Denial of earthquake claim for cracking damage attributed to ground movement

FirmFinancial Firm (Unknown - Insurer)
Decided2019-03-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants claimed under their home building policy for cracking they attributed to an earthquake, and the insurer denied the claim as ground movement. AFCA found no expert evidence of earthquake damage and that ground movement is excluded, and ordered nothing.

The complainants did not establish a prima facie claim for an insured event, and the insurer's expert reports showed the damage was caused by an excluded ground movement.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 545572 Page 1 of 6 Determination Case number: 545572 6 March 2019 1 Determination overview 1.1 Complaint The complainants lodged a claim under their Home Building Insurance Policy, held with financial firm (insurer), following cracking damage at the complainants ’ home. The complainants say the cracking damage was caused by an earthquake. The insurer denied the complainants ’ claim , saying the complainants had not established the damage was caused by earthquake or by one of the events covered by the policy. Rather, it says the cracking damage was caused by ground movement. This cause of damage is excluded from cover. The case analyst provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the insurer. A copy of the recommendation is attached to this determination. As the complainants rejected the recommendation, the complaint has been referred to me for determination. 1.2 Issues and key findings Were the findings in the recommendation correct? The findings contained in the recommendation were correct and are adopted in this determination. The complainants essentially reiterated their position in further discussions with the case analyst and an interpreter after the recommendation. These have been considered but do not affect the outcome. Is the insurer entitled to deny the complainants’ claim? The insurer is entitled to deny the complainants’ claim as the damage was not caused by earthquake or by one of the insured events. Rather, the available material establishes the damage was caused by ground movement which is excluded from cover. Determination | Case number: 545572 Page 2 of 6 1.3 Determination This determination is in favour of the insurer. I agree with the case analyst’s reasons for the recommendation and the recommended outcome. The insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 545572 Page 3 of 6 2 Reasons for determination 2.1 Were the findings in the recommendation correct? The findings in the recommendation were correct I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous AFCA decisions. I have considered all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. I am satisfied that the case analyst ’s recommendation contains an accurate summary of the complaint, the issues to be determined, any applicable paragraphs of the Rules and any relevant law. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. No new material provided after the recommendation After the recommendation was rejected, the complainants provided no new material but in conversations with the case analyst and an interpreter, essentially reiterated their position. 2.2 Is the insurer entitled to deny the complainants’ claim? Complainants must establish the damage was caused by earthquake The complainants must establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a valid or prima facie claim. The policy responds to certain insured events , one of which is earthquake damage. The complainants submit an earthquake damaged their property. They say this occurred in May/June 2018. They submit the house was painted a year or two before the earthquake damage. They say when the house was painted, there was no cracking damage. On this basis, they argue the cracking damage which is now apparent was caused by earthquake. The complainants have provided no expert evidence to support their assertions. The insurer must establish the damage was caused by ground movement If the complainants established the damage was caused by earthquake, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. Determination | Case number: 545572 Page 4 of 6 The insurer acknowledges there is cracking damage to the house. However, the insurer says the cracking damage was not caused by earthquake but was caused by ground movement. The insurer says it is entitled to deny the claim because the complainants have not established a prima facie claim. Relying on three expert reports, the insurer also argues it has established the damage was caused by ground movement. As ground movement is excluded from cover, the insurer says it is entitled to deny the claim. The insurer relies on its policy terms. The relevant parts of the policy terms are set out in paragraph 3.1 of the recommendation. Available information does not establish the damage was caused by earthquake but by ground movement I have considered the reports and photographs provided by the insurer , being an assessor’s report, a leak detection report and an engineer’s report. The c onclusion drawn by the engineer is set out in supporting section 3.2 of the recommendation. Having considered the available material, I am not satisfied the complainants have established on the balance of probabilities the claimed damage was caused by eart hquake. The insurer’s engineer found one relevant earthquake. It was 2.8 magnitude with an epicentre over 100 km south of the insured’s property. The engineer said this earthquake would not produce noticeable ground shaking. Both the engineer and the assessor considered the cracking damage was due to ground movement. The assessor relied on the fact that several adjacent properties had signs of ground movement. The assessor identified rusted downpipes and blocked drains. A plumber was engaged but his report does not assist the complainants. Rather, the plumber indicated repairs needed to be carried out to downpipes and stormwater drains. The engineer inspected and photographed the property. He also carried out a floor level survey, a search of Geoscience A ustralia website and reviewed the Victorian Geological maps. On this basis, he concluded the cracking damage was not caused by earthquake but by normal foundation movement which would be expected for a house situated on reactive clay. I am satisfied the experts engaged by the insurer have the requisite expertise to comment. In the absence of any expert contradictory material provided by the complainants, I am satisfied on the balance of probabilities the claimed cracking damage was not caused by an earthquake. From the available material, I am satisfied the complainants have not established a prima facie claim. Further, the available material establishes on the balance of probabilities the cracking damage was probably caused by ground movement. As this cause of damage is excluded from cover, the insurer is entitled to deny the claim. Determination | Case number: 545572 Page 5 of 6 Insurer not required to review or reassess the damage The complainants requested the damage be reviewed and reassessed. I am satisfied the recommendation is accurate and sets out in a detailed fashion the views expressed by the experts. I do not accept a further review or reassessment is required in view of the three reports already provided by the insurer. The insurer has already conducted thorough assessments and no information has been provided by the complainants to refute or raise concerns with those expert findings. In addition, all experts engaged by the insurer are consistent in their findings. That is, there is insufficient information to suggest earthquake damage, nor any other event to which the policy responds, caused the cracking damage. The complainants provided no other information, either before or after the recommendation, to support their claim. The available information suggests the cracking damage at the complainant s’ property was not caused by an earthquake but was caused by ground movement. This cause of damage is excluded under the policy terms and conditions. Based on the material provided and for the reasons stated, I agree with the recommendation and accept the insurer is entitled to deny the complainants’ claim. Determination | Case number: 545572 Page 6 of 6 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with Financial Ombudsman Service (FOS). This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 Our Approach It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a valid or prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.3 Relevant policy extracts The relevant policy extracts are referred to in the correspondence between the parties, in the attached recommendation and in the insurer’s Notice of Response dated 12 October 2018. Both the policy document and the Notice have been exchanged with the complainants. 3.4 Other relevant material considered and relied on  Parties’ submissions, emails , expert reports and photographs.  Correspondence between the parties.  Recommendation 11 January 2019. Recommendation | Case number: 545572 Page 1 of 4 Recommendation Case number: 545572 11 January 2019 4 Recommendation Overview 4.1 Complaint The complainants lodged a claim on 10 July 2018, under their home policy for damage to their property caused by an earthquake. The claim was assessed but subsequently denied, as the financial firm (insurer) says no insured event caused the damage. Rather, the insurer says the damage occurred due to movement and not from a single event, which are excluded under the policy. The complainants maintain damage occurred because of an earthquake, and request the insurer accept the claim or reassess the damage. 4.2 Issues and key findings Have the complainants established a valid claim? The complainants have not established a valid claim because:  the information provided shows the damage is not consistent with earthquake damage.  on balance, the cause of damage was movement, which is excluded under the policy. Is the insurer entitled to decline the claim? The insurer was entitled to decline the claim because the damage has not arisen because of an insured event. Rather, it arose from events which are specifically excluded from cover. 4.3 Recommendation This recommendation is in favour of the insurer. The insurer was entitled to decline the claim and is not required to take any further action. Recommendation | Case number: 545572 Page 2 of 4 5 Reasons for recommendation 5.1 Have the complainants established an insured event? Complainants have the onus to establish a valid claim It is established insurance law the complainants carry the initial onus to show that the terms and conditions of the relevant insurance policy covers the loss. This is known as a valid, or prima facie claim. Once the complainants establish a prima facie claim, the onus then shifts to the insurer to demonstrate the loss is not covered, either by way of one of the policy exclusions or on some other basis. The complainants ’ policy is a defined events policy. Therefore, the policy only responds where one or more of the listed events causes the damage, subject to any exclusions. The policy provides cover for damage caused by an earthquake. The insurer does not dispute the policy provides cover for loss or damage to buildings as the result of an earthquake. However, the insurer says damage is not the result of any of the listed events. Different opinions on the cause of damage The complainants state in May 2018, their property has been damaged by an earthquake which has allowed cracks to appear throughout the structure. The insurer engaged its assessor, leak detection specialist (LD) and engineers (SE) to assess the complainants’ property. Extracts of the SE’s findings are in section 3.2. SE concluded as the property had been built on highly reactive soil, this resulted in foundation and ground movement. SE determined there was insufficient information to suggest the earthquake impacted the property. The complainants maintain cracking is linked to an earthquake, and say damage occurred after the event as no cracking was present prior to the earthquake. Information suggests damage is a result of movement. The insurer relies on SE’s report, which it says, identifies the cause of damage as ground movement. Whilst the complainants do not agree with the findings from SE’s report, they have not provided any independent expert report in support of their position to challenge the information. Recommendation | Case number: 545572 Page 3 of 4 In the absence of any independent expert reports challenging SE’s findings, I accept the findings from SE establish, on the balance of probabilities, the cracking to the property is a result of movement. Complainants have not established a valid claim The complainants have requested for the claim to be accepted or for further assessments to occur. Having reviewed SE’s findings, I accept it is persuasive in statements, and logical in its conclusions. Based on the material before me, I am not satisfied the insurer is required to arrange any further investigation now. This is because the information provided suggests the insurer has engaged an assessor, leak specialist and engineer who have already provided their reasoning on the view. However, no information has been provided by the complainants to refute the insurers findings. The complainants need to establish, on the balance of probabilities, the property was damaged by an event for which the policy provides cover during the period of insurance. The complainants’ policy is a defined events policy with no cover for accidental damage. On the information provided, I am not satisfied the complainants established a valid claim for the damage to their property. 5.2 Is the insurer entitled to decline the claim? Insurer is entitled to decline the claim For the policy to respond, the damage must have arisen from an event as defined by the policy. The complainants have not presented any independent expert evidence of their own to chal lenge SE’s findings, such as a report from a suitably qualified person showing the cause of damage to the property was linked to an earthquake. Nor has it been established this damage arose because of an event as defined by the policy. On this basis, the insurer was entitled to decline the claim. Recommendation | Case number: 545572 Page 4 of 4 6 Supporting information 6.1 Policy wording What we do not cover- general exclusions You are not covered under any section of your policy for damage, loss, cost or legal liability that is caused by, arises from or involves: […] Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, … 6.2 Key Reports Record Key points financial firm’s expert (SE) Report 22 - 8 - 18 Only one relevant earthquake was found, 2.8 Magnitude with an epi - centre over 100 km south of the Ins ured’s property. This earthquake would not produce noticeable ground shaking or load is greater than SLS level wind gusts. Australian Standard 2870: Residential Slabs and Footings rec om men ds a soil layer thickness of 2.3m for a temperat e climate, and in accordance with Ta ble D1 I would expect a minimum reacti ve classification of H (High). Highly reactive clays are susceptible to subsidence caused by d rying shrinkage, where moisture is remove d from the ground by tree roots or wind. They are also susceptible to expansion with increased moisture content from groundwater. The floor survey confirmed a pattern of subsidence toward the north - western side of the building. This correlates with the par t of the property that is landscaped with mat ure plants, directly against the building, which commonly cause ground movement by removing moisture causing reactive clays to shrink . On the basis of the above observations and discussion, our con clusions to the cause of damage to the property are as follows: _ The cracks to the interior and exterior of the building are not the result of an earthquake. _ The damage is caused by normal foundation movement which would be expected for a house situated on reactive clay. _ The damage would be classified as slight in accordance wit h AS2870: Residential Slabs and footings, and wit hin the predicted range of ground movement for Class M - H reactive ground.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.