Home / Financial Firm (Unknown - Insurer) / Determination 547084

Determination 547084

Final settlement offer of 30% of water damage repair cost

FirmFinancial Firm (Unknown - Insurer)
Decided2019-02-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer offered 30% of the cost to repair water damage at a rental property, and the complainant sought more. AFCA set the settlement at 50% of the repair quote less the excess, and excluded the leaking pipe and waterproofing costs.

Both causes of loss were established but the parties' apportionments were not reasonably supported, so AFCA applied an equal sharing of the resultant damage.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 547084 Page 1 of 5 Determination Case number: 547084 31 January 2019 1 Determination overview 1.1 Complaint The complainant held a building insurance policy (the policy) with the financial firm (insurer). On 9 April 2018, the complainant lodged a claim seeking cover for water damage found at the insured property. The insurer has accepted the claim under the insured event Bursting, leaking, discharging or overflowing of water or liquid (insured event) as specified in the product disclosure statement (PDS). The complainant remains dissatisfied with the insurer’s final claim settlement offer and is seeking a higher settlement from the insurer under the claim. 1.2 Issues and key findings Is the complainant entitled to a higher claim settlement offer? The available information supports the fact that not all the damage claimed is the result of circumstances covered under the policy. However, the extent to which the insurer has limited its liability under the claim is not reasonable. The insurer is to increase the final settlement offer to 50% of the cost to repair the resultant water damage at the insured property. The policy clearly excludes from cover costs associated with repairing the leaking pipe as well as maintenance of the waterproofing needed in the wet areas subject of the claim. 1.3 Determination This determination is partially in favour of the complainant. The insurer is to increase is final settlement offer to represent 50% of the cost to repair the resultant water damage at the insured property less the applicable policy excess. Determination | Case number: 547084 Page 2 of 5 The insurer is entitled to decline cover for the costs to repair the leaking pipe as well as the cost to renew the waterproofing in the bathroom subject of this claim. Determination | Case number: 547084 Page 3 of 5 2 Reasons for determination 2.1 Is the complainant entitled to a higher claim settlement offer? The Complainant is entitled to a slightly higher claim settlement payment I have considered the available information and am satisfied on the balance of probabilities it establishes the following:  the insured property has been covered under the policy with the insurer since 2005  on 9 April 2018, a claim was lodged seeking cover for water damage noted at the insured property. The date of loss provided was 6 October 2017  the insured property, at the time of loss, was leased to tenants  the insurer’s appointed consultants having completed an assessment determined there were multiple causes for the damage and that the damage had been occurring for some time  the insurer, on the advice of its consultants, offered to cover 30% of the cost to repair the resultant water damage  the complainant ’s appointed consultant ‘R’, having completed its assessment, determined that 70% of the resultant damage was the result of a leak in the bathroom plumbing  the complainant rejected the insurer’s settlement offer and is seeking a higher settlement under the claim. The information from the parties is not reasonably compelling nor conclusive It is not in dispute the insured property has suffered water damage nor is the extent of the damage present. The available information, both from the complainant’s and insurer’s appointed consultants, clearly establishes the water damage is not the result one single cause. The consultants’ , although consistent in their findings with respect to there being more than one contributing cause, are entirely inconsistent in their views regarding the extent of contribution to the total damage by these different causes. Having considered the information, I am satisfied the claimed water damage is due both leaking plumbing (pipe) as well as a failure of the bathroom waterproofing over time. I acknowledge there is an assertion in the insurer’s appointed consultants’ reports that the complainant was aware of the ongoing damage for several years. However, there is an absence of any supporting and compelling evidence establishing this assertion. The complainant refutes the insurer’s assertion in this regard and says she only recently became aware of the issue when notified by the tenant. Without compelling Determination | Case number: 547084 Page 4 of 5 evidence, I am not satisfied it has been established on balance the complainant had been aware of the damage for several years, nor that she failed to arrange maintenance works to rectify the issue. As noted above, the appointed consultants agree there are two main causes for the water damage claimed. However, their assessment of the extent each cause has contributed to the total damage conflict significantly. The insurer is to slightly increase the final claim settlement offer The complainant’s consultant R says 70% of the damage is the result of the leaking pipe whilst 30% of the damage is due to failed waterproofing. The insurer’s consultants maintain 70% of the damage is the result of the failed waterproofing whilst 30% is due to the leaking pipe. It was on this basis the insurer has sought to limit its liability under the claim to only 30% of the total costs to repair the resultant water damage under the claim. I have carefully considered the evidence and not satisfied either of the parties have reasonably established on balance their apportionment of the damage (based on proximate cause) is the more reasonable and compelling. Although the consultants have sought to apportion the extent of damage to a ce rtain cause, their opinions’ lack reasonable supporting and compelling information as well as explanation. In the interest of completeness and considering what is fair in all the circumstances, I determine both parties equally share the total cost to repair the resultant water damage. Accordingly, the insurer is to increase its final settlement offer to 50% of the quote submitted by M less the excess. In the instance, the quote from M is no longer valid, the settlement is to be based on a fresh and current quote to be sourced by the insurer. The quote is to be sourced from a repairer that is prepared to honour the quote regardless of whether it is authorised by the insurer under the claim or as a private job for the complainant outside the claim. Further, I am satisfied the insurer is not obliged to cover nor contribute towards the cost to repair/replace the leaking pipe nor the maintenance works relating to the bathrooms waterproofing. These costs are clearly excluded from cover under the policy. Determination | Case number: 547084 Page 5 of 5 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS defini tions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.