Text of the determination
Determination | Case number: 544383 Page 1 of 23
Determination
Case number: 544383 8 July 2019
1 Determination overview
1.1 Complaint
The complainant holds a farm park insurance policy with the financial firm (the
insurer) and lodged a claim for storm damage to his property on 28 April 2015. The
insurer repaired most of the damage and offered to cash settle the complainant for
the rest of the damage.
The dispute concerns the quality of the repairs completed by the insurer’s tradesmen.
The complainant says the repairs were of poor quality and have caused further
issues. The complainant requires the insurer to rectify the repair works and pay him
compensation for the stress and inconvenience caused by delays and the insurer’s
management of his claim.
The insurer has declined further liability for some of these issues and paid a cash
settlement of $4,000 to the complainant on 30 October 2018, for the cost of rectifying
the outstanding repairs.
The insurer states that the rest of the damages claimed by the complainant arose by
factors excluded from the claim for storm damage and has declined further liability.
The complainant dispute s the insurer’s d ecision and requires the insurer to pay about
$20,000 for rectifications works and $10,000 compensation. In response, the insurer
offered $3,000 compensation.
1.2 Issues and key findings
Is the insurer liable for further rectification costs?
The insurer is liable to meet the cost of some additional rectification costs. Based on
the available information, I am satisfied that the insurer is obliged to cash settle the
complainant for the cost of the repairs to the carport, protruding timber, office room,
lights, barge capping, misaligned roof sheets and the living room beam.
Determination | Case number: 544383 Page 2 of 23
Is the complainant entitled to compensation?
The complainant has experienced an unusual degree of inconvenience in the
resolution of the claim. In these circumstances, I am satisfied that an award of
compensation of $3,000 for non-financial loss is warranted.
The complainant has also suffered losses and incurred expenses because of claims
management. Given these circumstances, I am satisfied that an award of $1,500 for
consequential loss is fair.
Upon proof, the insurer is also liable to reimburse the complainant for the cost of his
expert report.
1.3 Determination
The determination is partially in favour of the complainant.
Should the complainant accept this determination, then within 14 days of notification
of acceptance, the insurer is to reattend and assess:
the cost of rectifying the living room beams, architraves and skirting boards with a
lighter stain to match the doorjamb and the other wooden surfaces in the living
room
the cost of rectifying the misaligned roof sheets installed by its builder where they
enter the gutter on the south side of the building.
As the insurer is cash settling these costs, the insurer is to pay an additional 20% on
the said assessments to allow for interest, variances in the cost of repairs and any
additional risks to the complainant in undertaking repairs as he gives up the insurer’s
lifetime guarantee for the said rectification work.
Assuming the insurer has cancelled the $4,000 cheque, if it has not done so already,
within seven days of notification of acceptance of the determination, the insurer is to
pay to the complainant the following:
$792 for the carport
$112.26 for the protruding timber in the carport
$3,509 for the office room
$734 for lights
$230.91 for the rectification of the barge capping.
Within seven days of notification of acceptance of the determination, the insurer is to
pay the complainant $4,500 compensation.
Should the complainant accept this determination, within 14 days of acceptance, the
complainant is to submit to the insurer the invoice for the report from E builders.
Determination | Case number: 544383 Page 3 of 23
Within seven days of receipt of proof of the cost of the report, the insurer is to pay the
complainant for the cost of the report. The insurer is also to pay statutory interest on
this amount pursuant to section 57 of the Insurance Contracts Act 1984 from the date
the complainant paid for the report until the date of settlement.
Except as set out in this determination, the insurer is not required to take any further
action in relation to the claim or the complaint.
Determination | Case number: 544383 Page 4 of 23
2 Reasons for determination
2.1 Is the insurer liable for further rectification costs?
Policy terms and limits
The complainant must establish on the balance of probabilities he has suffered a loss
caused by an event to which the policy responds. This is known as a prima facie
claim. It is not in dispute there was storm damage to the property. The onus remains
with the complainant to establish the damage in dispute was caused by the storm or
by the insurer’s repairer.
Once so established, the onus shifts to the insurer to prove on the balance of
probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss.
The complainant’s farm park policy responds to accidental loss or damage subject to
terms and limitations. The policy covers the complainant’s farm building including his
residence and provides cover for accidental damage on a reinstatement or
replacement basis.
The policy says the insurer can decide to settle a claim by repairing or rebuilding any
damage to the same condition as when it was new or pay the complainant the
reasonable cost of repairing or rebuilding any damaged part of the building to the
same condition as when it was new.
The policy also states when it is not possible to use original materials during the
repair or rebuilding process, the insurer is entitled to use the nearest available
equivalent to the original materials.
The policy specifically states that the insurer will not pay to repair or rebuild property
which has not been physically damaged by an insured event.
The policy also excludes damages arising from inherent defects , faulty design,
structural defects, poor workmanship or wear and tear, gradual deterioration or
developing flaws or damages arising from lack of maintenance and neglect.
Circumstances of the claim
Following acceptance of the complainant’s claim, the insurer appointed builder I to
complete repairs and issued the complainant a cheque payable to I builder, on 4
December 2015. However, upon contacting I builder in July 2016, the complainant
found that I builder was no longer trading.
The complainant required items added to the scope of works. As a result, the
insurer’s assessor met with the complainant and the complainant’s broker to review
current issues. The insurer then authorised M builder to complete the repairs. Works
began but there were ongoing delays and disputes. The complainant sa id M’s work
Determination | Case number: 544383 Page 5 of 23
was poor. He also says M damaged his roof during repairs and this necessitated the
replacement of all roof sheets. Because of the complainant’s concerns, the
complainant requested M no longer carry out repairs.
The insurer, the complainant and the complainant’s broker met again on site to review
issues. The insurer offered to cash settle the complainant for the remaining repairs.
This was declined by the complainant. The insurer then appointed TK builders to
complete the outstanding repairs. In November 2016, TK completed repairs but
reported repairs in the carport and office room remained outstanding as the
complainant needed to repair pre-existing termite damage.
The insurer paid for temporary accommodation in October/November 2016.
In late October 2018, the insurer paid $4,000 to the complainant being a cash
settlement for repairs to the office and carport, the cost to saw off a piece of timber
which was left in the carport and reinstatement of external lights.
The insurer also offered a further $2,000 as a goodwill gesture . This offer was
subsequently withdrawn.
The complainant obtained a building report and rejected the offers. The complainant
says the damage was caused by the insurer’s builder and/or the storm damage
repairs were not adequately undertaken. When rejecting the offers, the complainant
estimated the rectification works to be about $50,000.
The complainant says the settlement cheque of $4,000 was not banked by him.
The insurer appointed the building consultant S to report on the workmanship issues
raised by the complainant. S inspected and photographed the property with the
complainant. Relying on this report, the insurer said it had adequately completed
repairs but made further goodwill offer of $3,000.
Complainant says repairs are substandard and caused further damage
The complainant wants all repairs completed to Australian Standards, so the house
and associated areas are returned to the previous functional level prior to the storm
event. The available material shows there has been discussion and reports obtained
in relation to several issues including:
roof pitch
carport/office
external light
timber barge
eave linings
barge capping and vermin access
staining of exposed beams.
Determination | Case number: 544383 Page 6 of 23
Further to the above issues, the complainant says the electricity has become unstable
after repairs and the roof sheets installed are not correctly aligned and installed.
Both parties rely on expert reports. A summary of the available relevant material is
included in supporting section 3 of this determination.
Insurer’s expert says rainwater runoff was pre-existing
The insurer appointed S to investigate the complainant’s concerns. S reports the
complainant told him there was some water runoff from the roof prior to the roof
repair. S says the complainant told him he had installed flashing between the gutter
and the roof to prevent water overflowing the gutter.
The complainant asserts water run off after the roof works increased considerably
making it impossible to pass under during periods of heavy rain. The complainant
says a roof blanket installed under the roof sheets had raised the roof to the extent
where rain water overshot the gutter.
S says the gap between the roof sheets and the roof battens are insignificant and did
not contribute to the rain water runoff. S also reported as the original roof battens had
remained unchanged, the cause of the water runoff was not consistent with the
rectification work completed.
S confirmed that its findings determined that rainwater runoff had been occurring at
the property over time including before the 2015 storm event. S said the 115mm low
front quad gutters at the complainant’s property w ere installed approximately 60mm
below the bottom of the edge of the roof sheeting. S says this is too low and allows
water to overshoot the front edge of the g utters during periods of heavy rain.
S also noted the gutter located over the front entrance of the residence was sagging,
causing a greater distance between the end of the roof sheets and the gutter, thereby
aggravating the issue.
S submitted colour photographs of the areas in contention to support the findings.
Based on S’s finding s, the insurer said the overflowing of the roof gutter was a
maintenance issue which is not covered by the policy.
Complainant’s expert partially agrees with insurer’s findings
The complainant appointed E to investigate the defective repairs.
E says the roof sheeting installed by the insurer’s builder is defective because it
overhangs by only 40mm. E says that the New South Wales (NSW) building guide
recommends a 50mm to 65mm overhang. Because of this, there is an overflow water
in the west corner of the gutter for approximately 6.2m in length.
Determination | Case number: 544383 Page 7 of 23
E agreed with S’s findings that the gutters are too low to catch rain water to rectify the
rain water runoff issue. E recommended the roof sheeting should be installed with a
50mm to 65mm overhang into the gutter and the 6.2m of guttering should be raised.
Water run-off not caused by storm or repairs
S submitted a further report in response to E’s findings. S states that the NSW
standards relied on by E is a guide only. Further, S says it provides a disclaimer that
the parties to a building project need to agree on the standards they consider as
appropriate, prior to works commencing. S argues that given that there was no
building contract between the complainant and the insurer’s builder, the NSW building
guide is not applicable in these circumstances. He reiterates the roof height and
overhang length are not the cause of water overflowing the roof gutter, but because
the gutter has been installed too low.
S says the roof sheet overhang was not defective workmanship. S also says the
former Building Code of Australia and the current National Construction Code do not
specify a distance a roof sheet should overhang the roof gutter.
S also identified the Australian Standard referable to the design and installation of
sheet roof and the manufacturer’s specification both do not specify a distance the roof
sheet should overhang into the roof gutter.
On this basis, S says as there is no specification which determines the overhang of
the roof sheets installed by the insurer’s builder , the repair work cannot be considered
defective and did not contribute to the rainwater runoff.
The complainant also contended the new roofing sheets are not aligned and has
submitted photographs to support his view. He asserts that the misaligned roof sheets
combined with the shorter length of the roof sheets are causing the rain water runoff.
This further assertion was not put to E for his opinion.
The experts agree that the gutters were not damaged by the storm and that the
location of the gutters contributes to the issue. The location of the gutters falls within
the policy exclusions for design faults. Given these circumstances, I am satisfied that
the insurer is not liable to rectify the gutters .
Having carefully considered the available information, I am not satisfied the
complainant has established on the balance of probabilities the cause of the roof
rainwater run-off is because of the storm event or the work undertaken by the
insurer’s builder. This is because I find S’s reports more persuasive in their detail and
rebuttal of E’s opinion. Therefore , I am not persuaded the insurer is liable to rectify the
overhang of the roof as requested by the complainant.
Determination | Case number: 544383 Page 8 of 23
Insurer liable to rectify misaligned roof sheets
Having considered the material and submissions of the complainant, I am satisfied
the insurer is liable to rectify the misaligned roof sheets installed by its builder where
they enter the gutter on the south side of the building.
I acknowledge S’s opinion this is not an installation defect but in view of the
photographs which show the sheets are misaligned, I am satisfied it is fair they are
rectified.
I reiterate I am satisfied this issue is not the cause of the water overflow.
Should the complainant accept this determination, then within 14 days of notification
of acceptance, the insurer is to reattend and assess the cost of rectifying the
misaligned roof sheets.
The insurer is then to cash settle the complainant this component of the claim.
Issues with carport probably pre -existed storm event
In the first report, S said the carport/office was constructed approximately three to five
years ago by a handy man using various second-hand materials. S noted the roof
sheets had holes from being previously fastened which caused the roof to leak. S
agreed timber on the south eastern end of the carport had been left too long and
should be cut off. Otherwise, S said the works completed by the insurer’s builder had
been completed in a manner equivalent to the method and type of construction of the
existing carport.
E reviewed the structure and said the completed work was inferior and not compliant.
E said the roof leaks, a damaged roof sheet is installed, new framing is poorly
constructed, and the roof sheets were not installed for the old screw holes to line up
with the rafters. E recommended that the structure is rectified to meet building code.
In reviewing the report by E, S agreed that the structure had been constructed with
second hand materials and did not comply with any building code. However, S argued
that because the structure did not comply with building codes before the storm event,
any rectification would involve total demolition and rebuilding of the structure.
On this basis, the insurer denied liability for rebuilding of the carport as it would result
in betterment which is outside the policy terms.
I have carefully considered the reports and photographs provided. I am not satisfied
the repair work is poor and not compliant. Rather, the available material indicates on
the balance of probabilities any remaining issues with the carport pre-existed the
storm event.
Determination | Case number: 544383 Page 9 of 23
The $4,000 payment included $792 for the carport and $112.26 for the cost to cut off
the timber.
In the circumstances, I am satisfied the insurer is not liable to indemnify the
complainant any further in relation to the carport.
Amount allowed for office room repairs is insufficient
The ceiling and wall lining in the office room were damaged during the storm. The
insurer ’s builder discovered termite damage while carrying out repairs. The
complainant did not repair the termite damage and the insurer cash settled this
damage for $2,300 based on M’s quote.
E said the ceiling and wall linings were damaged in the storm and it was agreed these
would be replaced by the insurer. He noted the termite damage did not form part of
the Scope of Works for the storm claim. E submitted a cost estimate of $3,509.00 for
the cost of repairs of the office room.
S said the repair costs are an upgrade to the original condition of the office and are
excessive. He said the office was constructed of poor quality material and was not
constructed in accordance with building standards. He also said the amount allowed
for labour by E was excessive, the ceiling area was overestimated, and the inclusion
of wall insulation bats and an architrave was an upgrade to the existing structure.
He also said the termite damage may have been a contributing factor to the damage
to the roof and wall sheeting.
S provided photographs which showed previous screw holes in the second-hand roof
sheeting used on the office roof. Photographs also showed extensive termite damage
to the roof rafter and wall frame which S says contributed to the damaged office
linings.
The complainant did not submit further material to oppose S’s view about E’s cost
estimates. I note the estimate provided by M did not include a scope of work to
confirm the dimensions of the office space or confirm the layout of the space. Given
the lack of a detailed supporting scope of works from M, I am not persuaded E’s cost
estimate is excessive.
I note the comments by S in relation to termite damage. I also note E was aware the
termite damage did not form part of the Scope of Works for the storm claim.
The $4,000 tendered to the complainant included $2,300 to repair the office. I am
satisfied it is fair in the circumstances the insurer indemnifies the complainant for the
repair of the office area in line with E’s cost estimate and increase its offer to $3,509.
Determination | Case number: 544383 Page 10 of 23
Cash settlement of $734 for lights is fair
The complainant says that the insurer’s builder removed an external light to complete
repairs and did not reinstate it, leaving live wires exposed. He submits that the
exposed live wires are a safety hazard to his family and his employees. The
complainant also says the electrical work was carried out by a non-licenced trade.
Initially, S said the external light would not have been moved for the roof repair.
E confirmed that live wires from the external light remained exposed. E said that the
light had been attached to a roof barge board and would have required to be moved/
removed to allow for the barge board capping to be installed. To reinstate the
complainant to his original position, E recommended the light be reinstated by a
qualified electrician.
In a supplementary report, S noted there are two separate electrical connections
under contention; one on the barge board and one on the rear weatherboard of the
house. S says that both connections had been disconnected and left in an
unprofessional manner.
S provided a cost estimate to address this issue.
The insurer allowed $734 to rectify this issue which included the S’s estimate, GST,
overheads, insurance, profit margin and contingencies.
Having considered the available information and in the absence of any other cost
estimate to address this issue, I am satisfied that the insurer has discharged its’
liability to the complainant for this issue.
Barge board and eave lining not damaged in the storm event
The insurer says that the barge boards and eave lining were not damaged during the
storm. The complainant says the timber barge boards and eave lining should have
been replaced when the roof was replaced.
The complainant submits the insurer’s builder covered the existing timber barge
boards with metal barge capping when the roof was replaced. The complainant
agrees that the timber barge boards and eaves were in a deteriorated state but
argues that the insurer should have replaced these deteriorated sections of his roof to
comply with Standards.
S said the barge boards were in a deteriorated state and were not damaged in the
storm. Given this, the insurer determined that the complainant was responsible for t he
barge boards as the policy does not cover items which were not damaged by an
insured event.
Determination | Case number: 544383 Page 11 of 23
S noted that the eave lining was sagging and attributed this to the lack of any
fasteners to support the sheeting. The insurer denied liability for the sagging eave
lining because this was a maintenance issue which the policy specifically excluded.
E agreed that the deteriorated barge boards were weathered and not damaged in the
storm event. E is silent about whether t he insurer’s builder’s action of capping t he
deteriorated barge boards with metal capping is appropriate and is within building
regulations. However, E agreed with S that the eave lining had sagged because it
was not adequately fastened and was not damaged by the storm.
Having considered the available material, I am satisfied the insurer is not liable to
replace the deteriorated barge boards or the eave linings because they were not
damaged in the storm event or by the repairs.
Settlement offer for barge capping is reasonable
The complainant says that after the roof repair, there was a gap between the barge
capping and the roof which allowed vermin to enter the roof cavity and poses a fire
risk. S reported a gap of approximately 50mm between the barge capping and the
roof sheeting but was not able to detect any vermin or vermin droppings.
Upon inspection, S observed the roof sheeting under the barge capping rests on a
timber barge board closing off access into the roof capacity. S also observed at every
corrugation of the roof sheeting there is a gap where small vermin can access the roof
cavity. He says this is a common issue with corrugated roof sheeting.
S concluded the gap between the barge capping and the roof sheeting does not
contribute to vermin access into the roof ca vity
Based on the findings by S, the insurer declined liability for this issue.
E submits that the barge capping installed by the insurer ’s builder was too large . E is,
however, silent about if this allowed vermin access. E says that the Australian
Standard requires capping to be purpose made and machine folded to ensure
minimum space between the capping and roof sheets. E contends that the insurer’s
builder did not adhere to the Standard by not having the flashings and capping
purpose built.
E submitted photographs of the barge capping. The capping installed by the insurer’s
builder does not appear to be bent at a 90-degree angle and does not appear to be in
contact with the roof sheeting. E concludes that the wrong size barge capping should
be replaced with the correct size barge capping for this roof.
In a supplementary report, S recommends the replacement and refitting of the barge
capping on the south western end of the house. S provided a detailed estimate to
remove and replace the existing metal barge capping with new for $163.60.
Determination | Case number: 544383 Page 12 of 23
The insurer offered to cash settle this issue by paying $230.91 inclusive of GST,
overheads, insurance, profit margin and contingencies.
Having reviewed the available information, I am not satisfied this issue has allowed
vermin to enter the roof cavity. However, I am satisfied the available material
establishes the insurer is liable to replace the barge capping.
In the absence of any further information, I am satisfied the settlement offer of
$230.91 to replace the barge capping is appropriate.
Complainant says timber beam was damaged by repairer
The complainant says that the exposed timber beams in the living room were
damaged in repairs. He says the beams were rough and a natural colour prior to
repair. He also complains the repairer did not obtain his consent prior to staining the
beams.
S reported the exposed beams had been stained and clear finished to match the
colour of the architraves and skirting of the residence. S agreed that the colour was
darker than the natural colour of the timber but given that the colour matched the
architraves and skirting, said the colour did not require rectification.
E reports the insurer’s builder took down lights and replaced the ceiling in the lounge
room. E says the beams prior to staining were rough sawn Oregon with a natural
colour as evidenced by photographs. E says the repairer stained and sanded the
timber beams and architraves and skirting boards with a darker stain. This was not
part of the scope of works.
The assessor reported the beams were damaged by glue during M’s repairs . The
insurer says t he complainant’s consent was obtained prior to reinstatement , the beam
does not require replacement because of repairs or faulty workmanship and
consequential loss is expressly excluded from cover.
E provided photographs of the beams both before and after the repairs. E says
although the beams may have matched the architraves and skirting, the staining does
not match the door jambs.
E recommended a qualified builder and painter create a rough sawn finish to the
beams and lighten the colour of the beams.
S reviewed the photographs provided by E. He says the photographs show the
exposed beams had previously been stained and finished in a colour extremely close
to the current colour. S says the beams were not a natural timber colour prior to
repairs.
Determination | Case number: 544383 Page 13 of 23
S spoke with the builder (TK) who said his painter wire brushed and refinished a small
section of the exposed beams in the colour to be used which was approved by the
complainant and his wife.
S reviewed photographs of the colour of the exposed beams prior to the repair and
the finished beam and argues that the two are very similar and so there is no need for
further rectification. S said the door jambs were made of a different material and will
appear as a different colour when stained. Because timber is a natural product, S
argued timber will stain and display differently and a closer match cannot be
guaranteed.
Insurer to cash settle cost of rectifying living room beams with a lighter stain
Staining the exposed beams were not part of the original scope of works. The
available information confirms this was done because a beam was damaged during
repairs.
Given these circumstances, I do not accept it is fair the insurer relies on the
consequential loss exclusion in circumstances where the damage was caused by the
insurer’s repairer .
The insurer’s policy provides where it is not possible to use original materials during
the repair process, the nearest available equivalent to the original materials will be
used.
I n circumstances where the damage was caused by the insurer’s repairer, I am
satisfied it is fair the insurer restores the complainant as near as possible to the
position he was in prior to the beams being damaged by the repairer.
I do not accept the insurer is obliged to bring the beams back to natural timber as,
from E’s photographs, I accept the beams before and after the repairs were stained
and are a very similar colour.
Should the complainant accept this determination, then within 14 days of notification
of acceptance, the insurer is to reattend and assess the cost of rectifying the living
room beams, architraves and skirting boards with a lighter stain to match the
doorjamb and the other wooden surfaces in the living room.
The insurer is then to forthwith cash settle the complainant this component.
Insurer not responsible for intermittent electricity issues
The complainant says that the electricity supply at his property has become unstable
after the repairs.
E says that the light circuit in the complainant’s home appeared to have been
removed when the ceiling lining was installed. E says that the light circuit tripped while
Determination | Case number: 544383 Page 14 of 23
he was conducting his inspection but was unable to provide a cause for the issue. E
recommended that a qualified electrician investigate the cause of the tripping.
The insurer says the repairer appointed a qualified electrician to reconnect the light
fittings and power points during the rectification work and says it is not responsible for
any further work in relation to the electricity at the property. The repairer also
submitted an invoice which indicated a qualified electrician attended the property to
install light fittings and check electricals.
Having reviewed the available material, I am not satisfied the unstable electricity at
the complainant’s ho me is caused by the storm event or repairs.
Cash settlement fair in the circumstances
During the dispute, the complainant has expressed a preference for the repairs to be
undertaken by the insurer. The policy provides the insurer can decide whether it will
cash settle the claim or undertake repairs. The available material persuades me the
relationship between the parties has broken down. In the circumstances, providing an
allowance for variations and contingencies is provided for, I am satisfied a cash
settlement is fair.
2.2 Is the complainant entitled to compensation?
Compensation paid in some circumstances
Under the FOS Terms of Reference, Australian Financial Complaints Authority
(AFCA) may award compensation (capped at $3,000) for non-financial loss where a
complainant has suffered an unusual degree or extent of physical inconvenience, time
taken to resolve the situation or interference with their expectation of enjoyment or
peace of mind.
AFCA takes a conservative approach to assessing compensation for non-financial
loss.
The complainant has raised several concerns about the way the repairs to his
property was carried out . The complainant says that the insurer’s builders:
damaged undamaged parts of his roof
damaged the timber beam in the living room
used damaged materials to repair his carport
completed works on his premises without a valid contract
failed to promptly progress the claim
lied to him and questioned his integrity.
Determination | Case number: 544383 Page 15 of 23
Fair the insurer pays $3,000 compensation
Having carefully reviewed the claim history, I agree that there are several aspects of
the repair which could have been handled better.
I acknowledge that the complainant’s concerns the insurer’s builder completed works
on his premises without a contract and this caused further stress. However, given tha t
the insurer provides a lifetime guarantee for work carried out with its authorisation, I
am not persuaded that the complainant has suffered a loss or detriment for this
reason.
The repairs remain incomplete after about four years. The complainant says he also
had to live in a caravan to be close to his farm animals and travelled between
locations for a period of 14 months. He says that he works a long day and has spent
countless hours corresponding with the insurer and managing the repairs.
I acknowledge that the complainant delayed in initiating the repairs after the insurer
made a cash settlement in December 2015. Further, the failure to fix the termite
damage caused delay. Three builders were appointed to carry out repairs, which
added to the complexity of the claim and time taken to resolve the claim. Having
reviewed the available material, I am not satisfied that the insurer was responsible for
all the delays experienced during the claim process.
In acknowledgement of the claims experience, the insurer has offered a sum of
$3,000 as compensation. In the circumstances, I consider an award of $3,000 as
compensation for non-financial loss is appropriate.
Complainant is entitled to $1,500 compensation for consequential loss
The complainant says that he spent numerous hours, often late into the night,
corresponding with the insurer to resolve his claim. He also submits that due to the
inadequate repairs of his carport, he lost animal feed. He says computer equipment
was damaged by rain, he had travel expenses and incurred compliance costs
because of the electrical issues.
AFCA can award compensation (with a $3,300 cap) for direct loss or consequential
loss. Direct losses are losses, such as, out of pocket expenses or other liabilities
which are caused directly because of the insurer’s c onduct. Consequential losses are
losses which are indirectly caused by the insurer’s conduct.
AFCA will not provide compensation for direct or consequential loss or non-financial
loss in a dispute arising from a claim on an insurance policy which expressly excludes
liability for such loss.
I am not satisfied the policy term prevents an award of compensation under the
Terms of Reference for losses caused because of the insurer’s conduct.
Determination | Case number: 544383 Page 16 of 23
I acknowledge the complainant has not provided substantive evidence to support his
claim and has not submitted a monetary figure for the losses borne by him.
However, taking all matters into account, I am satisfied it is fair a sum of $1,500 is
awarded for consequential loss.
Upon proof, the insurer is to pay for the cost of the report from E builders
AFCA may decide the insurer contribute to professional costs incurred by the
complainant during a complaint. Unless exceptional circumstances apply, AFC A will
not require the insurer to contribute more than $3,000 to these costs.
The complainant relied on a report from E builders. The complaint had a degree of
complexity and the report from E builders was useful in making this determination. As
the insurer obtained expert reports, I am satisfied the complainant genuinely required
expert assistance from E builders.
I am satisfied it is fair in the circumstances the insurer contributes to the cost of the
report from E builders.
Should the complainant accept this determination, then within 14 days of acceptance,
the complainant is to submit to the insurer the invoice from E builders for the cost of
the report relied on by the complainant.
Within seven days of receipt of proof of the cost of the report, the insurer is to pay the
complainant for the cost of the report.
Statutory interest on this amount pursuant to section 57 of the Insurance Contracts
Act 1984 (the Act) applies from the date the complainant paid for the report until the
date of settlement.
Determination | Case number: 544383 Page 17 of 23
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Our Approach
This complaint has not been the subject of a recommendation. Due to the nature of
the complaint, it has been referred directly to an ombudsman for determination, in line
with the Operational Guidelines to the FOS Terms of Reference.
The complaint is decided based on what is fair in all the circumstances, having regard
to the relevant law, good industry practice, codes of practice and previous decisions
(which are not binding).
There has been a full exchange of all material informatio n relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
I have reviewed and considered all the material provided by the parties. While the
parties have raised numerous issues in their submissions, for the purposes of this
determination, I have restricted commentary to those issues that I consider directly
relevant to the outcome only.
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
Determination | Case number: 544383 Page 18 of 23
3.3 Relevant policy extracts
The relevant policy extracts are referred to in the insurer’s Notice of Response dated
17 December 2018. Both the policy document and the Notice have been exchanged
with the complainant.
3.4 Reports
Re port Key points
Insurer’s e xpert ( CL )
First Report
Inspected and photographed 8 May 2015.
Confirmed storm damage to various areas including Shed 1
(office): carport roof off end of shed 1: shed 2; roof of main
dwelling.
I Builder Scope of Works
valid until 31 August 2015
Scope of Works describes work to be done to pool, main house,
office area, house roof, shed 2 and carport .
Total quote including GST $32,714.
Insurer’s e xpert ( CL )
Second Report
I builder authorised to carry out repairs to building (home) sheds (x
2) ($11,264) and pool ($21,450) in the amount of $32,714.00 inc
GST.
R ecommend a cash settlement for cattle loading ramp, farm
fences and cont ents $23,215.95 inc GST.
Insurer’s e xpert ( CL )
Third Report
Insured confirmed not register for GST.
Recommend settlement for cattle loading ramp and fencing
$19,207.20 including GST.
Insurer’s e xpert ( CL )
Fourt h Report
R ecommend that a cheque be drawn in favour of I builder for
$32,714.00 incl GST (less policy excess) to be sent care of the
Insured.
Insurer’s e xpert ( CL )
Supplement ary report 1
As I builder no longer in business, reinspected to ensure Scope of
Works accurate.
Added the removal and replacement of ceilings in the lounge and
living area as mould affected.
Further quotation from M builders $35,790.
Insured believes entire roof requires removal because of moisture
in the ceiling cavity.
CL considers some requests not insurance related.
Arranged building consultant to attend and prepare Scope of
Works.
Asked builder to comment on accommodation request.
Quote from M builders
6 September 2016
Quoted on work to shed 2 and office $40,740
Insurer’s e xpert ( CL )
Supplement ary report 2
Liaised with broker and insured and agreed M builders to proceed.
Work started. Ongoing delays and disputes.
Met with parties 5 October 2016. Thought matter was resolved.
CL is independent and does not work from broker ’s office.
Determination | Case number: 544383 Page 19 of 23
Re port Key points
Premise and residence not uninhabi table.
Settlement agreed for swimming pool $21,450.
If cannot reach agreement, engage S building consultants to
attend and inspect work completed by M builders.
Insurer’s e xpert ( CL )
Supplement ary report 3
Continue to liaise with broker.
M builder and complainant agree M not to proceed
Met with broker and complainant and builder TK.
TK will complete outstanding works as a matter of urgency.
TK builder invoice
18 November 2016
Invoice regarding completion of repairs $17,534.83.
Insurer’s e xpert ( CL )
Supplement ary report
TK have now completed work and submit invoice $17,534.83 GST
inclusive. Recommend payment.
Only outstanding repairs requiring completion relat es to the
carport and office, however, prior to these works being carried out
complainant needs to undertake maint enance related works and
we are awaiting completion of these.
Insurer’s e xpert ( CL )
Final report
Payments made to date $74,526.24.
Issues between complainant and TK builder
Complainant not completed termite related works to the office to
enable repairs to be undertaken.
In the circumstances we will close our file
Insurer’s e xpert ( CL )
Email 28 December 2018
Beams were not part of the original scope of works. When M
builder removed and replaced the cornice, spilt glue on beams. TK
attended, wire brushed the beams and stained them as per the
colours selected by complainant.
M building replaced two r oof sheets and damaged other sheets.
Entire roof replaced by TK.
TK believes no battens were replaced.
Carport constructed poorly with second hand materials. Any
framing repairs undertaken in a similar manner to original
construction.
TK building and M building deny the outside light was
disconnected by any of their contractors.
Approximately 5 m of barge capping should be replac ed at a cost
of $163.
Property damage repair
scope of works and
quotation (TK)
Works completed as per instructions November 2016.
Inspection 25 September 2017 dealt with light fitting, rainwater
overfl ow, screws behind the bottom hinge to the front door
Insurer’s e xpert ( S )
Repair audit r eport
17 October 2018
Inspected and photographed premises 8 October 201 8 and
commented on 7 issues.
Roof pitch – i nsulation blanket installed has not raised the roof
sheeting to any significant degree. Water is overflowing the roof
gutters because the gutters were installed too low below the roof
Determination | Case number: 544383 Page 20 of 23
Re port Key points
sheeting. This issue preceded the storm event and is compounded
on the s outhern side of the building by the out of level roof frame
and sagging gutter. Therefore, water overflowing the roof gutter
should be attended to as a maintenance issue.
Carport – this was constructed by handyman about 3 to 5 years
ago using some second - hand materials. Due to the method of
construction and materials used, carport does not comply wit h
building regulations. Reviewed Scope of Works. Considered all
items in scope have been completed in a manner equivalent to the
method and type of construct ion of the existing carport. Timber on
the south - east end of the carport has been left long and should be
cut off in line with the roof sheeting.
Outside light - reviewed exposed electrical wire on the south - west
corner of the original building and light fitting on a hot water heater
on the west side of the building. Due to location of connectors,
missing paint, condition and discolouration of wire, age and
condition of the saddle fixed to the wall , S said light fitting has
previously been installed on th e southern wall of the house where
the electrical wire is now located. A light in this location would not
have required removing for the roof to be replaced.
Timber barge - barge boards were not damaged by the storm
event and were not part of the scope. Ends were decayed. This is
because of lack of general maintenance and not due to the
insured event.
Sagging eaves linings were not damaged during the storm and not
part of the scope. The eaves were not securely fastened when
built which is a maintenance issue.
Vermin access - complainant says as there is a gap bet ween the
barge capping and the roof, vermin can enter the roof cavity.
Observed gap but did not observe any vermin or vermin
droppings. At every corrugation of the roof sheeting there is a gap
be tween the roof sheeting and fascia where vermin can access
the roof cavity which is a common issue with corrugat ed roof
sheeting. G ap between the barge capping and the roof sheeting
does not cont ribute to vermin access into the roof cavity .
Stained and fi nished exposed beams in living room. Beams
stained and clear finished in a colour like the architraves and
skirting. This matches the architraves and skirting, and
replacement is not warrant ed.
Insurer’s expert (S)
Supplement ary report
23 October 2018
Roof frame and battens are the original originals and sustained no
storm damage. No requirement to address movement when
replacing roof sheets.
Rectifying the battens/frame may alleviate the visual result but will
not address the cause of movement. Scope to remove the sheets,
rectify the battens/frame and replac e the sheets.
TK will need to address the issue of correspondence.
Items in the original scope for the repair of the carport have been
carried out. Carport, other buildings and parts of buildings on the
property including the office have not been approved by local
Determination | Case number: 544383 Page 21 of 23
Re port Key points
authorities and there are no regulations concerning the repair of
these buildings.
Prepared scope and costings to cut the timber, refix the outside
light, remove and reinstall metal barge c apping, refit barge
capping, rectify beams.
Capping was ordered of a size required to adequately cover the
barge board allowing for the curve in the roof sheets at the apex of
the roof. Work does not breach code or standards
Gap may be a fault in the finis h and can be rectified by replacing
and refitting the barge capping on the south - west end of the
house.
Reported as to how exposed beams could be brought back to a
natural timber colour.
Detailed estimate $40,456 including GST.
Insurer’s expert (S)
Email
25 October 2018
C arport repairs were undert aken by M builders.
B arge boards/metal capping - this was a private arrangement
between the complainant and T K and done at no cost to the
Insured or Insurer .
Insurer’s expert (S)
Report
21 December 2018
Reviewed photographs and the complainant’s building consultant
report.
Roof pitch: The New South Wales Guide to Standards and
Tolerances states in its disclaimer on page 2 that it is a guide only,
and states that: “Parties to a building project should agr ee on the
standards they consider appropriate and include comprehensive
detail in the cont ract documents.” I have spoken to K of T K
Building, who has confirmed that there has been no agreement in
a contract to include, or recognize, the New South Wales Gui de to
Standards and Tolerances as a benchmark standard for work
completed at the Ins ured’s property. Roof height and overhang
length are not the cause of water overflowing the roof gutter. The
cause is the gutter has been installed too low. Changing the ro of
to have a greater overhang will make no differenc e.
Roof Batten: complainant told me 8th October 2018 that the
original roof battens have been maintained in place and had not
changed when the roof was replaced. He also told me the gutter
overflowed prio r to the storm event. R oof batten has not been
replaced and that the roof height has not changed. C ause of the
water overflowing the roof gutter is due to the roof gutters being
installed too low below the roof. This has been confirmed by the E.
This is a maintenance issue.
Carport and office: E’s repairs are an upgrade to the original
condition of the office and are a betterment.
Outside light: the two electrical connections should be refitted at a
cost of $425.
Barge capping: it is fair to pay $163 to remove and replac e the
barge capping.
Exposed beams: were not a natural timber colour prior to the
event. E’s photographs show the beams have been previously
Determination | Case number: 544383 Page 22 of 23
Re port Key points
stained and finished in a colour that is extremely close to the
current colour. Spoke with the bu ilder TK and say the exposed
beams were not originally a natural timber finish and no further
action is required.
Insurer’s expert (S)
Report
9 January 2019
Reviewed submissions from the complainant and essentially
reiterated his opinion set out in earlier reports remains. Reiterated
he attended the property on 8 October 2018 in the presence of the
complainant and inspected and photographed all areas of
concern.
Insurer’s expert (S)
Report
11 April 2019
Reviewed submissions from the complainant and essentially
reiterated his opinion set out in earlier reports remains.
No information in the manufacturer’s installation manual or the
Australian Standards regarding design and installation of sheet
roof and w all cladding that enables a conclusion there is any form
of installation defect visible.
Even if the builder and the complainant agreed to use the New
South Wales guide the items referred to would not be visible from
a normal viewing position and would not be considered and
installation defect.
Complainant’s expert ( E )
Report
30 November 2018
Inspected and photographed 30 November 2018 for complainant
to identify defects and incomplete works undertak en by insurer
Roof pitch
R oof sheeting is defective because it does not overhang the inside
face of the gutter sufficiently and does not comply with New South
Wales standards. Because of this raised batten the last 6.2m of
roof water towards the west side of the north wall overflow s the
gutter. The gutter is far too low to catch the water. The roof
sheeting should be installed to correct overhang and the 6.2m of
gutter should be raised.
Carport and Office
The repair work not done to the code. The work carried out by the
insurer’s c ontractor is not fit for purpose. R ecommend ed this work
be carried out to meet the code and in a workmanship manner or a
monetary settlement is decided bet ween the two parties . Estimate
cost $3,509.
O utside light
Live wires are hanging down. The hole in th e wall and paint
missing does not match the size of the bas e plate. Light would
have been removed so barge capping could be installed. Light
needs to be reinstated as part of the roof work.
Timber barge
A gree with S - the condition of the barge boards is a result of
weat hering and does not form part of the storm damage and
bargeboards do not form part of the scope of works to rectify.
Sagging e aves l ine
Ag ree with the S report that this item is not a result of the storm
damage and therefore does not form p art of the scope of works.
Determination | Case number: 544383 Page 23 of 23
Re port Key points
Barge capping
B arge capping ordered is overside for this application
Wo rkmanship is poor in ordering the wrong size barge capping
and then installing the barge capping. The barge capping should
be replaced with the correct size b arge capping for this roof.
S tained and finished exposed beam
B eams prior to staining were rough sawn Oregon with a natural
colour as shown above. S taining and sanding of the timber beams
was not part of the scope of works to be completed .
An i nsurance c ontractor has sanded and stained the beams with a
darker stain. T exture of the beam is smooth with some small areas
having the rough sawn texture. An i nsurance contractor has also
stained some of the architraves and skirting boards with a darker
stain.
S r eport failed to mention that the architrave in that photo was also
one stained by the i nsuranc e contractor.
L ight circuit
I nsurer removed lights then reinstated lights once ceiling lin ing
installed. Electrician not engaged. The light circuit tripped. A
qualified electrician must inspect the lights and establish why the
circuit breaker trips.
3.5 Other relevant material considered and relied on
parties’ submissions and emails and all attachme nts to submissions and emails
including photographs invoices and reports
correspondence between the parties.