Text of the determination
Determination | Case number: 540685 Page 1 of 20
Determination
Case number: 540685 17 June 2019
1 Determination overview
1.1 Complaint
Claim 1
The complainant lodged a claim with the financial firm (insurer) on 17 March 2015.
This was because there was a leak from her upstairs shower. The insurer’s plumber
(SP) advised all the showers needed waterproofing. Based on this, the insurer denied
the claim. As a result, the complainant did not shower upstairs for several years.
The complainant engaged a plumber (NM) who inspected the ensuite shower and
believed the leak was from the shower outlet waste pipe. The plumber repaired this.
When the complainant next used this shower, the area flooded. This leak went
through part of the upstairs area, and into the downstairs area and garage. This
included damage to $30,000 worth of bamboo flooring and 18 poles. The bamboo
flooring and poles were to be used for the complainant’s pole dancing business.
Claim 2
In November 2017, the septic tank leaked into the granny flat downstairs, causing
extensive damage.
The complainant wants the insurer to cover all of the damage arising from both
claims, as well fees she has incurred. She has also complained about service issues
and the increase to her premium. In addition, she disputes the insurer’s decision to
make any payment conditional on her bank’s approval.
1.2 Issues and key findings
What is the insurer’s liability for Claim 1?
The insurer is liable to pay a total of $52,568.02 to rectify the damage to the upstairs
area, and resultant damage. The insurer must also organise for the push bike to be
cleaned.
Determination | Case number: 540685 Page 2 of 20
What is the insurer’s liability for Claim 2 ?
Under the policy, the insurer is not liable for the damage caused by the septic tank
leak. This is because the evidence shows the damage was due to the overflow relief
gully (ORG) not being installed correctly.
The insurer should pay $3,381.61 for the damage and losses caused by its
contractors that have not been included in Claim 1. The insurer is not liable to pay for
loss of rent or other losses being sought by the complainant, for the reasons set out in
section 2.2.
Does the insurer have to refund any premium payments?
The insurer is liable to refund any premium charged for incorrectly assessing the
complainant’s flood risk (if it has not done so already).
Is the insurer liable to pay compensation for non-financial loss?
The insurer has offered to pay $3,000 , being the maximum amount of our cap. I
consider this appropriate given the complainant’s claim experience.
Should the insurer contribute to the complainant’s professional costs?
The insurer should contribute to the complainant’s costs of the termite reports,
totalling $344.50 . The insurer is not required to contribute to the other costs as they
did not assist the complainant’s position.
Who should the insurer pay the cash settlement to?
It is fair for the monies to be paid to the complainant, not the mortgagee.
1.3 Determination
This determination is partly in favour of the complainant.
The insurer should settle this dispute in the following way:
pay $52,568.02 due to the upstairs shower leak (claim 1)
is not liable for damage due to the septic tank leak, as the ORG was faultily
installed (claim 2)
pay $3,381.61 to remedy the damage and losses caused by its contractors
refund any premium charged for incorrectly assessing the complainant’s flood risk
(if it has not done so already)
pay $3,000 in compensation for non-financial loss
contribute $344.50 towards the complainant’s professional costs
The insurer must pay the total amount of $59,294.13 to the complainant directly.
Determination | Case number: 540685 Page 3 of 20
The insurer must also arrange and pay for the push bike downstairs to be cleaned,
and any mould removed.
Determination | Case number: 540685 Page 4 of 20
2 Reasons for determination
2.1 What is the insurer’s liability for Claim 1?
Insurer has accepted liability for damage set out in AB’s scope of works
The insurer has accepted liability for this claim.
The insurer previously submitted an offer for the upstairs damage. This included
$28,567.44 (incl GST) based on AB’s ‘liability quotation’ dated 3 December 2018.
This quote was higher than the insurer’s assessor’s estimate of the works.
However, it is not clear if this quote is available to the complainant. Further, by cash
settling the claim, I note the insurer is transferring the risk of the works to the
complainant and she is losing the lifetime guarantee of the works.
Given these factors, I consider it is fair that a 15% allowance be added to reflect these
factors. Therefore, regarding the agreed scope of works set out in AB’s liability
quotation dated 3 December 2018, the insurer’s liability should be increased to
$32,852.66 .
Upstairs tiles
The complainant says that her upstairs tiles were damaged from the claim , as well as
from the excessive drying and wetting by the insurer’s contractor, BC.
The complainant’s representative has provided photos which show that some tiles are
cracked.
The compla inant’s representative also said in an email:
Tiles upstairs in every room have cracked and the underlay has buckled and
warped. It appears that the lack of bracing [downstairs, in the granny flat] over an
extended period of time has added to this damage.
The complainant provided a structural engineering report from DC. DC said the tiling
upstairs cracked due to the temporary bracing downstairs being removed for 8 weeks.
I am not persuaded by DC’s opinion.
DC’s report did not consider the influence of pre -existing termite damage or other
factors.
The insurer’s assessor (SB) identified pre -existing termite damage to the joist and
subfloor, with photographs in support. DC’s failure to take this into consideration does
undermine his conclusion.
Determination | Case number: 540685 Page 5 of 20
Importantly, the insurer’s engineer (EC) advised that removal of the ply bracing would
have, at best, only very slightly reduced the bracing resistance:
It should be clearly noted that removal of the ply to the western wall at best,
would have very slightly reduced the houses structural bracing resistance.
This is because all of the remaining diagonal bracing rods remained. It is
important to NOT assum e that the entire house was simply left unbraced
during repair works.
EC also made several compelling arguments challenging DC’s conclusions. This
centred around DC’s failure to consider relevant factors or other possible causes of
damage. For instance:
no review of the weather records – DC’s review of these records does not show
any significant winds in that eight-week period
a floor survey was not completed to determine whether foundation movement is
occurring
no consideration for tile age, wear and tear.
Given this, I am not persuaded the tile cracking, or any other structural damage was
caused by the temporary removal of ply to the western wall.
The complainant provided two quotes for tiling. One quote included $17,900 for the
upstairs floor tiles and $17,000 for renovating both bathrooms. The second quote was
for $14,059.20. It is not clear if this second quote was for all of the tiling, but the
inspection note dated 12 January 2019 indicates it was.
It is not clear how the second bathroom was affected by the flooding in the ensuite.
The complainant appears to say this is related to the claim or the works conducted
following this. I am not satisfied it was caused by the temporary removal of the ply
downstairs. The balance of the evidence does not explain how this second bathroom
was affected by the claim or works.
Given this, I am not satisfied the complainant’s quotes are f air and reasonable.
When reviewing AB’s quote and scope of works, I note that the amount for tiling
(excluding the supply and installation of tile underlay) is $7,797.86 (exclusive of GST).
If I include the cost of the underlay, this increases to $11,162.62 (exclusive of GST).
The insurer, in an email dated 5 March 2019, included $504.05 (to allow for an
increase in tiling as per the complainant’s quote) and $6,500 (as an additional
allowance for tile material upstairs). If I add this to AB’s quote for the tile works, this
would have increased the insurer’s overall tile settlement for upstairs to $18,166.67.
I consider this overall figure for the tiles to be more than fair. Therefore, the insurer
should only pay an additional $5,329.66 ($18,166.67 minus $12,837.02) towards the
Determination | Case number: 540685 Page 6 of 20
tiling upstairs. The $12,827.02 includes the 15% contingency added to AB’s quote
above.
Roof movement and leakage
The complainant raised a new issue near the end of the complaint, saying that the
roof may have experienced movement and leakage due to the lack of temporary
bracing for 8 weeks. She provided DC’s report in support.
DC’s opinion on this is clearly equivocal. He says, ‘there is a possibility that excessive
floor diaphragm deformation causes over deformation of roof diaphragm’ but
acknowledges ‘there are several other factors may be contributing toroof leakage’.
Therefore, he says he ‘cannot make a firm conclusion on this matter and further
investigation may be required’.
Given DC is not comfortable in saying any roof issue is related to the lack of
temporary bracing, I do not consider there is sufficient basis to conclude the insurer is
liable for this.
Upstairs carpet
The insurer provided an amount of $816.20 for the upstairs carpet in its settlement
offer. There is nothing to indicate this is unreasonable or unfair.
The insurer should pay $816.20 for the carpet upstairs.
Mould upstairs
The complainant’s representative advised that:
Mould has been left untreated upstairs for a period of more than 12 months…
[BC] used high
‐ pressure wetting machines, against the advice of the hygienist…
No other evidence has been provided to show there is mould in the upstairs area. The
insurer provided a report by GC dated November 2018 which said the mould has
been remediated appropriately. The complainant has not provided any evidence to
show mould has returned since then in the upstairs area.
Given this, I do not accept the insurer is liable for any further mould works.
Painting of walls upstairs
The insurer’s quote for upstairs includes some painting works, because of the water
ingress.
When I include all the painting amounts in AB’s quote and add GST and the 15% for
contingencies, this totals $4,336.98. There is nothing to indicate this is unreasonable.
Determination | Case number: 540685 Page 7 of 20
Therefore, I do not consider that the insurer is liable for any further amounts for the
painting of upstairs.
Bamboo poles and flooring
The complainant wants all the damaged bamboo flooring and poles covered under
the claim. The complainant’s representative said:
When the owner of the property did take a shower upstairs some years later, due
to a blockage in the pipe which had been caused by a separate issue, the water
backed up and flooded a significant portion of the upstairs floor and also leaked to
the garage area below and soaked and subsequently ruined $30,000 worth of
bamboo flooring stored in the garage.
The complainant says this blockage was due to the insurer’s failure to prop erly
diagnose the cause of the leak. Therefore, her claim for the bamboo poles and
flooring should not be subject to any policy limits.
I disagree.
If the blockage existed due to the first claim, then any flood tests would have always
failed. However, when NM conducted the works, he said he tested the new
installation and found it operating satisfactorily. He then allowed the complainant to
use it.
Upon its next use, the shower flooded. In such a context, the information is far from
clear in showing the blockage could have been due to the previous claim as opposed
to other factors, such as NM’s works.
Therefore, I accept the insurer’s liability for the bamboo poles and flooring should be
limited to the policy coverage.
For ‘ building materials ’, the policy states the following is covered:
building materials — for example, bricks, tiles or timber
items that are due to be fitted to your home — for example, an oven or
dishwasher.
The flooring is made of timber and was sitting in a pile in the complainant’s garage
waiting to be fitted (e.g. see R’s report for photos). R also said on 21 April 2017 that
the flooring was not installed and had been stored there for over one year.
Based on the policy definition and facts of the case, I consider the bamboo flooring to
be building materials as they were not installed. The insurer is therefore liable to pay
Determination | Case number: 540685 Page 8 of 20
$1,000 for the bamboo flooring (which is the cap under the policy for building
materials).
I also agree with the insurer that the poles should be considered ‘tools of trade’. Tools
of trade are defined in the policy to mean „ those items or equipment used in any
business, trade or profession‟ . The complainant advised that the poles were for her
pole dancing business. The poles should therefore be considered as tools of trade.
The insurer is liable to pay $2,000 for the pole dancing poles (which is the cap for
tools of trade under the policy).
Tiling downstairs
The insurer provided an amount of $5,997.60 for the tiling downstairs, as a result of
the water ingress from upstairs.
The complainant believes the floor has been damaged and would likely need to be
levelled. The insurer’s contractor, AB, responded to this when the complainant raised
this issue with the Queensland Building and Construction Commission (QBCC). AB
noted the slab was scuffed by a jackhammer in several places. However, they are
minor, with the slab ground clean and suitable for new tiles.
There is no expert evidence refuting AB’s response that the floor underneath the tiles
was damaged or required repairs.
Therefore, I accept the insurer’s offer to pay $5,997.60 for the tiling downstairs is
reasonable.
Curtains and blinds downstairs
The insurer provided an amount of $4,572 in its final settlement offer for the curtains
and blinds downstairs, as per the complainant’s quote. I am satisfied that this is a
reasonable offer.
The insurer must pay $4,572 for the carpets and blinds downstairs.
Gym equipment and push bike
The complainant says that there is mould on her gym and bike equipment in the
garage downstairs, due to the shower leakage.
The complainant submitted photographs of the equipment. The photos of the gym
equipment do not show any apparent evidence of mould.
For the bike, there is a substantive black substance on the seat. It is unclear if it is
mould or simply dirt. I note there is no evidence of such substance to the rest of the
bike.
Determination | Case number: 540685 Page 9 of 20
No reports or other assessment has been provided for these items. The insurer has
not responded to this aspect of the complainant’s claim.
Based on the available information, I accept the insurer should at least arrange for the
push bike to be cleaned, and any mould removed. I do not accept the evidence shows
the gym equipment is affected by mould.
Other items
In the complainant’s email dated 28 November 2018, she listed numerous other items
she says require remediation or replacement.
No photographs or reports were provided of these items. Her later submissions do not
provide any further clarification on these items.
Given the minimal information, I do not accept the insurer is liable to contribute any
amount to these items.
Air conditioner and security camera
The complainant says the air conditioner and security camera downstairs have mould
due to the leaking shower.
No reports or opinions have been provided to show how these were damaged or the
extent of it. Based on the minimal information available, the insurer is not liable to
compensate the complainant for these items.
Total – Claim 1
The insurer is liable to pay $52,568.02 for Claim 1 and must also organise for the
push bike to be cleaned.
2.2 What is the insurer’s liability for Claim 2?
Insurer not liable for septic tank leak as ORG was not compliant
Initially, the insurer accepted liability for this claim and conducted extensive works to
the granny flat downstairs. This included stripping the kitchen, removing plasterboard
from other walls and ceilings, and removing a bathroom vanity and carpet from the
bedroom.
Over a year later, the insurer denied the claim, on the basis the loss arose due to
faulty workmanship. Specifically, the overflow relief gully (ORG) was not compliant.
The purpose of the ORG is to release the pressure to the se wer system resulting from
a blockage or excessive rainwater, by directing the overflow away from the home.
Determination | Case number: 540685 Page 10 of 20
The insurer relied upon CR’s (consultant engineers) report which identified that the
height of the lowest internal fixture was 30mm lower than the riser of the ORG. This
does not comply with Australian Standard 3500.2:2003, which says:
A minimum height of 150mm shall be maintained between the top of the overflow
gully riser and the lowest fixture connected to the drain.
CR concluded that this has “dir ectly caused the inundation of septic water in the
internal areas of the residence, instead of being relieved external to the residence”.
CR’s evidence is plausible. The ORG needed to be 180mm lower than where it is
placed or the internal fixture 180mm higher. There is nothing to suggest the
inundation that occurred to this area was greater than 180mm.
Further, this Australian Standard was applicable when the granny flat was
constructed.
Therefore, I accept the installation of the ORG constitutes faulty workmanship and
this has caused the loss being claimed. On this basis, I do not accept the insurer was
liable under the terms of this policy for the damage resulting from this leak.
Complainant says there is about $100,000 worth of works required now
Generally, an insurer who incorrectly accepts a claim is not bound by this if the
evidence clearly shows the policy never responded to the loss. However, to the extent
this incorrect decision has prejudiced the insured, then it is fair the insurer make good
any of these losses.
The insurer says that based on the works it has conducted, and the amounts it has
paid, its incorrect decision has greatly benefited the complainant.
The complainant disputes this. She says the works would been less extensive had the
ins urer’s builders acted with reasonable care and skill when addressing the damage.
Instead, mould was allowed to spread and the extent of works required increased
significantly due to this and leaving the home in a state of disrepair.
This is reflected by the fact that hygienist G had to visit the property numerous times
to review whether the mould had been properly remediated.
The complainant has provided a quote from WD to restore the granny flat, totalling
$78,000. This does not include the quote for the bathroom, which was around
$20,000. She says the bathroom’s waterproofing has been affected by the works
done by the insurer’s builder.
The complainant is also seeking for loss of rent to the granny flat during this period of
time.
Determination | Case number: 540685 Page 11 of 20
The insurer provided a liability quotation from AB for this downstairs area. This
totalled $51,183.01. This included $5,997.60 for the tiling , which the insurer already
agreed to. AB’s quote only included minimal works to the bathroom.
Bathroom, ceiling, tiling, curtains and blinds
I am not satisfied that the available information shows that the downstairs bathroom is
required to be completely renovated, as a result of the insurer’s works.
The complainant has based this on her assertion the waterproofing was affected by
the works. There is minimal evidence supporting this. DC makes no comment about
this. Neither does builder GS.
The insurer notes the downstairs ceiling was cash settled based on R’s quote , for a
sum of $11,821.07. The complainant has not refuted this. The insurer has also
included $5,997.60 for the downstairs tiling in its settlement, as well as the curtains
and blinds.
Given this, I accept the insurer has made good on various issues with the downstairs
area.
Termi-mesh (termite protection)
The complainant says damage was done to her termite system during the works. She
provided a report from DB, in which said they:
„… found the system to have been compromised by the rectification work
undertaken. Evidential damage is apparent by torn mesh around steel columns
and slab penetration and the mesh perimeter has been ground back at rear door
entry.‟
The insurer has provided a copy of the inspection certificate completed by F to say
the termite protection has been restored. AB’s report to the QBCC identified there
was an issue but this was attended to by F, and the barrier repair was the closest
possible match.
I am satisfied the previous termite protection was affected by the insurer’s works. I am
not satisfied the available information shows it was appropriately restored. DB
specifically raises concerns that are legitimate and not addressed in the insurer’s
materials.
DB provided a quote for $2,173.60 (incl GST) to reinstate the system. This did not
include necessary structural work to access the system. Given this, I consider it fair to
allow $3,000 for this issue. This factors in any necessary structural work.
Determination | Case number: 540685 Page 12 of 20
Increased electricity costs caused by delays of insurer
The complainant says she incurred additional electricity costs due to the heaters
downstairs (which were drying out the property, in accordance with the hygienist’ s
instructions) being turned on for excessive amounts of time. This cost was due to the
insurer’s delays.
The complainant’s representative said $400 in additional electricity costs had been
incurred. The complainant has not provided evidence of this.
The insurer advised that there was a $381.61 difference in the electrical accounts and
added this to its updated offer to the complainant.
In the circumstances, I consider the insurer’s offer is fair , given it was based on
documented records. The insurer is to pay $381.61 for the difference in increased
electricity costs.
Slab, walls and front patio
The complainant did not provide much information regarding these points, only to
state that these items should be rectified.
The reports from DC and GS make no reference that these areas were adversely
affected by the insurer’s contractors. AB’s report to QBCC says the slab was not
adversely affected.
The insurer is therefore not liable for the slab and walls downstairs or the front patio.
Loss of rent
The complainant advised that she had received about 4 months’ worth of loss of rent
from the insurer for not being able to rent out the granny flat downstairs. However,
she is seeking more as the claim has been going on for over 12 months.
The complainant also says she was unable to rent the flat out while she was
showering downstairs, due to the incorrect advice from the original plumber that the
upstairs bathrooms needed waterproofing.
I do not accept the complainant’s position.
The evidence shows the granny flat was affected by the sewerage leak. This was not
covered by the policy due to the ORG not being compliant. Therefore, I accept the
granny flat would not have been rented whilst these repairs were being completed.
I am not satisfied there is clear evidence showing the insurer provided incorrect
advice. NM’s report makes no comment that he was satisf ied the waterproofing was
intact. Given the ensuite shower leaked the first time after he said he repaired the
issue, this indicates there may be an issue with its waterproofing.
Determination | Case number: 540685 Page 13 of 20
DP’s report dated 11 April 2017 noted a static dye test and spray test was co nducted
to a shower which passed. The report is not clear that all the showers were tested.
The photos only appear to show one bathroom. Further, no flood test was provided. In
MMP’s report dated 18 September 2018, a flood test to the main and downstairs
bathrooms failed. MMP concluded the waterproofing was likely affected, based on the
flood test.
Even if I accept there was incorrect advice, I am not satisfied the complainant acted
reasonably in mitigating her loss, if she chose to leave the granny flat untenanted for
two years before deciding to repair one of the bathrooms upstairs.
The complainant has also not provided evidence to show that the granny flat was
rented or could have been rented.
Given all this, I do not accept the insurer is required to increase the four months of
rent it has already paid.
Increased loan costs
The complainant says the insurer’s conduct resulted in her losing a discount on her
home loan and increased her repayments. This is because she lost a mortgage
package.
The evidence is unclear why this package was lost and how this was caused by the
insurer. The insurer is not liable for this.
Overall comments
I note the complainant’s main argument is the insurer should substantively contribute
to the granny flat due to the serious state of disrepair, the length of time taken and the
actual damage by the contractors.
However, beyond the items discussed above, I do not accept there is sufficient basis
to conclude that the insurer is required to contribute more towards the claim. It is likely
the event itself would have resulted in substantive works given the nature of the leak.
I am not persuaded by the complainant’s argument that this would have been a small
job given there is no evidence supporting this.
Therefore, I accept the insur er’s liability for Claim 2 is limited to the matters discussed
in this decision.
2.3 Does the insurer have to refund any premium payments?
Insurer liable to refund additional premium payments if it has not done so
already
The complainant raised a new issue near the end of her complaint and said that her
premium had increased for a year, due to her first claim being incorrectly considered
Determination | Case number: 540685 Page 14 of 20
as a flood claim rather than a water damage claim. The increase in premium was
$1,200 ($100 per month).
The complainant says that the insurer also incorrectly decided that her home was in a
flood zone.
This appears to relate to the 2017-18 renewal period. This document said the insurer
noted the complainant’s property was a flood risk and resulted in her premium
increasing.
The insurer provided policy screens to show the complainant’s claims were lodged as
escape of water claims. It also says that the issue of flood pricing was coincidental to
the complainant’s claims.
Having reviewed the insurer’s policy notes, there is nothin g to show the claims were
lodged incorrectly. I note though that on 12 October 2017, the insurer confirmed with
the local council that the complainant’s property is not prone to flooding.
Given this, if it has not done so, the insurer should refund any additional premium that
was being charged by incorrectly assessing the complainant’s flood risk.
2.4 Is the insurer liable to pay compensation for non-financial loss?
We can award compensation for non-financial loss
We can award compensation for non-financial loss where the insurer causes the
complainant to suffer undue delays, distress, inconvenience or anxiety. The maximum
amount we can award is $3,000.
Compensation is awarded conservatively. This will not be awarded for the ordinary
and normal degree of inconvenience experienced when correcting an unexpected
problem.
Insurer offered maximum under our cap for non-financial loss
There were delays in this matter and substantial inconvenience to the complainant.
The fact the insurer accepted liability for the sewerage leak, conducted extensive
works and then retracted that position would have been distressing.
There were also delays with the rectification works (before the insurer determined that
the ORG was non-compliant). The complainant queried:
Why should a small granny flat of under 60 square metres take over a year to
strip down to the frame?
Determination | Case number: 540685 Page 15 of 20
The insurer acknowledged this and offered to pay the complainant $3,000 in prior
settlement offers for non- financial loss. Given the complainant’s experiences, I am
satisfied it is appropriate the insurer pay $3,000 for non-financial loss.
2.5 Should the insurer contribute to the complainant’s costs?
Insurer is required to contribute to termite report costs
The complainant has sought reimbursement of several fees she incurred. This was
set out in her email dated 23 December 2018. This did not include DC’s report, but I
presume she will wish for this to be included.
AFCA may require an insurer to contribute to a complainant ’s professional costs. In
doing so, AFCA considers the complexity of the dispute and whether the expert
assisted the complainant’s position.
One of the fees was paid to the council about the ORG being compliant. Given I
preferred the insurer’s position on this point, the insurer is not required to con tribute to
this.
I do not accept DC’s or MG’s reports materially assisted the complainant’s position as
evident from above. I do accept the reports about the Termi-mesh did assist her.
According to her email, these total $344.50 . The insurer should reimburse these
costs.
2.6 Who should the insurer pay the cash settlement to?
Insurer must pay cash settlement to the complainant
The complainant wants any cash settlements paid to her. The insurer has said any
sums to be paid to her must be agreed to by the mortgagee.
I do not agree with the insurer’s position.
I acknowledge that under the policy, any cash settlement must be provided to the
‘credit provider’. However, this provision appears to be based on the ‘credit provider’
being noted on the Certificate of Insura nce, which is not the case here.
Regardless, I do not accept it is fair in all the circumstances that the insurer makes
any cash settlement payment contingent on the credit provider’s agreement for the
following reasons.
First, the insurer elected to repair the damage for both claims. Extensive delays
occurred and significant inconvenience was caused to the complainant. Now the
insurer has denied one of the claims and decided to cash settle the claim.
Determination | Case number: 540685 Page 16 of 20
This transfers the risk of the repairs to the complaina nt and removes her lifetime
guarantee. In such circumstances, it would be unfair for the monies not to be made
available to her.
Second, the insurer had elected to repair the damage. The complainant was entitled
to hold the insurer to this decision for the Claim 1 damage. The fact she is agreeing to
a cash settlement benefits the insurer.
Third, part of the settlement is to rectify issues caused by the insurer’s conduct rather
than part of the claim. Those monies are not subject to this policy provision.
Attempting to separate which monies are subject to the policy provision is impractical
and difficult.
Fourth, the complainant has continually maintained she has limited financial means. If
her bank decides to withhold some or all the monies, it is plain she will not be able to
repair the damage.
Given all this, I accept it is fair in all the circumstances that if the complaint accepts
this decision, any monies are to be paid to her directly.
Determination | Case number: 540685 Page 17 of 20
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services
provider
financial firm
dispute complaint
3.2 Key references
Policy documents
Record Key points
Product
Disclosure
Statement
(PDS)
9 January 2012
Page 18
Table 2.3 – Maximum amount we pay for some contents
This table shows the items we limit and whet her you can add an option to your
policy to increase your cover for those items.
…
Gener al Contents we limit The most we pay Option to increase cover
Tools of trade – see page $2,000 in total X
81 for the definition
Page 23 The events we cover
We c over your home or contents when certain th ings happen. These are known as
'listed eve nts'. You can make a claim if a listed event takes place and causes loss
or damage to y our home or content s during the policy period.
Page 25 Water and oil leaks
Determination | Case number: 540685 Page 18 of 20
Record Key points
…
If loss or d amage is caused by water or oil leaking or escaping from an item shown
here.
Covered
> water leaking or escaping from:
‒ house gutters, drainpipes or pipes
‒ sanitary f ixtures – for example, baths or toilets
‒ ap pliances – for example, washing machines or dishwashers
‒ waterbeds
‒ aquariums
‒ water tanks
‒ swimming pools
> oil leaking from a fixed heating system or sealed portable heater
> cost s to locate the cause of damage (if we agree to pay these costs before
you make any arrangements).
Not covered
> water leaking or escaping from a shower recess or shower base
> costs to repair or replace the item that the water or oil leaked or escaped
from
> loss or damage caus ed by storm surge.
Pa ge 38 Building materials
If you’re r enovating or altering your home and a listed event causes loss or
damage to your building materials at your site.
Covered under Buildings Insurance
> building materials — for example, bricks, tiles or timber
> items that are due to be fitted to your home — for example, an oven or
dishwasher.
The most we pay for these items under a:
> Home policy, is up to $1,000
> Home Plus policy, is up to $5,000.
Not covered
> sand, gravel or soil (we don’t classify them as building materials) .
Page 54 Exclusions for all cover
These excl usions apply to all cover under your policy.
Determination | Case number: 540685 Page 19 of 20
Record Key points
What we don’t cover
Loss, damage, injury or death arising from:
rust, co rrosion, gradual deterioration, depreciation, wear or tear
Page 61 Credit providers' rights
You may hav e used all or part of your home as security for a loan with a credit
provider.
Your credit pr ovider may be a bank, credit union or other type of lender.
When you ha ve Buildings Insurance, we note any credit provider you tell us about
on your cur rent Certificate of Insurance.
When you have a noted credit provider:
> we treat your home as being under mortgage
> we treat any statement, act, omission or claim by you as a statement, act,
omission or claim by the credit provider
> we may recover any payment either in your name or the credit provider’s name.
…
Payments to the credit provider
We may decide to pay you cash for a claim on your mor tgaged property. If so, we
will first pay t he credit provider the lower of these amounts after deducting any
excess an d unpaid premium:
> the Buildings sum insured, or
> the reasonable cost of repairing or replacing your home, or
> the balance then owing to the credit provider under the mortgage.
However, we will only pay the credit provider if:
> they are noted on your current Certificate of Insurance
> t hey give us any help we ask for
> the amount we have agreed to pay you is more than $20,000 - if it is less than
$20,000 we can choose to pay you or the credit provider.
If we make a payment to a credit provide r, then the pa yment d ischarges our
obligation to you under your policy for the amount paid.
Page 81 Tool s of trade
are those items or equipment used in any business, trade or profession. This does
not include your home office equipment.
Determination | Case number: 540685 Page 20 of 20
Australian Standards
3500.2:2003 ‘Sanitary Plumbing & Drainage’
5.4.1 4.6.6.6 Height below lowest fixture
A minimum height of 150mm shall be maintained between the top of the overflow
gully riser and the lowest fixture connected to the drain.
CRD engineers – causation report
17 December 2018
The purpose of an „overflow relief fully‟ is to act as a relief valve and redirect the
flow of sewer water away from the residence in the event of a blockage in the
sewer/septic system…
Since the upper level is located approximately 3m higher than the septic system
at ground level, any liquid drained from the upper level will contain a pressure
head. In the event of a blockage in the septic tank, the liquid will be forced out of
the drainage system, above the septic tank at the lowest level exposed to
atmosphere. The lowest level was measured to be the floor waste in the lower
level Bathroom…
The height of the lowest internal fixture was measured to be 30mm lower
than the riser of the ORG, which is not compliant with the Australian
Standard, and has directly caused the inundation of septic water in the
internal areas of the residence, instead of being relieved external to the
residence [emphasis added].
This standard was relevant at the time of the Granny Flat construction. We are of
the opinion that the compliance of the sanitary drainage was an oversight in the
certification of the Granny Flat. The ORG was constructed at the time of the upper
level and was compliant at this time, as the internal plumbing fixtures are located
approximately 3m higher. There has been no consideration given to the
compliance of the ORG during the certification of the Granny Flat, as the lowest
internal fixture has changed from the upper level to the lower level.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.