Home accidental damage claim for cracking from adjacent construction denied under construction and earth movement exclusions
Text of the determination
Determination | Case number: 539034 Page 1 of 11
Determination
Case number: 539034 12 February 2019
1 Determination overview
1.1 Complaint
The complainants lodged a claim on 24 May 2018 for cracking to their home,
following an incident that occurred on 10 January 2018.
The financial firm (insurer) denied the claim. It says the damage was caused by
development and building works on a site adjacent to the insured premises.
Whilst the complainants selected accidental damage cover, this cover specifically
excludes damage caused by construction, and the insurer is of the view that
construction next door caused the damage.
The complainants say that construction did not cause the damage to their home, and
seek for the insurer to accept their claim. Repairs to fix the damage are currently
estimated at approximately $83,000, plus GST.
1.2 Issues and key findings
Can the insurer deny the claim?
B ased on the insurer’s engineer’s (J’s) report, the panel considers that the proximate
cause of most of the damage (90%) was the construction and development at the
adjacent site.
The insurer cannot rely on the general exclusion of earth movement and vibration, as
J found there was no ground movement. The panel is satisfied that the vibration was
specifically caused by the construction, and not earth movement.
The insurer also cannot rely on the specific exclusion for accidental damage, as it
appears it was the intent of the policy to refer to causes that originate on the property
itself. Also, taking into account the legal principle of contra proferentum, the panel
considers that the exclusion was not intended to refer to construction occurring
externally to the property.
Determination | Case number: 539034 Page 2 of 11
The insurer must therefore accept 90% of the complainant s’ claim. The complainants
are responsible for 10% of the damage, as the property suffered from minor pre -
existing issues prior to the development works.
1.3 Determination
This determination is substantially in favour of the complainants.
The insurer must accept 90% of the claim. It can decide whether to cash settle the
complainants, or conduct repairs to the property.
The rectification works should be completed after the construction of the road at the
adjacent site is completed.
Determination | Case number: 539034 Page 3 of 11
2 Reasons for determination
2.1 Can the insurer deny the claim?
Background to matter
J provided a history of the matter:
The (male) complainant had advised that following the commencement of
subdivision works to the land behind the dwelling, significant cracking and
movement of building elements around the home had occurred.
Before commencement of works, the developer undertook a dilapidation survey of
the dwelling, which identified building faults.
During the works, the complainant was concerned about the extent of vibration and
movement of the dwelling. The complainant notified the developer, who carried out
site inspections. The developer offered $800 for rectification of the damage
sustained to the dwelling.
Of significant concern to the complainant was the extent of cracking to the
brickwork and the movement of the pool and pool surrounds following the works.
The works are incomplete and road construction is yet to commence. This may
lead to further vibration damage.
Responsibility of complainants to establish a valid claim
The complainants are required to demonstrate, on the balance of probabilities, that
they suffered a loss caused by a risk insured against under the policy. This is known
as establishing a valid claim.
The policy wording, together with the certificate of insurance, outlines the conditions
under which cover is provided, and the exclusions that apply to that cover.
The complainants do not dispute receiving a copy of the policy wording. They were
therefore made aware of the terms and conditions of the policy. The complainants
had selected cover for accidental damage.
The policy provided cover for:
accidental loss or damage to your home caused by an accident which occurs at
the insured address, when your home is insured by this policy.
The policy defines ‘accident’ as:
a single occurrence or series of occurrences arising from one event which you did
not intend or expect to happen.
The policy further provided:
Determination | Case number: 539034 Page 4 of 11
General Exclusions Applying to the Whole Policy
We will not cover:
Earth Movement
x loss or damage or the incurring of legal liability caused by erosion, vibration,
subsidence, landslip, mudslide, collapse, shrinkage or any other movement
But subject to policy terms…
What is NOT insured
Accidental loss or damage caused by:
…
any construction, renovation, alteration or extension work
It is clear that there was cracking and other damage to the property, and the
complainants did not intend for or expect this to happen. As will be discussed below, it
is evident that the damage was caused by a series of occurrences arising from the
development next door.
The complainants have therefore established a valid claim for accidental damage
under the policy. The insurer, in order to refuse the claim, has the onus of establishing
that cover is excluded by a policy term.
Insurer says exclusions apply
The insurer says that the damage was caused by ground movement, for which a
general exclusion applies.
The insurer also says that the claim for accidental damage cannot be accepted due to
the operation of the specific exclusion, which excludes cover for accidental damage
where that damage is caused by any construction, renovation, alteration or extension
work.
J’s engineering report found that damage caused by vibration
J noted that the soil on the site is primarily sand, and that the dwelling was well
maintained.
In relation to damage, J found that:
Comparisons to the original dilapidation survey were made, which identified
defects within the dwelling prior to the commencement of works.
Damage had occurred to the dwelling following the original dilapidation survey,
prior to development work at the rear of the building.
Determination | Case number: 539034 Page 5 of 11
The site inspection confirmed that damage had occurred to the dwelling. The
damage was consistent with damage that would be expected from significant
vibration of the sands on which the dwelling was constructed.
Movement of the external surrounding area of the pool had occurred.
An electronic level survey found that the dwelling movement was well within
expected movement tolerances, and there was no evidence of gross building
foundation movement as a result of the remedial works to the house.
The level survey found there was no evidence of gross structural damage to the
foundations, and that aesthetic damage had occurred to the brickwork around the
dwelling.
The rear and LHS fence had rotated due to overloading and vibration. This was
consistent with damage occurring during development works.
Paver settlement had occurred. This was consistent with vibration damage.
It was strongly advised that no remediation works be completed until the road
network within the adjoining subdivision was complete. It was anticipated that
further damage would occur during these works. On completion of the road works,
a full scope of remediation could be assessed for damage occurring as a result of
the adjoining construction works.
Complainants did not provide any independent evidence in support of their
position
The complainants advised that their property had incurred movement and vibration
damage, mainly to the front of the property. The complainants said that the damage
was not caused by construction.
However, importantly, the complainants have not provided any independent evidence
in support of their position.
The male complainant said that most of Western Australia is built on sand, and that if
this is excluded from cover, then the insurer should not offer cover. However, it is the
responsibility of each policy holder to check their cover, to ensure it meets their
needs.
The male complainant also said in a telephone call with this Service that the insurer
sent out a surveyor to do the engineer’s report.
However, J’s report confirms that the person who conduc ted an inspection of the site
and submitted the engineering report is a registered engineer in Queensland. The
complainants have not produced any evidence in support of their statement. The
panel is satisfied that an engineer, with appropriate skills and e xperience, completed
the engineering report on this matter.
Determination | Case number: 539034 Page 6 of 11
Developer’s dilapidation survey found cracking throughout property before
development began
The developer’s dilapidation survey noted that the property was in good condition.
However, it found some cracks throughout the property.
J later noted that the cracks to the brickwork were more prevalent at the time of the
inspection (after the development works), when compared to the cracks recorded in
the dilapidation survey.
Proximate cause of damage was the construction next door
It is evident from J’s report that the proximate cause of the majority of the damage
was the development and construction next door.
While there were some defects in the home prior to construction, J reported:
vibration damage at the site inspection
the cracks were worse post the dilapidation survey
no ground movement
he stated that damage to the fence was consistent with development works, and
it was strongly recommended that no remediation works be completed until the
road network next door was completed.
On the evidence submitted, the panel considers that 10% of the damage was pre-
existing, prior to the development works.
Earth movement exclusion not applicable
The complainants’ cover for accidental damage must be read subject to the general
exclusions to the whole policy , which provides in respect to ‘earth movement’ that the
insurer will not cover:
x loss or damage or the incurring of legal liability caused by erosion, vibration,
subsidence, landslip, mudslide, collapse, shrinkage or any other movement.
These specific words must be interpreted in the context of the expression ‘ earth
movement’ . Common sense and the law dictate the general words ‘any other
movement’ must also be interpreted in the context of the specific words that precede
it.
As noted above, an electronic level survey found that the dwelling movement was well
within expected movement tolerances. The results also showed that there was no
evidence of gross building foundation movement as a res ult of remedial works to the
house.
Determination | Case number: 539034 Page 7 of 11
Further, it can be seen above that the proximate cause of the damage was the
construction. It was the construction next door, rather than earth movement, that
caused the vibration. The vibration was a resulting effect of the construction.
As the insurer has not established that earth movement (in the form of vibration or
otherwise) was the proximate causes of the damage, it therefore cannot rely on the
general exclusion of ground movement to deny the claim.
Accidental damage exclusion not intended to apply to construction occurring
external to the property
The complainants selected accidental damage when incepting the policy. The panel
noted that the cover is for:
accidental loss or damage to your home caused by an accident which occurs at
the insured address, when your home is insured by this policy.
Home is defined as:
the private residential building at the insured address shown on the insurance
certificate, including domestic fixtures and permanent structural improvements
that are shown as insured on page 6.
The insurer has referred to the specific exclusion to deny the claim, which provided:
What is NOT insured
Accidental loss or damage caused by:
…
any construction, renovation, alteration or extension work.
Alth ough this exclusion is drafted broadly by including the word ‘any’, the panel does
not consider that this was intended by the insurer to include all construction in
general. The wording ‘construction’ should be read within the context of the words of
‘renovation, alteration or extension work’ - w ork that usually happens at an insured’s
home and the risk of which an insurer may not want to cover.
Considering the methods of accidental damage that are excluded in the section, it
could be fairly and reasonably interpreted that these are all things that occur at a
home at the insured address as defined, rather than originating outside of the
property.
This can be contrasted with the construction and development that occurred here,
namely next door, rather than at the insured address.
Determination | Case number: 539034 Page 8 of 11
Furthermore, the panel takes into account the principle of contra proferentem , which
states that if there is any doubt about the scope of an exclusion clause, then it is to be
interpreted against the party which drafted the contract, and the narrower
interpretation should be applied.
This is based on the consideration that the parties have not intended to limit the
remedies provided under the law for breach of contract, unless there is clear wording
in the contract to that effect. The insurer could have widened the exclusion, if it
intended to do so, by adding words such as ‘either inside or outside of the insured
address’.
Based on these factors, the panel considers that the policy intended for the exclusion
to apply to accidental damage caused by construction work originating at the insured
address.
As the construction work in this matter originated next door, and not on the insured
address itself, the exclusion is not applicable.
Insurer should accept the claim as per the terms of the policy
The insurer should accept the claim, as per the terms of the policy.
J suggested that on completion of the road works, a full scope of remediation would
need to be assessed for damage occurring because of the adjoining construction
works. The panel notes in this regard, any damage to the pool itself will not be
covered as there is a specific exclusion under the accidental damage cover. Further,
it appears from J’s report that the pool itself was not damaged, just the pool
surrounds. The damage to the pool surrounds should be covered.
The insurer must accept 90% of the cost of repairs, as per the revised scope of works
that is to be drawn up after the completion of the construction works. This is allowing
a deduction of 10% from the total sum, due to the existence of pre-existing defects
before the development next door commenced.
The insurer can choose to repair or cash settle the damage, with the complainants
contributing 10% of the repair costs.
If the parties are unable to come to a resolution about the scope of works, method of
settlement or amount of settlement, they can refer a new complaint to AFCA.
Determination | Case number: 539034 Page 9 of 11
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with Financial Ombudsman Service (FOS).
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Key references
Policy documents
Record Provi sion
Product Disclosure
Statement (PDS) – Part A
Page 26
Cover Part 4 – Optional Covers - Accidental Damage
What is insured
When you elect to pay an additional premium and your insurance
certificate states you have cover for accidental damage we will cover:
accidental loss or damage to your home caused by an accident
which occurs at the insured address, when your home is insured by
this policy
...
The exclusions applying to the insured events covered by this policy
also appl y to this optional cover, with the exception of the following:
In respect of damage caused by fire, under this option we will cover:
…
What is NOT insured
Accidental loss or damage caused by:
…
any construction, renovation, alteration or extension work
Page 3 accident - a single occurrence or series of occurrences arising from
one event which you did not intend or expect to happen.
Determination | Case number: 539034 Page 10 of 11
Record Provi sion
Pages 30 - 31 General Exclusions Appl ying To The Whole Policy
We will not cover:
…
Earth movement
loss or damage or the incur ring of legal liability caused by erosion,
vibration, subsidence, landslip, landslide, mudslide, collapse,
shrinkage or any other earth movement.
But subject to the policy terms and conditions, we will cover loss or
damage caus ed by earth movement that occurs within 72 hours and
as a direct result of the following insured events:
Earthquake,
Explosion, or
Storm and rainwater
Certificate of Insurance
24 September 2017
Policy Begins 24 September 2017 16:00
Policy Ends 24 September 2018 16:00
…
Home Insurance
Sum Insured $490,612
Accidental Damage Included
Expert reports
Record Key points
Developer’s dilapidation
survey
(survey undated;
date of inspection –
8 July 2016)
Property is in good condition.
Some cracks to interior and exterior of dwelling.
J’s engineering report
(for the insurer)
11 June 2018
Damage had occurred to the dwelling.
The damage was consistent with damage that would be expected
from significant vibration of the sands on which the dwelling was
constructed.
The damage included the following: damage had occurred to the
pool surrounds; the fenc es had moved; there was cracking to
brickwork;
An electronic level surve y found that the dwelling movement was
well within expected movement tolerances, as described by the
performance provisions of Australian Standard AS2870, and there
was no evidence of gross building foundation movement as a result
of the remedial works to the house.
The level survey found no evidence of gross structural damage to
Determination | Case number: 539034 Page 11 of 11
Record Key points
the foundation. Aesthetic damage had occurred to the brickwork,
however, no structural damage was observed.
Damage had occurred following the original dilapidation survey of
the bu ilding, and prior to development work at the rear of the
dwelling.
The rear and left - hand side fenc e had rotated due to overloading
and vibration. This was consistent with damage occurring during
development works.
Paver settlement was consistent with vib ration damage.
No remediation works should be completed until the road net work
within the adjoining subdivision is complete. It is anticipated that
further damage would occur during these works. On completion of
the road works, a full scope of remediation could be assessed for
damage occurring as a result of the adjoining construction works.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.