Home / Financial Firm (Unknown - Insurer) / Determination 540685

Determination 540685

Insurer denied septic leak claim and limited shower leak and contents claims

FirmFinancial Firm (Unknown - Insurer)
Decided2019-09-30
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$56,294
Non-financial loss$3,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for two leaks at her home, one of which the insurer later denied as caused by a non-compliant overflow gully. AFCA found the claim 1 damage payable, ordered contractor-caused and termite damage paid, and ordered $3,000 non-financial loss, $344.50 costs and a premium refund, with cash settlement payable to her directly.

The insurer's denial of the septic claim was upheld on the evidence of faulty workmanship, while the shower leak was payable and the insurer's contractors caused additional damage it must remedy.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay non financial lossrefund fees or chargesrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 540685 Page 1 of 20 Determination Case number: 540685 17 June 2019 1 Determination overview 1.1 Complaint Claim 1 The complainant lodged a claim with the financial firm (insurer) on 17 March 2015. This was because there was a leak from her upstairs shower. The insurer’s plumber (SP) advised all the showers needed waterproofing. Based on this, the insurer denied the claim. As a result, the complainant did not shower upstairs for several years. The complainant engaged a plumber (NM) who inspected the ensuite shower and believed the leak was from the shower outlet waste pipe. The plumber repaired this. When the complainant next used this shower, the area flooded. This leak went through part of the upstairs area, and into the downstairs area and garage. This included damage to $30,000 worth of bamboo flooring and 18 poles. The bamboo flooring and poles were to be used for the complainant’s pole dancing business. Claim 2 In November 2017, the septic tank leaked into the granny flat downstairs, causing extensive damage. The complainant wants the insurer to cover all of the damage arising from both claims, as well fees she has incurred. She has also complained about service issues and the increase to her premium. In addition, she disputes the insurer’s decision to make any payment conditional on her bank’s approval. 1.2 Issues and key findings What is the insurer’s liability for Claim 1? The insurer is liable to pay a total of $52,568.02 to rectify the damage to the upstairs area, and resultant damage. The insurer must also organise for the push bike to be cleaned. Determination | Case number: 540685 Page 2 of 20 What is the insurer’s liability for Claim 2 ? Under the policy, the insurer is not liable for the damage caused by the septic tank leak. This is because the evidence shows the damage was due to the overflow relief gully (ORG) not being installed correctly. The insurer should pay $3,381.61 for the damage and losses caused by its contractors that have not been included in Claim 1. The insurer is not liable to pay for loss of rent or other losses being sought by the complainant, for the reasons set out in section 2.2. Does the insurer have to refund any premium payments? The insurer is liable to refund any premium charged for incorrectly assessing the complainant’s flood risk (if it has not done so already). Is the insurer liable to pay compensation for non-financial loss? The insurer has offered to pay $3,000 , being the maximum amount of our cap. I consider this appropriate given the complainant’s claim experience. Should the insurer contribute to the complainant’s professional costs? The insurer should contribute to the complainant’s costs of the termite reports, totalling $344.50 . The insurer is not required to contribute to the other costs as they did not assist the complainant’s position. Who should the insurer pay the cash settlement to? It is fair for the monies to be paid to the complainant, not the mortgagee. 1.3 Determination This determination is partly in favour of the complainant. The insurer should settle this dispute in the following way:  pay $52,568.02 due to the upstairs shower leak (claim 1)  is not liable for damage due to the septic tank leak, as the ORG was faultily installed (claim 2)  pay $3,381.61 to remedy the damage and losses caused by its contractors  refund any premium charged for incorrectly assessing the complainant’s flood risk (if it has not done so already)  pay $3,000 in compensation for non-financial loss  contribute $344.50 towards the complainant’s professional costs The insurer must pay the total amount of $59,294.13 to the complainant directly. Determination | Case number: 540685 Page 3 of 20 The insurer must also arrange and pay for the push bike downstairs to be cleaned, and any mould removed. Determination | Case number: 540685 Page 4 of 20 2 Reasons for determination 2.1 What is the insurer’s liability for Claim 1? Insurer has accepted liability for damage set out in AB’s scope of works The insurer has accepted liability for this claim. The insurer previously submitted an offer for the upstairs damage. This included $28,567.44 (incl GST) based on AB’s ‘liability quotation’ dated 3 December 2018. This quote was higher than the insurer’s assessor’s estimate of the works. However, it is not clear if this quote is available to the complainant. Further, by cash settling the claim, I note the insurer is transferring the risk of the works to the complainant and she is losing the lifetime guarantee of the works. Given these factors, I consider it is fair that a 15% allowance be added to reflect these factors. Therefore, regarding the agreed scope of works set out in AB’s liability quotation dated 3 December 2018, the insurer’s liability should be increased to $32,852.66 . Upstairs tiles The complainant says that her upstairs tiles were damaged from the claim , as well as from the excessive drying and wetting by the insurer’s contractor, BC. The complainant’s representative has provided photos which show that some tiles are cracked. The compla inant’s representative also said in an email: Tiles upstairs in every room have cracked and the underlay has buckled and warped. It appears that the lack of bracing [downstairs, in the granny flat] over an extended period of time has added to this damage. The complainant provided a structural engineering report from DC. DC said the tiling upstairs cracked due to the temporary bracing downstairs being removed for 8 weeks. I am not persuaded by DC’s opinion. DC’s report did not consider the influence of pre -existing termite damage or other factors. The insurer’s assessor (SB) identified pre -existing termite damage to the joist and subfloor, with photographs in support. DC’s failure to take this into consideration does undermine his conclusion. Determination | Case number: 540685 Page 5 of 20 Importantly, the insurer’s engineer (EC) advised that removal of the ply bracing would have, at best, only very slightly reduced the bracing resistance: It should be clearly noted that removal of the ply to the western wall at best, would have very slightly reduced the houses structural bracing resistance. This is because all of the remaining diagonal bracing rods remained. It is important to NOT assum e that the entire house was simply left unbraced during repair works. EC also made several compelling arguments challenging DC’s conclusions. This centred around DC’s failure to consider relevant factors or other possible causes of damage. For instance:  no review of the weather records – DC’s review of these records does not show any significant winds in that eight-week period  a floor survey was not completed to determine whether foundation movement is occurring  no consideration for tile age, wear and tear. Given this, I am not persuaded the tile cracking, or any other structural damage was caused by the temporary removal of ply to the western wall. The complainant provided two quotes for tiling. One quote included $17,900 for the upstairs floor tiles and $17,000 for renovating both bathrooms. The second quote was for $14,059.20. It is not clear if this second quote was for all of the tiling, but the inspection note dated 12 January 2019 indicates it was. It is not clear how the second bathroom was affected by the flooding in the ensuite. The complainant appears to say this is related to the claim or the works conducted following this. I am not satisfied it was caused by the temporary removal of the ply downstairs. The balance of the evidence does not explain how this second bathroom was affected by the claim or works. Given this, I am not satisfied the complainant’s quotes are f air and reasonable. When reviewing AB’s quote and scope of works, I note that the amount for tiling (excluding the supply and installation of tile underlay) is $7,797.86 (exclusive of GST). If I include the cost of the underlay, this increases to $11,162.62 (exclusive of GST). The insurer, in an email dated 5 March 2019, included $504.05 (to allow for an increase in tiling as per the complainant’s quote) and $6,500 (as an additional allowance for tile material upstairs). If I add this to AB’s quote for the tile works, this would have increased the insurer’s overall tile settlement for upstairs to $18,166.67. I consider this overall figure for the tiles to be more than fair. Therefore, the insurer should only pay an additional $5,329.66 ($18,166.67 minus $12,837.02) towards the Determination | Case number: 540685 Page 6 of 20 tiling upstairs. The $12,827.02 includes the 15% contingency added to AB’s quote above. Roof movement and leakage The complainant raised a new issue near the end of the complaint, saying that the roof may have experienced movement and leakage due to the lack of temporary bracing for 8 weeks. She provided DC’s report in support. DC’s opinion on this is clearly equivocal. He says, ‘there is a possibility that excessive floor diaphragm deformation causes over deformation of roof diaphragm’ but acknowledges ‘there are several other factors may be contributing toroof leakage’. Therefore, he says he ‘cannot make a firm conclusion on this matter and further investigation may be required’. Given DC is not comfortable in saying any roof issue is related to the lack of temporary bracing, I do not consider there is sufficient basis to conclude the insurer is liable for this. Upstairs carpet The insurer provided an amount of $816.20 for the upstairs carpet in its settlement offer. There is nothing to indicate this is unreasonable or unfair. The insurer should pay $816.20 for the carpet upstairs. Mould upstairs The complainant’s representative advised that: Mould has been left untreated upstairs for a period of more than 12 months… [BC] used high ‐ pressure wetting machines, against the advice of the hygienist… No other evidence has been provided to show there is mould in the upstairs area. The insurer provided a report by GC dated November 2018 which said the mould has been remediated appropriately. The complainant has not provided any evidence to show mould has returned since then in the upstairs area. Given this, I do not accept the insurer is liable for any further mould works. Painting of walls upstairs The insurer’s quote for upstairs includes some painting works, because of the water ingress. When I include all the painting amounts in AB’s quote and add GST and the 15% for contingencies, this totals $4,336.98. There is nothing to indicate this is unreasonable. Determination | Case number: 540685 Page 7 of 20 Therefore, I do not consider that the insurer is liable for any further amounts for the painting of upstairs. Bamboo poles and flooring The complainant wants all the damaged bamboo flooring and poles covered under the claim. The complainant’s representative said: When the owner of the property did take a shower upstairs some years later, due to a blockage in the pipe which had been caused by a separate issue, the water backed up and flooded a significant portion of the upstairs floor and also leaked to the garage area below and soaked and subsequently ruined $30,000 worth of bamboo flooring stored in the garage. The complainant says this blockage was due to the insurer’s failure to prop erly diagnose the cause of the leak. Therefore, her claim for the bamboo poles and flooring should not be subject to any policy limits. I disagree. If the blockage existed due to the first claim, then any flood tests would have always failed. However, when NM conducted the works, he said he tested the new installation and found it operating satisfactorily. He then allowed the complainant to use it. Upon its next use, the shower flooded. In such a context, the information is far from clear in showing the blockage could have been due to the previous claim as opposed to other factors, such as NM’s works. Therefore, I accept the insurer’s liability for the bamboo poles and flooring should be limited to the policy coverage. For ‘ building materials ’, the policy states the following is covered:  building materials — for example, bricks, tiles or timber  items that are due to be fitted to your home — for example, an oven or dishwasher. The flooring is made of timber and was sitting in a pile in the complainant’s garage waiting to be fitted (e.g. see R’s report for photos). R also said on 21 April 2017 that the flooring was not installed and had been stored there for over one year. Based on the policy definition and facts of the case, I consider the bamboo flooring to be building materials as they were not installed. The insurer is therefore liable to pay Determination | Case number: 540685 Page 8 of 20 $1,000 for the bamboo flooring (which is the cap under the policy for building materials). I also agree with the insurer that the poles should be considered ‘tools of trade’. Tools of trade are defined in the policy to mean „ those items or equipment used in any business, trade or profession‟ . The complainant advised that the poles were for her pole dancing business. The poles should therefore be considered as tools of trade. The insurer is liable to pay $2,000 for the pole dancing poles (which is the cap for tools of trade under the policy). Tiling downstairs The insurer provided an amount of $5,997.60 for the tiling downstairs, as a result of the water ingress from upstairs. The complainant believes the floor has been damaged and would likely need to be levelled. The insurer’s contractor, AB, responded to this when the complainant raised this issue with the Queensland Building and Construction Commission (QBCC). AB noted the slab was scuffed by a jackhammer in several places. However, they are minor, with the slab ground clean and suitable for new tiles. There is no expert evidence refuting AB’s response that the floor underneath the tiles was damaged or required repairs. Therefore, I accept the insurer’s offer to pay $5,997.60 for the tiling downstairs is reasonable. Curtains and blinds downstairs The insurer provided an amount of $4,572 in its final settlement offer for the curtains and blinds downstairs, as per the complainant’s quote. I am satisfied that this is a reasonable offer. The insurer must pay $4,572 for the carpets and blinds downstairs. Gym equipment and push bike The complainant says that there is mould on her gym and bike equipment in the garage downstairs, due to the shower leakage. The complainant submitted photographs of the equipment. The photos of the gym equipment do not show any apparent evidence of mould. For the bike, there is a substantive black substance on the seat. It is unclear if it is mould or simply dirt. I note there is no evidence of such substance to the rest of the bike. Determination | Case number: 540685 Page 9 of 20 No reports or other assessment has been provided for these items. The insurer has not responded to this aspect of the complainant’s claim. Based on the available information, I accept the insurer should at least arrange for the push bike to be cleaned, and any mould removed. I do not accept the evidence shows the gym equipment is affected by mould. Other items In the complainant’s email dated 28 November 2018, she listed numerous other items she says require remediation or replacement. No photographs or reports were provided of these items. Her later submissions do not provide any further clarification on these items. Given the minimal information, I do not accept the insurer is liable to contribute any amount to these items. Air conditioner and security camera The complainant says the air conditioner and security camera downstairs have mould due to the leaking shower. No reports or opinions have been provided to show how these were damaged or the extent of it. Based on the minimal information available, the insurer is not liable to compensate the complainant for these items. Total – Claim 1 The insurer is liable to pay $52,568.02 for Claim 1 and must also organise for the push bike to be cleaned. 2.2 What is the insurer’s liability for Claim 2? Insurer not liable for septic tank leak as ORG was not compliant Initially, the insurer accepted liability for this claim and conducted extensive works to the granny flat downstairs. This included stripping the kitchen, removing plasterboard from other walls and ceilings, and removing a bathroom vanity and carpet from the bedroom. Over a year later, the insurer denied the claim, on the basis the loss arose due to faulty workmanship. Specifically, the overflow relief gully (ORG) was not compliant. The purpose of the ORG is to release the pressure to the se wer system resulting from a blockage or excessive rainwater, by directing the overflow away from the home. Determination | Case number: 540685 Page 10 of 20 The insurer relied upon CR’s (consultant engineers) report which identified that the height of the lowest internal fixture was 30mm lower than the riser of the ORG. This does not comply with Australian Standard 3500.2:2003, which says: A minimum height of 150mm shall be maintained between the top of the overflow gully riser and the lowest fixture connected to the drain. CR concluded that this has “dir ectly caused the inundation of septic water in the internal areas of the residence, instead of being relieved external to the residence”. CR’s evidence is plausible. The ORG needed to be 180mm lower than where it is placed or the internal fixture 180mm higher. There is nothing to suggest the inundation that occurred to this area was greater than 180mm. Further, this Australian Standard was applicable when the granny flat was constructed. Therefore, I accept the installation of the ORG constitutes faulty workmanship and this has caused the loss being claimed. On this basis, I do not accept the insurer was liable under the terms of this policy for the damage resulting from this leak. Complainant says there is about $100,000 worth of works required now Generally, an insurer who incorrectly accepts a claim is not bound by this if the evidence clearly shows the policy never responded to the loss. However, to the extent this incorrect decision has prejudiced the insured, then it is fair the insurer make good any of these losses. The insurer says that based on the works it has conducted, and the amounts it has paid, its incorrect decision has greatly benefited the complainant. The complainant disputes this. She says the works would been less extensive had the ins urer’s builders acted with reasonable care and skill when addressing the damage. Instead, mould was allowed to spread and the extent of works required increased significantly due to this and leaving the home in a state of disrepair. This is reflected by the fact that hygienist G had to visit the property numerous times to review whether the mould had been properly remediated. The complainant has provided a quote from WD to restore the granny flat, totalling $78,000. This does not include the quote for the bathroom, which was around $20,000. She says the bathroom’s waterproofing has been affected by the works done by the insurer’s builder. The complainant is also seeking for loss of rent to the granny flat during this period of time. Determination | Case number: 540685 Page 11 of 20 The insurer provided a liability quotation from AB for this downstairs area. This totalled $51,183.01. This included $5,997.60 for the tiling , which the insurer already agreed to. AB’s quote only included minimal works to the bathroom. Bathroom, ceiling, tiling, curtains and blinds I am not satisfied that the available information shows that the downstairs bathroom is required to be completely renovated, as a result of the insurer’s works. The complainant has based this on her assertion the waterproofing was affected by the works. There is minimal evidence supporting this. DC makes no comment about this. Neither does builder GS. The insurer notes the downstairs ceiling was cash settled based on R’s quote , for a sum of $11,821.07. The complainant has not refuted this. The insurer has also included $5,997.60 for the downstairs tiling in its settlement, as well as the curtains and blinds. Given this, I accept the insurer has made good on various issues with the downstairs area. Termi-mesh (termite protection) The complainant says damage was done to her termite system during the works. She provided a report from DB, in which said they: „… found the system to have been compromised by the rectification work undertaken. Evidential damage is apparent by torn mesh around steel columns and slab penetration and the mesh perimeter has been ground back at rear door entry.‟ The insurer has provided a copy of the inspection certificate completed by F to say the termite protection has been restored. AB’s report to the QBCC identified there was an issue but this was attended to by F, and the barrier repair was the closest possible match. I am satisfied the previous termite protection was affected by the insurer’s works. I am not satisfied the available information shows it was appropriately restored. DB specifically raises concerns that are legitimate and not addressed in the insurer’s materials. DB provided a quote for $2,173.60 (incl GST) to reinstate the system. This did not include necessary structural work to access the system. Given this, I consider it fair to allow $3,000 for this issue. This factors in any necessary structural work. Determination | Case number: 540685 Page 12 of 20 Increased electricity costs caused by delays of insurer The complainant says she incurred additional electricity costs due to the heaters downstairs (which were drying out the property, in accordance with the hygienist’ s instructions) being turned on for excessive amounts of time. This cost was due to the insurer’s delays. The complainant’s representative said $400 in additional electricity costs had been incurred. The complainant has not provided evidence of this. The insurer advised that there was a $381.61 difference in the electrical accounts and added this to its updated offer to the complainant. In the circumstances, I consider the insurer’s offer is fair , given it was based on documented records. The insurer is to pay $381.61 for the difference in increased electricity costs. Slab, walls and front patio The complainant did not provide much information regarding these points, only to state that these items should be rectified. The reports from DC and GS make no reference that these areas were adversely affected by the insurer’s contractors. AB’s report to QBCC says the slab was not adversely affected. The insurer is therefore not liable for the slab and walls downstairs or the front patio. Loss of rent The complainant advised that she had received about 4 months’ worth of loss of rent from the insurer for not being able to rent out the granny flat downstairs. However, she is seeking more as the claim has been going on for over 12 months. The complainant also says she was unable to rent the flat out while she was showering downstairs, due to the incorrect advice from the original plumber that the upstairs bathrooms needed waterproofing. I do not accept the complainant’s position. The evidence shows the granny flat was affected by the sewerage leak. This was not covered by the policy due to the ORG not being compliant. Therefore, I accept the granny flat would not have been rented whilst these repairs were being completed. I am not satisfied there is clear evidence showing the insurer provided incorrect advice. NM’s report makes no comment that he was satisf ied the waterproofing was intact. Given the ensuite shower leaked the first time after he said he repaired the issue, this indicates there may be an issue with its waterproofing. Determination | Case number: 540685 Page 13 of 20 DP’s report dated 11 April 2017 noted a static dye test and spray test was co nducted to a shower which passed. The report is not clear that all the showers were tested. The photos only appear to show one bathroom. Further, no flood test was provided. In MMP’s report dated 18 September 2018, a flood test to the main and downstairs bathrooms failed. MMP concluded the waterproofing was likely affected, based on the flood test. Even if I accept there was incorrect advice, I am not satisfied the complainant acted reasonably in mitigating her loss, if she chose to leave the granny flat untenanted for two years before deciding to repair one of the bathrooms upstairs. The complainant has also not provided evidence to show that the granny flat was rented or could have been rented. Given all this, I do not accept the insurer is required to increase the four months of rent it has already paid. Increased loan costs The complainant says the insurer’s conduct resulted in her losing a discount on her home loan and increased her repayments. This is because she lost a mortgage package. The evidence is unclear why this package was lost and how this was caused by the insurer. The insurer is not liable for this. Overall comments I note the complainant’s main argument is the insurer should substantively contribute to the granny flat due to the serious state of disrepair, the length of time taken and the actual damage by the contractors. However, beyond the items discussed above, I do not accept there is sufficient basis to conclude that the insurer is required to contribute more towards the claim. It is likely the event itself would have resulted in substantive works given the nature of the leak. I am not persuaded by the complainant’s argument that this would have been a small job given there is no evidence supporting this. Therefore, I accept the insur er’s liability for Claim 2 is limited to the matters discussed in this decision. 2.3 Does the insurer have to refund any premium payments? Insurer liable to refund additional premium payments if it has not done so already The complainant raised a new issue near the end of her complaint and said that her premium had increased for a year, due to her first claim being incorrectly considered Determination | Case number: 540685 Page 14 of 20 as a flood claim rather than a water damage claim. The increase in premium was $1,200 ($100 per month). The complainant says that the insurer also incorrectly decided that her home was in a flood zone. This appears to relate to the 2017-18 renewal period. This document said the insurer noted the complainant’s property was a flood risk and resulted in her premium increasing. The insurer provided policy screens to show the complainant’s claims were lodged as escape of water claims. It also says that the issue of flood pricing was coincidental to the complainant’s claims. Having reviewed the insurer’s policy notes, there is nothin g to show the claims were lodged incorrectly. I note though that on 12 October 2017, the insurer confirmed with the local council that the complainant’s property is not prone to flooding. Given this, if it has not done so, the insurer should refund any additional premium that was being charged by incorrectly assessing the complainant’s flood risk. 2.4 Is the insurer liable to pay compensation for non-financial loss? We can award compensation for non-financial loss We can award compensation for non-financial loss where the insurer causes the complainant to suffer undue delays, distress, inconvenience or anxiety. The maximum amount we can award is $3,000. Compensation is awarded conservatively. This will not be awarded for the ordinary and normal degree of inconvenience experienced when correcting an unexpected problem. Insurer offered maximum under our cap for non-financial loss There were delays in this matter and substantial inconvenience to the complainant. The fact the insurer accepted liability for the sewerage leak, conducted extensive works and then retracted that position would have been distressing. There were also delays with the rectification works (before the insurer determined that the ORG was non-compliant). The complainant queried: Why should a small granny flat of under 60 square metres take over a year to strip down to the frame? Determination | Case number: 540685 Page 15 of 20 The insurer acknowledged this and offered to pay the complainant $3,000 in prior settlement offers for non- financial loss. Given the complainant’s experiences, I am satisfied it is appropriate the insurer pay $3,000 for non-financial loss. 2.5 Should the insurer contribute to the complainant’s costs? Insurer is required to contribute to termite report costs The complainant has sought reimbursement of several fees she incurred. This was set out in her email dated 23 December 2018. This did not include DC’s report, but I presume she will wish for this to be included. AFCA may require an insurer to contribute to a complainant ’s professional costs. In doing so, AFCA considers the complexity of the dispute and whether the expert assisted the complainant’s position. One of the fees was paid to the council about the ORG being compliant. Given I preferred the insurer’s position on this point, the insurer is not required to con tribute to this. I do not accept DC’s or MG’s reports materially assisted the complainant’s position as evident from above. I do accept the reports about the Termi-mesh did assist her. According to her email, these total $344.50 . The insurer should reimburse these costs. 2.6 Who should the insurer pay the cash settlement to? Insurer must pay cash settlement to the complainant The complainant wants any cash settlements paid to her. The insurer has said any sums to be paid to her must be agreed to by the mortgagee. I do not agree with the insurer’s position. I acknowledge that under the policy, any cash settlement must be provided to the ‘credit provider’. However, this provision appears to be based on the ‘credit provider’ being noted on the Certificate of Insura nce, which is not the case here. Regardless, I do not accept it is fair in all the circumstances that the insurer makes any cash settlement payment contingent on the credit provider’s agreement for the following reasons. First, the insurer elected to repair the damage for both claims. Extensive delays occurred and significant inconvenience was caused to the complainant. Now the insurer has denied one of the claims and decided to cash settle the claim. Determination | Case number: 540685 Page 16 of 20 This transfers the risk of the repairs to the complaina nt and removes her lifetime guarantee. In such circumstances, it would be unfair for the monies not to be made available to her. Second, the insurer had elected to repair the damage. The complainant was entitled to hold the insurer to this decision for the Claim 1 damage. The fact she is agreeing to a cash settlement benefits the insurer. Third, part of the settlement is to rectify issues caused by the insurer’s conduct rather than part of the claim. Those monies are not subject to this policy provision. Attempting to separate which monies are subject to the policy provision is impractical and difficult. Fourth, the complainant has continually maintained she has limited financial means. If her bank decides to withhold some or all the monies, it is plain she will not be able to repair the damage. Given all this, I accept it is fair in all the circumstances that if the complaint accepts this decision, any monies are to be paid to her directly. Determination | Case number: 540685 Page 17 of 20 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference.  FOS definitions  AFCA term  applicant  complainant  financial services provider  financial firm  dispute  complaint 3.2 Key references Policy documents Record Key points Product Disclosure Statement (PDS) 9 January 2012 Page 18 Table 2.3 – Maximum amount we pay for some contents This table shows the items we limit and whet her you can add an option to your policy to increase your cover for those items. … Gener al Contents we limit The most we pay Option to increase cover Tools of trade – see page $2,000 in total X 81 for the definition Page 23 The events we cover We c over your home or contents when certain th ings happen. These are known as 'listed eve nts'. You can make a claim if a listed event takes place and causes loss or damage to y our home or content s during the policy period. Page 25 Water and oil leaks Determination | Case number: 540685 Page 18 of 20 Record Key points … If loss or d amage is caused by water or oil leaking or escaping from an item shown here. Covered > water leaking or escaping from: ‒ house gutters, drainpipes or pipes ‒ sanitary f ixtures – for example, baths or toilets ‒ ap pliances – for example, washing machines or dishwashers ‒ waterbeds ‒ aquariums ‒ water tanks ‒ swimming pools > oil leaking from a fixed heating system or sealed portable heater > cost s to locate the cause of damage (if we agree to pay these costs before you make any arrangements). Not covered > water leaking or escaping from a shower recess or shower base > costs to repair or replace the item that the water or oil leaked or escaped from > loss or damage caus ed by storm surge. Pa ge 38 Building materials If you’re r enovating or altering your home and a listed event causes loss or damage to your building materials at your site. Covered under Buildings Insurance > building materials — for example, bricks, tiles or timber > items that are due to be fitted to your home — for example, an oven or dishwasher. The most we pay for these items under a: > Home policy, is up to $1,000 > Home Plus policy, is up to $5,000. Not covered > sand, gravel or soil (we don’t classify them as building materials) . Page 54 Exclusions for all cover These excl usions apply to all cover under your policy. Determination | Case number: 540685 Page 19 of 20 Record Key points What we don’t cover Loss, damage, injury or death arising from:  rust, co rrosion, gradual deterioration, depreciation, wear or tear Page 61 Credit providers' rights You may hav e used all or part of your home as security for a loan with a credit provider. Your credit pr ovider may be a bank, credit union or other type of lender. When you ha ve Buildings Insurance, we note any credit provider you tell us about on your cur rent Certificate of Insurance. When you have a noted credit provider: > we treat your home as being under mortgage > we treat any statement, act, omission or claim by you as a statement, act, omission or claim by the credit provider > we may recover any payment either in your name or the credit provider’s name. … Payments to the credit provider We may decide to pay you cash for a claim on your mor tgaged property. If so, we will first pay t he credit provider the lower of these amounts after deducting any excess an d unpaid premium: > the Buildings sum insured, or > the reasonable cost of repairing or replacing your home, or > the balance then owing to the credit provider under the mortgage. However, we will only pay the credit provider if: > they are noted on your current Certificate of Insurance > t hey give us any help we ask for > the amount we have agreed to pay you is more than $20,000 - if it is less than $20,000 we can choose to pay you or the credit provider. If we make a payment to a credit provide r, then the pa yment d ischarges our obligation to you under your policy for the amount paid. Page 81 Tool s of trade are those items or equipment used in any business, trade or profession. This does not include your home office equipment. Determination | Case number: 540685 Page 20 of 20 Australian Standards 3500.2:2003 ‘Sanitary Plumbing & Drainage’ 5.4.1 4.6.6.6 Height below lowest fixture A minimum height of 150mm shall be maintained between the top of the overflow gully riser and the lowest fixture connected to the drain. CRD engineers – causation report 17 December 2018 The purpose of an „overflow relief fully‟ is to act as a relief valve and redirect the flow of sewer water away from the residence in the event of a blockage in the sewer/septic system… Since the upper level is located approximately 3m higher than the septic system at ground level, any liquid drained from the upper level will contain a pressure head. In the event of a blockage in the septic tank, the liquid will be forced out of the drainage system, above the septic tank at the lowest level exposed to atmosphere. The lowest level was measured to be the floor waste in the lower level Bathroom… The height of the lowest internal fixture was measured to be 30mm lower than the riser of the ORG, which is not compliant with the Australian Standard, and has directly caused the inundation of septic water in the internal areas of the residence, instead of being relieved external to the residence [emphasis added]. This standard was relevant at the time of the Granny Flat construction. We are of the opinion that the compliance of the sanitary drainage was an oversight in the certification of the Granny Flat. The ORG was constructed at the time of the upper level and was compliant at this time, as the internal plumbing fixtures are located approximately 3m higher. There has been no consideration given to the compliance of the ORG during the certification of the Granny Flat, as the lowest internal fixture has changed from the upper level to the lower level.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.