms,
Determination | Case number: 547967 Page 11 of 11
Subject Terms
Conditions and Exclusions of this insurance. The additional cover is:
Inspection after grounding
The reasonable expense of an inspection of the underwater part(s) of the
v essel after grounding, even if no damage is found …
Sue and Labour Costs:
Reas onable costs incurred by the insured in taking such measures as may be
appropriate for the purpose of averting or minimiz ing a claim under this section
…, whether such measures a re successful or not ….
Exclusions This insurance does not cover:
a ny loss or damage directly or indirectly caused by osmosis, blistering,
fibreglass or surface coat blistering, electrolysis, rust, corrosion, oxidation, rot,
fungus, mould, infestation, change of temperature or humidity, gradual
deterioration or inherent vice
any loss or expenditure incurred in remedying a fault in design or construction
or any cost or expense incurred by reason of betterment or alteration in design
or construction
t he co st of rectifying, repairing or replacing defective workmanship or
materials relating to any repair, alteration or maintenance work carried out on
the vessel …
General Terms and
Conditions
Avoidance of loss
The insured is required to take reasonable measures to avoid a claim which
would be recoverable under this insurance. The insured must act as if
uninsured.
Insured’s duties in the event of an incident …
In the event of an occurrence which may give rise to a claim which would be
recoverable under th is insuranc e, it is a condition precedent to the liability of the
insurer under this insurance that the insured complies fully with the following
obligations: …
Take all reasonable measures to minimise any loss or damage that may be
recoverable under this insuranc e …
Await the agreement of the insurer before effecting any repairs or
replacements …
Provide the insurer with detailed and accurate reports, invoices, receipts and
other bills regarding the circumstances of the insured event and of the
sustained l oss, damage or liability within a reasonable time of the insured
event ….
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.