Poor claim handling and defective cyclone repairs; consequential loss from missed teacher transfer
Summary
Cyclone repairs to the complainant's home were defective and the claim took well over a year to resolve. AFCA awarded $3,000 non-financial loss but refused the claimed consequential loss of a teacher transfer worth about $100,000.
Poor claim handling caused unusual inconvenience warranting non-financial loss, but the lost transfer was a choice within the complainant's control and was not reasonably contemplated from the insurer's breach.
Issues
- Poor claim handling primary · upheld
“The available information shows the insurer handled the claim poorly which caused an unusual degree of physical inconvenience.”
- Delay secondary · upheld
“The insurer took a significant amount of time to undertake the rectification repairs from when rectification concerns were raised.”
- Repairs or contractors secondary · upheld
“The insurer accepts the repairs were not completed correctly in the first instance.”
Subjects and remedies
home or building damagenatural disasterpay non financial loss
Text of the determination
Determination | Case number: 540458 Page 1 of 8
Determination
Case number: 540458 18 January 2019
1 Determination overview
1.1 Complaint
The complainant lodged a claim with her financial firm (insurer) for cyclone damage to
her home that occurred in March 2017. The insurer accepted the claim and arranged
repairs. The complainant was dissatisfied with the quality of repairs, rectification
attempts and claims service.
The complainant says the insurer’s claims handling and requirement to rectify repairs
caused to her miss the opportunity to undergo a teacher transfer resulting in the loss
of income of approximately $100,000.
The complainant seeks consequential loss and non-financial loss compensation.
1.2 Issues and key findings
Is the insurer entitled to pay non-financial loss compensation?
The available information shows the insurer handled the claim poorly which caused
an unusual degree of physical inconvenience, time taken to resolve the situation and
interfered with the complainant’s expectation of enjoyment and peace of mind. An
award of non-financial loss compensation is warranted.
Is the insurer required to pay consequential loss compensation?
Consequential loss is excluded under the policy. However, an award may be made
where the insurer breached its policy conditions. The insurer is not required to pay
consequential loss compensation as the information does not show the loss of income
naturally arose and was reasonably contemplated from the insurer’s requirement to
rectify repairs.
Determination | Case number: 540458 Page 2 of 8
1.3 Determination
This determination is partially in favour of the insurer.
The insurer is
required to pay non-financial loss compensation of $3,000
not required to pay consequential loss compensation.
Determination | Case number: 540458 Page 3 of 8
2 Reasons for determination
2.1 Is the insurer entitled to pay non-financial loss compensation?
Non-financial loss compensation is warranted
An award of compensation for non-financial loss may be made up to a maximum
award of $3,000 (under the FOS Terms of Reference). Such an award is subject to
consideration as to whether there has occurred an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with the
complai nant’s expectation of enjoyment or peace of mind.
The complainant lodged a claim with the insurer in March 2017 for cyclone damage to
her house in B. The parties agreed for D to complete house repairs by 14 December
2017. Following D’s repairs, the complai nant raised many quality issues with the
repairs including roof repairs and no exterior cladding repairs undertaken.
While waiting for the cladding to arrive, the complainant says she saw the cladding
continue to peel off the right-side during storms which required more cladding to be
ordered by D.
The complainant provided photographs which showed the cladding peeling off and
other outstanding cladding repairs required from her house. The file shows the
complainant arranged exterior plastic cladding throug h a local company. The
complainant raised concerns the roof repairs were not cyclone compliant particularly
at the start of cyclone season.
The complainant raised concerns D had missed damage in its scope of works
including faulty lights, painting, cabinets, fence, cleaning and irrigations repairs. The
complainant says D refused to undertake fencing repairs. The available information
shows the insurer agreed to cash settle these items after the complainant provided
reports and quotations.
Further, the complainant raised concerns with the condition D had left her house on
several occasions. For example, in October 2017, D had left corrugated iron at her
house, put a hole in the garage and left nails on the lawn. The insurer arranged D to
clean up the house. Also, in January 2018, D had left plaster dust all over the house,
doors and blinds. As noted, the insurer agreed to cash settle the complainant’s
cleaning costs.
The insurer’s builder, A and H identified following items that required rectification work
and cyclone related damage missed as outlined under section 3.2.
The insurer acknowledged the length of time taken to process the complainant’s claim
and complete rectification repairs. The insurer accepts the repairs were not completed
correctly in the first instance.
The insurer offered an apology to the complainant for the claims experience provided.
The insurer awarded $2,000 non-financial loss compensation in recognition of the
Determination | Case number: 540458 Page 4 of 8
service provided. As part of the complaint process, the insurer offered $15,000 non-
financial loss compensation.
While the insurer notes its service fell short of the complainant’s expectation, its
conduct was compliant with its obligations under the relevant industry code of practice
in relation to providing the complainant progress updates.
AFCA is precluded from awarding non-financial loss compensation where an
insurance policy excludes cover. AFCA can however consider an award of non-
financial loss compensation where the insurer breaches its policy obligations.
Based on the above, I am satisfied the non-financial loss did not occur from normal
handling of the claim, but due to the insurer’s poor claim handling. On this basis,
AFCA can consider an award of non-financial loss compensation.
I am satisfied the insurer’s claims handling and D’s poor quality repairs requiring
multiple areas of rectification caused an unusual degree and extent of physical
inconvenience, delayed a resolution to the situation and interfered with the
complainant’s expectation of enjoyment and peace of mind .
While quality repair issues were raised in December 2017, the insurer assessed
repairs required from May to August 2018. The insurer took a considerable amount of
time to assess the works required to be rectified and assess missing items. I consider
the complainant was further inconvenienced when D missed items in the scope of
works and refused to undertake work which led the complainant to arrange reports
and quotes to progress the claim.
The repairs were completed to the complainant’s satisfaction aro und September
2018, over a year and a half after the claimed event. The insurer took a significant
amount of time to undertake the rectification repairs from when rectification concerns
were raised.
Based on the above, I consider an award of non-financial loss compensation of
$3,000 is appropriate.
2.2 Is the insurer entitled to pay consequential loss compensation?
Consequential loss compensation not warranted
An award of consequential loss compensation may be awarded to a maximum of
$3,500 (under the FOS Terms of Reference). Consequential loss are losses which
are indirectly caused by the insurer’s conduct.
The complainant raises concerns that due to the insurer’s delayed actions to progress
her claim by the agreed date 14 December 2017, she suffered a loss of her
employment secured in the Sunshine Coast as she had to wait for the rectification
repairs to be complete before she could relocate.
Determination | Case number: 540458 Page 5 of 8
The complainant’s employment conditions are such that she could not start an
employment contract during 2018 but would be placed in a contract on 24 January
2019. The complainant says had the insurer notified her the repairs could not be
completed, she would have withdrawn her teacher transfer and reapplied for the
transfer the year after. She would have continued to stay at the school she was
teaching at on a full-time permanent basis.
On 24 January 2018, the complainant says she had a teacher’s transfer to the
Sunshine Coast and she was not meant to be at her B home. She stayed at her home
to make sure the repairs were done.
The complainant emailed the same day noting same. She said she was looking for
another job while waiting for the repairs to be completed and living off her savings to
support her children. The complainant confirmed she had explained this to D in the
middle of last year.
The next day, the complainant emailed the insurer noting due to D’s actions, she
struggled financially needing to go on unpaid leave for all of 2018 and relinquish her
teaching position at the Sunshine Coast to e nsure the cyclone repairs were
completed properly. The complainant noted the importance of the repairs to be
completed as soon as possible so that she can undertake contract employment on
the Sunshine Coast and ensure the house was safe to live in for possible future
tenants.
The complainant’s employer noted as the complainant was unable to take up duty for
the commencement of the 2018 school year, a request for extended leave needed to
cover the full school year to return to work at the start of the school year in
accordance with their extended leave policy. Teachers seeking an early return from
leave are not guaranteed placements. An early return generally requires two terms
notice and a vacancy available. Teachers can undertake supply and/or temporary
contract work whilst on unpaid leave.
The complainant commenced long service leave from 18 January 2018 to 29 March
2018 and unpaid special leave 11 April 2018 to 24 January 2019. After April 2018, the
complainant undertook some casual teaching placements and received some
Centrelink benefits.
The insurer says it was only approached to consider consequential loss
compensation in July 2018. Prior to this date, the complainant had not informed of her
position or that she was required to take leave or turn down employment opportunities
due to repairs required for the house. If this had been raised, it would have decided to
lessen additional loss or inconvenience.
There is a preclusion from awarding consequential loss compensation where an
insurance policy excludes cover. However, an award of consequential loss
compensation may be made where the insurer breaches its policy obligations. Also,
Determination | Case number: 540458 Page 6 of 8
consequential loss compensation may be awarded if the loss arises naturally and is
reasonably contemplated from the insurer’s breach.
The complainant put the insurer on notice that the rectification work required impacted
her move to the Sunshine Coast. However, the complainant ultimately decided to s tay
at her home to ensure the rectification works were completed.
I acknowledge it would have been a hard decision to make at the time however the
choice to accept or reject employment in the Sunshine Coast was within the
complainant’s direct control and not the insurers.
I do not consider the loss of a teacher transfer to the Sunshine Coast would have
been reasonably contemplated outcome from the insurer’s requirement to undertake
rectification works.
On this basis, the insurer is not required to pay the complainant consequential loss
compensation.
Determination | Case number: 540458 Page 7 of 8
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Rectification repair items and items missing
Expert Key points
Insurer’s builder (A)
Report
18 May 2018
Items required works: external painting to front and rear
elevation, metal roofing including painting, to the split rafter,
gable roll flashing had not been painted or replaced and
screws missing battens.
Insurer’s building inspector (H)
Report
6 June 2018
M ajor roof defect to roof frames, roof battens/purlins,
top/ribbon plate strap and bolt/connectors and minor defect
to roof truss and rafters.
R oof beams were not connected to the top plates at both
ends and joist were not connected to the wall frame at bot h
ends of the main roof.
T wo battens and rafters had multiple splits on the car park
roof, three battens had multiple splits at west skillion roo f
and one split batten at the laundry roof.
N o tied - down on the top plate on south si de of main roof
and at both end of carpark roof. There was loose tie - down
wall frame bolt in the main roof.
Insurer’s builder (A)
Report
22 June 2018
Items not completed by D : external painting to front and rear
elevation, metal roofing including painting , to the split rafter,
gable roll flashing had not been painted or replaced and
Determination | Case number: 540458 Page 8 of 8
Expert Key points
screws missing battens.
Insurer’s builder (A)
Report
22 June 2018
Following items needed to be rectification to sign off on the
completion of the re - roof: skillion roof re - screwed to old
HWD roof battens, tie down system with rafters missing
straps to the carport and southern aspect of house, no
sarking, secondary roof screws running length of southern
end of carport roof sheet.
Insurer’s builder (A)
Report
3 August 2018
The complainant notified that a single stair thread had been
damaged when post installed. A noted this did not appear
to have been pre - drilled causing the timber stair thread to
split.
Also identified D had not painted a section of skirting the
back of t he house and 5 window sills had been damaged
during cladding removal and replacement.
Insurer’s builder (A)
Report
8 August 2018
The complainant notified ot her works not completed by D:
*poor paint matching to gable end of robe in bedroom 3
*skirting and robe shelf supported in bedroom 3 not paint ed
*possible damage to left hand side bottom robe door *quad
skirting not finished or p ainted in living room *joint cracks in
wall lining sheets on side of external wall in kitchen/dining
room.
The complainant also notified items that should have been
included in the scope of works due to the cyclone event:
*soffits and *garage walls