Insurer's cash settlement of a water and mould damage claim after repair dispute; complainant sought total loss settlement

FirmFinancial Firm (Unknown - Insurer)
Decided2019-03-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$8,887
Non-financial loss$1,500
Amount claimed$467,121
SourceAFCA PDF

Summary

After a leaking pipe claim, the insurer cash settled instead of repairing, and the complainant disputed the amount and the contractor's mould remediation. AFCA rejected a total loss, increased the cash settlement by $8,886.63 and awarded $1,500 for claim handling, with an option for further assessment or a fixed $13,126.63 for unassessed damage.

Repairs were possible for less than the building sum insured, but the insurer's contractor remediation was inadequate and the relationship had broken down, so a cash settlement sufficient for the complainant's own contractors was the only feasible resolution.

Issues

Subjects and remedies

home or building damagepay claimpay non financial lossreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 542318 Page 1 of 13 Determination Case number: 542318 28 February 2019 1 Determination overview 1.1 Complaint The complainant lodged a claim under her home insurance policy with the financial firm (insurer) for damage caused by a leaking pipe. The insurer accepted the claim and arranged for its contractors to carry out the necessary repairs, including mould remediation. However, after a dispute arose during the repair process, the insurer decided to cash settle the claim. The complainant says the cash settlement amount is not sufficient to repair all of the damage to her home. She says the inadequate remediation works carried out by the insurer’s contractors resulted in the sp read of mould throughout the property such that it can no longer be repaired. The complainant seeks payment of the maximum sum insured for the building ($332,021) and contents ($44,100), plus an additional amount of $91,000 for the cost of obtaining alternative accommodation for a period of twelve months. She also seeks compensation for losses incurred due to the manner in which the insurer handled her claim. 1.2 Issues and key findings Should the building claim be settled as a total loss? The available information establishes that the damage to the property caused by the leaking pipe (and the actions of the insurer’s contractors) can be repaired for less than the amount of the building sum insured. Accordingly, the insurer is not required to settle the claim as a total loss. How should the claim be resolved? The cash settlement amount paid to date should be increased by $8,886.63 to better reflect the cost of the building repairs and temporary accommodation. Determination | Case number: 542318 Page 2 of 13 The complainant may elect to accept a further amount of $13,126.63 in full and final settlement of her claim for certain additional damage to the building and contents, which has not yet been assessed. Alternatively, the complainant can elect to have the insurer undertake a further assessment in order to quantify the additional damage (which may result in payment of a higher or lower amount). Is the complainant entitled to compensation? The complainant is entitled to compensation of $1,500 as compensation for losses suffered due to the insurer’s claims handling. 1.3 Determination This determination is partially in favour of the complainant. The insurer is required to pay the complainant the amount of $10,386.63 for building repairs, temporary accommodation and compensation. This amount relates to the damage already assessed and is in addition to any amounts paid to date. The insurer is also required to pay the complainant an additional amount to reflect certain damage to the building and contents which has not yet been assessed (as described in section 2.2 below). The complainant can elect to have this additional amount determined in one of two ways. The complainant may elect to either:  accept the amount of $13,126.63 for the unassessed damage, in which case no further assessment will be carried out, or  have the insurer undertake the further assessment process outlined in section 2.2 (in which case, the additional amount may be more or less than $13,126.63). The payments provided for under this determination are to be paid by the insurer in full and final settlement of the claim and all other issues raised by the complainant during the course of this complaint. The insurer is not required to make any payments until the complainant has provided it with the keys to her property, to allow the insurer’s contractors to remove their equipment. Determination | Case number: 542318 Page 3 of 13 2 Reasons for determination 2.1 Should the building claim be settled as a total loss? Insurer accepted claim for escape of water The complainant’s policy provides cover for damage caused by the events listed in the policy (including the insured event of ‘water or other liquid damage’), subject to the conditions and exclusions set out in the policy. The property was damaged by water from a leaking pipe in the wall behind the shower recess. The leak was discovered in June 2018 but is likely to have been present for some time, given the nature of the leak and the extent of the damage. The insurer’s loss adjuster (CL) confirmed there was water and mould damage to the bathroom in the area around the leaking pipe. Accordingly, the insurer accepted the claim. Cash settlement includes amount for additional mould remediation The insurer appointed its restoration contractor (SM) to carry out mould remediation and its builder (AC) to complete the building repairs. The insurer also arranged temporary accommodation for the complainant and her family. After SM completed the mould remediation to the bathroom, the complainant raised concerns about the presence of mould in other rooms at the property. Accordingly, the insurer appointed a mould specialist (PS) to investigate. PS reported that the insurer’s restoration c ontractor (SM) had failed to adequately remediate the mould in the bathroom and implement appropriate containment measures. PS observed that there was still visible mould and excessive moisture in the bathroom following completion of SM’s remediation work s, while mould-contaminated debris had been left outside the front door. However, PS concluded that the mould in the toilet and bedroom 2 was not related to the mould growth in the bathroom caused by the leaking pipe. PS advised that the mould in the toilet had been caused by rising damp, while the mould in bedroom 2 was caused by rainwater leaking through broken roof tiles. The complainant strongly disputes PS’s findings. She says all of the mould damage to the home was caused by the inadequate remediation works carried out by SM. Based on PS’s report, the insurer initially limited its liability for mould remediation to the bathroom and certain other areas in the immediate vicinity. However, the insurer Determination | Case number: 542318 Page 4 of 13 subsequently agreed to pay for remediation works to all other areas of the house on a goodwill basis (although it does not accept it is liable for the damage to these areas). The cash settlement amount paid by the insurer in September 2018 included a total of $13,497.78 for mould remediation, based on quotations provided by SM. Available information does not show mould cannot be effectively remediated The complainant says the insurer should be required to cash settle her for the full amount of the building sum insured ($332,021) on the basis that her home is a ‘total loss’. The complainant’s home will only be a ‘total loss’ if it is unable to be repaired for an amount which is less than the building sum insured. The tests carried out by the insurer’s mould specialist (PS) identified mould in v arious rooms at the property. PS recommended that mould remediation works be carried out in accordance with industry-recognised guidelines. There is nothing in PS’s report which indicates that the mould at the property cannot be effectively remediated. The works outlined by PS addressed all of the mould- affected areas identified at the time (including those he considered were unrelated to the leaking pipe). The complainant says it is impossible to remediate the type of mould found at her home so as to remove the health risks for herself and her family. Accordingly, she considers the house needs to be demolished and rebuilt. The complainant has provided a report from her mould specialist (CH), who inspected the property in December 2018 and advised that it was affected by mould throughout. CH stated that the property is currently unfit for occupation and requires expert mould remediation to return it to its pre-damaged condition. However, CH did not suggest that the mould at the property could not be effectively addressed. The complainant’s environmental risk consultant (EA) reviewed photographs of the property and advised that any mould contaminated materials should be removed. However, EA did not make any detailed comments about remediation. The complainant has provided information sourced from various internet sites, which confirms the serious health risks associated with mould. However, this information is general in nature and does not establish that the mould growth at the complainant’s property cannot be effectively remediated. Determination | Case number: 542318 Page 5 of 13 Insurer is not required to settle claim as a total loss Based on the available information, the panel is satisfied that the mould at the property can be addressed by appropriate remediation works carried out in accordance with i ndustry guidelines. The complainant has not provided an estimate for mould remediation works (or the other building repairs required). However, given the estimates provided by the insurer, the panel is satisfied that the property can be repaired for an amo unt which is significantly less than the building sum insured. Accordingly, the insurer is not required to settle the building claim as a total loss. 2.2 How should the claim be resolved? Insurer is generally bound by election to repair As outlined above, the insurer initially elected to settle the claim by arranging for its contractors to repair the damage caused by the leaking pipe. Once an insurer makes an election to repair the insured property (rather than to cash settle the policyholder for the cost of the repairs), it is generally obliged to complete the repairs in accordance with the terms of the policy. However, circumstances may arise which make the conduct of repairs by an insurer untenable. In such cases, it is reasonable for the insurer to cash settle the claim, so the policyholder can engage their own contractors to complete the necessary repairs. Building claim should be cash settled In the present case, the dispute between the parties arose after the insurer’s mould specialist (PS) advised that some of the mould at the property had developed after water entered through broken roof tiles. The insurer advised the complainant she was required to fix the roof tiles and remove any associated mould in the ceiling cavity before it would proceed with the claim- related repairs. The complainant disputed PS’s findings and the insurer’s decision to limit its mould remediation works to the areas directly adjacent to the bathroom. As a result of the dispute, the insurer was unable to progress the repairs and decided to cash settle the claim instead. The panel is not satisfied that the insurer ever adequately addressed the complainant’s concerns about PS’s findings. The complainant’s position that the mould contamination to the other rooms was caused by SM’ s inadequate containment measures was based on the test results Determination | Case number: 542318 Page 6 of 13 included in PS’s report. These tests showed that the species of mould identified in the other rooms matched those found in the bathroom (and not those in the ceiling cavity). The insurer also sought to attribute the spread of mould to the actions of the complainant’s plumber, who repaired the broken pipe. However, the potential for mould contamination during the plumbing repairs is not unexpected and would usually be considered a direct result of the leaking pipe (and therefore covered under the policy). Nevertheless, based on the reports and photographs provided, the panel accepts that there was mould growth in the ceiling cavity. In these circumstances, it was reasonable for the insurer to postpone the claim- related remediation until this issue had been addressed. The presence of pre-existing mould woul d make it difficult to determine whether the insurer’s remediation works have been successful. As outlined above, the insurer subsequently included the cost of mould remediation to the other rooms in the cash settlement. Accordingly, the issue of what ca used the mould contamination to these areas is no longer directly relevant. Since the initial dispute arose, there has been ongoing conflict between the parties which has prevented them from progressing other aspects of the claim. Based on the claim history, the panel considers the relationship has irretrievably broken down and the complainant no longer has any trust or confidence in the ability of the insurer or its contractors to complete their appointed tasks. In these circumstances, the panel considers that the only feasible manner by which the claim can be resolved is by way of a cash settlement. However, the cash settlement amount must be sufficient to ensure that the complainant can engage her own contractors to complete the claim-related repairs. Cash settlement does not reflect full cost of claim-related repairs The cash settlement offered by the insurer includes a total of $34,177.54 for the building repairs, made up of:  $13,497.78 for mould remediation to the internal areas of the property, and  $20,679.76 for the repair of water damage to the bathroom, the adjoining laundry wall and the hallway flooring. These amounts were based on scopes of work and quotations provided by the insurer’s contractors - SM for the mould remediation and AC for the b uilding repairs. Determination | Case number: 542318 Page 7 of 13 Having carefully reviewed the available information, the panel is not satisfied that the cash settlement amount accurately reflects the full cost to the complainant of undertaking the claim related repairs. Among other things, the cash settlement amount does not include any allowance for:  variations in the mould remediation works or the building repairs which may be required during the course of these works (noting that an earlier, unrelated claim for water damage at the property required multiple remediation attempts)  the cost of post-remediation verification clearance testing (which is specifically excluded from SM’s quotation)  any discounts or rebates reflected in the quotations obtained by the insurer from its contractors, which would not be available to the complainant  the transfer of risk to the complainant due to the loss of the lifetime guarantee provided under the policy, as a result of the claim being cash settled, and  any increase in the cost of the repairs due to the passage of time. In addition, the cash settlement amount does not include the cost of any structural works to the bathroom. In his report, PS noted that a structural engineer may be required to advise on methods of removing weight bearing materials in the course of the remediation works. The cash settlement amount also excludes the cost of repairing any water and mould damage to the sub-floor of the toilet, which is adjacent to the bathroom where the leaking pipe was discovered. The insurer says it is not liable for the damage to the toilet area based on PS’s findings that this damage was isolated from the damaged area of the bathroom and therefore had not been caused by the leaking pipe. PS concluded that the damage to the toilet had been caused by rising damp or some other form of water entry through the sub-floor. While the panel acknowledges PS’s findings, there is an absence of substantive information to establish the presence of rising damp or any other water entry to the sub-floor area. Further, as a mould specialist, the panel is not satisfied that PS is appropriately qualified to determine the cause of the damage to the toilet. However, the panel notes that, after the complainant disputed PS’s findings , the insurer sought to arrange for a structural engineer (SR) to inspect the property and determine the cause of the damage to the toilet. SR would also have been able to advise whether any additional structural works were required to the bathroom. However, the compla inant was reluctant to allow SR’s inspection to proceed, while the dispute about the mould remediation works remained unresolved. Accordingly, the panel does not have the benefit of his findings. Determination | Case number: 542318 Page 8 of 13 Cash settlement amount for building repairs should be increased The panel considers the cash settlement amount of $34,177.54 for the building repairs should be increased by 15% ($5,126.63) to take account of the issues outlined above (excluding structural damage to the bathroom and toilet). There is insufficient information to accurately determine the insurer’s liability for structural damage. This depends on the extent of any additional repairs required to the bathroom and the cause of the damage to the toilet. In both cases, assessment by a structural engineer is required. Accordingly, the insurer should:  appoint an appropriately qualified structural engineer to inspect the property and prepare a scope of works for any additional repairs to the bathroom and toilet required as a result of the leaking pipe (and which are not provided for in AC’s quotation), and  obtain a quotation for the additional repairs from AC and cash settle the complainant for the amount of AC’s quotation plus 5%. However, the panel also recognises that the complainant wishes to return to her property as soon as possible and a further assessment will extend the time taken to resolve the claim. In the circumstances, the panel considers the complainant should be given the option of accepting an additional settlement amount, in lieu of that which might be determined through the further assessment process. In considering the amount to be offered, the panel has had regard to the likely outcome of the engineer’s inspection, given the limited information provided to date. The panel considers it fair and reasonable that the cash settlement amount be increased by an additional 15% ($5,126.63), in the event the complainant elects not to proceed with the further assessment. However, this amount will only be available if the complainant also elects to accept a final cash settlement for her contents claim (as discussed below). Damage to contents has not been assessed The complainant seeks payment of the full contents sum insured ($44,100) for mould damage to her contents. The complainant says her contents have been affected by mould growth caused by the leaking pipe and the inadequate remediation carried out by SM. The complainant raised concerns about mould damage to her contents during the early stages of the claim. The insurer’s loss adjusted (CL) advised that SM would Determination | Case number: 542318 Page 9 of 13 catalogue the affected items and attempt to restore them. However, it appears this aspect of the claim was not progressed. The insurer is willing to accept liability for damage to the complainant’s contents, subject to suitable evidence of loss being provided. However, the insurer says the complainant has not shown that the cost of restoring or replacing the damaged contents exceeds the contents sum insured. Complainant can elect to have contents assessed or accept settlement in lieu The complainant has provided a list of her damaged contents items, together with photographs of her home prior to the discovery of the leaking pipe. However, the panel is not satisfied that the information provided establishes that the damage to the complainant’s contents items exceeds the sum insured. For claims involving mould damage to contents, a detailed assessment is usually required to confirm the extent of the damage, as well as whether the items can be restored or need to be replaced. Accordingly, the insurer is required to:  appoint a restoration company (that has not been involved in the claim to date) to assess the damage to the complainant’s contents, and  cash settle the complainant for the estimated cost of restoring or replacing her damaged items, based on a quotation provided by the restoration company. For the reasons outlined above in relation to the building repairs, the panel considers the complainant should be given the option of accepting a cash settlement for damage to her contents items, in lieu of that which might be determined through the proposed assessment process. In the circumstances, the panel considers it fair and reasonable that the complainant be offered a cash settlement of $8,000 for damage to her contents, in the event she elects not to proceed with the further assessment. However, this amount will only be available if the complainant also elects to accept a final cash settlement for her building claim (as discussed above). Temporary accommodation should be increased by $3,760 The cash settlement paid by the insurer in September 2018 included an amount of $14,050.60 for approximately seven weeks’ temporary accommodation costs. When added to amounts previously paid by the insurer, this amount reflects the maximum benefit for temporary accommodation available under the policy (being 10% of the building sum insured). Determination | Case number: 542318 Page 10 of 13 The insurer says the cash settlement for temporary accommodation was sufficient to allow for the claim- related repairs to be carried out. The insurer’s contractors had estimated a period of four weeks for the repairs (including mould remediation). As outlined above, the panel has found that the cash settlement for the building repairs should be increased to allow for additional works and possible variations (including structural repairs). While the amount paid for temporary accommodation already includes a buffer, the panel considers it appropriate that this amount be increased by an allowance for an additional two weeks’ accommodation ($3,760). The panel acknowledges that both parties have contributed to the delays experienced during the claim process, which has resulted in the cap for temporary accommodation being reached. However, the panel consider these delays are primarily attributable to the dispute which arose regarding whether all of the mould contamination at the property had been caused by the leaking pipe. As outlined above, it is clear that the remediation works carried out by SM were inadequate. Further, the panel is not satisfied that the insurer responded adequately to the concerns raised by the complainant. In these circumstances, the panel considers the proposed increase in the allowance for temporary accommodation is fair and reasonable. Complainant is required to co-operate with insurer The insurer has been seeking to arrange access to the property for several months to remove equipment belonging to its contractors. Within 7 days of accepting this determination, the complainant is required to provide the insurer with keys to the property, to allow the insurer’s contractors t o remove their equipment. The insurer is not required to make any payments under this determination until the keys have been provided. If the complainant elects to have the insurer conduct further assessments (as provided for above), the insurer may retain the keys until such time as any such further assessments have been completed. 2.3 Is the complainant entitled to compensation? AFCA may award compensation Under the FOS Terms of Reference, AFCA can award up to $3,500 in compensation for consequential financial loss suffered by a complainant in connection with their claim. Determination | Case number: 542318 Page 11 of 13 AFCA can award an additional amount (of up to $3,000) as compensation for non- financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with expectation of enjoyment or peace of mind. However, AFCA takes a conservative approach to assessing compensation for non- financial loss. AFCA expects complainants to be moderately robust and tolerate a normal degree of inconvenience when making a claim. Complainant is dissatisfied with claims handling The complainant is dissatisfied with the manner in which the insurer managed her claim. Among other things, the complainant says the insurer and its contractors:  failed to properly assess her claim and complete mould remediation works to an adequate standard  advised her that her house was safe to return to after the remediation works had been completed, putting the health of herself and her family at risk and causing the death of the family cat  acted unreasonably in cash settling the claim after giving her only seven days to remediate broken roof tiles and mould in the ceiling cavity, and  provided her with misleading information and withheld documents during the claims process. Complainant is entitled to compensation of $1,500 Having carefully reviewed the claim history, the panel considers there are several aspects of the claim which the insurer failed to manage appropriately, As outlined above, the panel accepts that the mould remediation works carried out by SM were inadequate and are likely to have contributed to the spread of mould to other areas of the house. The panel also accepts it was reasonable for the complainant to assume it was safe to return to the house, on the basis that SM had advised the property had been treated for mould and the remediation works were complete. The fact that the insurer was providing alternative accommodation for the complainant and her family does not alter its responsibility for ensuring they were properly advised about the condition of the house (particularly when the insurer was aware they were keen to return to their home as soon as possible). While the insurer ultimately cash settled the complainant for the cost of more extensive remediation works, its failure to adequately address her concerns about the findings in PS’s report delayed the claim, causing the complainant additional stress and inconvenience. Determination | Case number: 542318 Page 12 of 13 Further, the panel is not satisfied the insurer gave the complainant a reaso nable opportunity to rectify the pre-existing mould issues in the ceiling cavity, before proceeding to cash settle the claim. The panel has reviewed the medical information provided by the complainant concerning the death of her cat and the health issues experienced by her family. However, based on the information provided, the panel is not satisfied that the complainant has established that these issues were caused by the actions of the insurer and its contractors. In the circumstances, the panel considers the complainant is entitled to compensation of $1,500. Determination | Case number: 542318 Page 13 of 13 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F in ancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 Our approach to this complaint This complaint has not been the subject of a recommendation. Due to the nature of the complaint, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the FOS Terms of Reference. The panel consists of an Ombudsman and two representatives with consumer and insurance experience. The panel has decided this complaint based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only.