Home / Financial Firm (Unknown - Insurer) / Determination 543596
Determination 543596
Loss of rent claim declined and claim handling delay
Summary
After a hot water system burst at their tenantless investment property, the complainants claimed loss of rent and compensation for a five-month repair. AFCA found the property would likely have been sold, not re-let, and that the repair timeline was unavoidable.
The policy excludes loss of rent for untenanted property unless the insured shows a paying tenant would have occupied it, which the complainants did not establish.
Issues
- Claim denial primary · not upheld
“I am not satisfied the complainants have shown that they would have re-let the property had the damage not occurred.”
- Delay secondary · not upheld
“The insurer did not unreasonably delay in its management of the claim and the complainants are not entitled to any compensation as a result.”
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination | Case number: 543596 Page 1 of 7
Determination
Case number: 543596 14 February 2019
1 Determination overview
1.1 Complaint
The complainants (Mr G and Mrs G) hold a landlord and investment insurance policy
with the financial firm (insurer) that covers an investment property (property).
On 13 July 2017, a hot water system burst and caused major damage to the property.
The complainants lodged a claim, which the insurer has accepted. The damage to the
property has now been repaired. This complaint relates to whether the:
complainants are entitled to cover for loss of rent while the property was being
repaired, and
insurer unreasonably delayed in its handling of the claim.
1.2 Issues and key findings
Are the complainants entitled to cover for loss of rent?
At the time of the loss, the property was not tenanted. The information does not
support the property would have been occupied by a paying tenant, had the loss not
occurred. This means the insurer is not required to pay the complainants for loss of
rent while the property was being repaired.
Did the insurer unreasonably delay in its claims handling?
The damage to the property was extensive and required significant repairs. Even at
the beginning of the claim, the experts estimated the repairs would not be complete
until December 2017, which is what occurred. The insurer did not unreasonably delay
in its management of the claim and the complainants are not entitled to any
compensation as a result.
1.3 Determination
This determination is in favour of the insurer. The insurer is not required to take any
further action in relation to the claim.
Determination | Case number: 543596 Page 2 of 7
2 Reasons for determination
2.1 Are the complainants entitled to cover for loss of rent?
Policy provides cover for “Loss of Rent caused by an Insured Event”
There is no dispute between the parties that:
the terms of the policy are set out in the product disclosure statement (PDS)
on 13 July 2017, an insured event occurred when the hot water system at the
property burst
the complainants are entitled to cover under the policy
the property was not tenanted on the date the loss occurred (13 July 2017), and
the property repairs were not complete until 15 December 2017.
It took the insurer five months to repair the damage to the property. The complainants
seek cover under the policy for loss of rent for this period.
Page 16 of the PDS relates to loss of rent and states:
Loss of Rent
We cover: If we agree your building cannot be lived in because it has
been damaged as a result of an insured event, we will pay
the amount of rent lost while your building is being rebuilt
or repaired.
…
We do not cover: Loss of rent:
…
if the building was not occupied by a tenant paying rent
(but we will pay if you satisfy us that the building would
have been occupied by a paying tenant had the
damage not occurred).
The insurer says the complainants are not entitled to cover for loss of rent because:
at the time of the insured event, the property was not occupied by a tenant, and
the complainants have not satisfied it that the property would have been occupied
by a paying tenant had the damage not occurred.
Property would have been sold had the insured event not occurred
The property was previously occupied by long-term tenants who vacated the property
on 6 June 2017. On 10 July 2017, the complainants entered into a contract to sell the
property to Mr JS. The complainants say that this contract was conditional upon Mr
JS obtaining finance and that as he failed to do so, the sale did not proceed as
scheduled on 31 July 2017. The complainants say that had the damage not occurred,
they would have arranged to re-let the property to new tenants.
Determination | Case number: 543596 Page 3 of 7
I have considered the information provided by the complainants to support their
position they would have re-let the property had the damage not occurred. I do not
agree the information provided supports their position. Rather, I consider the
information shows that had the damage not occurred, the property would have been
sold. This is because:
after the repairs were complete (in December 2017), Mr JS purchased the property
on 28 September 2017, Mrs G telephoned the insurer and added Mr JS as an
authorised party the insurer could discuss the claim with
during a telephone call with Mr JS on the 28 September 2017, he told the insurer
there was a valid contract in place and described himself as the purchaser
after 28 September 2017, there were several interactions between the insurer (and
its contractors) and Mr JS
the titles office information shows that the date of the contract of sale between the
complainants and Mr JS remained 10 July 2017, which suggests that another
contract of sale was not entered into between the parties, and
several of the emails passing between the parties make reference to the pending
sale of the property.
Insurer not required to pay loss of rent
The exclusion clause relied on by the insurer contains a carve out that operates to
provide cover for a loss of rent claim when:
a property is not tenanted at the time of the damage, and
the insured can provide sufficient evidence to satisfy the insurer the property would
have been occupied by a paying tenant had the insured event not occurred.
I am not satisfied the complainants have shown that they would have re -let the
property had the damage not occurred. I consider it was reasonable for the insurer to
conclude the property would have been sold (or the sale would have gone through
earlier) had the damage not occurred. It follows the insurer is not required to pay them
for loss of rent.
2.2 Did the insurer unreasonably delay in its handling of the claim?
Insurer must act fairly and promptly to resolve a claim
When considering whether an insurer has delayed processing an insurance claim, we
will look at whether:
the insurer acted fairly and promptly to resolve the claim
there has been an unreasonable delay
there were factors which were outside the control of the insurer or otherwise
unavoidable
the insured’s actions caused or contributed to the delay.
Determination | Case number: 543596 Page 4 of 7
If we decide the insurer unreasonably handled or delayed the claim, we will look at
what loss (if any) stemmed from that conduct.
Complainants say insurer unreasonably delayed in its handling of the claim
The complainants have provided detailed reasons about why they say the insurer
unreasonably delayed managing the claim. These reasons include:
a delay of 10 days for a professional flooring expert to return from holiday to obtain
a view about how best to progress the claim
between 18 August until 27 September 2018, the complainants had numerous
phone calls with interested parties regarding concerns that only a domestic heat
pump was being used to assist drying the concrete slab
on 28 August 2018, moisture tests were unable to be done because of a broken
machine
ge neral delays in the insurer’s loss assessor (JCS) answering and returning calls.
While the complainants have raised several concerns regarding the time taken to
finalise the claim, their main concern relates to the insurer’s failure to install
commercial heaters at the property to assist with drying the concrete slab. The
complainants attribute a delay of at least 40 days to the insurer’s decision in this
regard. They say the fact the concrete slab dried relatively quickly after the heaters
were eventually installed demonstrates this.
Completion date of December 2017 was contemplated in the initial expert
material
Upon lodgement of the claim, the insurer engaged several experts to investigate and
manage the claim. These included loss assessors (JCS), as well as a building
contractor (TPC) who ultimately completed the repairs. The reports provided also
show the views of other experts were sought during the process.
The timber floorboards in the property were laid over plywood sheeting, which was
glued to the concrete slab. Upon removal of the water-affected floorboards and
plywood, it was discovered the concrete slab was significantly water affected. Prior to
commencing the installation of the new floorboards, the moisture reading of the
concrete slab had to be at a certain level. The Australian Standards are that the
relative humidity level should be 75% or less before timber flooring can be installed.
On 21 July 2017, TPC issued a report outlining the steps it had taken to progress the
claim. TPC initially sought the opinion of a professional flooring contractor (CF). CF
conducted moisture tests but expressed concern about guaranteeing works given the
moisture levels detected in the slab. TPC subseq uently sought the opinion of another
professional flooring contractor. TPC states that builders had conducted moisture
testing of the damaged flooring and the floors would need to be unsealed for “approx.
6 to 10 weeks” and that further testing would be required to confirm if the floorboards
could be sealed. The report then goes on to state:
Determination | Case number: 543596 Page 5 of 7
After talking to both the floor layers we believe that if the floor does not dry after 6
to 10 weeks we will then have to pull the boards and ply up also we will then need
to purchase the new flooring and it will then need to sit in the house for approx. 3
to 4 weeks to climatize to the home and this would then put the claim finish date
at December best case scenario.
Even at the early stages of the claim, the experts contemplated the lengthy period of
time that would be required to complete the repairs. Indeed, the initial report
anticipated the possibility that the repairs would not be complete by December 2017 –
this is what ultimately occurred. In my view, this initial timeframe provided by the
experts is noteworthy and I have placed significant weight on its contents.
The concrete slab required significant drying time
As noted, the moisture content of the slab had to be less than 75% humidity level
prior to other repairs being undertaken. The material shows that the regular
attendances were performed at the property to monitor the drying of the concrete
slab.
It was not until 29 September 2017 that TPC (on the advice of a flooring contractor),
installed a domestic heat pump at the property to assist in drying the concrete. In
explaining the decision not to use a domestic heat pump earlier than this, the insurer’s
experts have said:
The view was that concrete slabs have to be dried slowly. If they are dried too
quickly you are only drying the top portion and moisture will continue to wick up
from lower levels. This theory is supported by the length of time that it took for the
slab to dry once the commercial drying equipment was installed.
I understand that around this time, dehumidifiers were also installed at the property.
The insurer has explained that the dryers projects air up into the property, which then
draws over the slab and is captured by the dehumidifiers.
I am satisfied the insurer has provided sufficient information to show that its decision
not to install the domestic heat pump and dehumidifiers at the property until 29
September 2017 was reasonable. I note the reports supplied prior to this time
demonstrate the advice of flooring contractors and experts was sought. TPC’s initial
report anticipated that the flooring would need to be unsealed for 6-8 weeks (taking
the timeframe to mid-September 2017) and that further testing would occur after this
time. It appears that it was after this subsequent testing that the decision was made to
install the heaters and dehumidifiers.
There is no expert material before me and upon which I can conclude that the
decision to wait until 29 September 2017 was unreasonable. To the contrary, the
expert material suggests that it was reasonable for this to have occurred.
Determination | Case number: 543596 Page 6 of 7
After the installation of the heaters and dehumidifiers, further testing was undertaking.
By 19 October 2019, the moisture reading for the concrete slab was 74.9%. This was
an acceptable level and TPC were able to commence the repair works shortly after.
Further steps were required to finalise the repairs.
After the moisture level of the concrete slab was at an acceptable level, further steps
were required to finalise the repairs including:
a moisture barrier was required to be laid
the hardwood timber flooring had to be delivered and a climatization period
the hardwood flooring needed to be installed
at least one week was required for the hardwood flooring to settle, and
the hardwood flooring needed to be sanded and sealed.
I am satisfied it was reasonable for the insurer to wait for the moisture level of the
concrete slab to be at an acceptable level prior to commencing the climatization
period. This is because the flooring needs to rest in the environment in which it is to
be installed.
The information shows that, after the moisture level of the slab was at an acceptable
level, it took the insurer 8 weeks to finalise the repairs. The repairs were finalised on
15 December 2017 – which is in line with the initial estimate given in July 2017.
Insurer did not unreasonably delay the claim
I acknowledge the complainants ’ concerns regarding the length of time taken to repair
the property and have no doubt this has caused a significant level of stress and
frustration. However, the fact the repairs took five months does not, on its own, show
there was an unreasonable delay or that the insurer has otherwise made an error. To
be entitled to compensation for the manner in which the claim has been managed, it
must be shown that the insurer (and it ’s agents) have made an error or acted
unreasonably.
Having carefully reviewed the material, I do not consider the insurer has acted
unreasonably. The nature and extent of the damage sustained to the property meant
that it was always going to take a significant period for the repairs to be finalised. I
consider the length of time taken was unavoidable and not the result of any error.
I am also satisfied the insurer kept the complainants adequately informed about the
progress of the claim and the steps it was taking to finalise the matter.
There is no information before me to show th e insurer’s decisions were incorrect and
unreasonable. It therefore follows the complainants are not entitled to any
compensation for the length of time it took to repair the damage.
Determination | Case number: 543596 Page 7 of 7
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
D ispute complaint
C laim claim
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.