The insurer accepted a storm damage claim for the home but excluded the veranda damage, which it attributed to soil movement and non-compliant construction. AFCA found the insurer entitled to exclude the veranda and ordered nothing further.

The proximate cause of the veranda damage was differential soil movement from inadequate construction, which is excluded, rather than the covered storm.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case number: 539778 1 November 2018 1 Determination overview 1.1 Complaint The complainant holds a home building and contents policy underwritten by the financial firm (the insurer) covering his home address. On 25 November 2017, the property was damaged during a rainfall event and a claim lodged under the policy. The insurer accepted the claim and authorised the necessary repair works to be undertaken. However, it declined to cover any repairs relating to the movement of the front veranda. The insurer considered this damage did not arise from the storm event, but was consistent with long term soil movement and non-compliant construction. As these factors are specifically excluded from cover, the insurer declined this aspect of the complainant‟s claim. 1.2 Issues and key findings Was the insurer entitled to exclude the veranda repairs from the claim? The insurer was entitled to exclude the veranda repairs from the claim because:  the policy is a defined events policy;  there is insufficient evidence to show the proximate cause of the damage to the veranda arose from the storm event or any other event which is covered by the policy;  the material shows the damage to the veranda arose due to long term factors such as differential soil movement and non-compliant construction; and  soil movement is specifically excluded from cover. Is the complainant entitled to compensation for the manner in which the insurer managed the claim? The complainant is not entitled to compensation for the manner in which the insurer managed the claim, as the material shows it was managed reasonably overall. The complainant is not entitled to be reimbursed his expert fees as his report did not advance his case. Determination | Case number: 539778 Page 2 of 12 1.3 Determination This determination is in favour of the insurer. The insurer was entitled to exclude the veranda repairs from the claim and is not required to take any further action. Determination | Case number: 539778 Page 3 of 12 2 Reasons for determination 2.1 Was the insurer entitled to exclude the veranda repairs from the claim? Onus on the complainant to establish he is entitled to an increased payment There is no dispute between the parties the complainant suffered a loss from a risk insured against and the insurer accepted his claim. However, a dispute has arisen between the parties as to the extent of the insurer‟s liability under the policy. Principally, the complainant maintains the veranda was damaged in the storm event and should be repaired under the claim. As the party seeking the benefit of additional cover, the onus is on the complainant to establish either he is entitled to further funds or the insurer‟s offer is not reasonable. Proximate cause of the loss must be a covered event When considering whether the exclusion applies to defeat the claim, it is appropriate to first determine the proximate cause of the loss. What is the proximate cause of the loss being a question of fact depending upon the circumstances in each case. It is well established at law that a proximate cause is not necessarily the first or the last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss. If there are several causes operating contemporaneously, then each must be examined for the qualities of predominance and efficiency as the active, efficient cause that sets a relevant train of events in motion. Courts have said that if one cause would have resulted in the harm in any case and the other would not have done so in the absence of the first, then the first is the proximate cause. Insurer’s expert evidence The insurer appointed several experts to comment on the cause of the damage to the veranda, including assessing firm “CC”, building consultant “LS” and engineering firms “TE” and “LO”. Full details of all expert reports supplied by the parties in this matter are contained within section 3.3 of this determination. For the purposes of this determination, I propose to rely on LO‟s report as having the most weight of the insurer‟s experts as this incorporates the results of a floor level survey, geotechnical testing and classification of the soil at the site and weather data in its conclusions. LO‟s reports are unequi vocal in stating the proximate cause of the damage to the veranda was not the claimed event. LO noted that had the storm event caused the damage, the highly reactive clay soils at the site would have expanded with the increased moisture content. This means the slab would have heaved. Determination | Case number: 539778 Page 4 of 12 However, the presence of both mortar markings in the masonry and silicone or other flexible sealant in the gap between the masonry and slab shows the slab had actually subsided. The floor level survey undertaken by LO confirms the slab had subsided, which is the opposite of what would have occurred if the storm was the cause of the movement. LO concluded the cause of the paving settlement was due to differential movement between the paving segments, from consolidation of the subgrade due to inadequate preparation and compaction. The slab build therefore did not comply with the Australian Standards in place at the time of construction. I accept the staff of LO is appropriately qualified and experienced to comment in this matter. In the absence of conflicting information, the insurer is entitled to rely on their findings. As an aside, although I do not propose to recite their findings in detail here, I note LS, CC and TE are all largely in agreement that the claimed event was not the proximate cause of the damage to the veranda. Although they differ somewhat as to their conclusions of the actual cause, crucially, none of these reports attribute the damage to the veranda to the storm or any other insured event. Complainant’s expert evidence The complainant was invited to provide a report from a suitably qualified person, such as an engineer, in support of his position that the veranda was damaged in the claimed event. The complainant supplied two reports from engineering firm “SC”. I have considered these reports as part of my review. SC‟s initial report provides that a number of underlying factors may have contributed to the slab movement. Different settlements between the slab segments aggravated by the storm events as being a major factor. SC concluded the movement was likely caused by differential settlement of the subsoil. This was aggravated by rainstorm events which drastically changed the subsoil moisture conditions. However, in my view, SC‟s report does not go to establishi ng the complainant‟s position. SC‟s report appears to attribute the movement to differential settlement aggravated or exacerbated by rainfall events. That is, the rainfall event was only a contributing factor rather than the cause. Therefore, the storm event was not the proximate cause of the damage. Further, the use of the plural term for rainfall events suggests SC considered the issue to have arisen over time. In SC‟s later report, the conclusion has changed somewhat by the provision of a photograph dating from 2012 in which the step was not visible. SC latterly concluded the step could only have arisen as a result of the November 2017 event, by putting enough uplift pressure to overcome any frictional resistance between the slab and brick wall. Once the joint was forced open, this has allowed further differential movement to take place. Determination | Case number: 539778 Page 5 of 12 Insurer’s evidence to be preferred It is always difficult when faced with conflicting reports, and a decision must be made as to which report is to be preferred. After careful consideration, the insurer‟s evidence is to be preferred. The reasons for this are twofold. Firstly, as stated above, LO‟s report, in addition to being clear, unequivocal and compelling, is supported by other data such as the geotechnical data and borehole tests, floor level survey and weather data. But secondly, and more importantly, SC has altered their findings in between reports. Whilst this is not always fatal to the position held, especially where compelling evidence becomes known after the initial report was drafted, SC has altered their conclusion on the basis of a single photograph. In my view, SC‟s initial report was more credible, but they have set the conclusions within aside by their later report. SC now says the alleged absence of the step in 2012 must mean the claimed event was the cause, which can only be described as a flawed conclusion. No consideration appears to have been given by SC to any actions occurring in the ensuing timeframe. This is also at odd s with the complainant‟s acknowledgement that the step was in existence when he purchased the property, albeit in a much more minor form. In addition, in their latter report SC appears to assert that the slab has heaved, as he refers to „uplift pressure‟. This conclusion is at odds with both the floor level survey (which SC states he had read) and the photographic evidence. In the circumstances, SC‟s reports carry less weight and LO‟s findings are to be preferred. It therefore follows that as the co mplainant‟s reports did not advance his case, he is not entitled to reimbursement of any fees incurred. Cause of loss specifically excluded from cover The material presented shows the proximate cause of the damage to the veranda slab was due to differential soil movement due to inadequate preparation and compaction of the subsoils rather than the storm, or any other event which would attract cover under the policy. Therefore, whilst it may be the case the excessive rainfall experienced on the date of the loss exacerbated the damage evident to the veranda, it was not the proximate cause of the loss. The complainant has therefore not discharged the onus on him to establish a valid claim for the veranda. Even if it were accepted a claim was established, the exclusions would be operative to defeat the claim. The insurer was therefore entitled in these circumstances to exclude the veranda damage from the complainant‟s claim. Determination | Case number: 539778 Page 6 of 12 2.2 Is the complainant entitled to compensation for the manner in which the insurer managed the claim? The Terms of Reference allow for compensation in limited circumstances The FOS Terms of Reference (the Terms) enable AFCA to compensate a complainant for non-financial loss (capped at $3,000). Compensation for non-financial loss is limited. AFCA may decide a financial firm should compensate a complainant for such a loss only where there has been an unusual amount of:  physical inconvenience  time taken to resolve a situation  interference with the complainant‟ s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation and expects a complainant to bear the usual degree of stress and inconvenience when managing an insurance claim. The simple passage of time is not a trigger for compensation. Insurer’s management of claim reasonable overall The insurer‟s management of the claim was reasonable overall. Whilst I appreciate the complainant was dissatisfied with the service he received and the insurer‟s ultimate decision on the veranda, there is nothing in the material before me to suggest there were any undue delays. Whilst there are some extended periods of time between the appointment of the various experts, it is clear the other aspects of the claim were progressing and repairs underway. Overall, I consider the ins urer‟s management and progression of the claim reasonable. Complainant not entitled to compensation Accordingly, taking into consideration AFCA‟s conservative approach to compensation and the degree and extent of inconvenience incurred, I consider the insurer‟s conduct of the claim was appropriate overall. Therefore, any award of compensation in these particular circumstances is not appropriate. Determination | Case number: 539778 Page 7 of 12 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term  applicant  complainant  financial services provider  financial firm  dispute  complaint  claim  claim 3.2 AFCA approach to this complaint A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All of the provided material has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted only to those issues considered relevant to the outcome. 3.3 Relevant expert reports Record Key points Insurer’s expert ( CC ) Assessor‟s Report 18 December 2017  insured noted the veranda was raised prior to the event however it has worsened since the storm  we are unable to attribut e this to any one - off event  it is more likely the movement is due to poor drainage or normal wear and tear  we recommend an engineer be appointed to determine the cause. Insurer’s expert ( TE ) Engineer‟s Report 13 March 2018  the building was constructed approximately 18 years ago  the insured first noticed the damage one to two weeks after the storm took place  we do believe the storm contributed somewhat to the Determination | Case number: 539778 Page 8 of 12 Record Key points movement evident, however the pavement does not comply with the current Australian Standards (AS)  it is believed the veranda posts are bearing directly onto the pavement  it is typical for pavement to be founded on soils with min imal bearing capacity  it therefore should not be used to support structural members  in this case, the loading of the veranda posts is greater than what the pavement and founding soil can carry  as a result, the pavement has subsided  the veranda posts would need to be founded on their own footings whic h have suitable bearing capacity for the load  excessive water due to storm water pooling against or near the pavement could have further reduced the bearing capacity of the soils and ex acerbated settlement  it wo uld beneficial to grade the soils away from the pavement and install appropriat e drainage. Insurer’s expert ( LS ) Building consultant‟s Report 23 April 2018  the insured advised late last year he noticed a section of the concrete slab and tiled paving had lifted  the insured believes this is as a result of rainwater inundation  the section of paving has a control joint which has separated this section of paving  the right side has dropped approximately 20mm, leaving a step  although the insured believes the pavement has heaved, I believe the opposite has occurred  the section has dropped, given this particular area is sitting atop dirt  over time, the dirt has dried out to the extent that it is causing the paving to move  it appears inadequate reinforcing was in stalled at construction , meaning the paving at either side of the control joint are independent of each other  this means any movement would be limited to one section of paving, rather than a continuous strip of paving. Insurer’s expert ( LO ) Engineer‟s R eport 9 May 2018  the building was constructed in 2002  the insured has owned it for the previous five years and at the time of purchase, a small step of approximately 1mm was visible between the paved segments of the porch  after the November 2017 storm event, the insured noticed significant movement at the control join  the timber porch post supporting the roof are supported on stirrups on conc rete pad footings beneath the slab  the slab is not supported directly on t he pad footings, with a layer of soil b etween the paving and footing Determination | Case number: 539778 Page 9 of 12 Record Key points  the porch slab is approximately 100m thick and founded on natural soil subgrade. No crushed rock or sand subbase has been used  no perimeter or subsurface drainage has been installed around the slab  a step of approximately 20mm bet ween the adjacent paving segments is visible, separated by a construction joint  mortar marks to the masonry walls adjacent the slabs indicate the west and south slabs have settled  a filler has been applied at the base of the decorative skirtings to fil l a gap between the skirting and slab, consistent with settlement of the paving slab relative to the skirting  a surface level survey was conducted with an arbitrary datum point selected adjacent the front ent ry to the north  geological surveys indicate the site is constructed on tertiary age basaltic deposits  site borehole testing indicates fill material overlying clay  it is therefore expected the foundation soils will consist of reactive clays and the site would be classified as Class M or H highly reactive soils  an associated characteristic of highly reactive soils are a surface movement of between 20 - 75mm  the existing group of trees are expected to result in a site classification of P (problematic) due to expected abnormal site conditions  reactive clay soils experience volumetric changes wit h relative changes in soil moisture content  an increase in moisture causes the soil to swell, resulting in heave, and a decrease results in the soil shrinking, resulting in settlement of footings  climate data provided shows the rainfall on the date of loss is not anomalous, with higher daily rainfalls recorded throughout 2017  the slabs have a slight fall away from the building to assist with drainage  had the soil heaved, then this will occur at the slab perimeter where ponding is expected and foundation moisture more susceptible to change  the level survey shows no evidence of edge heave  in addition, water ponding at the slab would res ult in wides pread heave of the slab, rather than localised one paving segment only  the slab movement is not consistent with an increase in foundation moisture cont ent due to flash flooding  it was not due to a one - off storm event  the cause of the paving settlement has been caused by differential movement between the paving segments causing th e step Determination | Case number: 539778 Page 10 of 12 Record Key points  this is due to consolidation of the subgrade due to inadequate preparation and compaction and a reduction i n the subgrade moisture content causing shrinkage of the foundation clay. Complainant’s exp ert (SC ) Engineer‟s Report 3 July 2018  the slab is about 100mm thick, with stone tiles laid on top  the slab was probably built at the same time as the existing house, which is believed to be in the early 1990‟s and the owners have resided there for the last five years  three timber posts holding up the front porch are supported at the slab‟s edge , with footing underneath each post  a step of 20mm maximum has formed bet ween the slab‟s segment near the corner post  after heavy rainfall in November 2017, water ponded around the slab for several days  the step then gradually formed over a number of following weeks  the step now poses a trip hazard  we reviewed the reports from TE and LO and find major discrepancies in the findings  LO‟s findings in particular contradict the owner‟s account  a number of underlying fa ctors may have contributed to the slab‟s movement  different settlements between the slab segments aggravated by the storm events is a major driving factor  the severe rainstorm event of December 2017 has wors ened the situation by drastically changing the short - term subsoil moisture conditions under the slab, which might have already been under pressure from differential settlements  whilst there were smaller storm events in the past, but the slab‟s joint was able to resist relative moments of interlocking o f aggregates at the joint  the report ed event might have caus ed the slab joint to open up enough which allowed the vertical movements bet ween the slab segments to occur without resistance  the slab‟s movement was likely caused by differential settlement of t he subsoil under the slab, aggravated by rainstorm events drastically changing the short - term subs oil moisture conditions. Complainant’s expert ( SC ) Supplement ary Engineer‟s Report 21 September 2018  this report is a follow up after inspecting a phot o ta ken in December 2012 which was recently provided  from this photo, it is clear the porch slab did not have a step in it a few years ago  this supports the conclusion that the step did not occur gradually over time  rather it was formed not too long ago and li kely instigated by a drastic change in subsoil moisture conditions under the Determination | Case number: 539778 Page 11 of 12 Record Key points slab, caused by heavy rainfall over a period of time  the rainstorm at the end of 2017 was one of the worst in the area over the last few years, this event has caused the movement  it did so by putting enough uplift pressure to overcome any frictional resistance between the slab and the brick wall and footings  once the resistance was overcome, the joint was forced to open up, allowing further differential settlements to take place  th e report ed rainstorm is the proximate cause of the step in the porch slab. Insurer’s expert ( LO ) Supplement ary Engineer‟s Report 24 September 2018  after reviewing the supplementary report from SC, I conclude no new evidence or analysis has been provided  SC states the house was built in the 1990‟s whereas the insured confirmed it was built in 20 0 2  relevant standards at this date are therefore applicable  SC concludes the ongoing rainfall events have contributed to the movement of the slab, however a severe storm has caused drastic movement. SC provides no supporting evidence for this conclusion  the level survey shows the paving segment has dropped rather than heaved  this is supported by the fact the markings to the bricks show the original paving line  this is not consistent with moisture variations from a storm  sealant applied bet ween the base of the posts indicate long term movement and a past attempt to rectify the gaps between the paving and posts  a phot ograph taken in July 2015 clearly shows a step betwe en the segments, confirming this has been a long term issue  whilst the gap may have been less at the time of purchase, the movement has still occurred over a long period of time and has not been caused by a single storm event  the construction of the pavi ng slab itself is not compliant with the relevant Standard, being AS 3727 – 1993 Guide to Residential Pavements  pavements are highly susceptible to movement which is expected by the Standard  probes beneath the slab confirm no subbase has been installed as a means of controlling reactivity  this is non - compliant construction and compromis es the performance criteria  there is inadequate drainage on site, which is also considered non - compliant with the construction of the slab  whilst water being redirected to the paving is not considered to be the primary cause of movement, inadequate and non - Determination | Case number: 539778 Page 12 of 12 Record Key points compliant site drainage will contribute to long term moisture content variations and can compromise the performance of the slab.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.