Poor claim handling and defective cyclone repairs; consequential loss from missed teacher transfer

FirmFinancial Firm (Unknown - Insurer)
Decided2019-02-18
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$3,000
Amount claimed$100,000
SourceAFCA PDF

Summary

Cyclone repairs to the complainant's home were defective and the claim took well over a year to resolve. AFCA awarded $3,000 non-financial loss but refused the claimed consequential loss of a teacher transfer worth about $100,000.

Poor claim handling caused unusual inconvenience warranting non-financial loss, but the lost transfer was a choice within the complainant's control and was not reasonably contemplated from the insurer's breach.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 540458 Page 1 of 8 Determination Case number: 540458 18 January 2019 1 Determination overview 1.1 Complaint The complainant lodged a claim with her financial firm (insurer) for cyclone damage to her home that occurred in March 2017. The insurer accepted the claim and arranged repairs. The complainant was dissatisfied with the quality of repairs, rectification attempts and claims service. The complainant says the insurer’s claims handling and requirement to rectify repairs caused to her miss the opportunity to undergo a teacher transfer resulting in the loss of income of approximately $100,000. The complainant seeks consequential loss and non-financial loss compensation. 1.2 Issues and key findings Is the insurer entitled to pay non-financial loss compensation? The available information shows the insurer handled the claim poorly which caused an unusual degree of physical inconvenience, time taken to resolve the situation and interfered with the complainant’s expectation of enjoyment and peace of mind. An award of non-financial loss compensation is warranted. Is the insurer required to pay consequential loss compensation? Consequential loss is excluded under the policy. However, an award may be made where the insurer breached its policy conditions. The insurer is not required to pay consequential loss compensation as the information does not show the loss of income naturally arose and was reasonably contemplated from the insurer’s requirement to rectify repairs. Determination | Case number: 540458 Page 2 of 8 1.3 Determination This determination is partially in favour of the insurer. The insurer is  required to pay non-financial loss compensation of $3,000  not required to pay consequential loss compensation. Determination | Case number: 540458 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer entitled to pay non-financial loss compensation? Non-financial loss compensation is warranted An award of compensation for non-financial loss may be made up to a maximum award of $3,000 (under the FOS Terms of Reference). Such an award is subject to consideration as to whether there has occurred an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the complai nant’s expectation of enjoyment or peace of mind. The complainant lodged a claim with the insurer in March 2017 for cyclone damage to her house in B. The parties agreed for D to complete house repairs by 14 December 2017. Following D’s repairs, the complai nant raised many quality issues with the repairs including roof repairs and no exterior cladding repairs undertaken. While waiting for the cladding to arrive, the complainant says she saw the cladding continue to peel off the right-side during storms which required more cladding to be ordered by D. The complainant provided photographs which showed the cladding peeling off and other outstanding cladding repairs required from her house. The file shows the complainant arranged exterior plastic cladding throug h a local company. The complainant raised concerns the roof repairs were not cyclone compliant particularly at the start of cyclone season. The complainant raised concerns D had missed damage in its scope of works including faulty lights, painting, cabinets, fence, cleaning and irrigations repairs. The complainant says D refused to undertake fencing repairs. The available information shows the insurer agreed to cash settle these items after the complainant provided reports and quotations. Further, the complainant raised concerns with the condition D had left her house on several occasions. For example, in October 2017, D had left corrugated iron at her house, put a hole in the garage and left nails on the lawn. The insurer arranged D to clean up the house. Also, in January 2018, D had left plaster dust all over the house, doors and blinds. As noted, the insurer agreed to cash settle the complainant’s cleaning costs. The insurer’s builder, A and H identified following items that required rectification work and cyclone related damage missed as outlined under section 3.2. The insurer acknowledged the length of time taken to process the complainant’s claim and complete rectification repairs. The insurer accepts the repairs were not completed correctly in the first instance. The insurer offered an apology to the complainant for the claims experience provided. The insurer awarded $2,000 non-financial loss compensation in recognition of the Determination | Case number: 540458 Page 4 of 8 service provided. As part of the complaint process, the insurer offered $15,000 non- financial loss compensation. While the insurer notes its service fell short of the complainant’s expectation, its conduct was compliant with its obligations under the relevant industry code of practice in relation to providing the complainant progress updates. AFCA is precluded from awarding non-financial loss compensation where an insurance policy excludes cover. AFCA can however consider an award of non- financial loss compensation where the insurer breaches its policy obligations. Based on the above, I am satisfied the non-financial loss did not occur from normal handling of the claim, but due to the insurer’s poor claim handling. On this basis, AFCA can consider an award of non-financial loss compensation. I am satisfied the insurer’s claims handling and D’s poor quality repairs requiring multiple areas of rectification caused an unusual degree and extent of physical inconvenience, delayed a resolution to the situation and interfered with the complainant’s expectation of enjoyment and peace of mind . While quality repair issues were raised in December 2017, the insurer assessed repairs required from May to August 2018. The insurer took a considerable amount of time to assess the works required to be rectified and assess missing items. I consider the complainant was further inconvenienced when D missed items in the scope of works and refused to undertake work which led the complainant to arrange reports and quotes to progress the claim. The repairs were completed to the complainant’s satisfaction aro und September 2018, over a year and a half after the claimed event. The insurer took a significant amount of time to undertake the rectification repairs from when rectification concerns were raised. Based on the above, I consider an award of non-financial loss compensation of $3,000 is appropriate. 2.2 Is the insurer entitled to pay consequential loss compensation? Consequential loss compensation not warranted An award of consequential loss compensation may be awarded to a maximum of $3,500 (under the FOS Terms of Reference). Consequential loss are losses which are indirectly caused by the insurer’s conduct. The complainant raises concerns that due to the insurer’s delayed actions to progress her claim by the agreed date 14 December 2017, she suffered a loss of her employment secured in the Sunshine Coast as she had to wait for the rectification repairs to be complete before she could relocate. Determination | Case number: 540458 Page 5 of 8 The complainant’s employment conditions are such that she could not start an employment contract during 2018 but would be placed in a contract on 24 January 2019. The complainant says had the insurer notified her the repairs could not be completed, she would have withdrawn her teacher transfer and reapplied for the transfer the year after. She would have continued to stay at the school she was teaching at on a full-time permanent basis. On 24 January 2018, the complainant says she had a teacher’s transfer to the Sunshine Coast and she was not meant to be at her B home. She stayed at her home to make sure the repairs were done. The complainant emailed the same day noting same. She said she was looking for another job while waiting for the repairs to be completed and living off her savings to support her children. The complainant confirmed she had explained this to D in the middle of last year. The next day, the complainant emailed the insurer noting due to D’s actions, she struggled financially needing to go on unpaid leave for all of 2018 and relinquish her teaching position at the Sunshine Coast to e nsure the cyclone repairs were completed properly. The complainant noted the importance of the repairs to be completed as soon as possible so that she can undertake contract employment on the Sunshine Coast and ensure the house was safe to live in for possible future tenants. The complainant’s employer noted as the complainant was unable to take up duty for the commencement of the 2018 school year, a request for extended leave needed to cover the full school year to return to work at the start of the school year in accordance with their extended leave policy. Teachers seeking an early return from leave are not guaranteed placements. An early return generally requires two terms notice and a vacancy available. Teachers can undertake supply and/or temporary contract work whilst on unpaid leave. The complainant commenced long service leave from 18 January 2018 to 29 March 2018 and unpaid special leave 11 April 2018 to 24 January 2019. After April 2018, the complainant undertook some casual teaching placements and received some Centrelink benefits. The insurer says it was only approached to consider consequential loss compensation in July 2018. Prior to this date, the complainant had not informed of her position or that she was required to take leave or turn down employment opportunities due to repairs required for the house. If this had been raised, it would have decided to lessen additional loss or inconvenience. There is a preclusion from awarding consequential loss compensation where an insurance policy excludes cover. However, an award of consequential loss compensation may be made where the insurer breaches its policy obligations. Also, Determination | Case number: 540458 Page 6 of 8 consequential loss compensation may be awarded if the loss arises naturally and is reasonably contemplated from the insurer’s breach. The complainant put the insurer on notice that the rectification work required impacted her move to the Sunshine Coast. However, the complainant ultimately decided to s tay at her home to ensure the rectification works were completed. I acknowledge it would have been a hard decision to make at the time however the choice to accept or reject employment in the Sunshine Coast was within the complainant’s direct control and not the insurers. I do not consider the loss of a teacher transfer to the Sunshine Coast would have been reasonably contemplated outcome from the insurer’s requirement to undertake rectification works. On this basis, the insurer is not required to pay the complainant consequential loss compensation. Determination | Case number: 540458 Page 7 of 8 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 Rectification repair items and items missing Expert Key points Insurer’s builder (A) Report 18 May 2018  Items required works: external painting to front and rear elevation, metal roofing including painting, to the split rafter, gable roll flashing had not been painted or replaced and screws missing battens. Insurer’s building inspector (H) Report 6 June 2018  M ajor roof defect to roof frames, roof battens/purlins, top/ribbon plate strap and bolt/connectors and minor defect to roof truss and rafters.  R oof beams were not connected to the top plates at both ends and joist were not connected to the wall frame at bot h ends of the main roof.  T wo battens and rafters had multiple splits on the car park roof, three battens had multiple splits at west skillion roo f and one split batten at the laundry roof.  N o tied - down on the top plate on south si de of main roof and at both end of carpark roof. There was loose tie - down wall frame bolt in the main roof. Insurer’s builder (A) Report 22 June 2018 Items not completed by D : external painting to front and rear elevation, metal roofing including painting , to the split rafter, gable roll flashing had not been painted or replaced and Determination | Case number: 540458 Page 8 of 8 Expert Key points screws missing battens. Insurer’s builder (A) Report 22 June 2018  Following items needed to be rectification to sign off on the completion of the re - roof: skillion roof re - screwed to old HWD roof battens, tie down system with rafters missing straps to the carport and southern aspect of house, no sarking, secondary roof screws running length of southern end of carport roof sheet. Insurer’s builder (A) Report 3 August 2018  The complainant notified that a single stair thread had been damaged when post installed. A noted this did not appear to have been pre - drilled causing the timber stair thread to split.  Also identified D had not painted a section of skirting the back of t he house and 5 window sills had been damaged during cladding removal and replacement. Insurer’s builder (A) Report 8 August 2018  The complainant notified ot her works not completed by D: *poor paint matching to gable end of robe in bedroom 3 *skirting and robe shelf supported in bedroom 3 not paint ed *possible damage to left hand side bottom robe door *quad skirting not finished or p ainted in living room *joint cracks in wall lining sheets on side of external wall in kitchen/dining room.  The complainant also notified items that should have been included in the scope of works due to the cyclone event: *soffits and *garage walls