After a fire, the insurer cash settled the building and contents claims. The complainant disputed the amounts and the handling. AFCA ordered payment of builder's insurance and supervision costs with interest, confirmation of guttering, and $1,500 non-financial loss, but found the complainant had not established further indemnity.

The insured bears the onus to prove the extent of loss, but the insurer must include reasonable replacement costs it would otherwise omit and must resolve its own error promptly.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 543582 Page 1 of 13 Determination Case number: 543582 19 June 2019 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) after his property was damaged by fire. The insurer accepted the claim and offered to either authorise repairs or cash settle the complainant. The complainant did not confirm his preferred method of settlement and the insurer cash settled based on its scope of works and quote. The insurer also paid the complainant $15,000 for damaged contents because insufficient detail was provided. The complainant says it provided the same level of detail to the insurer as the insurer provided to him in relation to the building claim. Therefore, his contents claim should be accepted. The complainant also complains about th e insurer’s handling of the claim and whether the insurer had met its obligations under the policy. The complainant says the insurer has questionable practices and it deliberately chose not to provide detailed information about the proposed building repairs, so he could properly consider the cash settlement. The case manager issued a recommendation in favo ur of the insurer. As the complainant does not accept the recommendation, the complaint has been referred to me for determination. 1.2 Issues and key findings Is the insurer liable to indemnify the complainant further for the building claim? On the available information, the insurer is not liable to indemnify the complainant further for the buildings claim in the absence of adequate proof of the extent of loss and damage incurred. The complainant has not established that the replacement costs would be higher than the value already settled. However, the scope of works and drawing plans do not make it clear if the insurer included guttering on the shed. The insurer also failed to include the cost of the builder’s insurance and site supervision in its cash settlement. The insurer is liable for these further costs. Determination | Case number: 543582 Page 2 of 13 Is the insurer liable to indemnify the complainant further for the contents claim? On the available information, the insurer is not liable to indemnify the complainant further for the contents claim in the absence of adequate proof of the extent of loss and damage incurred. Is the complainant entitled to a remedy because of the insurer’s claims handling? While the insurer accepted it did not provide enough detail in its initial scope of works and quote, it has taken appropriate measures to address this error. However, the available information shows the insurer’s conduct caused inconvenience and it took too much time to resolve the situation which would have interfered with the complainant’s expectation of enjoyment or peace of mind. In the circumstances, an award of compensation of $1,500 is warranted. 1.3 Determination This determination is substantially in favour of the insurer. Within 30 days of notification of the complainant’s acceptance of this determination, the insurer is to:  confirm if guttering is included in the cash settlement value for the shed  if not, increase its settlement value by the cost of guttering  pay the complainant $500 for builder’s insurance a nd $480 for supervision costs  apply statutory interest in accordance with section 57 of the Insurance Contracts Act 1984 , to the additional cash settlement value  pay the complainant $1,500 compensation. In the absence of further information from the complainant which establishes the extent of loss sustained to the buildings or contents, the insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 543582 Page 3 of 13 2 Reasons for determination I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous decisions. I have considered all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. Complainant made further submissions after the recommendation After the recommendation, the complainant made further submissions. He provided no new material. Although at first, he accepted his list of contents was not detailed enough, he later indicated he wanted all issues in dispute dealt with in the determination. Where relevant, the further submissions will be referred to in the determination. 2.1 Is the insurer liable to indemnify the complainant further for the building claim? Complainant must establish the extent of loss and damage The complainant must establish on the balance of probabilities that he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. It is not in dispute the complainant’s buildings and contents were damaged in a fire. However, not only must the complainant establish the buildings and contents were damaged in a fire, the complainant also has the onus of proof to establish the extent of loss and damage sustained. After the recommendation, the complainant essentially reiterates his position in relation to the building claim which is that the insurer has not provided enough information in its scope of works and quote for the building items to show it has indemnified him on a new for old basis. He reiterates his request for this information. Amongst other things, the complainant says:  he should not have to get his own quote to show what the replacement costs are  the kit shed brochure and drawing plans for the shed do not show a new for old replacement, does not allow for gutters and is based on incorrect sizes  the original greenhouse was on a slope; however, the drawing plans do not show allowance for building on a slope  the scope of works does not allow for replacement of the irrigation system as opposed to the irrigation pipe. Determination | Case number: 543582 Page 4 of 13 The insurer has not responded to the additional informa tion or provided any material after the recommendation. Complainant must assist the insurer in its assessment of the claim The complainant says the level of detail provided in the scope of works and quote for the replacement of the shed, green house and irrigation system is not sufficient to determine whether the insurer has considered everything which was lost in the fire. The complainant says: ‘ To be able to price a like for like replacement, you would first have to know what you need to replace. And in doing so, you would need to create a detailed list of what needs replacing. It shouldn’t be difficult to provide that detailed list . ’ This indicates the complainant contends it is solely the insurer ’s responsibility to determine everything which was lost in the fire. However, the nature of the policy and the contractual relationship between the parties, requires the parties to cooperate and assist each other. The responsibility is not solely on the insurer to provide sufficient detail to show it has assessed everything, especially when items have been lost or damaged entirely; whether by fire or another covered incident. The policy states the complainant also has a responsibility to establish the extent of loss or damage and provide evidence which supports the extent of loss suffered. The insurer is entitled to rely on the complainant’s assistance and the complainant’s knowledge of his property, to determine its liability. The available information shows the insurer has requested the complainant provide further detail about what was damaged, whether contents or buildings. The complainant has not adequately assisted the insurer in this regard. Insurer cash settled $51,790 for the shed, greenhouse, irrigation and tank The insurer cash settled the complainant $42,587.22 for the damaged boundary fencing and reimbursement of other damaged items. These items are not in dispute. The insurer also cash settled the complainant a total of $51,790 for the damaged garden shed, greenhouse, irrigation and water tank. The available material establishes issues with the water tank are not in dispute. As for the other items, the complainant says:  the drawing plans for the replacement shed are not the correct size, do not have the correct door and it cannot be determined if the plans include gutters  the scope of works does not have enough detail to show him whether it includes replacing the irrigation system rather than just the pipe Determination | Case number: 543582 Page 5 of 13  the drawing plans for the greenhouse show it on a flat s urface when it was on a slope. Information provided does not establish the shed settlement was incorrect The insurer’s builder (RC) quoted twice. RC quoted $17,000 to: ‘ Cut and remove existing damaged garage concrete slab and replace with new. Supply and install garage based on plans provided by [RC]. Shed size, roof pitch, door/window openings may have to change slightly so they are inline (sic) with standard sizes used by shed supply companies. ’ The complainant says the plans are based on a kit shed and the dimensions are incorrect. The complainant says instead of 6 metres, it should be 6.1 metres and instead of 3 metres, it should be 3.4 metres. The complainant has the complete replacement cover option. He is, therefore, covered for the insurer’s cost to repair or rebuild the damaged shed on a new for old basis. The policy states ‘new for old’ means the insurer will repair to the same type , standard and specification. However, if the same is not available, then it will repair to a similar type, standard and specification as when new. The scope of works and quote was based on the insurer’s site attendance s, information from a shed builder and photographs. Even if I accepted the dimensions are incorrect, I am satisfied the quote and scope of works recognises the sizes may be subject to change slightly to be in line with standard sizes used by shed supply companies. Replacement costs based on a kit shed is, therefore, not contrary to the policy terms if this is what is available for replacement. This is in accordance with the new for old cover and does not result in the conclusion the insurer has incorrectly quoted on the replacement cost. I am satisfied the available material establishes the settlement cost for the shed was based on what it would cost the insurer to replace the shed new for old. The complainant has not provided any information to show it would cost him more to replace the shed on a new for old basis. If the shed was not originally a kit shed and will cost more to replace, the complainant must establish this. Difference in shed door types does not mean the settlement is incorrect The complainant says the scope of works includes the incorrect door type, a roller door instead of a tilt door. However, the information establishes the roller door costs more to install. As the insurer has cash settled the cost of the roller door, there is no monetary consequence on the complainant for the difference in door types. Determination | Case number: 543582 Page 6 of 13 The complainant says he prefers a tilt door because it provides shade and shelter when working in the shed. However, as he has been cash settled, he can replace the shed himself with either a roller door or a tilt door. Insurer to confirm if the garden shed plans include guttering While there is no information to show a new shed would cost the complainant more than the quoted amount, I accept the updated quote and drawing plans do not make it clear if it includes guttering. Within 30 days of the complainant’s acceptance of this determination, the insurer is to confirm whether the drawing plans and quote include an allowance for the same or similar type, standard and specification as the guttering on the damaged shed. If the plans do not include guttering, the insurer is to make an allowance for this. Information provided does not show replacement cost of the irrigation system is incorrect The insurer has allowed $8,250 for the removal and replacement of the rural irrigation water pipe at the property. The quote has been based on the assessor’s scope of works, which says the poly irrigation system has been damaged. The complainant has not provided information to show the replacement of the damaged irrigation system would cost more than $8,250 or confirmed how much it cost the complainant to install the irrigation system originally. Without information from the complainant to show either replacement of the irrigation system, or the original cost to install it, was higher than $8,250, I am not satisfied the available information establishes the insurer has not met its liability under the policy to pay to the complainant what it would cost the insurer to repair the damaged irrigation system. Information provided does not show replacement cost for greenhouse is incorrect The complainant says the insurer’s drawing plans for the greenhouse show it to be on a flat surface, however, the greenhouse was on a slope. The complainant was concerned the insurer had not sufficiently considered the material difference caused by the slope. The insurer has settled the complainant $11,000 for the replacement cost of the greenhouse on a new for old basis. The photographs of the greenhouse show it was not on level ground or a slab. However, having considered the available material, I am satisfied the drawings, plans and quote represent the replacement cost for a greenhouse to the same or similar type, standard and specification as when the damaged one was new. Determination | Case number: 543582 Page 7 of 13 The complainant has not provided sufficient information to show the installation cost of the original greenhouse or the current replacement cost of the greenhouse would be more than $11,000. Provision of a quote by the complainant The complainant says it is not an option for him to get his own quotes for replacement because even if his quote was higher than the insurer’ s, it would not establish that the insurer has not honoured the claim. The complainant is correct in the sense that the policy states the insurer’s liability only extends to the insurer’s cost in replacing the damaged property, not the complainant ’ s cost. However, the insurer must ensure the replacement cost is reasonable and relevant to the complainant’s costs . That means, it must adequately reflect what it would cost the complainant to organise the replacement or repairs himself. Therefore, if the complainant provided his own comparative quotes, it would assist to determine whether the insurer has met its liability under the policy. The complainant says he has not obtained his own comparative quote because he had to pay for it. He also complains the insurer did not address his suggestion the insurer pay for a comparative quote. However, in view of the policy terms and the complainant’s onus to establish the extent of loss, I am not satisfied this response is adequate. The complainant has the onus to establish the extent of loss or damage he has suffered. From the available material, I am not satisfied the complainant has satisfied this onus. In the absence of any further information from the complainant, this determination is made on the available information. Insurer is to increase the settlement offer to include insurance and supervision Some of the insurer’s amended quotes for replacement, during the claim, included costs for insurance and supervision. However, the quote which determined the final settlement value did not include these items. It is reasonable that the insurer pays the complainant the original quoted value for builder’s insurance ($500) and supervision ($480) given these costs would be incurred if the complainant is to organise repairs himself. Insurer to pay for insurance and supervision and confirm if the guttering is included in the cash settlement On the available information, and for the reasons outlined above, should the complainant accept this determination, then, within 30 days of notification of the complainant’s acceptance, the insurer is to:  confirm whether guttering is included in the drawing plans and quote for the shed Determination | Case number: 543582 Page 8 of 13  if not, increase its settlement value by the cost of guttering  pay the complainant $500 for builder’s insurance and $480 for supervision costs  apply statutory interest in accordance with section 57 of the Insurance Contracts Act 1984 , to the additional cash settlement value. In the absence of any further information from the complainant regarding details or specifics on what was lost in the fire, the value of the property to be replaced and the cost of replacement, the insurer is not required to take any further action in relation to the claim or the complaint. 2.2 Is the insurer liable to indemnify the complainant further for the contents claim? Complainant did not provide sufficient details of the damaged contents Initially, the complainant said he accepted the finding in the recommendation that his list of contents was not sufficient. He then requested for all his complaints to be addressed in the final determination. The complainant claims $83,938.54 for damaged contents. He provided a ver y limited description of those damaged contents. He said this was because the insurer had provided a very limited description of the building damage. In the circumstances, the insurer cash settled the complainant $15,000 based on information from its assessor. The assessor noted a large shed full of contents had been destroyed. The complainant told the assessor he would prepare a contents list once the shed structure debris had been removed. The policy terms are clear. The complainant must establish the extent of loss he has suffered. He is obliged to give an accurate and full detail of what was damaged and give proof of value and ownership for the items claimed. The material provided indicates he has not complied with the necessary proofs. In the circumstances, I am satisfied the insurer is not obliged to pay anything further than $15,000 until the necessary proofs are provided. The insurer is not liable to compensate the complainant further for the contents items, unless the complainant complies with the policy terms and provides the required information about the details, ownership and value of the damaged contents. If this occurs, the insurer is to consider whether it is liable to compensate the complainant further under the policy. Determination | Case number: 543582 Page 9 of 13 2.3 Is the complainant entitled to a remedy because of the insurer’s claims handling? Compensation paid in some circumstances The complainant says he has the right to confirm the insurer has honoured the conditions of the policy. He says it was impossible to do so without the detailed information the insurer possessed and would not provide. Because of this, he said he could not determine whether the offer made was fair or not. In the circumstances, he contends he was forced into a cash settlement. He points out in the internal complaints process, the insurer admitted the level of detail it provided in the first scope and quote was insufficient. While the insurer provided additional information, the complainant says this proves the insurer still does not understand what was lost in the fire. Because of this, the complainant submits the insurer has not honoured the new for old condition of the policy. He says the insurer ignored his request to confirm that it provided all the detailed information in its possession. He complains he spent many hours going through the complaint process which could have been avoided if the insurer provided full detailed information when he first asked for it. The insurer says it tried on many occasions to confirm how the complainant would like to proceed with claim. Further, at all times, before the cash settlement, the insurer says its builder was able to complete the repairs. It says the complainant has not provided information to show the scope of works is incomplete or inadequate. The insurer also says the complainant was reimbursed once the complainant advised of payment preference. It denies it forced a cash settlement. It says it cash settled the amount of the cost to the insurer to complete repairs to fulfil its liability under the policy. We can allow the payment of compensation (capped at $3,000) for non-financial loss. We may decide an insurer should compensate a complainant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant’s expectation of enjoyment or peace of mind. Fair the insurer pays the complainant $1,500 compensation The insurer accepted its initial scope and replacement quote for the damaged buildings did not contain enough information for the complainant to fairly consider whether the cash settlement value was appropriate. The insurer addressed its error. The file notes and email trails show the insurer attempted to gather further information from the complainant to adequately determine Determination | Case number: 543582 Page 10 of 13 its liability. The insurer also attempted to gather further information by providing plans/drawings of the shed and greenhouse. When an insurer has made an error, it needs to be provided the opportunity to correct its error and place the complainant in the position he would have been in, but for that error. I am satisfied the insurer has genuinely attempted to do this, despite failing to include the costs of builder’s insurance a nd supervision. I am not satisfied the insurer deliberately failed to provide detailed information in its quotes and scope of works or tried to mislead the complainant. However, I am not satisfied the insurer addressed the complainant’s issue promptly. I t was not until 14 May 2018, the insurer agreed the level of information given was not sufficient for the complainant to fairly consider the quote. At that time, the insurer indicated that it would try to get a more detailed quotation or appoint another builder. As set out above, I am satisfied it tried to get a more detailed quotation. However, it was not until 25 September 2018, all information was at hand and the assessor was able to review the new information. We take a conservative approach to compensation for non-financial loss. In the circumstances of this dispute, I consider the insurer’s conduct caused inconvenience and took too much time to resolve the situation which would have interfered with the complainant’s expectation of enjoyment or peace of mind. I am satisfied it is fair in all the circumstances the insurer pays to the complainant $1,500 compensation. Determination | Case number: 543582 Page 11 of 13 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.1 Our approach It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant terms of the policy The relevant policy extracts are referred to in the correspondence between the parties and in the insurer’s Notice of Response dated 1 October 2018. Both the policy document and the Notice have been exchanged with the complainant. Establishing your loss You will need to prove that an incident covered by yo ur policy has occurred and also the extent of the loss or damage you have suffered. Proof of ownership We may ask for proof of ownership in the event of a claim. Determination | Case number: 543582 Page 12 of 13 To process the claim, you must When requested, provide us with all proofs of ownership and value, information, co- operation and assistance in relation to a claim (including attending an interview or giving evidence in court if required) as we may reasonably require; Describe your loss or damage You must also give us accurate and full details of what was lost, stolen or damaged and give us proof of value and ownership for items claimed if we request it. When your contents are damaged Allowing us, a repairer or an expert appointed to us, to look at what is damaged is usually all that is needed to prove your loss. Sometimes though we might ask you to produce recent photographs of the building and/or your contents or other evidence that supports the extent of the loss you have suffered. For valuable and badly damaged items, we may ask you to provide proof of ownership and value. If we decide that you are unable to reasonably substantiate your claim, we might reduce or refuse your claim. When the building is damaged Allowing us, a repairer or an expert appointed by us, to look at what is damaged is usually all that is needed to prove your loss. Sometimes though we might ask you to produce a copy of the most recent plans and drawings for the building, photographs of the building or other evidence that supports the extent of the loss you have suffered. If we decide that you are unable to reasonably substantiate your claim, we might reduce or refuse your claim. How to prove ownership and value For lost, damaged or stolen items that are no longer available for inspection (e.g. an electrical appliance that is part of the building), you must validate your claim by giving us details of when and where they were purchased and reasonable proof of ownership and value. A statutory declaration is not of itself considered acceptable evidence of proof of ownership and value. If we decide that you are unable to reasonably substantiate your claim, we might reduce or refuse your claim. Determination | Case number: 543582 Page 13 of 13 3.3 Matters not addressed in this determination The complainant says the insurer has engaged in several unfair and questionable practices which breach the General Insurance Code of Practice and which need to be addressed so they do not happen again. The complainant was advised Code breaches will be not be addressed in this determination, but we will review and report any breaches to the necessary authority where considered appropriate. This determination has not addressed any Code breaches because it is not the forum to do so. 3.4 Other relevant material considered and relied on  p arties’ submissions, photographs, reports and emails and all attachments to all correspondence both before and after the recommendation  i nsurer’s claim file notes  correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.