Home / Financial Firm (Unknown - Insurer) / Determination 541290

Determination 541290

Additional mould damage declined after roof repair delay; cash settlement of prior offer

FirmFinancial Firm (Unknown - Insurer)
Decided2019-02-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$2,137
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Complainant claimed storm and mould damage under a home policy held by relatives. AFCA declined the additional mould damage and most other items, and ordered cash settlement of the insurer's prior $2,137.45 offer, with no compensation for the acknowledged privacy breach.

Damage excluded for mould, wear and tear and failure to maintain; the proximate cause of the increased mould was the complainant's delay in roof repairs and lack of ventilation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 541290 Page 1 of 7 Determination Case number: 541290 19 February 2019 1 Determination overview 1.1 Complaint The complainant lodged a claim under his home insurance policy with the financial firm (insurer) for damage to his home following a storm in April 2017. The insurer accepted liability for mould damage to the property, on the basis the damage had been caused by water entering through the roof. However, the insurer told the complainant he needed to fix the maintenance issues with the roof before it would start the internal repairs. The complainant completed the roof repairs in May 2018, following which the insurer reassessed the property and found that the mould damage had increased. The insurer says it is not liable for the additional damage because this damage was caused by the delay in completing the roof repairs and/or by other factors which are excluded from cover under the policy. The complainant disputes the insur er’s decision and seeks cover for the cost of repairing all of the mould damage to the house, as well as various other items of damage he says were caused by the storm. The complainant is also dissatisfied with the manner in which his claim has been handled. 1.2 Issues and key findings Is the insurer liable for the additional damage to the property? The insurer is not liable for the increased mould growth at the property. This damage was caused by the eleven month delay in the complainant undertaking repairs, as well as a lack of ventilation, which is excluded from cover under the policy. The information provided does not show that any of the other damage to the property was caused by the storm in April 2017. How should this complaint be settled? The claim should be cash settled based on the scope of works prepared by the insurer’s builder in 2017. The complainant is not entitled to compensation. Determination | Case number: 541290 Page 2 of 7 1.3 Determination This determination is in favour of the financial firm. The financial firm is to cash settle the complainant for the amount of $2,137.45 previously offered, in accordance with the terms and conditions of the policy. Determination | Case number: 541290 Page 3 of 7 2 Reasons for determination 2.1 Is the insurer liable for the additional damage to the property? Policy provides cover for insured events subject to exclusions The complainant is required to show that, on the balance of probabilities, he has suffered a loss caused by a risk insured against under the policy. This is known as a valid (or prima facie ) claim. If the complainant is able to establish a prima facie claim, then the onus shifts to the insurer to show that, on the balance of probabilities, it is entitled to rely on a n exclusion under the policy to deny the claim. The complainant ’s policy provides cover for damage caused by the insured events listed in the policy (including storm), subject to the conditions and exclusions set out in the policy. However, the policy excludes cover for damage caused by:  mould  gradual depreciation, deterioration and wear or tear  previous damage that has not been repaired, and  the policyholder failing to maintain their home in good repair and condition (that is, watertight, structurally sound and well maintained. The insurer’s liability depends on the proximate cause of the damage – that is the dominant, effective or operative cause. Insurer accepted liability for mould damage following assessment in 2017 As outlined above, the complainant lodged a claim for damage to his property, which he advised had been caused by storms in April 2017. After inspecting the property, the insurer’s builder (AJ) reported that there was water and mould damage to the main bedroom and the lounge room. AJ considered the damage had been caused by water entering through the de teriorated ridge capping tiles. Based on AJ’s findings, the insurer would have been entitled to deny liability for the internal damage because the proximate cause of the damage was the gradual deterioration of the roof tiles. However, AJ recommended that the claim be accepted, as the complainant would not have been aware of the issues with the roof. The insurer subsequently accepted liability for the internal water damage, as set out in AJ’s scope of works. However, it Determination | Case number: 541290 Page 4 of 7 advised the complainant he would need to repair the roof (and pay the excess) before the repairs could proceed. The complainant says he was verbally advised by the insurer (or its contractors) that a mould specialist would be appointed. However, the insurer denies this and there is no document ary information to support the complainant’s recollection. The complainant has acknowledged that he was aware of the mould and the need to complete the roof repairs. Accordingly, it was his responsibility to undertake the repairs so the claim could progress. The complainant did not notify the insurer that the repairs had been completed until May 2018, approximately eleven months after the initial assessment was conducted. Mould damage to property increased during delay in roof repairs After the complainant advised the roof repairs had been completed, the insurer arranged for its builder (AJ) to reinspect the property in May 2018, to confirm whether the original scope of works remained appropriate. AJ reported that the mould growth in the main bedroom and lounge room had increased and mould had spread to the other rooms. Accordingly, the repairs set out in the original scope of works were no longer adequate to remediate the damage. AJ noted that the delay in the complainant carrying out the roof repairs would have allowed further rainwater to enter the building. However, AJ considered that the main cause of the worsening mould was inadequate ventilation and a lack of air circulating inside the house. It appears the rooms were kept heated with the windows shut for extended periods of time, due to the health of the complainant’s elderly mother. The insurer subsequently appointed a building consultant (CR) to inspect the property and report on the cause of the mould. CR disagreed with AJ’s findings that the mould growth had been caused by water entering through the roof. CJ removed the roof tiles near the affected area and could find no sign of water staining to the rear of the ceilings. He concluded that the damage had been caused by a lack of ventilation and air flow. The insurer says it is not liable for the additional repairs which are required to address the increased mould growth which occurred following its initial assessment in June 2017. The insurer has offered to cash settle the claim for the cost of completing the repairs set out in AJ’s original scope of works. Determination | Case number: 541290 Page 5 of 7 Insurer is not liable for cost of additional repairs Based on the available information, I consider the insurer is not liable for the cost of repairing the additional mould damage which occurred before the complainant completed the roof repairs. To the extent that the increased damage was caused by ongoing water entry, the insurer is not liable for this damage because the complainant was responsible for undertaking the roof repairs. If, as CR has advised, the mould growth was caused by a lack of ventilation, then the insurer is not liable for this damage because it was not caused by the storm (or any other insured event under the policy). The policy excludes cover for damage caused by mould. Insurer is not liable for other items of damage During the dispute process, the complainant expressed concern about other items of damage to various parts of the property. These items were not raised when the original claim was lodged. They include damage to:  various window panes  the ceiling and guttering of the front veranda  a sewer vent pipe  the rear laundry roofing and lighting  the bathroom vanity and window  external wall linings at the rear of the property  the front concrete boundary fence, and  the Colourbond fence along the side boundary. The insurer arranged for its building consultant (CR) to review each of these items and advise whether they had been caused by the storm in April 2017. In his report, CR advised that none of the damage had been caused by the storm. In many cases, CR considered the damage had been caused by wear and tear and gradual deterioration, which is excluded from cover under the property. While CR considered that the damage to the sewer vent pipe may have been exacerbated by the storm, he identified the proximate cause of the damage as the extensive corrosion at the base of the pipe. Having carefully reviewed CR’s report, I am satisfied that it provides a logical a nd rational explanation for how each of the items of damage was caused. CR’s conclusions are supported by the close-up, colour photographs included in his report. Determination | Case number: 541290 Page 6 of 7 Based on the information provided, I am satisfied that the items of damage identified by the complainant were not caused by the storm in April 2017 (which is the subject of the current claim). The insurer has offered to consider whether any of these items are covered under other insured events, subject to the complainant lodging a separate claim. 2.2 How should this complaint be settled? Insurer is required to cash settle claim for $2,137.45 As outlined above, the insurer has offered to cash settle the claim for the cost of the repairs set out in the scope of works prepared by AJ in June 2017. These works involved bleed sealing and repainting the affected areas of the bedroom and lounge room. Given the current mould damage to the property exceeds the insurer’s liability, it is not appropriate for the insurer to be required to undertake the repairs. Accordingly, the claim should be cash settled. The insurer has increased the amount originally quoted by AJ for the repairs to 20% to $2,137.45. I am satisfied this increase is appropriate to reflect the passage of time, as well as the transfer of risk to the complainant as a result of the claim being cash settled. The insurer is required to pay the complainant the amount of $2,137.45 in full and final settlement of his claim. The insurer is not required to pay interest on this amount. Complainant is not entitled to compensation The complainant is dissatisfied with the manner in which the claim has been handled. Among other things, he says the insurer’s consultants have been rude and dismissive and have breached their privacy obligations. The complainant ha s provided copies of emails received from the insurer’s consultants. However, I do not consider these emails to be inappropriate in either their content or tone. The complainant says the insurer failed to add his name to the policy as an authorised representative and disclosed information to him before this had been rectified. The insurer has acknowledged its breach of privacy and apologised to the complainant. However, given the complainant had already been authorised by his relatives as a representative, I am not satisfied that either he or they have suffered any material effects as a result. In these circumstances, I do not consider the complainant is entitled to compensation. Determination | Case number: 541290 Page 7 of 7 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint 3.2 AFCA approach to this complaint This complaint was the subject of a recommendation issued on behalf of AFCA on 3 January 2019. The complainant rejected the recommendation. This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered (whether or not it is expressly referenced in this determination). The home insurance policy to which this claim relates is held in the names of the complainant’s relatives, for whom he is acting as an authorised representative. For the purposes of this determination, the complainant and the policyholders are collectively referred to as ‘the complainant’.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.