Text of the determination
Determination | Case number: 538716 Page 1 of 26
Determination
Case number: 538716 30 July 2019
1 Determination overview
1.1 Complaint
The complainant’s apartment was water damaged in late December 2016. The
complainant says the owners corporation had knocked out a section of the balcony
slab above the complainant’s apartment, which resulted in water ingress.
The financial firm (insurer) paid for the plaster to be removed, and the apartment
treated for mould.
The complainant says the flooding also caused other issues in his apartment,
including damage to the back wall of his kitchen.
The complainant says that this section of the balcony is still leaking. However, he
says the insurer says it is a maintenance issue, and he is therefore not entitled to
alternative accommodation from the insurer.
The complainant also advised of several other items in dispute , including service
issues.
1.2 Issues and key findings
Is the insurer required to make any further payments or do any further works?
At the c omplainant’s option, t he insurer must repair or pay for the costs of repair to
the complainant for:
removal of two screws
certain kitchen repairs as listed in the complainant’s builder’s ( ID’s ) report,
including removal of kitchen cabinets
ID’s report
the supply and installation of new floor and skirting tiles to the laundry
painting of the lounge room walls
up to $5,000 for removal and storage costs.
Determination | Case number: 538716 Page 2 of 26
The insurer is not liable for any further costs or repairs.
The insurer is to pay to the complainant temporary accommodation costs, based on
the revised estimate of the length of time for repairs, in view of the findings in this
determination.
Is the complainant entitled to compensation?
The insurer caused the complainant stress and inconvenience during its claim
processing, due to the delays and unresponsiveness of its representatives. It is fair
the insurer pays the complainant $1,500 compensation.
It is also fair the insurer contributes up to $3,000 for the professional costs incurred by
the complainant in the course of the complaint.
1.3 Determination
This determination is substantially in favour of the complainant.
Should the complainant accept this determination, within seven working days of being
notified of the acceptance, the insurer is to arrange:
to pay $1,500 compensation
to pay $550 for ID’s report, plus statutory interest
for a scope of works to be prepared and assessed, addressing the items in ID’s
report from 2.5.1 to 2.5.3.4.6 and 2.5.3.7. The assessment is to include a builder’s
margin and GST, and the reinstatement of the kitchen cabinets. All assessments
are to inc lude a builder’s margin and GST
for a scope of works to be prepared and assessed, addressing the items in ID’s
report in paragraph 1.2.6
for a scope of works to be prepared and assessed, addressing the ite ms in ID’s
report in item 3.4
to assess the cost to paint the loungeroom walls
for its builder to re-attend the unit and remove the two screws, or cash settle.
Should the complainant opt for a cash settlement, the cash settlement is to be made
within seven working days of notification of the option. When making the cash
settlement, the insurer is to further allow 20%, to take into account interest and any
variations or contingencies which may occur during the repairs.
Within seven working days of acceptance, the complainant is to provide:
proof to the insurer of his removal and storage costs. Upon receipt of proof, the
insurer is to pay to the complainant up to $5,000 for removal and storage costs
Determination | Case number: 538716 Page 3 of 26
a copy of the invoices evidencing the cost of other building reports. If these reports
were paid by the complainant, then, upon receipt of invoices, the insurer is to pay
for the cost of these reports, up to $3,000.
The insurer is also to pay statutory interest, pursuant to section 57 of the Insurance
Contracts Act 1984 (the Act), on these costs, from the payment date until the date of
settlement.
Within seven working days of acceptance, the complainant is to provide proof to the
insurer of his current temporary accommodation costs.
Upon being satisfied of the proof, the insurer is to pay to the complainant temporary
accommodation costs based on the revised estimate of the length of time for repairs,
in view of the findings in this determination.
Should the complainant opt for the insurer to complete repairs, this payment is to be
made when the insurer commences repairs. Should the complainant opt for a cash
settlement, this payment is to be made at the time of the cash settlement.
If not already done, the insurer is entitled to deduct the policy excess. Otherwise, the
insurer is not required to take any further action in relation to the claim or the
complaint.
Determination | Case number: 538716 Page 4 of 26
2 Reasons for determination
2.1 Is the insurer required to make any further payments or do any further
works?
Complainant must establish a valid claim
The complainant must establish on the balance of probabilities he has suffered a loss
caused by an event to which the policy responds. This is known as a prima facie
claim.
The policy provides cover against loss or damage to the insured property as well as
other benefits, subject to the limits in the policy.
Loss or damage is defined to mean direct physical loss of or damage to property from
any sudden and accidental cause not otherwise excluded by the policy.
Although the insurer submitted the policy might not respond because leaks had
occurred before the policy commenced, it is not in dispute that after the policy
commenced, the complainant’s property was damaged by water leaking from a
balcony in the unit above the complainant’s unit.
I am satisfied the complainant has established a valid claim.
The dispute relates to the extent of the insurer’s responsibility for the complainant’s
claims. The policy provides several benefits. The policy says the insurer will pay the
reasonable cost to rebuild, replace or repair the insured property, to a condition which
is equivalent to or substantially the same as, but not better nor more extensive than,
when it was new.
The insurer relies on a policy exclusion which sa ys it is not responsible to pay for
costs to rebuild or replace any undamaged property.
The insurer removed carpet and plaster and treated the complainant’s unit for mould
damage. The complainant complains about several issues, including that the insurer
left screws protruding out of the frame of the building. Because of the damage, the
complainant leased a nearby property.
There are several items in dispute. I will deal with each item separately. The relevant
policy terms and material relied on by the parties is summarised in supporting section
3 of this determination.
Insurer paid policy limit of $2,000 for utility bills and owners corporation fees
The complainant requires the insurer to pay utility bills for the temporary
accommodation. He says he would not be incurring these extra bills if he was in his
own apartment.
Determination | Case number: 538716 Page 5 of 26
The insurer says it paid the complainant the maximum policy limit of $2,000 in respect
of utility bills and owners corporation levies.
The insurer also says if there are any outstandi ng amounts regarding these issues
during the period the complainant is unable to occupy the insured unit, owing to the
non-completion of necessary external maintenance related repairs (which are the
responsibility of the owners corporation), then this should be raised with the owners
corporation.
The insurer’s policy says it will pay up to $2,000 for contributions, levies, maintenance
and other fees the insured is required to pay during the period the insured unit is unfit
to be occupied, because of damage caused which is admitted as a claim.
The available information supports the insurer’s contention that the policy maximum
of $2,000 has been paid to the complainant.
Under the terms of the policy, I am satisfied the insurer is not required to pay anything
further for utility bills and owners corporation fees, whether incurred for the insured
unit or for the alternative accommodation.
Insurer to reappoint the builder to remove two protruding nails and screws, or
cash settle the complainant
The complainant claims the insurer ’s builder (AB) left screws protruding out of the
frame of the unit. He says this presents a danger to his safety.
In late September 2018, AB attended and removed the nails.
Earlier this year, the available information indicates two protruding nails and screws
remained. The insurer was willing to reappoint the builder to reattend to remove them.
If it has not done so already, at the complainant’s option, the insurer is to appoint the
builder to re-attend the unit and remove the two screws, or cash settle the
complainant for this item.
To effectively undertake repairs, the kitchen cabinets need to be removed
The complainant claims the water ingress from the apartment above caused damage
to the back wall of his kitchen. The complainant says the kitchen joinery must be
removed to make proper repairs.
The available material relevant to this issue is summarised in supporting section 3 of
this determination. With certain provisos, the insurer agreed to the appointment of an
expert builder by the complainant.
The insurer relies on its two builders (TB and AB). Both builders say the kitchen
joinery does not need to be removed to rectify the damage to this wall.
Determination | Case number: 538716 Page 6 of 26
The complainant relied on a report from ID, who inspected and photographed the
damage in February 2019. ID inspected the kitchen and the adjoining room. He found
no evidence of recent water ingress. However, he identified water damage and five
faults to the wall plaster across the back of the kitchen. He also said the top plate of
the wall was warped and lifted off because water had absorbed into the timber wall
frame.
ID concluded the wall plaster across the back of the kitchen was water damaged and
could only be repaired by removal of the kitchen cabinets. He also concluded the
warped and delaminated top plate was damaged because of water absorption into the
top plate over a long period of time.
Once it had this recommendation, the insurer said it needed to be assessed for
reasonableness and communicated to repairers for incorporation into their scopes of
works.
The insurer also notes the comments by ID , who said as the removal of the original
kitchen cabinets will most likely damage parts of the cabinets, ID recommended all
kitchen cabinets and bench tops are totally replaced with new cabinets and new
bench tops. The insurer said this was unacceptable because the policy does not
provide cover for the cost of replacing undamaged property.
The issue in dispute was whether the wall plaster across the back of the kitchen could
be repaired without removing the kitchen cabinets. I accept ID’s report dealt with
issues beyond the scope of what had been agreed. The insurer obtained no further
expert opinion after provision of the report from ID. In circumstances where it had
already engaged two builders, I am not satisfied its response was adequate in these
circumstances.
ID’s report is the most recent and most comprehensive , and accompanied by
photographs and persuasive explanation.
Having carefully considered the available information, I am satisfied on the balance of
probabilities that the wall plaster across the back of the kitchen was water damaged,
and can only be repaired by removal of the kitchen cabinets.
Insurer is responsible for certain items listed in ID’s report
I note there have been numerous delays in this claim.
One source of the delays has been the owners corporation ’s completion of external
cladding works to the building. There were long delays while these works were
approved by the owners and funds raised. The available information does not
establish whether these works are yet complete. These works are the responsibility of
the owners corporation, and neither the complainant or the insurer have control over
when the rectification works will be completed.
Determination | Case number: 538716 Page 7 of 26
The complainant continues to submit the balcony above his unit is still leaking even
though ID said the moisture levels in the party wall were within acceptable tolerances,
with no evidence of recent water ingress.
In support of this contention, the complainant provided flood tests performed in late
May 2019 on the balcony of the unit above the complainant’s unit. In the absence of
any further information, I accept the balcony was still leaking at that time.
The insurer says this indicates the owners corporation has still not yet completed all
necessary maintenance work. The insurer expects any residual issues relating to
ongoing leaks will be remedied through the owners corporation’s ongoing program of
works, which includes other issues as well as the leaking balcony.
The insurer has advised it cannot complete internal works until the external works are
complete, and the water ingress issues rectified. I accept this proposition.
The available material establishes the water ingress issues are problematic.
Significant attempts have been made to rectify the water ingress issues, including the
leaking balcony.
Given this, the long delays already incurred and the unknown time as to when the
rectification works will be complete, I consider it fair the complainant have the option
to have the insurer’s builders undertake repair works when the water ingress issues
are rectified, or opt to take a cash settlement from the insurer based on ID’s scope of
works. The complainant will then be able to arrange for these works to be completed
at a time suitable to him, and this will provide finality to the claim and the complaint.
Specifically, at this time, on the available information, I am satisfied the insurer is
responsible for the items listed in ID’s report from 2.5.1 to 2.5.3.4.6 and 2.5.3.7.
Should the complainant accept this determination, within seven working days of being
notified of the acceptance, the insurer is to arrange for a scope of works to be
prepared and assessed, addressing the items in ID’s report from 2.5.1 to 2.5.3.4.6
and 2.5.3.7. The assessment is to include a builder’s margin and GST , and the
reinstatement of the kitchen cabinets.
Should the complainant opt for a cash settlement, the insurer is then to cash settle the
complainant. In making a cash settlement, I am satisfied it is fair the insurer makes a
further allowance of 20% to take into account interest, and any variations or
contingencies which may occur during the repairs.
As for items 2.5.3.5, 2.5.3.6 and 2.5.3.9, I am not satisfied the available information
establishes the original kitchen cabinets will necessarily be damaged when removed
or that it will be necessary to replace all kitchen cabinets, bench tops and the kitchen
island and sinks and taps etc. However, if the original kitchen cabinets are damaged
Determination | Case number: 538716 Page 8 of 26
when removed, the parties can return to AFCA for further consideration of these
items.
The parties are encouraged to work together to resolve this aspect of the claim and
complaint.
Insurer to reimburse the complainant $550, plus interest, for ID’s report
The insurer said it was willing to pay up to $500 for the cost of the report. The report
cost $550.
In view of the expert reports provided by the insurer, it was fair the co mplainant
obtained an expert report. Further, the expert report was useful in making this
determination.
In the circumstances, it is fair the insurer reimburses the complainant $550 for the
cost of ID ’s report.
The insurer is also to pay statutory interes t, pursuant to section 57 of the Act, on
$550, from the payment date (26 February 2019) to the date of settlement.
At the complainant’s option, the i nsurer to cash settle repair cost of, or repair,
bulkhead and cornice on the south side of the kitchen
ID inspected the south wall of the kitchen. He said the moisture meter revealed
moisture levels to be acceptable. He found no evidence of recent water ingress.
ID found the east and west end of the particle board bulkhead located above the
overhead cupboard within the cooktop area, had cracked. He described the cracking
and said the bulkhead revealed a slight inward bowing.
He concluded water ingress had affected the particle board bulkhead, as described in
the report. ID detailed rectification to the bulkhead and cornice on the south side of
the kitchen.
The complainant told ID when it rains, water still leaks into his apartment from the
balcony above. As set out earlier, in support of this contention, the complainant
provided flood tests performed in late May 2019 on the balcony of the unit above the
complainant’s unit.
In the absence of any further information, I accept the balcony was still leaking at that
time. Even though ID did not find evidence of recent water ingress, I acknowledge ID
inspected in summer when there may not have been recent rain.
In the absence of any persuasive rebuttal material from the insurer, I am satisfied the
available information establishes the bulkhead and cornice on the south side of the
kitchen have been damaged from water leaking from the balcony above.
Determination | Case number: 538716 Page 9 of 26
As set out earlier, I am satisfied it is fair this aspect of the claim is cash settled at the
complainant’s option.
On the available information, I am satisfied the insurer is responsible for all the items
listed in ID’ s report in paragraph 1.2.6.
Should the complainant accept this determination, within seven working days of being
notified of the acceptance, the insurer is to arrange for a scope of works to be
prepared and assessed, addressing the items in ID’s report in paragraph 1.2.6. The
assessment is to include a builder’s margin and GST .
At the complainant’s option, t he insurer is then to cash settle the complainant. In
making a cash settlement, I am satisfied it is fair the insurer makes a further
allowance of 20% to take into account interest, and any variations or contingencies
which may occur during the repairs.
The parties are encouraged to work together to resolve this aspect of the claim and
complaint.
At the complainant’s option, the i nsurer to cash settle or repair damage in the
laundry, as per item 3.4 of ID’s report
The complainant asked ID to address some further issues which arose after the
complaint came to AFCA.
The complainant said there is a big discrepancy in the scope of works regarding tiles
in the laundry being the same as tiles in the bathroom and second toilet. He contends
a builder will not be able to source the exact matching tiles because the building is 17
years old. He says this will not be determined until reinstatement works commence.
The complainant says if the builder cannot source the exact tile, tiles in the laundry
will need to be replaced after the skirting tile replacement.
ID noted the laundry skirting tiles located on the south wall of the room had been
removed because plasterboard on this wall was water damaged. He said the
plasterboard and skirting tiles will need to be replaced accordingly. Because of the
need to match tiles within the room with the same colour, texture and size tile, he
recommended all floor and skirting tiles are replaced.
The insurer made similar arguments about the efficacy of the report. These
arguments and my determination about this issue is set out above.
The insurer referred to AB’s scope of works. AB’s scope made certain allowances,
including re-tiling the splashback and painting all walls. Otherwise, the insurer
obtained no further expert opinion.
Determination | Case number: 538716 Page 10 of 26
I accept the policy provides the insurer is not required to pay for the cost to rebuild or
replace any undamaged property. However, considering the nature of the work, I am
satisfied it is fair the necessary work of repairing includes the reasonable cost of
repairing the laundry room to a condition which is equivalent to or the substantially the
same as when it was new. Due to the age of the tiles, I accept it may be difficult to
obtain the same tiles as were used originally. In the circumstances, I am satisfied as
the plasterboard and skirting tiles will need to be replaced, it is fair all tiles within the
laundry room are the same.
On the available information, I am satisfied the insurer is responsible for the items
listed in ID’s report in item 3.4.
Should the complainant accept this determination, within seven working days of being
notified of the acceptance, the insurer is to arrange for a scope of works to be
prepared and assessed addressing the items in ID’s report in item 3.4. The
assessment is to include a builder’s margin and GST.
At the complainant ’s option, t he insurer is then to cash settle the complainant. In
making a cash settlement, I am satisfied it is fair the insurer makes a further
allowance of 20% to take into account interest, and any variations or contingencies
which may occur during the repairs.
The parties are encouraged to work together to resolve this aspect of the claim and
complaint.
Insurer not liable to replace the tiles in the bathroom and toilet
The complainant said that, prior to the water ingress, the tiles in the laundry and
bathroom were like the tiles in the laundry. He says if this is no longer the case, he
would like to be put back in the same position he was in prior to the loss.
ID notes that the tiles within the toilet and bathroom are the same as the tiles within
the laundry, but he says the tiles in these rooms have not been water damaged.
To bring the apartment back to its original condition, ID reports all tiles within the
bathroom and toilet are to be replaced at the same time as the laundry tiles are
replaced.
The insurer notes ID says the tiles in these rooms are not damaged. It says it does
not have to replace these tiles because the policy does not provide cover for the cost
of replacing undamaged property.
I have carefully considered the report and photographs provided. The toilet and
bathroom are separate rooms from the laundry. The available evidence establishes
the tiles in these rooms were not water damaged.
Determination | Case number: 538716 Page 11 of 26
The policy provides the insurer is not required to pay for the cost to replace
undamaged property.
In these circumstances, I am satisfied the insurer is not liable to pay for the cost to
replace the tiles in the bathroom and toilet, because they were not damaged in the
insured event.
Insurer to paint, or cash settle the complainant to paint lounge room walls
The complainant says that the lounge room walls need to be painted, following
damage caused by mould remediation works. He says the walls were damaged and
left with marks following storage of doors against them.
The insurer says two contradictory things. Firstly, the insurer says this is a new issue
which had not been raised before. The insurer then says this issue was covered by
the quote from AB.
AB’s scope of works refers to the cost to prepare and paint all lounge room walls to
match existing as close as possible.
On the available information, I am satisfied the insurer is required to paint the
loungeroom walls.
Should the complainant accept this determination, within seven working days of being
notified of the acceptance, the insurer is to assess, and cash settle the complainant
for the cost to paint the lounge room walls. The assessment is to include a builder’s
margin and GST.
At the complainant’s option, t he insurer is then to cash settle the complainant. In
making a cash settlement, I am satisfied it is fair the insurer makes a further
allowance of 20% to take into account interest, and any variations or contingencies
which may occur during the repairs.
The parties are encouraged to work together to resolve this aspect of the claim and
complaint.
Insurer not liable for moving costs or cleaning costs
The complainant claims for the cost to move from one rental property to another in
February 2019. He also claims for end of lease cleaning costs.
The insurer says this is a new issue and there is no cover available under the policy.
It also says this is related to the issue of who needs to be paying the complainant’s
temporary accommodation expenses. In these circumstances, the insurer says any
responsibility for these costs lie with the owners corporation.
The complainant has not provided any material to quantify his claim for this aspect.
Determination | Case number: 538716 Page 12 of 26
He has also not advised under what part of the policy he is making these claims. The
complainant said:
End of lease Cleaning costs following move. (I don't know who should be paying
this, but I do know it shouldn't be me)
On the available information, I am not satisfied the insurer is liable for moving costs or
cleaning costs.
Insurer to pay to the complainant up to $5,000 for removal and storage costs
The complainant says he submitted storage costs to the insurer in May 2017, but this
was rejected. He says he was told to submit these costs to his contents insurer.
He refers to a policy benefit of $10,000.
I have carefully considered the insurer’s policy. The policy term referred to by the
complainant is not applicable. However, under section 1, Part C, the policy provides
the insurer will pay up to $5,000 for the reasonable costs a lot owner necessarily
incurs in removing their undamaged contents to the nearest place of safekeeping,
storing their undamaged contents at that place and returning the undamaged contents
to the insured premises.
This benefit is payable following damage to the property which is admitted as a claim
and which damage makes the property unfit to be occupied.
The water damage claim has been admitted. Photographs show the property is unfit
to be occupied.
Should the complainant accept this determination, within seven working days of
acceptance, the complainant is to provide proof to the insurer of his removal and
storage costs.
Upon being satisfied of the proof, the insurer is to pay to the complainant up to $5,000
for removal and storage costs.
The insurer is also to pay statutory interest pursuant, to section 57 of the Act, on
these costs, from the payment date until the date of settlement.
Insurer liable for temporary accommodation for the time of repairs
The complainant says the insurer has not left his apartment in a safe condition and
should be paying his accommodation costs. The complainant also argues the balcony
leak is still not rectified and for this reason also the insurer should be paying his
ongoing accommodation costs.
Determination | Case number: 538716 Page 13 of 26
The complainant says the owners corporation has repaired cladding around the
apartment, but the leak persists. He also says the owners corporation have raised a
special levy to replace cladding and windows and undertake other extensive works.
The complainant relies on a report provided after a balcony flood test was done by the
builder undertaking these works on 23 May 2019.
Initially, the insurer said the maintenance related balcony repairs to the unit above the
complainant’s unit were professionally completed. Upon receipt of the recent flood
test report, the insurer said this indicates the owners corporation has still not
completed all necessary maintenance related works that are required to ensure the
unit is watertight before the insurer can commence the agreed internal repairs.
The insurer refers to the necessary works regarding sealing of the exterior cladding
and window frames and other issues relating to leaks which are being remedied
through the owners corporation’s ongoing program of works . The works were subject
to tenders and financing.
The insurer says once all necessary external maintenance related repairs are
completed, it will commence repairs in the complainant’s unit.
The complainant acknowledges the insurer paid accommodation costs until June
2017 and the owners corporation paid accommodation costs until June 2018.
The complainant requires the insurer to pay all his past and future temporary
accommodation expenses.
From the available information, I accept the insurer paid the complainant $1,541
temporary accommodation costs from 2 January 2017 to 24 April 2017. The insurer
also says it paid temporary accommodation costs between 24 April 2017 and 16 June
2017.
From 1 June 2017 to 30 June 2018, the insurer says temporary accommodation costs
in the sum of $1,695 per month have been reimbursed to the complainant by the
owners corporation.
The insurer says it is agreed no further temporary accommodation costs will be
provided by it until the leaks affecting the property had been rectified. The insurer
says once the leaks have been rectified the insurer will cover reasonable temporary
accommodation cost during the period required to complete internal repairs. The
insurer indicated internal repairs would take three weeks.
The insurer concludes as the complainant has been reimbursed for temporary
accommodation costs incurred to 30 June 2018, and as the owners corporation has
agreed to reimburse the complainant for such further e xpenses he may incur until
such time all necessary external maintenance related repairs are completed, the
insurer has no further liability until repairs commence.
Determination | Case number: 538716 Page 14 of 26
The insurer says while the complainant might be out of pocket, while the leaks are
being repaired, this is not covered by the policy. The insurer also says the reason the
complainant’s unit is unfit to be occupied is owing to delays by the owners corporation
fixing the leaks.
The available correspondence indicates the cost of the balcony repairs and other
building maintenance issues was being negotiated between the committee of the
owners corporation and a contractor.
The available information also shows a contractor was appointed and that the
contractor provided a flood test which showed the balcony was still leaking in May
2019.
The policy provides the insurer will pay the reasonable costs of temporary
accommodation necessarily incurred if the unit is made unfit to be occupied for its
intended purpose because of damage which is admitted as a claim.
The water damage incurred in December 2016 has been admitted as a claim. The
photographs indicate the unit is unfit to be occupied.
In these circumstances, save that the owners corporation has paid for temporary
accommodation, the insurer would usually be liable to pay from the time of the event
until the time of reoccupation following completion of repairs.
Repairs have not been completed because they cannot be commenced until the
water leaks are repaired. This approach is common insurance practice and is not
unreasonable.
Furthermore, the available information establishes the owners corporation are
responsible for and are undertaking the necessary work to repair the balcony leak and
other maintenance related issues. In addition, the available information establishes
the owners corporation agreed to pay the complainant’s temporary accommodation
expenses from 16 June 2017 until such time it was confirmed there was no further
water ingress into the complainant’s unit.
In the circumstances, on the available information, the insurer is not liable for
accommodation expenses until it is confirmed there is no further water ingress into
the complainant’s unit. The available information indicates the owners corporation
have adopted responsibility for the com plainant’s accommodation expenses while the
balcony leak repair and other maintenance related issues are being undertaken.
Once these external repairs are confirmed, the insurer is then able to commence
internal repairs and is liable to pay for the reasonable cost of temporary
accommodation until the complainant can reoccupy the unit following repair
completion.
Determination | Case number: 538716 Page 15 of 26
The insurer said repairs could be completed in three weeks. However, this estimate
was based on a scope of works which is no longer applicable to the claim.
The insurer is to reconsider the length of time for repairs in view of the findings in this
determination.
Should the complainant accept this determination, within seven working days of
acceptance, the complainant is to provide proof to the ins urer of his current temporary
accommodation costs.
Upon being satisfied of the proof, the insurer is to pay to the complainant temporary
accommodation costs based on the revised estimate of the length of time for repairs
in view of the findings in this determination.
Should the complainant opt for the insurer to complete repairs, this payment is to be
made when the insurer commences repairs. Should the complainant opt for a cash
settlement, this payment is to be made at the time of the cash settlement.
It is assumed the owners corporation has continued to pay, and continues to pay, for
the temporary accommodation. Should this arrangement cease, the parties can return
to AFCA for further consideration of this issue.
2.2 Is the complainant entitled to compensation?
Compensation paid in some circumstances
The Terms of Reference allow the payment of compensation (capped at $3,000) for
non-financial loss. We may decide an insurer should compensate a complainant for
such loss only where there has been an unusual amount of physical inconvenience,
time taken to resolve a situation, or interference with the complainant’s expectation of
enjoyment or peace of mind.
The complainant advised of multiple service issues and delays with this matter:
The conduct of [insurer] and it's business partners [business partner] in its
handling of the claim from the start. Not answering emails I sent, originally trying
to settle claim, despite walls still being wet in February six weeks after the event.
The complainant also complains he has not been able to live in his own home for
several years and has had multiple moves.
Insurer acknowledged issues with its claims management
The insurer advised the complainant:
Firstly, you have expressed concern about responsiveness of claims staff. We are
sorry that your claims experience has not met your expectations, and while there
Determination | Case number: 538716 Page 16 of 26
is no excuse for any unreasonable delays or lack of responsiveness, if a reason is
to be offered it is simply that this matter has been (as you can appreciate)
complicated, lengthy, and has involved a significant volume of correspondence
from multiple parties.
The insurer agrees the complainant’s predicament is unfortunate but says its liability
is limited to reinstating the resultant internal damage to the complainant’s unit. It
reiterates it can only commence the internal works once the unit is watertight, and this
issue is in the hands of the owners corporation.
Fair the insurer pays the complainant $1,500 compensation
Once the claim was made, the insurer arranged for the damage to be assessed and a
scope of works was prepared. Several disputed issues were raised which were
addressed in a final decision letter on 20 December 2017.
Otherwise, although considerable time has passed, the available information shows
the insurer clearly said it would deal with repairing the internal damages once the
external building watertight arrangements were completed. These arrangements are
the responsibility of the owners corporation.
We take a conservative approach to compensation for non-financial loss. In the
circumstances of this dispute, I am not satisfied the insurer’s c onduct has
substantially interfered with the complainant’s expectation of enjoyment or peace of
mind. I acknowledge the complainant’s predicament, but not all delays were caused
by the insurer.
I acknowledge the claim is complex and involves other parties. I note the
acknowledgement by the insurer of delays and lack of, or confusion in,
communication.
Whilst acknowledging not all the delay was caused by the insurer, I consider the
complainant suffered some stress and inconvenience because of the way in which the
insurer managed the claim.
Having carefully considered all the available material, I am satisfied it is fair the
insurer pays to the complainant $1,500 compensation.
Insurer to pay up to $3,000 for t he complainant’s other expert reports
The Terms of Reference also allow for the payment of a complainant’s costs in
pursuing their matter. We may decide the insurer contribute to the professional costs
incurred by the complainant in the course of the complaint. Unless exceptional
circumstances apply, we will not require the insurer to contribute more than $3,000 to
these costs.
In addition to the report from his builder (ID), reports were also obtained from other
builders (FI and BC). In deciding whether the insurer should contribute to these costs,
Determination | Case number: 538716 Page 17 of 26
we consider what is fair in the circumstances. We consider the complexity of the
dispute and whether the complainant genuinely required expert assistance.
The dispute was complex. The insurer had the benefit o f expert reports. I am satisfied
the complainant genuinely required expert assistance.
Should the complainant accept this determination, then within seven working days of
acceptance, the complainant is to provide the insurer with a copy of the invoices
evidencing the cost of FI’s and BC’s reports. If these reports were paid by the
complainant, then, upon receipt of invoices, the insurer is to pay for the cost of these
reports, up to $3,000.
Determination | Case number: 538716 Page 18 of 26
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference b ut has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
ap plicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 AFCA approach
As advised to the parties, we have considered it appropriate to expedite this
complaint in accordance with the FOS Terms of Reference due to the nature of the
complaint. Accordingly, this complaint has not been the subject of a recommendation
and has proceeded directly to determination.
This complaint has been determined based on what is fair in the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All the material provided by the parties has been reviewed and
considered for the purposes of this determination.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law that an insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
Determination | Case number: 538716 Page 19 of 26
3.3 Policy extracts
Record Key points
Product
Disclosure
Statement
(PDS)
Page 17, 18 , 19,
20
General Definitions – the meaning of some words
The words listed below have been given a specific meaning in this Policy and
these specific meanings apply when the wor ds begin with a capital letter.
There are other definitions that are specific to individual Sections and these
appear in the relevant S ection.
Event(s)
means a happening or an incident not intended to happen that occurs during a
particular interval of time, or a series of happenings or incidents consequent
upon or attributable thereto, which causes or results in Loss or Damage or a
legal liability to pay compensation whic h is claimable under this Policy.
Insured Property
(a) Building
Building means:
building or buildings as defined by the Strat a Schemes Management
Act, Strata Titles Act, Community Titles Act or similar legislation applying
where Your Buildin g is situated, including:
…
(v) floor coverings but excluding carpets (whether fixed or un - fixed)
and Floating Floors;
…
Loss or Damage
m eans direct physical loss of, destruction of, or damage to property from any
sudden and accident al cause not otherwise excluded by this Policy.
Replacement
means:
(a) the reasonable cost of rebuilding, replacing or repairing Your Insured
Property to a condition which is equivalent to or substantially the same
as but not better nor more extensive than when it was new; and
(b) …
Temporary Accommodation
means, as regards any Lot occupied by the Lot Owner, an amount of money
calculated on the basis of similar accommodation located in the vicinity.
Determination | Case number: 538716 Page 20 of 26
Record Key points
Pages 22, 25 ,
26
Section 1 - Insured Property
What We cover
This Section contains Parts A, B and C that provide cover against the Events
listed below whic h occur during the Period of Insurance.
Section 1 - Part A
You are covered for the following Events.
1. We will pay up to the Sum Insured shown on the Schedule for Section 1 ,
against Loss or Damage to Your Insured Property on the basis set out in
“Claims – basis of settlement”,
…
6. Electricity, gas, water and similar charges – excess costs
We will pay up to $2,000 for the cost of:
(a) increased usage of metered electricity, gas, sewerage, oil and water;
(b) …
(c) additional management charges;
You are required to pay following Loss or Damage to Your Insured Property by
an Event which is admitted as a claim under Section 1 .
Section 1 – Part B
Part B applies to You and Lot Owners. Cover for Events 1) to 5) of Part B are
included up to the Sum Insured shown on the Schedule for Part B of Section
1.
…
(b) Temporary accommodation
When a Lot Owner occupies their Lot We will pay the reasonable cost of
Temporary Accommodation they nec essarily incur if their Lot is made
unfit to be occupied for its intended purpose by:
i. L oss or D amage that is admitted as a claim under Section 1 ; or
ii. reasonable access to or occupancy of their Lot is prevented by
damage from an Event claimable under Section 1 happening to
other property in the immediate vicinity.
We will pay:
under b i) from the time of the Event until the time they reoccupy
their Lot following complet ion o f rebuilding, repairs or
replacement; or
Determination | Case number: 538716 Page 21 of 26
Record Key points
if Your Insured Property is not rebuilt or replac ed, for the time it
would have reas onably taken to rebuild or replace their Lot up to a
maximum of twelve (12) months;
under b ii) from the time of the Event until the time when access
to their Lot is re - established.
Page 27 Section 1 - Part C
Part C applies to Lot Owners. Cover for Events 1) to 6) of Part C are included
in addition to the Sum Insured for Section 1.
…
3 . Lot Owners’ contributions and fees
We will pay, up to $2,000 a Lot, for contributions, levies, maintenance and
other fees the Lot Owner is required to pay during the period their Lot is unfit to
be occupied for its intended purpose by Loss or Damage to Your Insured
Property that is admitted as a claim under Section 1 .
4. Lot Owners’ removal and storage costs
We will pay up to $5,000 for the reasonable costs a Lot Owner necessarily
incurs in:
(a) removing their undamaged Contents to the nearest place of safe
keeping;
(b) storing their undamaged Contents at that place or an equivalent
alternate plac e;
(c) returning their undamaged Contents to Your Situation when occupancy
of their Lot is permitted;
(d) …
f ollowing Loss or Damage to Your Insured Property that is admitted as a claim
under Section 1 that makes their Lot unfit to be occupied for its intended
purpose.
Page 29 Claims – basis of settlement
1. Replacement
If Your Insured Property is damaged, We may choose to either rebuild,
replace, repair or pay the amount it would cost to rebuild, replace or repair.
The amount We pay under Section 1 will be the cost of Replacement at the
time of Replacement su bject to the following provisions:
(a) the necessary work of rebuilding, replacing or repairing (which may be
carried out upon another site or in any manner suitable to Your
Determination | Case number: 538716 Page 22 of 26
Record Key points
requirements provided Our liability is not increased), must be
commenced and carried o ut without unreasonable delay;
(b) …
We will not pay for the cost to:
i. Rebuild or replace Your undamaged Insured Propert y;
3.4 Expert reports and correspondence
Record Key points
Report from
builder (P)
8 August 2016
Engaged by owners corporation to investigate leak on 3 August 2016 to the
bedroom in unit 18. Photographs provided.
Membrane has failed at the leak site and will need to be repaired.
The rest of the ceilings in unit 18 were scanned after testing. No evidence
of dampness. T he greater balcony area is protected by efficient membrane
system.
Email from loss
adjuster to
broker
19 January
2017
AB (builder) will attend to supply quotations for repairs.
Scope of works
prepared by
insurer’s builder
(AB)
Included work in bedroom 1, bedroom 2, hall, painting, laundry, toilet, and
lounge room.
Letter from loss
adjuster to
broker
9 February
2017
Repairs as quoted by AB and payment will be forwarded to you in due
course.
Policy excess $1,000 payable to AB.
Building report
(FI)
15 February
Inspected and photographed damage in bedrooms which included mould, a
hairline crack in the ceiling, sagging paint, rusty ceiling beam, insulation
bats on the walls above the ceiling were compressed stained and mouldy,
architraves warped and cracked, underlay/carpet was removed, water
stains on the wall above the east facing window, bottom of the wall on the
Determination | Case number: 538716 Page 23 of 26
Record Key points
2017 east side of the bedroom was wet, nails rusty, plasterboard wall on the
north side of the bedroom exposed to rainwater, downlights hangin g,
probably mould in the ceiling, timber flooring in the hallway damaged which
would require replac ement, vertical hairline cracks in the corner walls above
the left - hand and right - hand side of the cooktop in the kitchen probably
caused by the ingress of r ainwater and accumulation of moisture in the wall
cavity between the kitchen and the bedroom at the south - east corner of the
apartment.
Recommended insurer approves and carry out remedial works.
Recommended alternative accommodation while remedial works ar e being
completed given the amount of dust that will be releas ed from the
plasterboard when it is sanded, and the mould spores will bec ome airborne.
Building report
(BC)
4 May 2017
Inspected and photographed 11 and 20 April 2017 and 3 May 2017.
Owner of Apartment 27 has replac ed the balcony tiles and waterproofing.
Photographs show extensive removal of plasterboard linings in
complainant’s apartment.
Apartment 27 still leaking into apartment 18 as shown by water dripping
through the wall framing .
Made recommendations in relation to better waterproofing the balcony
above the complainant’s apartment.
Report from
adjuster to
insurer
8 January 2018
Complainant engaged representative to deal with external maintenance
related repairs to be actione d more quickly by the owners corporation.
Report from
adjuster to
insurer
15 May 2018
Both builders (TB) and (AB) confirm plastering works can be successfully
performed without having to remove the kitchen joinery in Unit 18.
Maintenance related balcony repairs to Unit 27 have been completed and
Unit 27 now rainwat er tight.
Owners corporation have agreed to several external cladding areas to the
building and window frames and will incorporate repairs to the surrounds of
Unit 18.
Owners corporation paying for complainant’s temporary accommodation
costs until external maintenanc e works completed.
Email from
builder (AB) In our opinion all plaster repairs can be carried out to a satisfactory
standard without the need to remove the kitchen joinery.
Determination | Case number: 538716 Page 24 of 26
Record Key points
Undated
Email from
builder (TB)
Undated
Kitchen cabinets do not need to be removed.
Plaster does not need to be touched as it backs onto the kitchen cabinet
carcass and will only ever be evident if the kitchen cabinets are removed.
All that is required is to rehang plaster to the bed/kitchen party wall on the
external bedroom side of the wall.
We have allowed to cut out and patch over the hole on the internal/kitchen
side of the party wall which is more than enough.
Once the bedroom side of the party wall is re - plastered no one will ever
know nor will it affect the use of the premises.
Report from
adjuster to
insurer
5 July 2018
Required external maintenance related cladding repairs are still being
discussed by the committee of the owners corporation and a d ecision has
not yet been made regarding approval.
Report and
letter from
adjuster to
insurer and
complainant
20 August 2018
Confirming plastering works can be successfully performed without having
to remove the kitchen joinery.
Required external maintenance related cladding repairs had been placed
on hold by the committee and will be discussed in early September 2018.
Invoice (AB)
26 September
2018
Callout fee to remove nails that have been exposed after plaster removal by
other: $242.
Tender Fo rm
September
2018
Tender form for facade, window, balcony, balcony refurbishment upgrade
and painting work at the complainant’s residential apartment building.
Report from
building
practitioner (ID)
25 February
Inspected and photographed complainant’s Unit on 26 February 2019 to
review adequacy of repairs.
Water damaged plaster and flooring removed in preparation to perform
rectification works.
Determination | Case number: 538716 Page 25 of 26
Record Key points
2019 Inspected south wall in the kitchen and found no evidence of recent water
ingress. Described da mage and concluded water ingress has adversely
affected the particleboard bulkhead. Recommended rectification of
bulkhead described.
Inspected north wall of bedroom 1 between this room and the kitchen which
showed no evidence of recent water ingress. Wall plaster across the back
of the kitchen was water damaged and ID identified faults. The top plate of
the wall was warped and lift ed off probably becaus e water absorption into
the timber wall frame. Wall plaster across the back of the kitchen has been
water damaged and can only be repaired by removal of the kitchen
cabinets. The warped and delaminated top plate is caused by wat er
absorption over a long time.
Inspected tiles in the laundry. Tiles located on the sout h wall of the room
had been removed because plasterboard was wat er damaged.
Recommended removal of all skirting and floor tiles within this room to
ensure the tiles are the same.
Inspected bat hroom tiles and toilet tiles. Floor and skirting tiles have not
been adversely affected by ingress of wate r. Tiles in these rooms are the
same as the tiles in the toilet and bathroom.
Recommended to bring the apartment back to its original condition all for
and skirting tiles within the bathroom and toilet are replaced at the same
time as the laundry tiles wit h the same tile.
Payment to ID
26 February
2019
Complainant paid ID $5 5 0.
Report from GG
Flood test
performed
23 May 2019
Unit 27 balcony flood test performed 23 May 2019 by the builders
undertaking the building works on the complainant’s building.
After a second inspection after an hour, water was still covering the balc ony
and there was presence of water leaks on unit 18.
Water was coming out on the south - east part of the slab and the leak origin
was not known.
Photographs show water was leaking on top of the plastic covering the floor
on the east side under the tested balcony.
Photograph annotat ed - water running through the slab structure and water
on the ceiling structure under the tested balcony.
3.5 Other relevant material considered and relied on
parties’ submissions/emails and all attachments to submissions and emails
expert reports
Determination | Case number: 538716 Page 26 of 26
photographs
correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.