Refusal to cover keel replacement for corrosion; adequacy of cash settlement and claim delay

FirmFinancial Firm (Unknown - Insurer)
Decided2019-03-06
ProductGeneral Insurance · Boat
OutcomeFor the complainant in part
Amount awarded$7,970
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer accepted impact damage to the boat but denied cover for replacing the keel because corrosion pre-dated the grounding, and offered a $25,685 cash settlement. AFCA upheld the keel denial, but ordered a $5,310 settlement increase, a further $2,660 in hardstand fees and interest on unpaid amounts.

The insurer proved long-term corrosion as an excluded cause on the expert evidence, but the cash settlement under-provided for the impact repairs and the insurer was partly responsible for claim delay.

Issues

Subjects and remedies

pay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 547967 Page 1 of 11 Determination Case number: 547967 14 February 2019 1 Determination overview 1.1 Complaint The complainant lodged a claim under her pleasure craft insurance policy with the financial firm (insurer) after her boat was damaged in an accident in January 2017. The insurer accepted liability for some of the damage to the boat and offered to cash settle the complainant for $25,685 for the necessary repairs. However, the insurer denied liability for corrosion damage to the keel, on the basis that this damage was not caused by the incident i n January 2017. The complainant disputes the insurer’ s decision and seeks cover for the cost of a replacement keel, together with an increase in the settlement amount for the topside repairs. The complainant is also dissatisfied with the manner in which the insurer handled the claim. She says the insurer should be required to reimburse her for hardstand fees and other expenses incurred during the claim process. 1.2 Issues and key findings Is the insurer liable for the cost of replacing the keel? The available information establishes that the corrosion damage which necessitates the replacement of the keel pre-existed the incident in January 2017 and was caused by excluded factors. Accordingly, the insurer is not liable for the cost of replacing the keel . Is the insurer otherwise required to increase the settlement offer? The insurer is required to increase the settlement offer to better reflect the cost to the complainant of carrying out the claim-related repairs. Determination | Case number: 547967 Page 2 of 11 1.3 Determination The determination is partly in favour of the complainant. The insurer is required to increase the cash settlement amount by $5,310. To the extent the cash settlement has not been paid, the insurer is to pay interest on the unpaid amount at the interest rate calculated in accordance with section 57 of the Insurance Contracts Act 1984, from 30 May 2018 until the payment date. Determination | Case number: 547967 Page 3 of 11 2 Reasons for determination 2.1 Is the insurer liable for the costs of replacing the keel? Policy provides cover for physical damage subject to exclusions The complainant is required to show that, on the balance of probabilities, she has suffered a loss caused by a risk insured against under the policy. This is known as a valid (or prima facie ) claim. If the complainant is able to establish a prima facie claim, then the onus shifts to the insurer to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy to deny the claim. The complainant’s policy provides cover for physical damage to her boat, subject to the conditions and exclusions set out in the policy. However, the policy excludes cover for damage caused by corrosion, oxidation, gradual deterioration or inherent vice. The policy also excludes cover for the costs of remedying a fault in design or construction or rectifying defective workmanship relating to any repair, alteration or maintenance work. Insurer has accepted liability for some of the damage to the boat The insurer accepts that the complainant’s boat was damaged during a storm in early January 2017, while anchored at a private marina. During the incident, the boat impacted another vessel (causing damage to its starboard topside) and grounded on a nearby rock shelf (causing damage to the toe of the keel). The complainant lodged a claim shortly after the incident occurred. On receipt of the claim, the insurer requested additional information, including quotations for the repair of the damage. The complainant did not contact the insurer again until April 2018, when she provided quotations from her repairers totalling approximately $60,000 for the repair of the damage. The quotations provided by the complainant’s repairers included $32,850 for a replacement keel. The existing keel is unable to be repaired because it has suffered extensive corrosion damage. Based on reports provided by its consultants, the insurer accepted liability for the damage to the topside and the impact damage to the keel. Determination | Case number: 547967 Page 4 of 11 However, the insurer says it is not liable for the additional costs required to replace (rather than repair) the keel because the corrosion was not caused by the incident in January 2017. The insurer says the corrosion was long-term and pre-existed the grounding damage. The complainant disputes the insurer’s decision. She says the corrosion to the keel occurred due to saltwater entering through the crack caused by the grounding, both during the incident and while the boat was awaiting repairs. Insurer is required to show corrosion is excluded from cover The insurer has accepted that the toe of the keel was damaged during the incident in January 2017. Its contractors have also confirmed that water entering through a damaged section of the keel can give rise to internal corrosion. On this basis, I am satisfied the complainant has established a valid (or prima facie ) claim under the policy. Accordingly, the insurer is required to show that, on the balance of probabilities, the corrosion pre-existed the grounding and/or was caused by excluded factors. Insurer relies on reports provided by its consultants The insurer has provided reports from its marine surveyor (IM) and corrosion specialist (LC), who both concluded that the corrosion to the keel was long-term and pre-existed the grounding in January 2017. Following his inspection of the keel, IM confirmed there was significant evidence of corrosion in the area around the split in the welded joint caused by the grounding. However, IM also observed evidence of long-term corrosion including:  deep pitting on the vertical section of the port side of the keel  numerous spot welds to both sides of the keel, evidencing past repairs  corrosion damage and evidence of past repairs to the longitudinal floors adjacent to the keel, and  significant pitting to the alloy plates in the forward quarters below the waterline/ Based on the nature and extent of the corrosion damage to the keel, IM concluded that this damage pre-existed the incident in January 2017. A fter the complainants disputed IM’s findings, the insurer appointed a corrosion specialist (LC) to provide a further report. In his report, LC concluded that the boat had a long history of corrosion damage, given the numerous signs of internal and external corrosion and evidence of multiple past repairs. Determination | Case number: 547967 Page 5 of 11 In particular, LC advised that the corrosion to the keel appeared to have originated internally, rather than having been caused by an external event. He considered the grounding of the boat had merely exposed the pre -existing corrosion damage. LC identified a number of factors which he considered wo uld have made the boat susceptible to corrosion damage, including:  the zinc anodes had insufficient mass, given the volume of the boat below the water line  the physical placement of the anodes was inadequate to provide effective cathodic protection to the hull and the keel, and  the manner in which the anodes had been installed provided a poor connection to the hull which was likely to result in high resistance. The insurer also notes that the insurance risk evaluation report obtained by the complainant in August 2016 (prior to the purchase of the boat) identified welded patches on the keel and pitting in the hull plating, which is indicative of corrosion damage. Available information establishes corrosion was caused by long-term factors The complainant disputes the findings in IM and LC’s report. She says the insurer has failed to show that the corrosion damage to the keel was not caused by water entering through the crack caused by the grounding incident. The complainant says the damage was exacerbated by the extended period of time the boat remained in the water, due to the difficulties encountered in arranging for it to be lifted. The complainant has provided extensive information (including extracts from research journals and industry publications) which establish that corrosion damage can occur in these circumstances. However, the complainant has not provided any independent information which establishes that, as a question of fact, the corrosion damage to the keel of her boat occurred in this manner. In particular, the complainant has not provided any reports from her repairers (or other appropriately qualified consultants) which refute the findings in IM and LC’s reports. Having carefully reviewed the available information, I am satisfied that the keel already had long-term, pre-existing corrosion damage at the time of the incident in January 2017. The reports provided by IM and LC provide a logical and rational basis for their findings that the boat suffered long-term corrosion damage. The evidence of pre- Determination | Case number: 547967 Page 6 of 11 existing damage and past repairs is clearly apparent from the close-up, colour photographs included in IM’s report. Further, LC has provided a detailed explanation as to why the corrosion damage observed is not consistent with having been caused by the grounding. LC advised that:  if the keel had been flooded due to major damage from the grounding, then the anodes would have completely dissipated (rather than remaining intact with only ‘normal’ wear)  alternatively, if the cracking damage had been relatively minor, then the corrosion would have been localised to the toe area. While the grounding incident may have exacerbated the corrosion, I am satisfied that the extent of the pre-existing damage was sufficient to prevent a repairer from being able to warrant the repairs to the keel. Insurer is not liable for costs of replacing keel For the reasons outlined above, I am satisfied that the corrosion damage which necessitated the replacement of the keel was not caused by the incident in January 2017. Accordingly, the insurer is not liable for the costs of replacing the keel. The complainant says the insurer should not be entitled to deny liability for the corrosion damage because she relied on the insurance risk evaluation report when she purchased the boat. The risk evaluation report was prepared by a third party shipwright and provided a general overview of the condition of the boat. After reviewing the report, the insurer agreed to provide cover for the boat, subject to the terms and condition of the policy (including the exclusion for corrosion damage). The fact that the report identified past repairs to the keel does not prevent the insurer from relying on the relevant policy exclusion. Cash settlement for keel repairs should be increased The cash settlement of $25,685 offered by the insurer included an amount of $6,800 for the repair of impact damage to the keel. This figure reflected an estimate obtained by the insurer from its repairer (AE), on the basis that the keel could be effectively repaired (that is, assuming there was no corrosion damage). The complainant says the amount allowed for the keel repairs is insufficient. She says it is nonsensical to assume there is no corrosion damage, when such damage clearly exists. Determination | Case number: 547967 Page 7 of 11 As outlined above, the keel has suffered impact damage for which the insurer is liable under the policy. However, the keel cannot be repaired due to the extent of the corrosion damage, for which the insurer is not liable. In these circumstances, it is appropriate for the insurer to cash settle the claim for the estimated cost of repairing the impact damage only. The complainant can then put this amount towards the costs of the keel replacement. The complainant also says the estimate is insufficient, as AE does not have the facilities to undertake the necessary repairs and would have to travel a significant distance to complete the repairs onsite. The complainant says the settlement amount should be increased by at least $10,000. However, it is reasonable for the insurer to cash settle the complainant for the theoretical cost of the repairs, assuming they were carried out by a repairer local to the area where the boat is located. The insurer says the complainant’s repairer (HW) declined to provide a quotation for the theoretical cost of repairing the impact damage only. In these circumstances, I consider it was reasonable for the insurer to obtain an alternative quotation to determine the cash settlement. I accept that the quotation provided by AE was not actionable and therefore may not reflect the full cost to the complainant of the relevant repairs. However, in the absence of an alternative quotation provided by the complainant, I am not satisfied that settlement amount should be increased by the amount she contends. I consider it is fair in the circumstances that the settlement amount for the impact damage to the hull should be increased by 25% ($1,700). The complainant also seeks reimbursement for the following additional amounts incurred in relation to the repairs (as outlined in the complainant’s email to the insurer dated 9 April 2018):  $420 for cleaning and paint stripping to examine the keel  $210 for obtaining measurements to provide to the repairer for estimate purposes  $720 for temporary repairs and assistance to move the boat to HW, who is able to undertake the keel works. I am satisfied that the policy provides cover for the above amounts, which appear to be reasonable. On this basis, the cash settlement should be increased by an additional amount of $1,350. Determination | Case number: 547967 Page 8 of 11 2.2 Is the insurer otherwise required to increase the settlement offer? Insurer is not required to increase settlement amount for topside repairs The cash settlement offered by the insurer includes the amount of $15,565 for the repair of the impact damage to the topside of the boat, based on a quotation provided by the complainant’s repairer (YM). The complainant initially obtained a quotation from YM for $22,440 for these repairs. However, this quotation provides for the repair and respray of both sides of the boat. The insurer rejected this quotation on the basis that only the starboard side was damaged during the incident in January 2017. The policy does not require the insurer to repair undamaged parts of the boat, including for matching purposes. Accordingly, the insurer is not liable for the additional amount of HW’s original quotation. The complainant says the method proposed by the insurer for the repair of the dents to the starboard side is inadequate. She says the dented panels need to be replaced. The complainant has referred to general information about acceptable repair methods. However, she has not provided a report from a repairer who has inspected her boat which indicates that the proposed repair method is inadequate. Further, the original quotation provided by YM (which the complainant submitted as part of her claim) does not appear to provide for the replacement of the damaged panels. For the reasons outlined above, I am satisfied that the amount of $15,565 allowed for the repair of the topside damage is appropriate. Accordingly, the insurer is not required to increase this amount. Provision for hardstand fees is appropriate The settlement amount offered by the insurer includes provision for eight weeks of hard stand fees - four weeks to complete the repairs (based on estimates provided), plus an additional four weeks on a without prejudice basis. The complainant says the allowance for hard stand fees is insufficient. She seeks cover for all of the hard stand fees incurred during the claim process (over $20,000). As outlined above, the complainant lodged the claim shortly after the incident in January 2017. By email dated 12 January 2017, the insurer sought further information, including whether the complainant had contacted repairers to inspect the damage to the boat. The insurer had previously invited the complainant to contact it to discuss lifting of the Determination | Case number: 547967 Page 9 of 11 boat, but had also advised her that the boat remained her responsibility during the claim process. It appears from the information provided that the complainant did not contact the insurer again until 9 April 2018 (almost fifteen months later), when she provided quotations for the repairs. The complainant has explained that this delay was due to the difficulty she experienced in arranging for the boat to be lifted and repair quotations obtained (due to factors including the size of the boat and the lack of suitable, operational facilities). The complainant says the insurer failed to assess the damage to the boat and to provide her with appropriate assistance in facilitating the necessary repairs. I am satisfied that the insurer clearly outlined the information the complainant was required to provide in order for the claim to proceed, consistent with her obligations under the policy. It was reasonable for the insurer to seek this information before deciding whether an assessment was required. There is no information to show the complainant contacted the insurer to discuss the difficulties she was having. Had she done so, the insurer may have been able to assist in expediting the claim process. Once the insurer received further information from the complainant, it acted promptly to arrange an inspection by its marine surveyor (IM), seek revised quotations and make a settlement offer. Further investigations were subsequently required due to the complainant disputing the insurer’s decision not to cover the cost of a replacement keel. In these circumstances, I do not consider the insurer is required to reimburse the complainant for all of the hard stand fees incurred during the claim period. However, I consider the insurer was partly responsible for some of the delay in resolving the claim, because its initial settlement offer did not sufficiently provide for the cost of repairing the topside damage and the impact damage to the keel. I consider it fair in the circumstances that the insurer pay the complainant hard stand fees for a further four weeks ($2,660), in addition to the eight weeks provided for under the cash settlement offer. The insurer is not required to reimburse the complainant for travel and accommodation expenses incurred in connection with the claim, as the policy does not provide cover for these expenses. Determination | Case number: 547967 Page 10 of 11 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with Financial Ombudsman Service (FOS). This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term app licant complainant financial services provider financial firm dispute complaint claim claim 3.2 AFCA approach to this complaint We have considered it appropriate to expedite this complaint in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the complaint. Accordingly, this complaint has not been the subject of a preliminary assessment and has proceeded directly to determination. This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. 3.3 Key policy terms Subject Terms Scope of cover Hull and Property insurance provides cover for physical loss or damage to your vessel, its machinery, gear and equipment, fixtures and fittings, tenders as well as personal effects. Additional cover Additional cover under this section … is subject in all respects to the Terms, Determination | Case number: 547967 Page 11 of 11 Subject Terms Conditions and Exclusions of this insurance. The additional cover is: Inspection after grounding The reasonable expense of an inspection of the underwater part(s) of the v essel after grounding, even if no damage is found … Sue and Labour Costs: Reas onable costs incurred by the insured in taking such measures as may be appropriate for the purpose of averting or minimiz ing a claim under this section …, whether such measures a re successful or not …. Exclusions This insurance does not cover:  a ny loss or damage directly or indirectly caused by osmosis, blistering, fibreglass or surface coat blistering, electrolysis, rust, corrosion, oxidation, rot, fungus, mould, infestation, change of temperature or humidity, gradual deterioration or inherent vice  any loss or expenditure incurred in remedying a fault in design or construction or any cost or expense incurred by reason of betterment or alteration in design or construction  t he co st of rectifying, repairing or replacing defective workmanship or materials relating to any repair, alteration or maintenance work carried out on the vessel … General Terms and Conditions Avoidance of loss The insured is required to take reasonable measures to avoid a claim which would be recoverable under this insurance. The insured must act as if uninsured. Insured’s duties in the event of an incident … In the event of an occurrence which may give rise to a claim which would be recoverable under th is insuranc e, it is a condition precedent to the liability of the insurer under this insurance that the insured complies fully with the following obligations: …  Take all reasonable measures to minimise any loss or damage that may be recoverable under this insuranc e …  Await the agreement of the insurer before effecting any repairs or replacements …  Provide the insurer with detailed and accurate reports, invoices, receipts and other bills regarding the circumstances of the insured event and of the sustained l oss, damage or liability within a reasonable time of the insured event ….

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.