Determination 541600

Cash settlement of storm damage claim: settlement amount, roof defects and claim handling

Firmexpert
Decided2019-08-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$2,727
Non-financial loss$750
Amount claimed—
SourceAFCA PDF

Summary

After a storm damaged a commercial building, the insurer cash settled part of the claim and disputed the rest on roof defect and wear and tear grounds. AFCA ordered a further cash payment of $2,727.45, $750 non-financial loss, and an expert assessment and rectification of mould damage.

The insurer could cash settle under the policy, but the settlement had to reflect a guarantee uplift and cover all storm damage, and the roof defect denial was not established.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossrepair or rectify

Related

Find similar determinations

Text of the determination

Determination | Case number: 541600 Page 1 of 6 Determination Case number: 541600 29 May 2019 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer), in January 2018, after a storm occurred at the insured property. The parties disagree whether the insurer is entitled to cash settle the claim, the amount of the settlement and whether the complainant needs to attend to maintenance issues as required by the insurer. The complainant has also raised issues with the insurer’s handling of the claim. The case analyst provided the parties with a recommendation on the issues in dispute. The recommendation has been rejected by the complainant and the matter has been referred for determination. 1.2 Issues and key findings Is the insurer entitled to cash settle the claim? Under the terms of the policy, the insurer is entitled to cash settle the claim. AFCA takes the view that a cash settlement should reflect the loss of guarantees for the works. The settlement should have a 20% uplift. The cash settlement sum reflecting the uplift is of $16,368.14 from which the excess of $100 is deductible. Did the insurer correctly settle the claim? The insurer paid an amount of $13,540.69 in August 2018. This was an amount that was not in dispute, however the payment should reflect the loss of any guarantee. The amount to cash settle is $16,268.14. Is the complainant required to attend to the roofing issues? The insurer has failed to show that the construction of the roof was not to standard when the property was built proximately forty years ago. Is the complainant entitled to compensation? The complainant is entitled to $750 compensation for the conduct of the insurer. Determination | Case number: 541600 Page 2 of 6 Should this determination deal with the unresolved issues? This determination accepts that matters have not yet been resolved, in relation to mould remediation. 1.3 Determination The determination is partially in favour of the complainant. If the complainant accepts this determination, the insurer is to pay a further sum of $2,727.45 within fourteen days. The insurer is to pay $750 non-financial compensation. The insurer is to appoint an independent expert to assess the mould damage. Should the expert recommend that further work be undertaken, the insurer is to arrange for that work to be carried out. Determination | Case number: 541600 Page 3 of 6 2 Reasons for determination I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous decisions. I have considered all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. I am satisfied that the case analyst’s recommendation contains an accurate summary of the complaint, the issues to be determined, any applicable paragraphs of the rules and any relevant law. A copy of the recommendation is attached. 2.1 Is the insurer entitled to cash settle the claim? The complainant’s broker (S) represents the complainant in this dispute. For simplicity, I will refer to both these parties as ‘the complainant’. Policy provides for insurer to cash settle The policy provides the insurer an election to either repair the damage to the building AFCA takes the view that there should be an uplift on a cash settlement to compensate for the loss of any guarantees. I have applied a 20% uplift to the cash settlement. Is it fair for the insurer to state that they are cash settling because of the roof pitch? The insurer obtained a report from an expert (DC) builders who inspected and reported on the damage. The insurer says that the expert has advised them that the roof does not meet the Australian Building Codes 2016 because it does not meet the immovable pitch. The complainant states there have been many storms in the seventeen years that he has owned the property and that it has never sustained any damage. The building was built proximately forty years ago and the insurer has not provided any information which would show that the roof was not built to the standard at that time. I, therefore, am satisfied that the insurer cannot deny liability because of design or defects. I am, however, satisfied, that some of the damage to the property in the kitchen was a result of wear and tear and not the storm. The complainant obtained a quote from its expert builder (EB). Determination | Case number: 541600 Page 4 of 6 In response to this quote (DC) assessed these matters. I am satisfied that a number of items contained in ( EB’s ) scope of works are for repairs to items which are not a result of the storm and are further excluded from coverage under the policy. I am satisfied that the insurer will have discharged its obligations upon payment of a total sum of $16,268.14. I note that $13,540.69 has already been paid. This sum should be deducted from the payment. Complainant says further damage may have occurred since DC attended The complainant is concerned the damage has worsened over time and there is a liability for the exposure for staff and patients, given that it has been many months since (EB) has attended. The complainant also says mould has appeared in the wet areas because of the time that has occurred since the storm. He wants this either removed or treated. The insurer has proposed a further meeting to look at the scopes of works and the roof. I am not satisfied that the amount paid is in relation to all the damage. The complainant’s concern about the mould is reasonable. The insurer is to appoint an expert to examine the mould and provide a scope of works for its rectification. The expert is only required to examine the mould related issues that occurred as a result of the storm. The expert should use the scope of works provided by the insurer to determine this. Upon presentation of the expert’s report, the insurer is to undertake any rectificatio n works set out in that report. The report is to be obtained within eight weeks of acceptance of the determination by the complainant. Any works are to be completed within time specified by the expert. 2.2 Is the complainant entitled to compensation? AFCA can award compensation for non-financial loss, capped at $3,000 per claim, where there has been:  an unusual degree or extent of physical inconvenience  time taken to resolve the situation  interference with an applicant’s expectation of enjoyment or peace of mind. Determination | Case number: 541600 Page 5 of 6 However, we take a conservative approach to compensation for non-financial loss. We expect complainants to be moderately robust and bear the normal degree of inconvenience experienced when a problem occurs and take reasonable steps to reduce inconvenience. I accept that the insurer has not provided the service that should be expected in the circumstances. I also accept that the complex matters and the fact the complainant provided a scope of works which took into account areas which did not appear to be damaged by the storm, made settling the claim difficult for the insurer. In the circumstances, I consider the complainant is entitled to $750 in non-financial compensation because of the claims experience. Determination | Case number: 541600 Page 6 of 6 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with Financial Ombudsman Service (FOS). This determination is made under FOS Terms o f Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim Recommendation | Case number: 541600 Page 1 of 11 Recommendation Case number: 541600 19 December 2018 4 Overview 4.1 Complaint In January 2018, the complainant lodged a claim with the financial firm (insurer) after a storm occurred to the insured property (a dental practice). The insurer assessed and accepted the claim. The parties disagree whether the insurer is entitled to cash settle the claim, the amount of cash settlement and whether the complainant needs to attend to the roof issues the insurer requires. The complainant also raises issues with the insurer’s handling of the claim. 4.2 Issues and key findings Is the insurer entitled to cash settle the claim? Yes. The insurer’s election to cash settle the claim is fair in all the circumstances because the insurer repairers are unable to complete the repairs because of the pre- existing wear and tear issues. Did the insurer correctly settle the claim? The insurer has already cash settled the complainant the undisputed amount of $13,540.69 in August 2018. If both parties accept this recommendation, the parties should take the steps outlined in section 2 of this recommendation. Is the complainant required to attend to roof issues? The complainant is not required to address the roof issues as the insurer has been unable to provide evidence it was defective when built. However, the complainant should undertake the work recommended by his roof cleaner (SB) to the skylights. Is the complainant entitled to compensation? The complainant is entitled to $500 non-financial compensation for his claims experience. Recommendation | Case number: 541600 Page 2 of 11 4.3 Recommendation This recommendation is partly in favour of the complainant. To help move the claim forward, if both parties accept this recommendation, the parties should take the steps outlined in section 2 of this recommendation. Further, within 14 days of both parties’ acceptance of this recommendation, the insurer is to pay the complainant $500 non-financial compensation. Recommendation | Case number: 541600 Page 3 of 11 5 Reasons for recommendation 5.1 Is the insurer entitled to cash settle the claim? The complainant’s broker (Ms S) represents the complainant in this dispute. For simplicity, I will refer to both these parties as ‘the complainant’. Policy provides insurer with discretion on how to settle claim The policy provides the insurer with an election whether to repair damage to the building, replace the building or pay the complainant what it would cost the insurer to repair or replace the building. In the event the insurer elects to repair or replace the property, the insurer provides a lifetime guarantee on the quality of materials and workmanship of that work for the lifetime of the building. The guarantee does not apply where the complainant authorises or makes the repairs. Insurer seeks to cash settle the claim The insurer organised for its expert builders (DC) to inspect and report on the damage. In its report, DC recommended a cash settlement of all items of works as it was unable to warrant the repairs. This was due to the extent of maintenance and faults identified with the roof and downpipes. The insurer says these are unrelated to the insured event, as well as pre-existing wear and tear issues. The insurer relies on information from DC about the Australian Building Codes 2016 in saying it cannot warrant the work as the minimal roof pitch is not met. Fair in the circumstances for insurer to cash settle the claim The insurer relies on information provided by DC and its building coordinator (CA) about the roofing material and roof pitch. The insurer relies on the Australian Building Codes 2016, Australian Standards (AS 1562.1, 2018) and manufacturers guidelines in support of its position. In response, the complainant says there have been many storm events in the 17 years he has owned the property, but the property has never sustained any damage. He has only had one previous claim in 2017, when a tree fell on the property. The complainant has his roof regularly maintained and installed additional downpipes around three years ago. He provided a statement from SB, who does the regular maintenance of the complainant’s roof. Although DC says the roof pitch is not compliant to today’s Australian Standards, it should be noted the property was built around 40 years ago. The insurer accepts the former regulations which governed roofing standards was vague about minimal roof pitch when the roof was installed. In its report SC acknowledges the roof is in good condition. Recommendation | Case number: 541600 Page 4 of 11 The complainant’s policy specifically excludes loss or damage caused by error in design or defects. The insurer has been unable to provide evidence the complainant’s roof was defective when it was built. However, as outlined in this recommendation, on balance, I am satisfied some of the damage to the kitchen is pre-existing and caused by wear and tear, not the storm. Given the policy also specifically excludes damage caused by wear and tear and gradual det erioration, I consider the insurer’s discretion to settle the claim fair in the circumstances. 5.2 Did the insurer correctly settle the claim? Insurer has already cash settled complainant $13,540.69 The insurer cash settled the complainant the undisputed amount of $13,540.69 (net of GST and excess) on 28 August 2018. This was based on DC’s scope of works dated 27 July 2018, for the amounts in a quote obtained by the complainant from its expert builder (EB). The insurer does not accept all of the items in EB’s scope of works are claim related, relying on information from DC and CA about pre-existing and wear and tear issues. The insurer also says some items had already been included in DC’s original scope of work, therefore its proposed cash settlement already i ncluded these items. CA added some items EB reported on to DC’s scope of works (Plumber disconnect gas upright oven, kitchen sink/tapware and water filer to facilitate works. Reconnect upon completion of associated works (3 units)). The insurer said it wo uld consider a revised quote from EB based on DC’s scope of works. To date, the complainant has not provided this. Complainant says further damage may have occurred since DC attended The complainant is concerned the damage has worsened overtime and there is a massive liability exposure for staff and patients, given it has been more than six months since EB attended and more than ten months since DC attended. In addition, the complainant says mould has appeared in the wet areas because of the time since the storm. He wants this either removed or treated. The complainant says he requested EB reattend to provide an updated quote, to determine if any additional repairs are required. As at the date of this recommendation, the complainant has not provided any further information from EB. Insurer’s offer of a further inspection fair and reasonable The insurer provided information from DC commenting on EB’s quote. I reviewed this. Whilst DC notes some of the items EB quoted for are already included in DC’s scope of works, DC also notes: Recommendation | Case number: 541600 Page 5 of 11  in the reception area, at the time of its inspection, there was only evidence of staining on the ceiling adjacent to the skylight, with no sagging evident to suggest physical damage to the plasterboard. DC acknowledges this may have changed with time  its scope of works did not include any items for the laundry, as the complainant advised there was no damage to this area as the water did not get that far. In view of the complainant’s concerns about possible further damage since DC’s a nd EB’s inspections, following a recent conciliation between the parties, the insurer proposed a further site meeting to look at the scope of works and roof. The complainant did not agree to the proposed site assessment, querying the usefulness of it and considering it may delay the outcome of the complaint. Insurer not liable for pre-existing and wear and tear issues The evidence provided by the insurer from DC and CA about the pre-existing and wear and tear issues in the kitchen is persuasive and consistent. Although the complainant says the storm event caused all of the damage, he did not provide any expert evidence challenging the insurer’s. The complainant’s policy specifically excludes damage caused by wear and tear and gradual deterioration. In the absence of evidence in support of his position, I accept the insurer’s assessment about the pre -existing kitchen issues. That is, the damage to the kitchen sink and benchtops around the sink is long term and not solely caused by the storm. The parties agree the sub floor structure by the bay window of the waiting area is a pre-existing issue and should not be included in any settlement amount. The parties should work together to resolve the claim In the circumstances where both parties agree there may be further damage, it is not possible for me to currently determine whether the insurer correctly settled the whole claim. This will only be able to be determined once a further assessment has taken place and any further reports are reviewed I consider it fair and reasonable the parties work together towards arranging another inspection to assess whether there is further damage and if so, what it is. I consider this an appropriate course of action to take given further damage may have arisen since the initial i nspections. 5.3 Is the complainant required to attend to roof issues? The insurer says the policy entitles it to require the complainant correct the pre - existing issues with the building to mitigate repeated and/or worsening damage from the same contributing cause. Specifically, the insurer says as it has now informed the complainant of the inadequacies with the roof, skylight and insufficient downpipes, the Recommendation | Case number: 541600 Page 6 of 11 policy will not respond to any future loss or damage which may arise if the complainant does not address the defects. As stated earlier in my recommendation, the insurer has been unable to provide evidence the complainant’s roof was defective when it was built. Therefore, in the circumstances, the complainant is not required to address the roof issues. Howe ver, given the issues the complainant’s roof cleaner (SB) raises with the skylights in his report and his recommendation the complainant have the skylights reinstalled to allow for better water flow, I consider the policy requires the complainant undertake this work. This is because the complainant’s policy requires him to comply with the insurer’s recommendations to prevent or minimise loss or damage. 5.4 Is the complainant entitled to compensation? We can award non-financial loss compensation in certain circumstances We can award compensation for non-financial loss, capped at $3,000 per claim, where there has been:  an unusual degree or extent of physical inconvenience  time taken to resolve the situation  interference with an applicant’s expectation of enjoyment or peace of mind. However, we take a conservative approach to compensation for non-financial loss. We expect complainants to be moderately robust and bear the normal degree of inconvenience experienced when a problem occurs and take reasonable steps to reduce inconvenience. Complainant disputes insurer’s claim handling The complainant raised issues with the insurer’s claim handling, specifically the time taken by it to settle the claim as well as its decisions to cash settle the claim and the cash settlement amount. As stated above, he is concerned the damage has worsened overtime and there is a massive liability exposure for staff and patients . The insurer accepts it did not explain the process and some of its decisions properly. Complainant entitled to non-financial loss compensation I reviewed the information provided by the parties about the service issues raised by the complainant, including the insurer’s claim notes. A chronology of events is provided in section 3 of this recommendation. Having reviewed the chronology, I consider the insurer processed the claim within a reasonable timeframe. However, I also consider there are some issues with the insurer’s handling of the claim, particularly DC increased its liability quote five times before the insurer issued the cash settlement to the complainant for the undisputed Recommendation | Case number: 541600 Page 7 of 11 amount on 28 August 2018. Further, as outlined above, I consider the insurer has made some errors in its claim decisions. I also consider the complainant contributed to some of the delays and the current situation. These include providing EB’s quote in mid May 2018, around five months after the storm event, as well as not undertaking any of the rectification works since receiving the cash settlement cheque. In addition, the complainan t refused the insurer’s offer of another site assessment in November 2018, which I consider to be an appropriate course to take. Finally, in late November 2018, the complainant advised it had requested EB reattend to provide an updated quote. This Service has not received any further information from the complainant since then. In the circumstances, given the above, I consider the complainant is entitled to $500 in non-financial compensation owing to his claims experience. Within 14 days of both parties’ ac ceptance of this recommendation, the insurer is to pay the complainant $500. Recommendation | Case number: 541600 Page 8 of 11 6 Supporting information 6.1 Policy terms General policy conditions … 3. Reasonable care and reducing risk You must take reasonable steps to ensure that you and your tenants: (a) maintain buildings , structures, fixtures, fittings, furnishings, appliances, vehicles , machinery , implements and plant in sound condition to minimise or avoid theft, loss or damage; .. (c) avoid or minimise loss of or damage to property or injury to other people; … (f) comply, at your expense, with all our recommendations to prevent or minimise theft, loss or damage . … General claims condi tions … 2. Minimise loss You must: (a) take all reasonable precautions to minimise or prevent further loss , damage , injury or illness; and (b) take all reasonable steps to recover lost or stolen property. General exclusions … Section 1A – Property damage About thi s section This section of the policy covers physical loss of or damage to your property from a variety of causes including but not limited to events such as fire, lightning and explosion. We do not cover the theft or breakdown of your property under this section. Your insurance under this section … What we exclude We will also not pay for loss or damage caused by: … ▼ faulty materials or workmanship or error in design or latent defect; ▼ gradually operating causes including but not limited to wear and tear, gradual deterioration, disease, fading, tree roots, evaporation, change in flavour, colour, or texture; ▼ scratching, denting, chipping, marring, developing flaws, restoration, normal upkeep or making good; ▼ … ▼ atmospheric moisture, rot, mould, mildew, fungus , rust, corrosion, oxidation, variations in temperature, action of light, ▼ … Recommendation | Case number: 541600 Page 9 of 11 What we pay … 1. Building(s), specified items or contents Reinstatement or replacement Unless the schedule shows you are insured for ‘Indemnity’ then, when buildings , specified items or contents are lost or destroyed we will, at our option: (a) rebuild the buildings at the premi se s shown on your schedule or at another site; … If the buildings , specified items or contents are damaged , then we will, at our option: (a) repair or replace the buildings , specified items or contents ; or (b) pay the cost of repairing or replacing the buildings , specified items or contents . 6.2 Expert reports Report Key points Financial firm’s expert builder (DC) assessment r eport 06 - 02 - 2018  Based on our visual inspection and the information available at the time of our assessment we believe the cause of the damage is due to a very large body of water overloading the gutters particularly to the rear perimeter and rising up the flashing seals o f the skylight faster than the roof could dissipate.  The structafloor by the bay window of the waiting area has rotted out. The rot is very dry and powdery and not part of the hail damage. [The complainant] advised me that an additional downpipe had been installed wit hin 2.5 met res of the affected area about three years ago, which would explain why the damage is old and has not spread.  The kitchen sink cabinet and the bencht op around the sink have many years of water damage.  The Kliplok roof is under t he minimum pitch of 1 degree and requires either structural changes to roof frame or the sheets replaced with a material that complies with the current pitch of .5 degrees.  Cannot Warrant the work for it is recommended to offer cover for the claimed resultant damage though unfortunately on this occasion we would be unable to warrant these repairs due to the issues raised in this report with regards to the non - complying roof m aterials due to the pitch of less than 1 degree. Complainant’s expert roof cleaner (SB) email 29 - 03 - 2018  I have been cleaning the gutters bi - annually on the above property for the past 3 years.  The cliplock roof wit h a pitch of approximat ely 5 degrees i s quite common even on new developments that I install gutter guard too.  The roof itself is in good condition for its age, no visible signs of rust or decay are evident.  The gutters have not been full of debris for the past year after tree at rear of pro perty was removed.  The downpipes are 100x 100 and are clear of any obstruction, two Recommendation | Case number: 541600 Page 10 of 11 Report Key points on the rear of building and two on the front.  The sky lights have some surface rust forming on the framing supports but not to the point of leaking. Financial firm’s expert builder (DC) email 06 - 06 - 2018  At the time of our inspection there was only staining evident on the ceiling adjacent to the skylight, with no sagging evident to suggest physical damage to the plasterboard. This may have changed with time.  Due to the age and general wear and tear we have only allowed for the removal and reinstatement of the cupboards and benc htop to replac e the kick panels and one end panel.  At the time of our inspe ction we were advise by complainant that there was no damage to the lau ndry area as t he water did not get that far. Financial firm expert building coordinator (CA) r eport 19 - 06 - 2018  Based on the information obtained during my site inspection and the information provided by DC, I am of the opinion the damage observed throughout the kitchen area to be pre - existing and unrelated to a single event. Though due to claim handling to date, the kitchen items included in the SOW can remain.  It is recommended the customer –  engage in a qualified roof plumbing contractor to revie w and address the non - compliant issues outlined above.  engage a qualified plumbing contractor to carry out a leak detection test to the kitchen area, due to the condition of the particle board subfloor  engage a mould testing professional to test the kitche n area and particle board subfloor. Remediation to be carried out if required, as per the professional’s recommendation Financial firm’s expert builder (DC) assessment r eport 06 - 02 - 2018  Due to the issues identified i n the maintenance/Defect DC in not in the position to warrant any repairs to this property and recommend that all claimable item are a noted as LIABILITY QUOTE only.  Please note: Due to the maintenanc e issues id entified in this report, DC is currently not in any position to carry ou t repairs to the property and recommend that the Owner Insured engage further specialist to rectify all structural issue that are not claim related and is considered a maintenance issue wit h pre - existing structural issues as opposed to damag e creat ed due t o a one off event. Financial firm’s expert builder (DC) email 14 - 09 - 2018  We believe that the roofing material that was assessed appeared to be of a Klip - Loc 406 (Lysaght) profile and/or of similar that doesn’t adherer to the Australian standards - AS 1562 .1  Further to the AS 1562.1 it is mandatory that Manufactures recommendations are applied and adhered in order to warrant repairs. Recommendation | Case number: 541600 Page 11 of 11 6.3 Chronology of events Date Action 19 - 12 - 2017 Storm event 22 - 01 - 2018 Complainant lodges claim for water damage with insurer 06 - 02 - 2018 Insurer expert builder (DC) attends property to report on damage caused by storm 13 - 02 - 2018 DC building report with photographs 07 - 03 - 2018 Insurer issues letter to complainant advising of maintenance issues 18 - 05 - 2018 Complainant provides quote from his expert builder (EB) 12 - 06 - 2018 Onsite inspection between insurer building coordinator (CA), insurer commercial assessor (CF) and complainant 19 - 06 - 2018 CA expert review report 19 - 06 - 2018 DC liability quote wit h home warranty error 27 - 07 - 2018 DC final building and roofing report wit h claim covered liability quote 16 - 08 - 2018 Insurer IDR final decision letter 27 - 08 - 2018 Complainant lodges dispute with FOS 28 - 08 - 2018 Insurer cash settles complainant for undisputed amount ($13.540.69) 14 - 09 - 2018 DC supplementary report