Home / Financial Firm (Unknown - Insurer) / Determination 538716

Determination 538716

Water damage claim: scope of repairs, temporary accommodation and claim delays

FirmFinancial Firm (Unknown - Insurer)
Decided2019-08-30
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded$8,550
Non-financial loss$1,500
Amount claimed—
SourceAFCA PDF

Summary

The complainant's apartment was water damaged from a neighbouring balcony and he disputed the scope of repairs, temporary accommodation and claim handling. AFCA ordered the insurer to fund items in the builder's report, a $1,500 non-financial loss payment, and some costs, but refused several heads of claim.

The policy covers reasonable repair of damaged property but not replacement of undamaged property, and temporary accommodation is payable only once internal repairs can start after the external leaks are fixed.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interestpay non financial lossrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 538716 Page 1 of 26 Determination Case number: 538716 30 July 2019 1 Determination overview 1.1 Complaint The complainant’s apartment was water damaged in late December 2016. The complainant says the owners corporation had knocked out a section of the balcony slab above the complainant’s apartment, which resulted in water ingress. The financial firm (insurer) paid for the plaster to be removed, and the apartment treated for mould. The complainant says the flooding also caused other issues in his apartment, including damage to the back wall of his kitchen. The complainant says that this section of the balcony is still leaking. However, he says the insurer says it is a maintenance issue, and he is therefore not entitled to alternative accommodation from the insurer. The complainant also advised of several other items in dispute , including service issues. 1.2 Issues and key findings Is the insurer required to make any further payments or do any further works? At the c omplainant’s option, t he insurer must repair or pay for the costs of repair to the complainant for:  removal of two screws  certain kitchen repairs as listed in the complainant’s builder’s ( ID’s ) report, including removal of kitchen cabinets  ID’s report  the supply and installation of new floor and skirting tiles to the laundry  painting of the lounge room walls  up to $5,000 for removal and storage costs. Determination | Case number: 538716 Page 2 of 26 The insurer is not liable for any further costs or repairs. The insurer is to pay to the complainant temporary accommodation costs, based on the revised estimate of the length of time for repairs, in view of the findings in this determination. Is the complainant entitled to compensation? The insurer caused the complainant stress and inconvenience during its claim processing, due to the delays and unresponsiveness of its representatives. It is fair the insurer pays the complainant $1,500 compensation. It is also fair the insurer contributes up to $3,000 for the professional costs incurred by the complainant in the course of the complaint. 1.3 Determination This determination is substantially in favour of the complainant. Should the complainant accept this determination, within seven working days of being notified of the acceptance, the insurer is to arrange:  to pay $1,500 compensation  to pay $550 for ID’s report, plus statutory interest  for a scope of works to be prepared and assessed, addressing the items in ID’s report from 2.5.1 to 2.5.3.4.6 and 2.5.3.7. The assessment is to include a builder’s margin and GST, and the reinstatement of the kitchen cabinets. All assessments are to inc lude a builder’s margin and GST  for a scope of works to be prepared and assessed, addressing the items in ID’s report in paragraph 1.2.6  for a scope of works to be prepared and assessed, addressing the ite ms in ID’s report in item 3.4  to assess the cost to paint the loungeroom walls  for its builder to re-attend the unit and remove the two screws, or cash settle. Should the complainant opt for a cash settlement, the cash settlement is to be made within seven working days of notification of the option. When making the cash settlement, the insurer is to further allow 20%, to take into account interest and any variations or contingencies which may occur during the repairs. Within seven working days of acceptance, the complainant is to provide:  proof to the insurer of his removal and storage costs. Upon receipt of proof, the insurer is to pay to the complainant up to $5,000 for removal and storage costs Determination | Case number: 538716 Page 3 of 26  a copy of the invoices evidencing the cost of other building reports. If these reports were paid by the complainant, then, upon receipt of invoices, the insurer is to pay for the cost of these reports, up to $3,000. The insurer is also to pay statutory interest, pursuant to section 57 of the Insurance Contracts Act 1984 (the Act), on these costs, from the payment date until the date of settlement. Within seven working days of acceptance, the complainant is to provide proof to the insurer of his current temporary accommodation costs. Upon being satisfied of the proof, the insurer is to pay to the complainant temporary accommodation costs based on the revised estimate of the length of time for repairs, in view of the findings in this determination. Should the complainant opt for the insurer to complete repairs, this payment is to be made when the insurer commences repairs. Should the complainant opt for a cash settlement, this payment is to be made at the time of the cash settlement. If not already done, the insurer is entitled to deduct the policy excess. Otherwise, the insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 538716 Page 4 of 26 2 Reasons for determination 2.1 Is the insurer required to make any further payments or do any further works? Complainant must establish a valid claim The complainant must establish on the balance of probabilities he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. The policy provides cover against loss or damage to the insured property as well as other benefits, subject to the limits in the policy. Loss or damage is defined to mean direct physical loss of or damage to property from any sudden and accidental cause not otherwise excluded by the policy. Although the insurer submitted the policy might not respond because leaks had occurred before the policy commenced, it is not in dispute that after the policy commenced, the complainant’s property was damaged by water leaking from a balcony in the unit above the complainant’s unit. I am satisfied the complainant has established a valid claim. The dispute relates to the extent of the insurer’s responsibility for the complainant’s claims. The policy provides several benefits. The policy says the insurer will pay the reasonable cost to rebuild, replace or repair the insured property, to a condition which is equivalent to or substantially the same as, but not better nor more extensive than, when it was new. The insurer relies on a policy exclusion which sa ys it is not responsible to pay for costs to rebuild or replace any undamaged property. The insurer removed carpet and plaster and treated the complainant’s unit for mould damage. The complainant complains about several issues, including that the insurer left screws protruding out of the frame of the building. Because of the damage, the complainant leased a nearby property. There are several items in dispute. I will deal with each item separately. The relevant policy terms and material relied on by the parties is summarised in supporting section 3 of this determination. Insurer paid policy limit of $2,000 for utility bills and owners corporation fees The complainant requires the insurer to pay utility bills for the temporary accommodation. He says he would not be incurring these extra bills if he was in his own apartment. Determination | Case number: 538716 Page 5 of 26 The insurer says it paid the complainant the maximum policy limit of $2,000 in respect of utility bills and owners corporation levies. The insurer also says if there are any outstandi ng amounts regarding these issues during the period the complainant is unable to occupy the insured unit, owing to the non-completion of necessary external maintenance related repairs (which are the responsibility of the owners corporation), then this should be raised with the owners corporation. The insurer’s policy says it will pay up to $2,000 for contributions, levies, maintenance and other fees the insured is required to pay during the period the insured unit is unfit to be occupied, because of damage caused which is admitted as a claim. The available information supports the insurer’s contention that the policy maximum of $2,000 has been paid to the complainant. Under the terms of the policy, I am satisfied the insurer is not required to pay anything further for utility bills and owners corporation fees, whether incurred for the insured unit or for the alternative accommodation. Insurer to reappoint the builder to remove two protruding nails and screws, or cash settle the complainant The complainant claims the insurer ’s builder (AB) left screws protruding out of the frame of the unit. He says this presents a danger to his safety. In late September 2018, AB attended and removed the nails. Earlier this year, the available information indicates two protruding nails and screws remained. The insurer was willing to reappoint the builder to reattend to remove them. If it has not done so already, at the complainant’s option, the insurer is to appoint the builder to re-attend the unit and remove the two screws, or cash settle the complainant for this item. To effectively undertake repairs, the kitchen cabinets need to be removed The complainant claims the water ingress from the apartment above caused damage to the back wall of his kitchen. The complainant says the kitchen joinery must be removed to make proper repairs. The available material relevant to this issue is summarised in supporting section 3 of this determination. With certain provisos, the insurer agreed to the appointment of an expert builder by the complainant. The insurer relies on its two builders (TB and AB). Both builders say the kitchen joinery does not need to be removed to rectify the damage to this wall. Determination | Case number: 538716 Page 6 of 26 The complainant relied on a report from ID, who inspected and photographed the damage in February 2019. ID inspected the kitchen and the adjoining room. He found no evidence of recent water ingress. However, he identified water damage and five faults to the wall plaster across the back of the kitchen. He also said the top plate of the wall was warped and lifted off because water had absorbed into the timber wall frame. ID concluded the wall plaster across the back of the kitchen was water damaged and could only be repaired by removal of the kitchen cabinets. He also concluded the warped and delaminated top plate was damaged because of water absorption into the top plate over a long period of time. Once it had this recommendation, the insurer said it needed to be assessed for reasonableness and communicated to repairers for incorporation into their scopes of works. The insurer also notes the comments by ID , who said as the removal of the original kitchen cabinets will most likely damage parts of the cabinets, ID recommended all kitchen cabinets and bench tops are totally replaced with new cabinets and new bench tops. The insurer said this was unacceptable because the policy does not provide cover for the cost of replacing undamaged property. The issue in dispute was whether the wall plaster across the back of the kitchen could be repaired without removing the kitchen cabinets. I accept ID’s report dealt with issues beyond the scope of what had been agreed. The insurer obtained no further expert opinion after provision of the report from ID. In circumstances where it had already engaged two builders, I am not satisfied its response was adequate in these circumstances. ID’s report is the most recent and most comprehensive , and accompanied by photographs and persuasive explanation. Having carefully considered the available information, I am satisfied on the balance of probabilities that the wall plaster across the back of the kitchen was water damaged, and can only be repaired by removal of the kitchen cabinets. Insurer is responsible for certain items listed in ID’s report I note there have been numerous delays in this claim. One source of the delays has been the owners corporation ’s completion of external cladding works to the building. There were long delays while these works were approved by the owners and funds raised. The available information does not establish whether these works are yet complete. These works are the responsibility of the owners corporation, and neither the complainant or the insurer have control over when the rectification works will be completed. Determination | Case number: 538716 Page 7 of 26 The complainant continues to submit the balcony above his unit is still leaking even though ID said the moisture levels in the party wall were within acceptable tolerances, with no evidence of recent water ingress. In support of this contention, the complainant provided flood tests performed in late May 2019 on the balcony of the unit above the complainant’s unit. In the absence of any further information, I accept the balcony was still leaking at that time. The insurer says this indicates the owners corporation has still not yet completed all necessary maintenance work. The insurer expects any residual issues relating to ongoing leaks will be remedied through the owners corporation’s ongoing program of works, which includes other issues as well as the leaking balcony. The insurer has advised it cannot complete internal works until the external works are complete, and the water ingress issues rectified. I accept this proposition. The available material establishes the water ingress issues are problematic. Significant attempts have been made to rectify the water ingress issues, including the leaking balcony. Given this, the long delays already incurred and the unknown time as to when the rectification works will be complete, I consider it fair the complainant have the option to have the insurer’s builders undertake repair works when the water ingress issues are rectified, or opt to take a cash settlement from the insurer based on ID’s scope of works. The complainant will then be able to arrange for these works to be completed at a time suitable to him, and this will provide finality to the claim and the complaint. Specifically, at this time, on the available information, I am satisfied the insurer is responsible for the items listed in ID’s report from 2.5.1 to 2.5.3.4.6 and 2.5.3.7. Should the complainant accept this determination, within seven working days of being notified of the acceptance, the insurer is to arrange for a scope of works to be prepared and assessed, addressing the items in ID’s report from 2.5.1 to 2.5.3.4.6 and 2.5.3.7. The assessment is to include a builder’s margin and GST , and the reinstatement of the kitchen cabinets. Should the complainant opt for a cash settlement, the insurer is then to cash settle the complainant. In making a cash settlement, I am satisfied it is fair the insurer makes a further allowance of 20% to take into account interest, and any variations or contingencies which may occur during the repairs. As for items 2.5.3.5, 2.5.3.6 and 2.5.3.9, I am not satisfied the available information establishes the original kitchen cabinets will necessarily be damaged when removed or that it will be necessary to replace all kitchen cabinets, bench tops and the kitchen island and sinks and taps etc. However, if the original kitchen cabinets are damaged Determination | Case number: 538716 Page 8 of 26 when removed, the parties can return to AFCA for further consideration of these items. The parties are encouraged to work together to resolve this aspect of the claim and complaint. Insurer to reimburse the complainant $550, plus interest, for ID’s report The insurer said it was willing to pay up to $500 for the cost of the report. The report cost $550. In view of the expert reports provided by the insurer, it was fair the co mplainant obtained an expert report. Further, the expert report was useful in making this determination. In the circumstances, it is fair the insurer reimburses the complainant $550 for the cost of ID ’s report. The insurer is also to pay statutory interes t, pursuant to section 57 of the Act, on $550, from the payment date (26 February 2019) to the date of settlement. At the complainant’s option, the i nsurer to cash settle repair cost of, or repair, bulkhead and cornice on the south side of the kitchen ID inspected the south wall of the kitchen. He said the moisture meter revealed moisture levels to be acceptable. He found no evidence of recent water ingress. ID found the east and west end of the particle board bulkhead located above the overhead cupboard within the cooktop area, had cracked. He described the cracking and said the bulkhead revealed a slight inward bowing. He concluded water ingress had affected the particle board bulkhead, as described in the report. ID detailed rectification to the bulkhead and cornice on the south side of the kitchen. The complainant told ID when it rains, water still leaks into his apartment from the balcony above. As set out earlier, in support of this contention, the complainant provided flood tests performed in late May 2019 on the balcony of the unit above the complainant’s unit. In the absence of any further information, I accept the balcony was still leaking at that time. Even though ID did not find evidence of recent water ingress, I acknowledge ID inspected in summer when there may not have been recent rain. In the absence of any persuasive rebuttal material from the insurer, I am satisfied the available information establishes the bulkhead and cornice on the south side of the kitchen have been damaged from water leaking from the balcony above. Determination | Case number: 538716 Page 9 of 26 As set out earlier, I am satisfied it is fair this aspect of the claim is cash settled at the complainant’s option. On the available information, I am satisfied the insurer is responsible for all the items listed in ID’ s report in paragraph 1.2.6. Should the complainant accept this determination, within seven working days of being notified of the acceptance, the insurer is to arrange for a scope of works to be prepared and assessed, addressing the items in ID’s report in paragraph 1.2.6. The assessment is to include a builder’s margin and GST . At the complainant’s option, t he insurer is then to cash settle the complainant. In making a cash settlement, I am satisfied it is fair the insurer makes a further allowance of 20% to take into account interest, and any variations or contingencies which may occur during the repairs. The parties are encouraged to work together to resolve this aspect of the claim and complaint. At the complainant’s option, the i nsurer to cash settle or repair damage in the laundry, as per item 3.4 of ID’s report The complainant asked ID to address some further issues which arose after the complaint came to AFCA. The complainant said there is a big discrepancy in the scope of works regarding tiles in the laundry being the same as tiles in the bathroom and second toilet. He contends a builder will not be able to source the exact matching tiles because the building is 17 years old. He says this will not be determined until reinstatement works commence. The complainant says if the builder cannot source the exact tile, tiles in the laundry will need to be replaced after the skirting tile replacement. ID noted the laundry skirting tiles located on the south wall of the room had been removed because plasterboard on this wall was water damaged. He said the plasterboard and skirting tiles will need to be replaced accordingly. Because of the need to match tiles within the room with the same colour, texture and size tile, he recommended all floor and skirting tiles are replaced. The insurer made similar arguments about the efficacy of the report. These arguments and my determination about this issue is set out above. The insurer referred to AB’s scope of works. AB’s scope made certain allowances, including re-tiling the splashback and painting all walls. Otherwise, the insurer obtained no further expert opinion. Determination | Case number: 538716 Page 10 of 26 I accept the policy provides the insurer is not required to pay for the cost to rebuild or replace any undamaged property. However, considering the nature of the work, I am satisfied it is fair the necessary work of repairing includes the reasonable cost of repairing the laundry room to a condition which is equivalent to or the substantially the same as when it was new. Due to the age of the tiles, I accept it may be difficult to obtain the same tiles as were used originally. In the circumstances, I am satisfied as the plasterboard and skirting tiles will need to be replaced, it is fair all tiles within the laundry room are the same. On the available information, I am satisfied the insurer is responsible for the items listed in ID’s report in item 3.4. Should the complainant accept this determination, within seven working days of being notified of the acceptance, the insurer is to arrange for a scope of works to be prepared and assessed addressing the items in ID’s report in item 3.4. The assessment is to include a builder’s margin and GST. At the complainant ’s option, t he insurer is then to cash settle the complainant. In making a cash settlement, I am satisfied it is fair the insurer makes a further allowance of 20% to take into account interest, and any variations or contingencies which may occur during the repairs. The parties are encouraged to work together to resolve this aspect of the claim and complaint. Insurer not liable to replace the tiles in the bathroom and toilet The complainant said that, prior to the water ingress, the tiles in the laundry and bathroom were like the tiles in the laundry. He says if this is no longer the case, he would like to be put back in the same position he was in prior to the loss. ID notes that the tiles within the toilet and bathroom are the same as the tiles within the laundry, but he says the tiles in these rooms have not been water damaged. To bring the apartment back to its original condition, ID reports all tiles within the bathroom and toilet are to be replaced at the same time as the laundry tiles are replaced. The insurer notes ID says the tiles in these rooms are not damaged. It says it does not have to replace these tiles because the policy does not provide cover for the cost of replacing undamaged property. I have carefully considered the report and photographs provided. The toilet and bathroom are separate rooms from the laundry. The available evidence establishes the tiles in these rooms were not water damaged. Determination | Case number: 538716 Page 11 of 26 The policy provides the insurer is not required to pay for the cost to replace undamaged property. In these circumstances, I am satisfied the insurer is not liable to pay for the cost to replace the tiles in the bathroom and toilet, because they were not damaged in the insured event. Insurer to paint, or cash settle the complainant to paint lounge room walls The complainant says that the lounge room walls need to be painted, following damage caused by mould remediation works. He says the walls were damaged and left with marks following storage of doors against them. The insurer says two contradictory things. Firstly, the insurer says this is a new issue which had not been raised before. The insurer then says this issue was covered by the quote from AB. AB’s scope of works refers to the cost to prepare and paint all lounge room walls to match existing as close as possible. On the available information, I am satisfied the insurer is required to paint the loungeroom walls. Should the complainant accept this determination, within seven working days of being notified of the acceptance, the insurer is to assess, and cash settle the complainant for the cost to paint the lounge room walls. The assessment is to include a builder’s margin and GST. At the complainant’s option, t he insurer is then to cash settle the complainant. In making a cash settlement, I am satisfied it is fair the insurer makes a further allowance of 20% to take into account interest, and any variations or contingencies which may occur during the repairs. The parties are encouraged to work together to resolve this aspect of the claim and complaint. Insurer not liable for moving costs or cleaning costs The complainant claims for the cost to move from one rental property to another in February 2019. He also claims for end of lease cleaning costs. The insurer says this is a new issue and there is no cover available under the policy. It also says this is related to the issue of who needs to be paying the complainant’s temporary accommodation expenses. In these circumstances, the insurer says any responsibility for these costs lie with the owners corporation. The complainant has not provided any material to quantify his claim for this aspect. Determination | Case number: 538716 Page 12 of 26 He has also not advised under what part of the policy he is making these claims. The complainant said: End of lease Cleaning costs following move. (I don't know who should be paying this, but I do know it shouldn't be me) On the available information, I am not satisfied the insurer is liable for moving costs or cleaning costs. Insurer to pay to the complainant up to $5,000 for removal and storage costs The complainant says he submitted storage costs to the insurer in May 2017, but this was rejected. He says he was told to submit these costs to his contents insurer. He refers to a policy benefit of $10,000. I have carefully considered the insurer’s policy. The policy term referred to by the complainant is not applicable. However, under section 1, Part C, the policy provides the insurer will pay up to $5,000 for the reasonable costs a lot owner necessarily incurs in removing their undamaged contents to the nearest place of safekeeping, storing their undamaged contents at that place and returning the undamaged contents to the insured premises. This benefit is payable following damage to the property which is admitted as a claim and which damage makes the property unfit to be occupied. The water damage claim has been admitted. Photographs show the property is unfit to be occupied. Should the complainant accept this determination, within seven working days of acceptance, the complainant is to provide proof to the insurer of his removal and storage costs. Upon being satisfied of the proof, the insurer is to pay to the complainant up to $5,000 for removal and storage costs. The insurer is also to pay statutory interest pursuant, to section 57 of the Act, on these costs, from the payment date until the date of settlement. Insurer liable for temporary accommodation for the time of repairs The complainant says the insurer has not left his apartment in a safe condition and should be paying his accommodation costs. The complainant also argues the balcony leak is still not rectified and for this reason also the insurer should be paying his ongoing accommodation costs. Determination | Case number: 538716 Page 13 of 26 The complainant says the owners corporation has repaired cladding around the apartment, but the leak persists. He also says the owners corporation have raised a special levy to replace cladding and windows and undertake other extensive works. The complainant relies on a report provided after a balcony flood test was done by the builder undertaking these works on 23 May 2019. Initially, the insurer said the maintenance related balcony repairs to the unit above the complainant’s unit were professionally completed. Upon receipt of the recent flood test report, the insurer said this indicates the owners corporation has still not completed all necessary maintenance related works that are required to ensure the unit is watertight before the insurer can commence the agreed internal repairs. The insurer refers to the necessary works regarding sealing of the exterior cladding and window frames and other issues relating to leaks which are being remedied through the owners corporation’s ongoing program of works . The works were subject to tenders and financing. The insurer says once all necessary external maintenance related repairs are completed, it will commence repairs in the complainant’s unit. The complainant acknowledges the insurer paid accommodation costs until June 2017 and the owners corporation paid accommodation costs until June 2018. The complainant requires the insurer to pay all his past and future temporary accommodation expenses. From the available information, I accept the insurer paid the complainant $1,541 temporary accommodation costs from 2 January 2017 to 24 April 2017. The insurer also says it paid temporary accommodation costs between 24 April 2017 and 16 June 2017. From 1 June 2017 to 30 June 2018, the insurer says temporary accommodation costs in the sum of $1,695 per month have been reimbursed to the complainant by the owners corporation. The insurer says it is agreed no further temporary accommodation costs will be provided by it until the leaks affecting the property had been rectified. The insurer says once the leaks have been rectified the insurer will cover reasonable temporary accommodation cost during the period required to complete internal repairs. The insurer indicated internal repairs would take three weeks. The insurer concludes as the complainant has been reimbursed for temporary accommodation costs incurred to 30 June 2018, and as the owners corporation has agreed to reimburse the complainant for such further e xpenses he may incur until such time all necessary external maintenance related repairs are completed, the insurer has no further liability until repairs commence. Determination | Case number: 538716 Page 14 of 26 The insurer says while the complainant might be out of pocket, while the leaks are being repaired, this is not covered by the policy. The insurer also says the reason the complainant’s unit is unfit to be occupied is owing to delays by the owners corporation fixing the leaks. The available correspondence indicates the cost of the balcony repairs and other building maintenance issues was being negotiated between the committee of the owners corporation and a contractor. The available information also shows a contractor was appointed and that the contractor provided a flood test which showed the balcony was still leaking in May 2019. The policy provides the insurer will pay the reasonable costs of temporary accommodation necessarily incurred if the unit is made unfit to be occupied for its intended purpose because of damage which is admitted as a claim. The water damage incurred in December 2016 has been admitted as a claim. The photographs indicate the unit is unfit to be occupied. In these circumstances, save that the owners corporation has paid for temporary accommodation, the insurer would usually be liable to pay from the time of the event until the time of reoccupation following completion of repairs. Repairs have not been completed because they cannot be commenced until the water leaks are repaired. This approach is common insurance practice and is not unreasonable. Furthermore, the available information establishes the owners corporation are responsible for and are undertaking the necessary work to repair the balcony leak and other maintenance related issues. In addition, the available information establishes the owners corporation agreed to pay the complainant’s temporary accommodation expenses from 16 June 2017 until such time it was confirmed there was no further water ingress into the complainant’s unit. In the circumstances, on the available information, the insurer is not liable for accommodation expenses until it is confirmed there is no further water ingress into the complainant’s unit. The available information indicates the owners corporation have adopted responsibility for the com plainant’s accommodation expenses while the balcony leak repair and other maintenance related issues are being undertaken. Once these external repairs are confirmed, the insurer is then able to commence internal repairs and is liable to pay for the reasonable cost of temporary accommodation until the complainant can reoccupy the unit following repair completion. Determination | Case number: 538716 Page 15 of 26 The insurer said repairs could be completed in three weeks. However, this estimate was based on a scope of works which is no longer applicable to the claim. The insurer is to reconsider the length of time for repairs in view of the findings in this determination. Should the complainant accept this determination, within seven working days of acceptance, the complainant is to provide proof to the ins urer of his current temporary accommodation costs. Upon being satisfied of the proof, the insurer is to pay to the complainant temporary accommodation costs based on the revised estimate of the length of time for repairs in view of the findings in this determination. Should the complainant opt for the insurer to complete repairs, this payment is to be made when the insurer commences repairs. Should the complainant opt for a cash settlement, this payment is to be made at the time of the cash settlement. It is assumed the owners corporation has continued to pay, and continues to pay, for the temporary accommodation. Should this arrangement cease, the parties can return to AFCA for further consideration of this issue. 2.2 Is the complainant entitled to compensation? Compensation paid in some circumstances The Terms of Reference allow the payment of compensation (capped at $3,000) for non-financial loss. We may decide an insurer should compensate a complainant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant’s expectation of enjoyment or peace of mind. The complainant advised of multiple service issues and delays with this matter: The conduct of [insurer] and it's business partners [business partner] in its handling of the claim from the start. Not answering emails I sent, originally trying to settle claim, despite walls still being wet in February six weeks after the event. The complainant also complains he has not been able to live in his own home for several years and has had multiple moves. Insurer acknowledged issues with its claims management The insurer advised the complainant: Firstly, you have expressed concern about responsiveness of claims staff. We are sorry that your claims experience has not met your expectations, and while there Determination | Case number: 538716 Page 16 of 26 is no excuse for any unreasonable delays or lack of responsiveness, if a reason is to be offered it is simply that this matter has been (as you can appreciate) complicated, lengthy, and has involved a significant volume of correspondence from multiple parties. The insurer agrees the complainant’s predicament is unfortunate but says its liability is limited to reinstating the resultant internal damage to the complainant’s unit. It reiterates it can only commence the internal works once the unit is watertight, and this issue is in the hands of the owners corporation. Fair the insurer pays the complainant $1,500 compensation Once the claim was made, the insurer arranged for the damage to be assessed and a scope of works was prepared. Several disputed issues were raised which were addressed in a final decision letter on 20 December 2017. Otherwise, although considerable time has passed, the available information shows the insurer clearly said it would deal with repairing the internal damages once the external building watertight arrangements were completed. These arrangements are the responsibility of the owners corporation. We take a conservative approach to compensation for non-financial loss. In the circumstances of this dispute, I am not satisfied the insurer’s c onduct has substantially interfered with the complainant’s expectation of enjoyment or peace of mind. I acknowledge the complainant’s predicament, but not all delays were caused by the insurer. I acknowledge the claim is complex and involves other parties. I note the acknowledgement by the insurer of delays and lack of, or confusion in, communication. Whilst acknowledging not all the delay was caused by the insurer, I consider the complainant suffered some stress and inconvenience because of the way in which the insurer managed the claim. Having carefully considered all the available material, I am satisfied it is fair the insurer pays to the complainant $1,500 compensation. Insurer to pay up to $3,000 for t he complainant’s other expert reports The Terms of Reference also allow for the payment of a complainant’s costs in pursuing their matter. We may decide the insurer contribute to the professional costs incurred by the complainant in the course of the complaint. Unless exceptional circumstances apply, we will not require the insurer to contribute more than $3,000 to these costs. In addition to the report from his builder (ID), reports were also obtained from other builders (FI and BC). In deciding whether the insurer should contribute to these costs, Determination | Case number: 538716 Page 17 of 26 we consider what is fair in the circumstances. We consider the complexity of the dispute and whether the complainant genuinely required expert assistance. The dispute was complex. The insurer had the benefit o f expert reports. I am satisfied the complainant genuinely required expert assistance. Should the complainant accept this determination, then within seven working days of acceptance, the complainant is to provide the insurer with a copy of the invoices evidencing the cost of FI’s and BC’s reports. If these reports were paid by the complainant, then, upon receipt of invoices, the insurer is to pay for the cost of these reports, up to $3,000. Determination | Case number: 538716 Page 18 of 26 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference b ut has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term ap plicant complainant financial services provider financial firm dispute complaint claim claim 3.2 AFCA approach As advised to the parties, we have considered it appropriate to expedite this complaint in accordance with the FOS Terms of Reference due to the nature of the complaint. Accordingly, this complaint has not been the subject of a recommendation and has proceeded directly to determination. This complaint has been determined based on what is fair in the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All the material provided by the parties has been reviewed and considered for the purposes of this determination. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that an insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. Determination | Case number: 538716 Page 19 of 26 3.3 Policy extracts Record Key points Product Disclosure Statement (PDS) Page 17, 18 , 19, 20 General Definitions – the meaning of some words The words listed below have been given a specific meaning in this Policy and these specific meanings apply when the wor ds begin with a capital letter. There are other definitions that are specific to individual Sections and these appear in the relevant S ection. Event(s) means a happening or an incident not intended to happen that occurs during a particular interval of time, or a series of happenings or incidents consequent upon or attributable thereto, which causes or results in Loss or Damage or a legal liability to pay compensation whic h is claimable under this Policy. Insured Property (a) Building Building means: building or buildings as defined by the Strat a Schemes Management Act, Strata Titles Act, Community Titles Act or similar legislation applying where Your Buildin g is situated, including: … (v) floor coverings but excluding carpets (whether fixed or un - fixed) and Floating Floors; … Loss or Damage m eans direct physical loss of, destruction of, or damage to property from any sudden and accident al cause not otherwise excluded by this Policy. Replacement means: (a) the reasonable cost of rebuilding, replacing or repairing Your Insured Property to a condition which is equivalent to or substantially the same as but not better nor more extensive than when it was new; and (b) … Temporary Accommodation means, as regards any Lot occupied by the Lot Owner, an amount of money calculated on the basis of similar accommodation located in the vicinity. Determination | Case number: 538716 Page 20 of 26 Record Key points Pages 22, 25 , 26 Section 1 - Insured Property What We cover This Section contains Parts A, B and C that provide cover against the Events listed below whic h occur during the Period of Insurance. Section 1 - Part A You are covered for the following Events. 1. We will pay up to the Sum Insured shown on the Schedule for Section 1 , against Loss or Damage to Your Insured Property on the basis set out in “Claims – basis of settlement”, … 6. Electricity, gas, water and similar charges – excess costs We will pay up to $2,000 for the cost of: (a) increased usage of metered electricity, gas, sewerage, oil and water; (b) … (c) additional management charges; You are required to pay following Loss or Damage to Your Insured Property by an Event which is admitted as a claim under Section 1 . Section 1 – Part B Part B applies to You and Lot Owners. Cover for Events 1) to 5) of Part B are included up to the Sum Insured shown on the Schedule for Part B of Section 1. … (b) Temporary accommodation When a Lot Owner occupies their Lot We will pay the reasonable cost of Temporary Accommodation they nec essarily incur if their Lot is made unfit to be occupied for its intended purpose by: i. L oss or D amage that is admitted as a claim under Section 1 ; or ii. reasonable access to or occupancy of their Lot is prevented by damage from an Event claimable under Section 1 happening to other property in the immediate vicinity. We will pay:  under b i) from the time of the Event until the time they reoccupy their Lot following complet ion o f rebuilding, repairs or replacement; or Determination | Case number: 538716 Page 21 of 26 Record Key points  if Your Insured Property is not rebuilt or replac ed, for the time it would have reas onably taken to rebuild or replace their Lot up to a maximum of twelve (12) months;  under b ii) from the time of the Event until the time when access to their Lot is re - established. Page 27 Section 1 - Part C Part C applies to Lot Owners. Cover for Events 1) to 6) of Part C are included in addition to the Sum Insured for Section 1. … 3 . Lot Owners’ contributions and fees We will pay, up to $2,000 a Lot, for contributions, levies, maintenance and other fees the Lot Owner is required to pay during the period their Lot is unfit to be occupied for its intended purpose by Loss or Damage to Your Insured Property that is admitted as a claim under Section 1 . 4. Lot Owners’ removal and storage costs We will pay up to $5,000 for the reasonable costs a Lot Owner necessarily incurs in: (a) removing their undamaged Contents to the nearest place of safe keeping; (b) storing their undamaged Contents at that place or an equivalent alternate plac e; (c) returning their undamaged Contents to Your Situation when occupancy of their Lot is permitted; (d) … f ollowing Loss or Damage to Your Insured Property that is admitted as a claim under Section 1 that makes their Lot unfit to be occupied for its intended purpose. Page 29 Claims – basis of settlement 1. Replacement If Your Insured Property is damaged, We may choose to either rebuild, replace, repair or pay the amount it would cost to rebuild, replace or repair. The amount We pay under Section 1 will be the cost of Replacement at the time of Replacement su bject to the following provisions: (a) the necessary work of rebuilding, replacing or repairing (which may be carried out upon another site or in any manner suitable to Your Determination | Case number: 538716 Page 22 of 26 Record Key points requirements provided Our liability is not increased), must be commenced and carried o ut without unreasonable delay; (b) … We will not pay for the cost to: i. Rebuild or replace Your undamaged Insured Propert y; 3.4 Expert reports and correspondence Record Key points Report from builder (P) 8 August 2016  Engaged by owners corporation to investigate leak on 3 August 2016 to the bedroom in unit 18. Photographs provided.  Membrane has failed at the leak site and will need to be repaired.  The rest of the ceilings in unit 18 were scanned after testing. No evidence of dampness. T he greater balcony area is protected by efficient membrane system. Email from loss adjuster to broker 19 January 2017  AB (builder) will attend to supply quotations for repairs. Scope of works prepared by insurer’s builder (AB)  Included work in bedroom 1, bedroom 2, hall, painting, laundry, toilet, and lounge room. Letter from loss adjuster to broker 9 February 2017  Repairs as quoted by AB and payment will be forwarded to you in due course.  Policy excess $1,000 payable to AB. Building report (FI) 15 February  Inspected and photographed damage in bedrooms which included mould, a hairline crack in the ceiling, sagging paint, rusty ceiling beam, insulation bats on the walls above the ceiling were compressed stained and mouldy, architraves warped and cracked, underlay/carpet was removed, water stains on the wall above the east facing window, bottom of the wall on the Determination | Case number: 538716 Page 23 of 26 Record Key points 2017 east side of the bedroom was wet, nails rusty, plasterboard wall on the north side of the bedroom exposed to rainwater, downlights hangin g, probably mould in the ceiling, timber flooring in the hallway damaged which would require replac ement, vertical hairline cracks in the corner walls above the left - hand and right - hand side of the cooktop in the kitchen probably caused by the ingress of r ainwater and accumulation of moisture in the wall cavity between the kitchen and the bedroom at the south - east corner of the apartment.  Recommended insurer approves and carry out remedial works.  Recommended alternative accommodation while remedial works ar e being completed given the amount of dust that will be releas ed from the plasterboard when it is sanded, and the mould spores will bec ome airborne. Building report (BC) 4 May 2017  Inspected and photographed 11 and 20 April 2017 and 3 May 2017.  Owner of Apartment 27 has replac ed the balcony tiles and waterproofing.  Photographs show extensive removal of plasterboard linings in complainant’s apartment.  Apartment 27 still leaking into apartment 18 as shown by water dripping through the wall framing .  Made recommendations in relation to better waterproofing the balcony above the complainant’s apartment. Report from adjuster to insurer 8 January 2018  Complainant engaged representative to deal with external maintenance related repairs to be actione d more quickly by the owners corporation. Report from adjuster to insurer 15 May 2018  Both builders (TB) and (AB) confirm plastering works can be successfully performed without having to remove the kitchen joinery in Unit 18.  Maintenance related balcony repairs to Unit 27 have been completed and Unit 27 now rainwat er tight.  Owners corporation have agreed to several external cladding areas to the building and window frames and will incorporate repairs to the surrounds of Unit 18.  Owners corporation paying for complainant’s temporary accommodation costs until external maintenanc e works completed. Email from builder (AB)  In our opinion all plaster repairs can be carried out to a satisfactory standard without the need to remove the kitchen joinery. Determination | Case number: 538716 Page 24 of 26 Record Key points Undated Email from builder (TB) Undated  Kitchen cabinets do not need to be removed.  Plaster does not need to be touched as it backs onto the kitchen cabinet carcass and will only ever be evident if the kitchen cabinets are removed.  All that is required is to rehang plaster to the bed/kitchen party wall on the external bedroom side of the wall.  We have allowed to cut out and patch over the hole on the internal/kitchen side of the party wall which is more than enough.  Once the bedroom side of the party wall is re - plastered no one will ever know nor will it affect the use of the premises. Report from adjuster to insurer 5 July 2018  Required external maintenance related cladding repairs are still being discussed by the committee of the owners corporation and a d ecision has not yet been made regarding approval. Report and letter from adjuster to insurer and complainant 20 August 2018  Confirming plastering works can be successfully performed without having to remove the kitchen joinery.  Required external maintenance related cladding repairs had been placed on hold by the committee and will be discussed in early September 2018. Invoice (AB) 26 September 2018  Callout fee to remove nails that have been exposed after plaster removal by other: $242. Tender Fo rm September 2018  Tender form for facade, window, balcony, balcony refurbishment upgrade and painting work at the complainant’s residential apartment building. Report from building practitioner (ID) 25 February  Inspected and photographed complainant’s Unit on 26 February 2019 to review adequacy of repairs.  Water damaged plaster and flooring removed in preparation to perform rectification works. Determination | Case number: 538716 Page 25 of 26 Record Key points 2019  Inspected south wall in the kitchen and found no evidence of recent water ingress. Described da mage and concluded water ingress has adversely affected the particleboard bulkhead. Recommended rectification of bulkhead described.  Inspected north wall of bedroom 1 between this room and the kitchen which showed no evidence of recent water ingress. Wall plaster across the back of the kitchen was water damaged and ID identified faults. The top plate of the wall was warped and lift ed off probably becaus e water absorption into the timber wall frame. Wall plaster across the back of the kitchen has been water damaged and can only be repaired by removal of the kitchen cabinets. The warped and delaminated top plate is caused by wat er absorption over a long time.  Inspected tiles in the laundry. Tiles located on the sout h wall of the room had been removed because plasterboard was wat er damaged. Recommended removal of all skirting and floor tiles within this room to ensure the tiles are the same.  Inspected bat hroom tiles and toilet tiles. Floor and skirting tiles have not been adversely affected by ingress of wate r. Tiles in these rooms are the same as the tiles in the toilet and bathroom.  Recommended to bring the apartment back to its original condition all for and skirting tiles within the bathroom and toilet are replaced at the same time as the laundry tiles wit h the same tile. Payment to ID 26 February 2019  Complainant paid ID $5 5 0. Report from GG Flood test performed 23 May 2019  Unit 27 balcony flood test performed 23 May 2019 by the builders undertaking the building works on the complainant’s building.  After a second inspection after an hour, water was still covering the balc ony and there was presence of water leaks on unit 18.  Water was coming out on the south - east part of the slab and the leak origin was not known.  Photographs show water was leaking on top of the plastic covering the floor on the east side under the tested balcony.  Photograph annotat ed - water running through the slab structure and water on the ceiling structure under the tested balcony. 3.5 Other relevant material considered and relied on  parties’ submissions/emails and all attachments to submissions and emails  expert reports Determination | Case number: 538716 Page 26 of 26  photographs  correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.