Determination 538230
Cash settlement amount for storm damage repairs after claim delays
Summary
After a December 2016 storm, the insurer accepted a claim and offered cash settlements while the complainant's delays and cancelled inspections slowed assessment. AFCA ordered a $100,000 cash settlement, above the insurer's offer, but refused compensation for non-financial loss.
The insurer must exercise its cash-settlement discretion fairly and in good faith, and the complainant's own delays did not justify limiting the insurer's liability for storm damage.
Issues
- Claim amount dispute primary · upheld
“The insurer is required to cash settle the claim for the sum of $100,000 to complete all repairs in line with policy provisions.”
- Claim denial secondary · upheld
“The insurer's claims of exacerbated damage due to these delays is not substantiated; these delays are not a valid reason for the insurer to limit its liability.”
- Delay secondary · not upheld
“The delays were imposed by the complainant.”
Subjects and remedies
natural disasterpay claim
Text of the determination
Determination | Case number: 538230 Page 1 of 11
Determination
Case number: 538230 11 February 2019
1 Determination overview
1.1 Complaint
The complainant lodged a storm damage claim on 9 February 2017 with the financial
firm (the insurer) for an event which occurred on 27 December 2016. The insurer
accepted the claim. It obtained a scope of works and elected to cash settle the claim
because:
the complainant failed to mitigate her loss, causing exacerbation of damage
the complainant failed to complete maintenance issues, allowing further damage
it is not liable for the extra non-event related damage
its repair contractors cannot separate claim related and non-claim related repairs.
The insurer says the complainant lodged the claim six weeks after the damage
occurred, cancelled numerous claim related appointments , caused delays in obtaining
her own report and inhibited its ability to promptly assess the extent of damage.
The complainant disagrees with the insurers claim of exacerbated damage and
rejected the latest cash settlement offer of $93,400. She says the amount is not
sufficient and does not consider her absorbing the risk of having the work carried out.
She maintains her quote of $172,189.05 reflects the true value of the repairs.
1.2 Issues and key findings
Did either party contribute to the claimed delays?
The chronology of events in section 3.3 of this determination shows most delays
experienced during the claim were substantially caused by the complainant.
Is the insurer liable for all claimed damage?
Although the insurer has not substantiated what extra damage occurred due to
delays, it is reasonable to find that the delays had some impact on the assessment of
claim related damage.
Determination | Case number: 538230 Page 2 of 11
Is the complainant entitled to compensation?
For the reasons outlined in section 2.3 below, the complainant is not entitled to
compensation.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is required to cash settle the claim for the sum of $100,000 to complete all
repairs in line with policy provisions.
Determination | Case number: 538230 Page 3 of 11
2 Reasons for determination
2.1 Did either party contribute to the claimed delays?
The property owner who lodged the claim with the insurer is represented by a broker.
For the sake of brevity, this determination refers to the property owner and her
representative as „the complainant‟.
Insurer was unable to promptly determine the extent of loss
The complainant explained that the property which sustained storm damage is not her
primary place of residence, and she was suffering ill health at the time. She says it is
for these reasons the claim was not lodged for six weeks.
Following receipt of the claim, the insurer attended the property and confirmed its
acceptance of liability. It attempted to arrange an on-site inspection to determine the
extent and cost of the loss. Claim notes show the following dates were arranged,
however, the complainant cancelled each of them:
2 March 2017
10 April 2017
20 April 2017.
The insurer, on 19 April 2017, then enquired if the complainant would provide her own
quote. A few days later she confirmed she would.
The insurer successfully arranged AI‟s on -site assessment on 1 May 2017, and
obtained its detailed scope of works and estimate on 9 May 2017. It also attempted to
arrange a quote from HP around 23 June 2017, as it still had not received the
complainant‟s preferred repairer‟s report. The available information shows the
complainant refused property access to HP, and informed HP its services were not
required.
Complainant’s actions resulted in delays
Information shows the insurer was inhibited in obtaining information required to
explore a fair and reasonable outcome with the complainant to finalise the claim.
Despite numerous follow ups with the complainant and SC, the insurer did not receive
her quote until 15 August 2017. Nor was it allowed to obtain HP‟s comparative quote.
While the panel considers the complainant was of ill health, it acknowledges her
representative‟s presence during the claim. The panel is not satisfied sufficient action
was taken by the complainant‟s representative to assist with progressing the claim.
The panel is satisfied:
the delays were imposed by the complainant
Determination | Case number: 538230 Page 4 of 11
the insurer‟s claims of exacerbated damage due to these delays is not
substantiated
these delays are not a valid reason for the insurer to limit its liability.
2.2 Is the insurer liable for all claimed damage?
Insurer did not substantiate how delays caused extra damage
On 13 and 14 September 2018, the complainant confirmed the issue in dispute is the
cost of the repairs. She also maintains there is no extra damage, and all damage
occurred because of the storm.
The insurer is unable to specify what extra damage occurred due to delays. Nor is it
able to confirm if any damage was exacerbated by the delay or how the delays
contributed to the extent of damage. However, it is reasonable to find that the delays
did have some impact on the claim related damage.
In these circumstances, the panel is satisfied that it is fair and reasonable to take into
account the delays in assessing the cash settlement of the claim.
Insurer is liable for damage to the upstairs landing area
At conciliation, both parties agreed the landing area was struck out of the scope of
works. Following the conciliation, the complainant retracted from the agreement.
AI‟s report recommends the complainant arrange a roof assessment to determine the
cause of long term water damage to the landing area; the complainant did not arrange
a roof inspection, and the insurer has not substantiated why it says it is long term
damage.
Due to the uncertainty in respect to the insurer‟s liability , the panel cannot be
completely satisfied the landing area damage occurred d ue to the storm giving rise to
this claim, but an allowance should be made by the panel in assessing a cash
settlement.
Insurer must exercise discretion to cash settle reasonably
The policy allows the insurer to settle a claim by repairing damage or paying the
complainant the cost to repair or reinstate the property to the condition it was in just
before the loss or damage occurred (cash settlement). However, the insurer must
exercise this discretion fairly, reasonably and consistent with the principles of utmost
good faith.
The panel recognises the insurer never initially offered to complete the repairs. When
the complainant eventually requested it to do so it refused, as there may be
exacerbated damage and the quote originally obtained was out of date (only valid for
30 days). The insurer chose to offer a cash settlement for the repairs:
Determination | Case number: 538230 Page 5 of 11
based on the scope of works provided by AI
because it says it is not liable to complete repairs not directly caused by the storm.
As already discussed, the panel is not satisfied the insurer substantiated what non-
storm related damage occurred for which it is not liable, but believes allowance
should be made for the impact of the delays on the storm related damage.
Given how long this claim has remained unresolved, the panel forms the view that
obtaining further quotes to determine a fair cash settlement amount will likely result in
further disagreements and delays. It finds that a cash settlement with appropriate
allowance for contingencies is appropriate in this circumstance.
Insurer is required to repair all claimed damage reported
There is an argument that there is insufficient information available to determine a fair
and reasonable repair cost because:
the insu rer‟s scope of works was an estimate only
the insurer says the original settlement offer fell short of the true cost of repairs
neither party provided a comparative quote
the insurer‟s amended cash settlement calculations are not sufficiently
substantiated to show repairs are actionable for the offered amounts.
In addition, the panel is satisfied by the material available and discussions during the
conciliation, that th e complainant‟s quote is likely inflated (see section 3.3 below,
complainant‟s representative‟s claim note of 31 August 2018). For the above reasons,
it is unfair to entirely rely on the estimates and quotes currently available.
The panel further considers the complainant‟s material shows, on 29 January 2018,
she was willing for AI to complete the repairs identified in its scope of works if a cash
settlement could not be agreed. She reiterated this on 14 February 2018 and 30
March 2018. Additionally, upon lodging this complaint, she expressed her desire for a
cash settlement amount, but also stated she „just needs it fixed‟.
The panel is satisfied the complainant was willing since January 2018 for AI to
complete the repairs, but would have agreed to an acceptable settlement. The panel
notes that there have been a number of offers of cash settlement in the course of the
dispute. The insurer‟s latest offer was around $94,000 , with the complainant‟s latest
position being $120,000.
Taking into account all the factors outlined above, the panel is satisfied that a
settlement should be based on the original insurer‟s assessment of the damages of
$73,366.91 together with a 25% allowance for the complainant having the builder‟s
risk, making a total of $94,208, and a further a sum for other minor items in dispute or
unexpected items. The panel finds it is fair that the insurer is required to pay $100,000
to the complainant to complete the repairs.
Determination | Case number: 538230 Page 6 of 11
2.3 Is the complainant entitled to compensation?
AFCA has a conservative approach to compensation
Non-financial loss includes claims for stress or inconvenience caused by an error of
the insurer. The maximum amount AFCA can award for non-financial loss is $3,000
for each claim of loss.
AFCA will only award this type of compensation if there has been an unusual degree
or extent of inconvenience. AFCA will not award compensation for loss a complainant
may incur because of pursuing a complaint or rectifying an insurer‟s error.
When assessing whether the circumstances are of an unusual nature , AFCA will
review:
the degree or extent of physical inconvenience suffered
the general time taken to resolve the complaint
the extent to which the insurer‟s actions interfered with the complainant‟s
expectation of enjoyment or peace of mind.
If compensation is awarded, it is unlikely to be substantial.
Complainant is not entitled to compensation
The panel considered the chronology of events and:
the delay between the date of event and the date of claim lodgement
the complainant‟s cancellation of various initial assessment appointments
the complainant‟s delay in prov iding a quote
the complainant‟s refusal of allowing the insurer to obtain a comparative quote.
Although the insurer is liable to complete the repairs and some delays arose due to its
attempt to limit liability, the panel is satisfied the insurer attempted to seek avenues to
progress the claim and it sought to accommodate the complainant in rescheduling
appointments.
The material available shows the complainant did not satisfactorily participate in
allowing the assessment to progress in a timely manner. On this basis, the panel is
satisfied the complainant is not entitled to compensation.
Determination | Case number: 538230 Page 7 of 11
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Reports relied upon
Report Key points
AI
(Insurer)
Loss adjuster‟s
report #1
09 - 05 - 2017
S torm - related damage to multiple rooms .
C omplainant informed writer the roof tiles were replaced by the SES .
Q uote allows for repair of damaged plaster glass ceilings including decorative
mouldings – may require special attendance to replicate .
Q uote stands for 30 days only.
AI
(Insurer)
Loss adjuster‟s
report #2
12 - 05 - 2017
R eport completed following delayed ins pection of property on 01 - 05 - 2017 .
C onc erns re matching ceiling and decorative mouldings – to be advis ed accordingly
if special manufacture required and quoted .
Q uote allows for replacement of carpets in lounge and second lounge, cutting off at
doorway (policy provision only for “same room”) .
C omplainant advised carpet is imported and of high quality – to be determined if
import is required and how policy responds in this case .
F laking paint on office ceiling – deemed age - related damage .
D amage in upstairs ceiling loft appears to be long - term water damage as noted in
first report .
R oof should be inspected to determine cause of water ingress so that damage can
be rectified – ins ured to arrange ins pection by preferred contractor .
D amage to carpet in second lounge room near sliding d oor:
> not storm related, but a maintenance issue
> sliding door repaired to prevent water entry into the room
> carpet accept ed as other carpet damage was identified in same room
> insured required to repair sliding door .
Determination | Case number: 538230 Page 8 of 11
Report Key points
AI allowed provision for replacement of d amaged velvet wallpaper:
> wallpaper company advised no longer available
> would need to be sourced from England or Germany
> unsure how policy would respond in such a circumstance .
C leaning of piano area arranged to determine extend of piano damage .
I nitial res erve for repairs and carpet replacement are grossly inadequat e – possible
repair costs may increase given concerns to match materials .
P er complainant‟s request, scope of works was forwarded to her preferred builder,
SC, to obtain a quote.
SC
(Complainant)
Repair quote
20 - 07 - 2017
Q uote compiled based on specifications/scope of works AI provided to SC via email
on 12 - 05 - 2017 .
S ome photographs attached .
N o comments regarding cause of damage, only scope of works and quote.
Claim note
(Insurer)
In ternal records
27 - 02 - 2018
If they (complainant) are not able to get more via c/s they are wanting AI to do the
works, which P has said if they do, he will have to get them to re - quote again and it
will be more than the above amount.
3.3 Chronology of events
Date Event
27 - 12 - 2016 Date of storm event.
09 - 02 - 2017 Claim lodged by broker.
Insurer‟s claim notes indicate (p a g e 44, re delay in lodgement) applicant was unwell
and had periods in hospital.
12 - 02 - 2017 Complainants representative‟s claim notes confir m loss adjuster appoint ed .
20 - 02 - 2017 Insurer ‟s loss adjuster attended premis es.
03 - 03 - 2017 Complainants representative‟s claim notes show insurer informed it is awaiting scope
of works /quote from builder.
27 - 03 - 2017 Insurer‟s claim notes show :
claim liability accepted and communicated wit h complainant
insurer awaiting loss adjuster‟s report and quote
i nsured cancelled builder‟s appointment, not yet reschedule d .
31 - 03 - 2017 Complainant‟s representative‟s claim notes show AI builder‟s quote arrang ed .
19 - 04 - 2017 Insurer‟s claim notes indicate complainant cancelled appointments for assessment of
reported damage:
0 2 - 0 3 - 20 17
10 - 0 4 - 20 17
20 - 0 4 - 20 17
Insurer requested complainant to confirm if she will provide her own quote.
Determination | Case number: 538230 Page 9 of 11
Date Event
20 - 04 - 2017 Complainant‟s representative‟s claim notes show assessment booked for 01 - 05 - 2017.
21 - 04 - 2017 Insurer‟s claim notes show complainant confirmed she will get her own quote.
02 - 05 - 2017 Complainant‟s representative‟s claim notes show AI attended site assessment.
08 - 05 - 2017 Complainant‟s representative‟s claim notes show loss adjuster will liaise with SC re
quote items.
18 - 05 - 2017 Insurer update d complainant :
Loss adjuster second report received
AI repair quot e provided
Loss adjuster awaiting insured‟s preferred r epairer quote (Structural Concepts)
Loss adjuster recommends loft roof ins pection due to long term water damage.
30 - 05 - 2017 Insurer‟s claim notes show an unsuccessful follow up call to the complainant for her
preferred quote.
09 - 06 - 2017 IG informed complainant it continues to await SC‟s quote to progress the claim.
23 - 06 - 2017 Insurer ‟s claim notes show it emailed the complainant a follow up for her quote.
Complainant‟s representative‟s claim notes show she was informed b y SC it do es not
specialize in domestic claims.
Complainant emailed insurer‟s loss adjust er seeking second quot e from HP .
26 - 06 - 2017 Insurer‟s claim notes show the complainant instructed t he insurer to obtain HP quot e as
SC is slow.
10 - 07 - 2017 Insurer confirmed with the complainant HP is engaged to provide a second quot e.
20 - 07 - 2017 Insurer‟s claim notes show HP is unable to attend property as complainant changed
he r mind and want s to wait for he r own report.
SC report completion date (not received by insurer until 15 - 08 - 2018).
28 - 07 - 2017 Insurer‟s claim notes show it confirmed with the complainant HP has not provided
access to the property.
Still awaiting SC ‟s q uote.
Complainant‟s representative‟s claim notes show the insurer informed her HP unable to
obtain second quote due to her refusal to allow another builder access to the property ,
and she instructed it their service was not required.
09 - 08 - 2017 Loss adjuster informed complai nant:
SC still has not provided its report
HP will attend in place of SC unle ss it provides the report by 11 - 08 - 2017
c laim file will be closed if SC report not provided and insured denies access to HP .
15 - 08 - 2017 Insurer received SC quote dated 20 - 07 - 2017 from SC directly.
Insurer‟s claim notes indicat e it recommends cash settlement.
31 - 08 - 2017 Insurer‟s claim notes indicate loss adjusted followed up for response to cash settlement
offer.
Complainant‟s representative‟s claim notes show :
complainant‟s rela tive knew SC would be expensive
loss adjuster emailed informing there is room to negotiate but only in consideration of
Determination | Case number: 538230 Page 10 of 11
Date Event
what is fair to both parties considering the view that damage likely occurred over long
period of time (but will not be anywhere near the quote provided by SC)
l oss adjuster confirmed compl ainant refus ed HP access
l oss adjuster keen to set up an appointment.
Insurer‟s claim notes show it forwarded both quotes to the complainant with options for
progressing claim.
18 - 09 - 2017 Meeting between complainant and loss adjuster confirmed for 27 - 09 - 2017.
27 - 09 - 2017 Complainant‟s representative‟s claim notes provide min utes for on - site client meeting:
r eviewed and compared SC and AIB quotes
m ajority of cost discrepancies are related to wall paper and carpets
w allpaper made of gold is under - priced by AI
explore if negotiating a settlement range to resolve, or insurer to complete repairs.
02 - 10 - 2017 Insurer‟ claim notes show contact from complainant :
disputing cash settlement amount
complainant said there is additional damage now (water damage to walls in the sleep
outs that was not visible at t he time of inspections).
The notes also say:
the property remains vacant and maintenance issues have not been addressed
alternative loss adju ster appointed to review quot e
acknowledges AI under - q uoted the reserve amount for carpet and wallpaper amounts.
05 - 10 - 2017 IG informed broker:
SC‟s quo te is quadruple that of AI‟s quote.
SC ‟s quote includes additional wor ks not relat ed to the claimed event
insurer suggest s an alternate loss adjuster (and qualified building consult ant) attend to
inspect the pro perty
a ny identified maintenance needs to be rectified to avoid further damage.
10 - 10 - 2017 Complainant‟s representative‟s claim notes show meeting with the loss adjus ter
arranged in an attempt to resolve the claim.
24 - 10 - 2017 Loss adjuster attempted to cont act complainant to arrange a time to inspect property,
assess actual resultant damage , and amend the scope of works.
07 - 11 - 2017 Insurer‟s claim notes show new loss adjuster not yet allowed access to the property.
16 - 11 - 2017 Insurer‟s claim notes indicate new loss adjuster has not been allowed access to
property, but an appointment now scheduled for 27 - 11 - 2017.
06 - 12 - 2017 Insurer‟s claim notes show new los s adjuster at tended property and report due shortly.
07 - 12 - 2017 Complainants representative‟s claim notes indicate wallpaper can be fixed rather than
replaced ; a waiting update figures from loss adjuster.
29 - 01 - 2018 Loss adjuster confirmed complainant requested increased settlement amount based on
SC ‟s quote , or AI to do identified repairs .
Insurer infor med complainant AI ‟s quote expired - further resultant damage occurred
due to insured‟s delaying of claim process and failure to mitigate loss.
Insurer ‟s claim notes explain it cannot proc eed with AI as quote expired an d damage
has escalated due to her dela ys and failure to mitigat e the loss.
14 - 02 - 2018 Complainant instructed the insurer to attend to repairs if it cannot offer a reasonable
Determination | Case number: 538230 Page 11 of 11
Date Event
cash settleme nt amount .
06 - 03 - 2018 Complainant discussed with the insurer the claim should be settled for $110, 000 , or AI
to complete the repairs.
Insurer responded:
AI unable to do the repairs due to further da mage caused by insured‟s delays
AI could have attended to quoted repairs back around May 2017 but in sured wanted to
seek own report
SC‟s quote provided for non - claim - related repairs.
30 - 03 - 2018 Complainant informed insurer:
insured cannot fix repairs for offered amount
repairs already authorise d to proceed back on 14 - 02 - 2018
requests insurer to provide photographs and commentary of additional damage it says
occurred due to delays .
09 - 04 - 2018 Insurer informed the complainant:
settlement offer stands as is
SC‟s quote is excessive
further damages occurred due to insured‟s failure to mitigate loss, restricting property
access and seeking own report; insurer was unable to attend to repair damage due to
the above.
03 - 07 - 2018 Loss adjuster informed the insurer :
of the main differences bet ween SC and AI‟s quotes (brea kdown provided)
SC are a commercial builder and do not carry out domestic work, leading to their
significant delays and increased costs.