Text of the determination
Determination | Case number: 545043 Page 1 of 9
Determination
Case number: 545043 16 April 2019
1 Determination overview
1.1 Complaint
The complainant holds a farm policy with the financial firm (the insurer). Following
heavy rain from Cyclone Nora, the insured sustained water related damage.
Accordingly, the complainant lodged a claim under her policy.
The insurer denied the claim saying damage was caused by flood, which is excluded
from cover.
The complainant disputes this and says the damage is a result of upstream landslide
and erosion, together with debris accumulation. On that basis, the complainant seeks
settlement of the claim in full.
1.2 Issues and key findings
What is the extent of the insurer’ s liability?
The insurer is entitled to deny liability for the complainant’s claim except for the
bridge. The damage to the bridge is payable because it is not clear this was caused
by floodwater.
The insurer should also contribute 10% of BMT’s report gi ven this provided limited
assistance to the complainant’s position.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer should settle the claim in the manner set out in section 2.1.
Determination | Case number: 545043 Page 2 of 9
2 Reasons for determination
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
The panel has reviewed and considered all the material provided by the parties. While
the parties have raised numerous issues in their submissions, for the purposes of this
determination, the panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
The complainant is represented. For the sake of clarity and brevity, both the
complainant and the representative have been referred to as ‘the complainant ’ in this
determination.
2.1 What is the extent of the insurer’s liability?
Subject to exclusions, the policy provides cover for accidental damage
The complainant says heavy rain caused the accumulation of debris, which blocked
the creek flowing through the property and caused it to overflow.
The policy provides cover for accidental loss or damage (including damage caused b y
a number of specific events) to the farm property, domestic farm buildings and
contents. The relevant policy provisions are contained under section 3.2 below.
Accidental loss or accidental damage is not defined. Generally, in context of
insurance policies, this would be loss or damage that is unintended and unexpected.
It is not in dispute the insured property sustained the following damage:
damage to the bridge across the northern branch of C Creek – this provides
access to the western side of the property
erosion and scour damage to the paved access road, creek bank retaining wall and
the lower horse paddocks
accumulated debris
fence damage to the lower horse paddocks
damage to the water supply intake point and water supply reticulation.
Further, there is no dispute this damage was unintended and unexpected.
Determination | Case number: 545043 Page 3 of 9
The insurer relies on a policy exclusion to deny the claim
The insurer says there is a general exclusion for flood applicable to the sections of the
policy relevant to this dispute.
Flood is defined in the policy as:
… the covering of normally dry land by water that has escaped or been released
from the normal confines of:
any lake, or any river, creek or other natural watercourse, whether or not altered or
modified, or
any reservoir, canal or dam.
In support the insurer relies on a hydrologist report issued by (WRM).
The complainant has provided a copy of another hydrologist report issued by (BMT).
The complainant says the cause of the damage was not flood but rather the
accumulation of debris in the creek which caused a blockage to an access bridge and
overflowed onto the property.
When an insurer is relying on an exclusion, it has the onus of proof in establishing it
applies. The standard of proof is the balance of probabilities.
Flood exclusion applies to the majority of the damage
Both hydrologist reports mentioned above examined the origin of water that inundated
the insured property on 26 March 2018. In particular, the reports assess whether the
subject property was inundated by floodwaters, local stormwater runoff or a
combination of both.
In summary, both WRM and BMT agree the flow of water which inundated the insured
property came from the overflowing C Creek. Under the policy, this water would be
floodwater.
However, the complainant says the cause of damage is the storm accumulated debris
build up in the creek’s catchment area. In support, the complainant relies on BMT’s
letter dated 2 October 2018. Amongst other things, BMT concluded that:
Had the blockage not occurred, the northern diversion, inundation and scour of
the access road would not have occurred. This land is free draining and not flood
effected in the absence of the complete debris blockage of the properties access
crossing.
Notwithstanding this, the applicable policy defines flood as water that has escaped or
been released from its confines. Commonly, with flood related matters, the water
escapes its usual confines (for example a creek) due to the torrential rain overfilling it.
In following BMT’s conclusion, in this insta nce the water escaped its confines
because of the torrential rain and debris build up. However, regardless of the
Determination | Case number: 545043 Page 4 of 9
influencing factor, once the water escapes its confines, it is flood for the purposes of
the policy.
Consequently, on the basis of the available material, the damage being claimed
(excluding the bridge) was caused by floodwater.
Therefore, the insurer is entitled to rely on this exclusion to deny most of the claim.
Insurer is liable for the damage to the bridge
BMT’s letter dated 2 October 201 8 noted there was significant debris build-up in C
Creek with whole trees deposited in the creek and transported downstream. This
vegetation debris became trapped against the bridge and caused a major blockage.
This resulted in the water escaping the creek ’s normal confines and causing resultant
damage.
WRM’s evidence does not refute this possible series of events.
Based on this, it appears the bridge could have been damaged by debris that was in
the creek but before the waters had escaped their normal confines. At the least, the
evidence is unclear whether the damage to the bridge was caused before or after the
water escaped their confines.
The flood exclusion only applies if the insurer can show water had escaped the
creek’s normal confines and this water caused the damage claimed. Given the above,
the panel is not satisfied the insurer has discharged its onus of proof.
Therefore, the insurer is liable to reimburse the complainant’s costs for repairing the
bridge. According to the invoices provided, this totalled $4,265.80. The insurer is to
pay this sum as well as interest pursuant to section 57 of the Insurance Contracts Act
1984 (the Act). Interest is payable from 22 June 2018, being the date the insurer
denied this aspect of the complainant’s claim, unt il payment is issued.
Insurer only required to contribute $300 to BMT’s fee
The complainant has claimed for the costs of BMT’s report, totalling $3,000.
An insurer may be required to contribute to the complainant’s professional costs.
Normally, this would be awarded if the issues in dispute required the assistance of
such a professional and this report assisted the complainant’s position.
The panel accepts the issues required the services of an expert. Further, BMT’s
evidence assisted the panel in reviewing the matter. However, BMT’s report only
provided limited assistance to the complainant as reflected by the fact the panel
awarded less than 10% of the complainant’s overall amount.
Given this, the panel considers it is fair in all the circumstances the ins urer is only
required to contribute 10% of BMT’s fee.
Determination | Case number: 545043 Page 5 of 9
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
Dispute complaint
3.2 Relevant policy provisions
Record, page number Provi sion
PDS, page 4 Words that have a special meaning in this policy
[…]
Flood means the covering of normally dry land by water that had
escaped or been released from the normal confines of:
any lake, or any river, creek or other natural watercourse, whether
or not altered or modified, or
an y reservoir, canal or dam.
PDS, page 5 When your insurance cover does not apply
[…]
Flood, storm surge, the action of the sea, tidal wave or high water.
This exclusion is not applicable to Sections, 7, 9 and 10 of this
policy.
PDS, page 11 Specified events
Specified Events means a loss or damage directly caused by the
following events (a) to (s):
a) Fire
b) lightening
c) thunderbolt
d) explosion
e) implosion
f) earthquake or tsunami
g) subterranean fire
Determination | Case number: 545043 Page 6 of 9
Record, page number Provi sion
h) volcanic eruption
i) impact
j) aircraft
k) sonic boom
l) breakage of glass
m) the acts of persons taking part in riots or civil commotion or of
strikes or of locked - out workers or of persons taking part in
labour disturbances which do not assume the proportions of or
amount to an apprising
n) failing objects
o) water and/or other liquid s and/or substances discharged and/ or
overflowing and/ or leaking from an apparatus and/or appliance
and/or pipes
p) storm, tempest, rainwater, wind, hail, tornado, cyclone or
hurricane, freeze or weight of snow
q) power surge
r) deliberat e or malicious acts.
PDS, page 26 Farm property means any Farm Buildings, Farm Contents, Farm
Improvements, Specified Farm Improvements, Specified Items,
Unspecified Farm Buildings that are shown on Your Schedule as
being insured.
3.3 The complainant’s loss based on material sup plied
Details Description Quantum
(incl. GST)
OCF
Tax invoice
31 - 03 - 2018
Excavator hire $847
OCF
Tax invoice
31 - 03 - 2018
Emergency flood damage equipment and labour hire
> re - establishment of water supply intake
> removal of debris from bridge structure
> repairs/backfilling to bridge approaches
> repairs to creek crossings
$3,473.25
LC
Tax invoice
20 - 04 - 2018
Repairs to the horse paddocks $7,584.50
OCF
Quotation
20 - 04 - 2018
To load remove and dispose approximately 100m of
debris from the road bridge area
$7,018
LC
Tax invoice
20 - 04 - 2018
Repairs to roads, plant, labour and machinery 21,369.70
Determination | Case number: 545043 Page 7 of 9
Details Description Quantum
(incl. GST)
AIH
Tax invoice
24 - 04 - 2018
Emergency works to re - instate the water supply $2,406
CCF
Quotation
27 - 04 - 2018
Supply and installation of electric fence material to re -
instate the boundary line
$6,222.70
LLC
Tax invoice
05 - 11 - 2018
Supply and install bridge hand railing
Bridge reconstruction
$4,265.80
OCC
Q uotation
05 - 11 - 2018
To remove, load out and clear all trees and rubbish
associated with flood damaged area – including:
excavator hire
float fees
truck hire
labour hire
disposal fees
$10,527
BMT
Tax invoice
08 - 11 - 2018
Professional services for the period ending 2 November
2018
$3,300
Total $52,221.95
3.4 Key points on relevant expert material
Record Key points
financial firm ’s loss adjuster
(CL)
CL First Report
28 - 05 - 2018
72 - hour rainfall resulted in excess of 700mm in parts, with a
nearby (C) approximately 9km west from the insured farm
recording a total of over 500mm rainfall
the insured farm has a creek that runs through the property
on 26 March 2018, between 10:30pm and 11:30pm, the torrential
rain caus ed bank erosion in the upper catchment of the creek:
> debris accumulated in the creek, blocking the main flow at the
bridge and resulting in an overbank flow causing damage
downstream.
Council’ s hydrologi st (BMT)
Forensic review of the R valley
rainfall event of 28 March 2018
– results of investigation
13 - 06 - 2018
The primary cause of the flooding in the area was floodwater in F
creek, C creek contributed approximately 25% of the total flow
erosion and landslips in the upper F and C creek catchments
caused debris and sediment loads
flood debris blockage on the C creek crossing exacerbat ed the
Determination | Case number: 545043 Page 8 of 9
Record Key points
floodin g, the debris load caused the guard rail to collapse which
may have produced a flood wave
approximately, the area is flooded every 100 years
stream flow analysis and the gauge rating for the R gauge are
unreliable due to inadequate cross - section extent, la ck of high flow
measurement and due to inadequate lengths of records
major flood debris blockage on the C creek crossing exacerbated
flooding in the local area
the collapse of the guard rail on the C creek crossing may have
caused localised flood waves. Ho wever further flood modelling is
required to determine this
there was severe erosion and stream bank collapse in C creek
area, and there may have been land slips in the upper catchments
of C creek and F creek, downstream of the dam, which caus ed the
very h igh debris and sediment load.
The insurer ’ s Hydrologi st
(WRM )
Site Specific Hydrologist
Report
18 - 06 - 2018
overall the eastern part of the property was inundated and
damaged, the damage to the western part is limited to the waters
supply damage, the residence and main horse training facility
were not inundated or damaged
given the drainage characterises of the insured property,
stormwat er generated at the property would freely drain into the
waterways traversing the subject property without significant
ponding on site
the insured property is located in the C creek catchment:
> the Northern and Sothern branches of the C creek catchment
join approximately 600m upstream of the C creek’s confluenc e
with F creek
> C creek drains into F creek about 200m southeast (downstream)
of the R road (outside of the ins ured property)
> C dam is located on F creek approximately 5.5km to the south -
southwest (upstream) of the confluenc e of C and F creeks
(outside of the insured property)
> F creek joins the B river, approximately 7.2km north
(downstream) of the insured property (outside of the insured
property)
over the 23 - 27 March 2018 period, according to the BOM, an
average rainfall of 400mm was recorded in the area of the
insured’s property. Specifically, the weather stations closest to the
insured property recorded the following in the said period:
> C station, 6.8 km SES recorded 343m m of rainfall
> B station, 5.2km NNE recorded 375mm of rainfall
> CD station, 5.5km SSW recorded 610mm of rainfall.
The insurer’ s (council’ s)
hydrologi st (BMT)
Review of rainfall event and
associated damage to your
property
2 October 2018
Waters rose and fell in under an hour away from the main F creek
channel
flooding peaked in C creek at the intake road at around 11pm on
26 March 2018
debris build up, mainly large trees, was very significant
creek main channel and bank scouring was sever e
Determination | Case number: 545043 Page 9 of 9
Record Key points
vegetation debris was trapped against the F road access crossing
and against the I Road crossing – up to 2 met res metres above
the ground level
the rainfall event that caused the damage was short, sharp,
intense thunderstorm event that generated the ra infall that led to
the inundation and damage over an hour or less