Home / Financial Firm (Unknown - Insurer) / Determination 538155
Determination 538155
Driveway damage claim declined under faulty workmanship exclusion
Summary
The complainant claimed for asphalt driveway damage under his home policy, which the insurer declined as faulty workmanship. AFCA accepted the insurer's expert evidence and found the exclusion applied.
On the balance of probabilities the insurer proved faulty workmanship caused the damage, which the policy specifically excludes.
Issues
- Claim denial primary · not upheld“The insurer declined the claim on the basis the damage was due to faulty workmanship, which the policy excludes.”
- Product terms interpretation secondary · not upheld“I do not accept that a truck's wheel driven over the asphalt pavement/driveway is impact.”
Subjects and remedies
home or building damageno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination | Case number: 538155 Page 1 of 4
Determination
Case number: 538155 15 April 2019
1 Determination overview
1.1 Complaint
The complainant lodged a claim for damage to his asphalt driveway under his home
building and contents policy held with the financial firm (insurer).
The insurer declined the claim on the basis the damage was due to faulty
workmanship in the construction of the driveway. It says damage caused by faulty
workmanship is excluded under the policy.
The Case Manager provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the insurer. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
I agree with the Case Manager‟s reasons for the recommendation and the
recommended outcome. The findings contained in the recommendation were correct
and are adopted in this determination.
Is the insurer entitled to decline the complainant’s claim?
The policy covers accidental loss or damage subject to exclusions, including an
exclusion for loss or damage resulting from or caused by faulty design or
workmanship.
The evidence establishes, on balance, that the damage would not have occurred if it
were not for the faulty workmanship in the construction of the driveway.
That means the insurer is entitled to decline the claim.
1.3 Determination
This determination is in favour of the financial firm.
It is not required to take any further action.
Determination | Case number: 538155 Page 2 of 4
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good industry
practice, codes of practice and previous AFCA decisions. I have taken into account all
the material submitted by the parties, both before and after the recommendation. I am
satisfied that the documentation I have relied on has been provided to both parties.
I am satisfied that the case manager‟s recommendation contains an accurate
summary of the complaint, the issues to be determined, any applicable paragraphs of
the Rules and any relevant law.
No new evidence provided after the recommendation
The complainant rejected the recommendation and made a further submission. He
says:
the insurer‟s e ngineer report is not enough to support a conclusion of workmanship
issues with the driveway, or that the claimed damage was a result of any fa ulty
workmanship
the underlying cause of damage to the driveway is s tormwater, not faulty
workmanship.
The submission does not include any new information, or any information that alters
the outcome of the complaint.
2.2 Is the insurer entitled to decline the complainant’s claim ?
Evidence of faulty workmanship in construction of the driveway
I have carefully considered the available information. I am more persuaded by the
insurer‟s expert (DB) reports because they not only explore possible faults in the
construction of the driveway as being responsible for the damage, but include
consideration of what impact (if any) rainwater, and drainage may have had. DB also
persuasively addresses points made in the complainant‟s engineer‟s report. DB
concludes that rainwater would not have caused driveway failure if the driveway had
been prepared and constructed properly.
The complainant maintains the report of his engineer (AS) shows water ingress rather
than faulty workmanship was the cause of damage. However, this conclusion is not
specifically drawn in AS‟s report. Rather, AS empha sises that the damage likely
originated in the sub-grade due to the impact of a number of factors including
moisture/drainage. AS says that while the weight of the truck and prior rainfall were
the „ likely tipping point ‟ , AS did not consider these to be the underlying cause of the
damage.
Determination | Case number: 538155 Page 3 of 4
The complainant also says the insurer‟s engineer‟s assessment included
speculations, and some of the statements in it are incorrect. He refers to his
recollection of the driveway construction, which in his view was done professionally
and to standard. I note that the complainant has not provided any documentation
(such as a statement from the person(s) who constructed the driveway) that may
contradict the insurer‟s assessment of faulty workmanship.
I accept the evidence shows, on balance, the cause of damage to the driveway is
faulty workmanship. This is specifically excluded from cover under the policy. That
means the insurer is entitled to decline the claim.
Determination | Case number: 538155 Page 4 of 4
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with Financial Ombudsman Service (FOS).
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
Recommendation | Case number: 538155 Page 1 of 11
Recommendation
Case number: 538155 24 January 2019
4 Overview
4.1 Complaint
The complainant holds a home building and contents insurance policy with the
financial firm (insurer). He lodged a claim against the policy for damage to an asphalt
driveway at the insured property.
The insurer declined the claim on the basis the cause of damage is faulty
workmanship and excluded from cover under the policy terms.
The complainant disagrees with the insurer‟s decision and seeks a review.
4.2 Issues and key findings
Is the insurer entitled to decline the claim?
The available information establishes the cause of damage to the driveway is faulty
design or workmanship. The complainant‟s policy specifically excludes damage
caused in this manner. Accordingly, the insurer is entitled to decline the claim.
4.3 Recommendation
This recommendation is in favour of the insurer.
The insurer is not required to take any further action.
Recommendation | Case number: 538155 Page 2 of 11
5 Reasons for recommendation
5.1 Is the insurer entitled to decline the claim?
Onus on complainant to establish claimable loss
The complainant first needs to show he suffered a loss or damage caused by a risk
insured against under the policy. This is known as establishing a claimable loss (or
prima facie claim).
The complainant lodged a claim for damage to the driveway at the ins ured property.
The damage is reported to have occurred on 28 February 2018 during the delivery of
fill by a 24-tonne truck.
The complainant‟s policy covers accidental loss or damage to the building, including
paved driveways. Accidental loss or damage is not defined in the product disclosure
statement (PDS); however, it is generally accepted to mean loss or damage that is
unintended or unexpected.
It is not in dispute that there is damage to the driveway at the insured property. On the
available information the damage was neither intended nor expected, therefore, I am
satisfied the complainant has established a prima facie claim for accidental damage.
Insurer relying on a policy exclusion for faulty workmanship
Cover under the policy is subject to conditions and exclusions set out in the PDS.
General exclusions that apply to all cover includes for loss or damage resulting from
or caused by faulty design or workmanship as set out on page 53 of the PDS.
The insurer appointed engineers (DB) to inspect and report on the cause and extent
of damage. In its reports, DB concludes the driveway was not constructed to comply
with Australian Standard AS 3727. After considering DB‟s reports, the insurer
declined the claim on the basis of policy exclusion for loss or damage caused by
faulty workmanship.
As the insurer is relying on this exclusion, it needs to show on the balance of
probabilities that workmanship issues in the construction of the driveway caused the
damage.
Description of driveway/pavement
The complainant says the driveway was constructed just over a year prior to the date
of loss. On the available information, the driveway slopes downwards away from the
home and there are three areas of claimed damage towards its garage entry end.
Areas of damage are labelled L1-L3 in this recommendation for clarity. L1 is closest to
the garage entry, L3 the next moving away from the garage, and L2 alongside a
retaining wall down as the driveway bends away from the home.
Recommendation | Case number: 538155 Page 3 of 11
Parties provided expert reports on damage
The insurer ‟s engineer DB obtained a soil testing report from geotechnical engineers
(AW). This included sub-surface soil material profile bore-log at two points on the
driveway; one at a location relatively close to L3 measured 25mm asphalt surface,
20mm base depths, and the other at the edge of the driveway (not close to L1-L3)
had 200mm base material.
DB says variations in depth of material over areas of the driveway is evidence of poor
and incompetent workmanship. DB contends the work does not comply with the
AS3727 specifications for a minimum asphalt surface and base depth. It says the
specification for a residential asphalt driveway is 30mm and 150mm surface and base
respectively. It concludes the claimed damage was likely caused by one or a
combination of failures to:
“supply & install a gravel & asphalt pavement „fit for purpose‟” and soil type/class
“prepare & compact the filled ground and the service trenches installed beneath
the existing asphalt driveway”
“provide adequate depth of gravel pavement thickness and preparation &
compaction of the gravel base course pavement supporting the asphalt surface”
“prepare & compact the asphalt wearing surface and very likely failure to install a
bitumen emulsion tack coat to ensure adhesion of the asphalt to th e gravel pavement”
The complainant says the driveway was constructed appropriately and damage
occurred because of heavy rainfall the weekend prior to the date of loss, combined
with the weight of the 24-tonne truck. He obtained and provided a report from
engineer (AS) in support of his position.
AS‟s report includes its own measurement of asphalt and base material along the
driveway; one within the area of damage at L3 measured approximately 20mm
asphalt surface and 150mm of gravel/base, and the same measurement was taken at
the edge of the driveway (not within L1-L3). Following an analysis of the mechanisms
of damage, AS concludes it is “moisture and material type within the subgrade level
that is the principal cause of the issues observed in this case, notwithstanding two of
the three failure types as were the primary subject of this investigation”.
The insurer provided DB‟s comments on AS‟s findings, as well as on subsequent
submissions by the complainant (some of which the complainant sought and provided
AS‟s contribution to). The reports are summarised in section 3.2 of this
recommendation.
I have reviewed reports and statements provided by both DB and AS. I accept it has
been provided following observation and testing by persons suitably qualified to report
on the damage, including about its cause. I have preferred DB‟s report as it
addresses the cause of damage in more detail. While AS also reported on the cause,
Recommendation | Case number: 538155 Page 4 of 11
its report focuses on mechanisms through which the damage occurred within the
subgrade of the driveway.
I accept DB‟s report shows failure in construction of the driveway.
Reports shows on balance that faulty workmanship is cause of damage
The experts do not appear to dispute that AS3727 applies to construction of the
complainant‟s driveway. Mea surements completed by the experts confirm the depth
of asphalt surface and base/gravel; DB found base material depths of 25mm and
200mm, while AS founds depths of 150mm. DB says the variability in these
measurements supports its conclusion that the driveway was not compliant with
relevant standard, and that faulty workmanship in its construction caused the
observed damage.
In addition, DB points to other factors (listed above) that have combined to cause the
damage including preparation and compaction of filled ground and service trenches
beneath the driveway.
The complainant says the insurer has not taken the effects of heavy rainfall into
account. He refers to AS‟s report in relation to moisture in the subgrade/subsoil and
that the sub-grade is where the failure that resulted in the observed damage occurred.
After reviewing AS‟s initial report, DB notes there is insufficient information to
establish the subgrade was prepared properly. This position seems to be confirmed in
AS‟s email to this service on 1 4 January 2019. DB notes that if failure occurred in
sub-grade as described by AS, this also constitutes faulty workmanship.
I have carefully reviewed the information provided by both parties and note:
there is evidence the asphalt surface and base depth of the driveway is non-
compliant. I accept that this is faulty workmanship, and that DB‟s reports show this to
be the likely cause of damage
AS says the “overlying standard of pavement [is] considered acceptable” under
the relevant standard, and that acceptable overlying pavement is unlikely to have
bridged the subgrade failure. However, the reporter also says it cannot be established
on the available information whether the subgrade was properly prepared. This would
also be faulty workmanship
AS‟s explanat ion of water/moisture in the sub-grade does not of itself show the
damage was not due to any defect in construction
I have reviewed and accept DB‟s explanation that if constructed properly
(including where service trenches are present - which is not uncommon) the relatively
new driveway, should not have failed because of extensive periods of rain or the truck
load in question.
On the available information I am satisfied, on the balance of probabilities:
Recommendation | Case number: 538155 Page 5 of 11
there is faulty workmanship in the construction of the driveway
the claimed damage would not likely have occurred if it had been constructed
appropriately.
In view of the above, and in the absence of any information to the contrary, I accept
the insurer has established the claim falls within a policy exclusion for faulty
workmanship. The insurer is entitled to decline the claim.
Cover for specified events - impact does not apply to claim
The complainant suggested earlier in his complaint that the damage should be
covered under specific event „impact‟. For co mpleteness, I will briefly address this
point.
The insurer says there is no cover under „impact‟ based on the policy definition of
impact as collision of two or more objects. It says rolling tyres cannot be considered a
violent impact or a crash.
There is no definition of „collision‟ in the policy. Therefore, it is necessary to consider
the ordinary and general meaning of the word. In doing so, it is useful to consider its
dictionary definition. The Macquarie Dictionary defines collision as “the act of
coll iding; a coming violently into contact; crash”
After considering the policy term and the ordinary meaning of collision, I do not accept
that a truck‟s wheel driven over the asphalt pavement/driveway is impact. This is
because:
collision involves two or more objects coming violently into contact or crashing
the act of vehicle tyres over a road is not ordinarily seen to constitute a crash
In view of above, I do not consider the circumstances of this claim fall within the policy
cover for impact damage.
Recommendation | Case number: 538155 Page 6 of 11
6 Supporting information
6.1 General information
A full exchange of the relevant information has taken place between the respective
parties and each party has had the opportunity of addressing any issues raised.
All of the provided material has been read and co nsidered. The parties have raised
numerous issues in their submissions. For the purpose of this recommendation,
commentary is restricted to only those issues considered relevant to the outcome.
6.2 Expert reports
Record Key points
Financial firm’s
engineer (DB)
Report
7 May 2018
Observation
driveway grading unlikely to res ult in ponding of water on surface
evidence of longitudinal „rutting‟ (or ground movement or failure in pavement (asphalt
+ gravel +subgrade) and “longitudinal cracking” (indication of g round movement in
gravel pavement)
evidence of service installation that means likely compaction or re - c ompaction of
sub - grade material. This often results in pavement failure where not done correctly
Defects or damage to asphalt pavement
previous attempt to repair pothole
cracking and as phalt failure suggests ground movement
“de - bonding and lateral movement in asphalt on the edge of driveway”
Cause of damage
Driveway construction non - complaint with Australian Standard AS 3727 (resident ial
pavement)
poor workmanship including one or more of:
installation not fit for purpos e or suitable for the natural ground (subgrade) in
location
inadequate preparation and compaction of nat ural subgrade, gravel base course
pavement, and asphalt wearing surface
failure to install bitumen emulsion tack coat prior to installing asphalt
“subsoil moisture degradation of gravel pavement that supports the asphalt
wearing surface”
Financial firm’s
engineer (DB)
Report
30 May 2018
Consideration of AW’ s report
soil test conducted “as close as possible” to failed surfaces
AW reports underground services in numerous locations below surface of failed
areas
AW report dated 28 May 2018 confirms:
Soil class at location is class M which requires minimum pavement of 30mm AC
and 150mm of base (i.e. subgrade gravel pavement) under the standard
bore - log test conducted confirms driveway‟s sub - grade thickness at property is
20mm thickness, not 150mm as required under the standard
bore - log result confirm 600mm of fill m aterial includes organics which is
unsuitable material for road construction
Opinion taking AW report into account
Recommendation | Case number: 538155 Page 7 of 11
Record Key points
“…[W]e have re - confirmed that the damage was most likely caused by one or a
combination of the following:
“failure to supply and install a gr avel and asphalt pavement “fir for purpose” and
suitable for the highly reactive natural soil in the area”
“failure to prepare and compact the filled ground and the service trenches
installed beneath the existing asphalt driveway ”
“failure to provide adequ ate depth of gravel pavement thickness and preparation
& compaction of the gravel bas e course pavement supporting the asphalt
surface”
“failure to prepare & compact the asphalt wearing surface and very likely failure
to install a bitumen emulsion tack coat to ensure adhesion of the asphalt to the
gravel pavement”
Proximate cause of the event
“…the most likely cause of “damage” to the as phalt driveway pavement is defective
workmanship”
Complainant’s
engineer (AS)
Report
5 September
2018
Testing
“Two test pits were undert aken at the site, at the longitudinal extremities of the
driveway, and the following was observed:
Test pit 1 was within pavement and within the failure in location… identified
approximately 20mm of asphalt with what appears to b e a stone size of 10 or
14mm, overlying 150mm of gravel (type unknown), overlying a moist cohesive
clay (unable to determine if fill or native)”
Test pit 2 was just to the edge of the pavement, not within a failure, and located
close to the entrance of the property…. identified approximately 20mm of asphalt
with what appears to be a stone size of 7 or 10mm, overlying 150mm of gravel
(type unknown), overlying a moist cohesive clay (unable to determine if fill or
native).”
Opinion on pavement failure mechanis m s
the type of failure in location 1 is asphalt slippage failure other two locations is
subgrade failure
subgrade failure is “the failure of the insitu native or fill material upon which the
pavement (comprising in this case, gravel and asphalt ) sits atop”
asphalt slippage failure is “principally the failure of asphalt in tension, whereby the
tensile stress applied to the asphalt has exceeded its tensile capacity beyond yield
and ultimate point, resulting in a severance of the material”)
Subgrade failure
c onstruction of stable subgrade in a properly drained environment is vital to overlying
pavement to sustain traffic loading and achieve reasonable service”. Relevant
components in this case are:
low shrink/swell and reactivity value:
- evidence of high mois ture in subgrade
- under moisture fluctuation, the material in subgrade is “prone to issues that will
affect the overall pavement strength”
- the failure principally commenced in the soil material at site
good material, with good compaction at an optimum moisture content:
- “subgrade material needs to be of acceptable class for soil class, and prepared
to meet minimum compaction and moisture standards, to be considered suitable
for an overlying pavement and subsequent loads that pavement will present”
- only anecdot al statement by complainant is available in relation to sub - grade
Recommendation | Case number: 538155 Page 8 of 11
Record Key points
suitability and preparation, no proof.
- “if there are locations where insufficient gravel layer dept h exists on an
improperly constructed fill layer…then this is and under constructe d/insufficient
gravel depth when measured against the Australian Standard”
- not withstanding the above, “the depth of gravel being discussed as possibly
installed or not (i.e. whether 20mm or 200mm) would not have adequat ely
bridged the subgrade failure typ e in this case”
good surface and subsurface drainage:
- “to prevent moisture ingress to the subgrade and overlying pavement, best
practice road drainage needs to be utilised in the pavement construction”
- surface drainage appears good, with room for improve ment in side drains
- complainant advised that “no subsoil drains were installed”
- “good subsoil drainage network will assist in preventing moisture finding its way
into a pavement and/or subgrade”
- in relation to service trenches, it is common that they “c arry ad introduce water
to pavements and subgrade, particularly after periods of prolonged rainfall, and
for cases where trench is not appropriately drained and/or material used for
backfill is not compacted properly”
Asphalt slippage failure
Layer thickness of asphalt
- insufficient asphalt thickness for stone size will weaken its ability to sustain
wheel load
Frictional resistance against underlying material
- For asphalt to perform properly it must bond properly to base layer. Bitumen
emulsion pri mer is typically used in residential driveways
- primer could have reduced extent of damage but not prevented it at L1
Loading capacity of pavement
“for pavement…assumed as 100 - 150mm of gravel, with 20 - 30mm of as phalt
overlay, at 23t …tandem tipper as per the one shown in photo…would ordinarily
not be a vehicle that would exceed the capacity of a properly constructed
pavement of this profile, provided the subgrade was prepared properly and is of
an acceptable material standard”
Weight of vehicle and prior r ainfall were a “likely tipping point ” but not the
underlying cause of damage.
Conclusion
“Ultimately it is the issue of moisture and material type within the subgrade
level that is the principal cause of the issues I obs erved in this case,
notwithsta nding two of the three failure types as were the primary subject of this
investigation.
Financial firm’s
engineer (DB)
Report
21 September
2018
DB and AW considered AS‟s report and comments include:
“the actual in - situ construction of the driveway pavement is a critical component of
the findings relating to the “caus e of the damage”
Quality of gravel “has no bearing on performance of pavement due to inadequate
depth of pavement or poor preparation of the subgrade including the service
trenches beneath the driveway gravel & asphalt pavement”
Location observed/ tested for cause of damage
location 1 has “observed longitudinal cracking in this pavement which in our
opinion was the result of ground movemen t (settlement) most likely from a poorly
compacted service trench or poorly compacted subgrade and not addressed by
Recommendation | Case number: 538155 Page 9 of 11
Record Key points
AS
testing sites where measurement of asphalt surface/gravel and subsurface
completed by both AS and AW are within close proximity. DB agree s with AS
about the mechanism of damage being most likely “subgrade failure” However
say that:” [w] ith due respect to the location in the driveway & the topography it
remains our opinion that the pavement failure & subgrade failure is most likely
the resu lt of a poorly compacted service trenc h located under the driveway
pavement, that is defective workmanship in the construction of the driveway”
DB and AW generally agree with AS‟s:
(i) - definition of terminologies „subgrade failure‟ and asphalt slippage fa ilure, and
(ii)explanation of mechanism by which they occur
(iii) description of soil mechanism.
However, they note in relation to (iii) that AS:
does not mention “general practice in road construction to arrange in - situ
density testing of the prepared subgrade so as to provide evidence that the
necessary subgrade compaction has been achieved and not just the subjective &
anecdotal opinion of p asser - by‟s”. However, they say they are not aware of any
“in situ density (compaction) testing having been completed to the subgrade or
the driveway pavement gravel”
they have not been provided evidence that this occurred
AS says service trenches run thr ough the damage location and service trenches
commonly carry and introduce wat er to pavement and subgrade, particularly after
prolonged rainfall and where there is inappropriate drainage or backfill material.
However, they maintain “pockets of failure in t he driveway pavement is most likely
related to poorly compacted servic e trenches located under the driveway pavement,
that is, defective workmanship in the construction of the driveway ”.
AS says focus on subgrade more than gravel being the sourc e of failur e regardless
of the depth if gravel installed. It says the depth of gravel “would not have adequately
bridged the subgrade failure type in this case”, however DB‟s says its focus has been
on “all reasonable likely causes”
Conclusion
Maintain position that likely cause of “failure and rutting” damage to asphalt driveway
is one or a combination of the following:
Failure to supply & install a gravel & asphalt pavement “fit for purpose” and suitable
for the highly reactive natural soils in the area.
Failure t o prepare & compact the filled ground and the service trenches installed
beneath the existing asphalt driveway.
Failure to provide adequate depth of gravel pavement thickness and preparation &
compaction of the gravel base course pavement supporting the a sphalt surface.
Failure to prepare & compact the asphalt wearing surface and very likely failure to
install a bitumen emulsion tack coat to ensure adhesion of the asphalt to the gravel
pavement.
They also contend AS‟s report “generally supports” their conclusion.
Complainant’s
engineer (AS)
Email
“…moisture and water are the determining factor in the subgrade losing strength
in your [complainant‟s] case. It is important to read this in the context of
everything I said in my original report, and not to be isolat ed. Please refer to the
Recommendation | Case number: 538155 Page 10 of 11
Record Key points
18 December
2018
report for the entire commentary in relation to this”
Financial firm’s
engineer (DB)
Report
5 January 2019
DB comment/ response to point made by AS/complainant relating to:
Effect of water going into co mpacted areas of subgrade around service
trenche s
normal for backfill to be used in such area
slope of driveway would normally prevent pooling of water on driveway and soaking
into gravel pavement
failed section of driveway are located in areas where the driveway naturally slopes
if well - constructed and compacted, there should be no void in gravel that would allow
“immediate migration of moisture through the compacted gravel”
any moisture from natural ground water into service trenches and sand fill would
generally “flow downhill following the slope in the service trench excavation in the
natural ground”
“gravel & asphalt pavements normally have in - ground servic e trenches for wat er,
sewer, stormwat er & communications crossing from one footpath to the other and
these road crossings do not regularly fail & subside after days of heavy rainfall”
Sub - surface drainage cost and complex, may not have prevented damage, not
appropriate for residential driveway
sub - soil drains rely on simple drainage principle that “w ater flows down - hill” and
engineering input not required
sub - soil drains are used for residential driveways “as required so as to construct a
suitable “fit for use” pavement that will not fail & subside after extended periods of
rainfall which is very com mon in parts of Queensland”
sub - surface drainage likely to have improved performance of driveway, but most
likely failure is not simply due to lack of sub - s oil drain but factors concluded in
previous reports
Asphalt failure mechanism from 3rd loaded truck is evidence water was the
primary problem (moisture pumping)
if properly and adequately compacted driveway “highly unlikely to develop a loss in
shear strength in the short minutes, hours or days bet ween the first & third loaded
truck deliveries to the pro perty”
“absence of voids in a properly compacted gravel pavement would normally mitigate
& slow the ingress of any moisture”
Poor construction meant driveway would have failed regardless of whether it was the
1st or 3rd load
No evidence of moisture pumping at insured premises, and unlikely the cause of
failure relates to moisture pumping,
Ground preparation around service trenche s
“all service trenc hes in the natural ground under road pavements are tested with the
normal “proof rolling” undertaken on all road construction so as to identify “soft spots”
prior to the placement of any road - base gravel”
AW‟s testing shows gravel/base at one location of the driveway is 20mm and 200mm
at another. AS3727 requires 30mm Asphalt and 150mm base. The inconsistency in
depth is described as “incompetent or poor workmanship and likely cause of failure”
The significance of rainfall recorded in the area over the weekend prior to
claimed incident
Driveway is designed to “regularly get wet from excessive rainfall”
Recommendation | Case number: 538155 Page 11 of 11
Record Key points
If correctl y constructed and compliant with AS3727, driveway should not fail following
an extended period of rain and use by three trucks
“extended periods of rainfall can identify isolated workmanship and construction
faults & defects in gravel & asphalt pavement su rfaces in driveways, streets & roads
normally indicated by “pot - holes” in the pavement”
Mechanism of failure and consideration of AS statement pavement may have
been constructed correctly/with good workmanship, but with time, loading,
and continual moisture ingress, a sudden failure such a s the one observed can
occur
AS does not say pavement was constructed correctly, it says “may”
Evidence driveway not constructed in compliance with AS 3727
The driveway is “brand new” in terms of the normal life expectancy of a residential
road pavement”
Drainage
Subsoil drains are likely to have improved th e performance of the driveway, however,
“the most likely cause of the driveway pavement failure & subsidence is not simply
the absence of “sub - soil drains” and is more likely or a combination of factors” (set
out in previous report).
“[a]part from the matt er of “moisture pumping”, which it does not consider relevant to
present failure, DB says “in my opinion the [AS] Report generally supports my
conclusions”
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.