Home / Financial Firm (Unknown - Insurer) / Determination 542007
Determination 542007
Partial decline of water leak claim
Summary
Complainant's insurer accepted resultant water damage from a split shower pipe but declined the cost of waterproofing and retiling to repair the pipe, and the complainant disputed the scope. AFCA found the partial decline and the offer consistent with the policy and no compensation warranted.
Waterproofing and retiling are consequential damage from repairing the leaking pipe itself, which is excluded, and no other insured event responds.
Issues
- Claim denial primary · not upheld
“I therefore consider the insurer was entitled to decline to cover the costs to waterproof and retile the bathroom”
- Claim amount dispute secondary · not upheld
“I am satisfied the insurer's offer for repairing the resultant damage aligns with its obligations under the policy”
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination | Case number: 542007 Page 1 of 6
Determination
Case number: 542007 26 February 2019
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) for damage following
a water leak at his property.
The insurer partially accepted the claim, saying the resultant damage from the water
leak is covered, however the costs to repair the leak itself are not covered.
The complainant disputes the insurer’s decision as well as the offer regarding the
resultant damages.
1.2 Issues and key findings
Was the insurer entitled to partially decline the claim?
I consider the insurer was entitled to decline to cover the costs to waterproof and
retile the bathroom.
In the absence of any information from the complainant to dispute the scope of works
provided by the insurer, I am satisfied the insurer’s offer for repairing the resultant
damage aligns with its obligations under the policy.
Is the complainant entitled to compensation?
I do not consider the insurer has erred in the assessment of the claim, or its actions to
settle the claim. It follows that the complainant is not entitled to compensation.
1.3 Determination
This determination is in favour of the insurer.
The insurer was entitled to partially decline the claim and the complainant is not
entitled to any compensation under 9.3 of our Terms of Reference (TOR).
Determination | Case number: 542007 Page 2 of 6
2 Reasons for determination
2.1 Was the insurer entitled to partially decline the claim?
Complainant has initial onus to establish prima facie claim
The complainant is required to show that, on the balance of probabilities, he has
suffered a loss caused by a risk insured against under the policy. This is known as a
valid (or prima facie ) claim.
If the complainant is able to establish a prima facie claim, then the onus shifts to the
insurer to show that, on the balance of probabilities, it is entitled to rely on an
exclusion under the policy or is otherwise entitled to deny the claim.
The complainant holds a home cover insurance policy providing cover for a number of
insured events, including water or other liquid damage.
The complainant lodged a claim on 22 January 2018, for water damage to his
property following a leak from a water pipe to the shower recess. The complainant
says he was away for a few days and when he returned to the property, noticed the
carpet in the bedroom was very wet. The insurer partially accepted the claim,
however it declined to cover the costs to repair the leak.
The complainant accepts he is required to replace the pipe, however says the insurer
is required to cover the damage to the whole shower recess after the pipe is replaced,
which includes waterproofing the whole shower and retiling.
Insurer says only resultant damage covered
The insurer appointed a builder (BB) to inspect the property, who stated:
there was water damage to the bedroom wall, skirting and carpet
a plumber attended and found a plastic water pipe to the shower recess had split,
causing a leak
the cause of the damage is due to the escape of water from the split plastic pipe to
the shower recess plumbing.
Following its make-safe works at the property, BB says it cut and sealed the hot and
cold water pipework to the ensuite shower in the roof space. The insurer says there
was no physical damage to the bathroom from BB’s inspection of the leak.
The insurer says BB completed a thorough leak detection test report, which satisfies
its obligations under the policy to find the source of the leak. In terms of paying a
reasonable cost to repair the damaged section of the building, the insurer says this
means the costs cannot be excessive. It says extending cover to remove and replace
all tiles to 300m past the shower recess and re-waterproofing the affected area is
excessive.
Determination | Case number: 542007 Page 3 of 6
The insurer says the policy covers resultant damage from the burst pipe, but not any
works associated with repairing the burst pipe itself. It says in order to access and
repair the split pipe, further tiles need to be removed which will result in the bathroom
needing to have the waterproofing re-done. It says this work is consequential damage
incurred to repair the pipe itself, not damage from the insured event, therefore it is
excluded under the policy.
Waterproofing and retiling not covered under the policy
The PDS provides the following cover under the insured event of water or other liquid:
Damage caused by water or other liquid which suddenly escapes from your or
your neighbour’s:
…
- Shower recess
…
If this Policy insures your building and we accept your claim, we ’ll pay a
reasonable cost to:
- Find the source of the leak
- Remove and repair the damaged section of your building (and only this section).
The PDS also provides the following specific exclusion under this insured event:
Costs to:
- Fix leaks
-Replace lost water
- Repair or replace defective parts or items that caused the damage, or the cost of
lost water as a result of a leak
…
The PDS defines damage or damaged to mean:
When an item insured by this Policy is physically harmed, but not from wear and
tear.
There is no dispute the waterproofing and tiling were not damaged by the leaking pipe
or by the inspection of the leaking pipe. Although these items will need to be replaced
once the leaking pipe is repaired, I consider, on balance, this means the
waterproofing and re-tiling are consequential damage relating to repairing the leaking
pipe itself. This means the waterproofing and re -tiling works do not fall within the
insured event claimed.
Having reviewed the PDS, there is also no other insured event under the policy which
would respond to cover these works.
Determination | Case number: 542007 Page 4 of 6
I therefore consider the insurer was entitled to decline to cover the costs to waterproof
and retile the bathroom.
Insurer entitled to settle resultant damage within terms of policy
The insurer has accepted resultant damage to the property, however the complainant
is dissatisfied with the insurer’s offer. The complainant seeks:
carpet replaced new for old
skirting fully replaced as the skirting is no longer available
rusted beading replaced.
The insurer says the insured event caused damage to the bedroom wall, skirting and
carpet. It says BB can match existing skirting and the metal plaster bead has since
rusted and this has been included in a revised scope of works.
The complainant is dissatisfied with th e insurer’s offer, as he says the same skirting is
no longer available, and the carpet offered is of a lower quality. However, the
complainant has not provided any information to dispute the scope of works provided
by the insurer.
The PDS states, under the insured event of water or other liquid, that the insurer will
not replace undamaged property to create a uniform appearance.
In the absence of any further information from the complainant, I am satisfied the
insurer’s offer for repairing the resultant da mage aligns with its obligations under the
policy.
2.2 Is the complainant entitled to compensation?
No compensation warranted in the circumstances
Under paragraph 9.3 of the TOR, we may award compensation for non-financial loss
(capped at $3,000) where there has been an unusual amount of:
physical inconvenience
time taken to resolve the situation
interference with the complainant’s expectation of enjoyment or peace of mind.
We take a conservative approach to compensation and expect a complainant to bear
a normal degree of inconvenience during the course of the claim.
The complainant says the claim has taken a long time and he needed to take time off
work to deal with the claim.
I have reviewed the claim notes for the insurer’s actions on the clai m. The
complainant lodged the claim on 22 January 2018 and the insurer appointed BB to
Determination | Case number: 542007 Page 5 of 6
inspect the property shortly after. BB attended the property on 2 February 2018. The
insurer arranged a scope of works and received a quote for the carpet in March 2018.
The claim notes indicate there was a delay on the claim in April 2018 because the
complainant went away on holidays.
The insurer says it appointed BB to undertake a leak detection test to further
investigate the leak in May 2018. On 5 June 2018, the complainant disputed the claim
decision regarding the extent of coverage. The insurer then sent a partial decline
letter on 19 June 2018. The insurer’s Internal Dispute Resolution letter was sent on 2
July 2018.
Having considered the information provided, I do not consider there were any
unreasonable delays on the insurer’s part in handling the claim. I acknowledge any
claim will bring a measure of stress and inconvenience to an insured. However, I do
not consider the circumstances warrant an award of compensation under 9.3 of our
TOR.
Determination | Case number: 542007 Page 6 of 6
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodg ed with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 AFCA approach to this complaint
A full exchange of the relevant information has taken place between the respective
parties and each party has had the opportunity of addressing any issues raised.
All of the provided material has been reviewed and considered. The parties have
raised numerous issues in their submissions to AFCA. For the purposes of this
determination, commentary is restricted to only those issues considered relevant to
the outcome.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.