Determination 537421

Insurer refused to complete water damage repairs until waterproofing was done; cash settlement disputed

FirmFinancial Firm (Unknown - Insurer)
Decided2019-02-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant's water damage repairs stalled after the firm insisted on waterproofing before repairs, and the firm had rejected cash settlement offers. AFCA ordered the firm to undertake the agreed repairs, found it not liable for waterproofing, and awarded $2,000 non-financial loss for delay.

The conciliated repair obligation governed, and waterproofing was outside the policy because the walls had no structural damage from the insured event, while the firm's poor communication and delay justified non-financial loss.

Issues

Subjects and remedies

home or building damagepay non financial lossrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 537421 Page 1 of 14 Determination Case number: 537421 7 January 2019 1 Determination overview 1.1 Complaint The complainant holds a home building and contents insurance policy with the financial firm. The complainant lodged a claim for water damage arising from a leaking pipe which occurred on or about 15 May 2014. A dispute regarding the claim was later lodged at the Financial Ombudsman Service (now the Australian Financial Complaints Authority). The dispute was conciliated and terms of agreement were entered into between the parties. The relevant terms included that:  within 4 weeks the complainant was required to confirm that the gap in the concrete path identified by the financial firm during its claim assessment had been rectified.  within 14 days of the confirmation that the concrete path was rectified the financial firm would authorise its repairer to conduct repairs. The complainant met the requirement to rectify the gap in the concrete path and notified the financial firm. The financial firm determined that no waterproofing of the walls had been completed by the complainant. It refused to undertake repairs until waterproofing had occurred. The complainant disputes the financial firm‟s refusal to progress the repairs and has rejected cash settlement offers. 1.2 Issues and key findings Is the financial firm required to undertake the outstanding repairs? The financial firm is required to undertake rather than cash settle the repairs. However, the financial firm is not liable for waterproofing the wall. Is the complainant entitled to non-financial loss? The complainant is entitled to $2,000 for non-financial loss to compensate her for the delay caused by the financial firm in resolving the dispute adequately. Determination | Case number: 537421 Page 2 of 14 1.3 Determination This determination is partly in favour of the complainant. This determination finds:  The financial firm and the complainant should undertake and finalise repairs in accordance with 2.1 of this determination.  The financial firm should pay compensation of $2,000 for non-financial loss to the complainant within 21 days from the date of the acceptance by the complainant of this determination. Determination | Case number: 537421 Page 3 of 14 2 Reasons for determination For the purpose of this Determination the complainant and her authorised agent will both be referred to as „complainant‟. This complaint has been the subject of a recommendation issued by AFCA on 7 November 2018. The financial firm has rejected the recommendation and provided further submissions. This determination follows consideration of all of the exchanged material, both before and after the recommendation and is based on what is fair in the circumstances. 2.1 Is the financial firm required to undertake the outstanding repairs? The parties agree that an insured event has occurred The parties have agreed that an insured event occurred which resulted in damage covered by the insurance policy. A disagreement has arisen regarding the extent to which the financial firm is liable for the repairs. In particular, whether the financial firm is required to undertake or cash settle repairs and whether it is required to complete waterproofing to the walls. The complainant had notice of the need to conduct waterproofing The evidence provided to AFCA suggests the financial firm has previously communicated to the complainant that she needed to undertake waterproofing. The financial firm informed the complainant of the need to water proof both prior to and post the agreement, as follows:  The claims decision letter dated 6 August 2014  Email to the complainant‟s broker dated 27 October 2014  Report dated 29 October 2015 stating the assessor had met with the complainant and her representative to discuss concerns. It appears that they had not heard from the broker in over 12 months at this point. However, the report goes on to suggest that the complainant had agreed to pay for waterproofing to the relevant wall.  Email to the complainant dated 12 May 2017 There are also several expert reports which refer to the need for waterproofing which have been exchanged with the complainant. The expert evidence that waterproofing is required to ensure the repairs can withstand ongoing elevated moisture levels is accepted. The relevant walls are partially below ground level and were exposed to water from the storm water pipe. Determination | Case number: 537421 Page 4 of 14 However, the walls will also be continuously affected by general ground level moisture variation in the soil adjacent to the wall. Accordingly, if the wall has no waterproofing then the re-painting of the walls will fail as the paint will flake and peel. Based on the evidence, the waterproofing is required and the complainant had notice that waterproofing was necessary, prior to any repairs. The conciliated agreement failed to address the issue of waterproofing The parties conciliated the dispute on 4 February 2016 and reached terms of agreement. The terms of agreement did not address the issue of waterproofing. The complainant has stated they had no knowledge of the requirement to waterproof the affected walls. The financial firm has provided contrary evidence that the complainant was aware of the need to waterproof the walls. The terms of agreement do not address the significant aspect of waterproofing which the financial firm states it required prior to undertaking repairs. There is no evidence that the relevant wall needs rebuilding The policy requires damage to the insured building by an insured event to apply the policy terms, which includes rebuilding to current building standards. The expert reports do not record any structural damage to the walls. As the structure of the brick wall has no damage caused by the insured event, the policy does not require the financial firm to either rebuild it or bring the wall itself up to current building standards. The financial firm is not responsible for the cost of waterproofing The damage recorded to the walls was to the painted surface of the wall which the financial firm has agreed to pay to clean and re-paint. The painting cannot be undertaken until the masonry surface has adequately dried to ensure the paint finish will be up to a workmanlike standard. It is accepted that if a waterproofing coat is not applied to the wall then it will result in the paint peeling and flaking. The financial firm is not liable for the waterproofing. The financial firm must undertake the repairs as agreed The complainant and the financial firm originally agreed that the financial firm would undertake rather than cash settle the repairs. The complainant should first complete the waterproofing works to the wall to ensure the paintwork will not be negatively impacted by the moisture levels. The financial firm should obtain new quotations for the work given the time which has elapsed and then undertake the repairs. Determination | Case number: 537421 Page 5 of 14 The complainant should also provide the documentation evidencing the returned funds from the financial firm‟s prior attempt to cash settle. The complainant clearly cannot retain these funds if the financial firm undertakes repairs directly. Alternative ly, exclusively at the complainant‟s discretion, they may elect to cash settle and the financial firm is to make payment to the complainant in accordance with the updated repair quotations, less any amount previously paid. The financial firm has agreed to cover additional items post-agreement A review of the correspondence after the terms of agreement indicates that the financial firm also agreed to perform additional works to the property. As the terms of agreement do not appear to encompass all the agreed repairs, it is appropriate for the financial firm to undertake all repairs it has previously agreed to. This includes, but is not limited to, the additional works recorded in its email correspondence dated 26 April 2016. The complainant’s claim for con tents cannot be assessed The complainant has raised a claim for contents but has failed to provide an itemised list to AFCA with replacement costs for the items claimed. Given this, AFCA has no ability to determine what items can be claimed under the polic y. It is also noted that the complainant has a duty to mitigate her loss and should take steps to protect her items from any damage. 2.2 What is the second issue? AFCA may award compensation for non-financial loss AFCA will only award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant‟s expectation of enjoyment or peace of mind. In assessing whether to award compensation for non-financial loss, AFCA expects the complainants to be moderately robust, bear the normal degree of inconvenience experienced when a problem occurs, and take reasonable steps to minimise the inconvenience suffered. The complainant is entitled to compensation for non-financial loss The financial firm engaged in a conciliation to resolve the dispute and within the terms of agreement itself, failed to adequately communicate its requirements to undertake repairs to the complainant. It then relied on the need to waterproof, which did not form part of the agreement, to refuse to undertake the repairs. This has unduly extended the time taken to resolve this dispute and required it to return to AFCA for a determination. Determination | Case number: 537421 Page 6 of 14 The delay has clearly had an impact on the complainant‟s peace of mind and interfered with her enjoyment of the property which over two years later is still unrepaired. After reviewing the course and conduct of the dispute, it is considered appropriate to maintain the award for $2,000. Determination | Case number: 537421 Page 7 of 14 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term a pplicant complainant financial services provider financial firm dispute complaint claim claim 3.2 Relevant Policy Terms Section 1 - Buildings and Contents What is covered We will cover your buildings and your contents for loss or damage from the events listed below. • Liquid that escapes from… a fixed pipe or something attached to a pipe, fixed gutter, fixed tank or a drain • Storm, rainwater, hail, or wind. This includes storm, rainwater, hail or wind damage to gates, fences or walls that are entirely or partly at the situation. We will not cover storm, rainwater, hail or wind damage: – where water enters your buildings through an opening made for any building renovation or repair work – where water enters your buildings because of a structural defect, faulty design or faulty workmanship when your buildings were constructed. Determination | Case number: 537421 Page 8 of 14 (Contents) • If you have insured your contents, we will pay for storage charges necessarily and reasonably incurred to protect them from further loss or damage following a claim by fire, storm or rainwater. • If you are unable to live at your situation after loss or damage has occurred, we will pay the reasonable costs to remove and store your contents while your situation is being repaired. We will pay this for up to 12 months. We will also cover your contents while they are in storage. We will only pay for this when you are unable to live at your situation. Additional things we will pay for when you have insured your buildings We will pay the costs necessary to meet the requirements of any statutory authority in connection with rebuilding or repairing the buildings at the situation… The most we will pay in any one period of insurance is $25,000. How we pay a claim for your buildings When loss or damage occurs to your buildings, we will pay the cost of rebuilding your buildings or repairing the damaged portions to the same condition as when they were new. We will also pay any additional costs required for your buildings to comply with government or local authority bylaws. We will not pay these additional costs if you were required to comply with these bylaws, and had not done so, before the loss or damage occurred. 3.3 Relevant correspondence and chronology of events Date Activity 16 - 07 - 2014 Assessment report obtained by insurer. 06 - 08 - 2014 Insurer‟s letter: “As per the reported findings … and in line with the noted policy wording the following portions of the claim have not been accepted:  Repairs to the storm water pipe that has caused the damage  Water proofing required at propert y  Drainage required at property These work s are maintenance related and do not fall under one of the listed insured events. … We recommend you engage a suitable tradesperson to attend to the maintenance work required to prevent further damage as liability will not be accepted for any future claims arising due to these issues not being addressed.” Determination | Case number: 537421 Page 9 of 14 Date Activity 07 - 08 - 2014 Insurer‟s email to broker informing only accepting resultant damage accepted. 27 - 10 - 2014 Insurer‟s email to broker outlining its position following a phone convers ation: There has been a leak in the stormwater which has led to some damage to the property. The following aspects are not covered by the claim:  repairs to the storm water pipe/drainage that caused the damage  waterproofing which is required at the property  drainage which we have been advised is required at the property  the concrete path - subsidence of this area did not occur within 72 hours of the leak ing storm water. 03 - 02 - 2016 Insurer‟s email to the complainant confirming the EFT transact ion completed and enquiring if all furniture from rumpus room is removed to commence work. Insurer‟s email to repairer:  enquiring if further damage has been identified  asking repairer to contact the complainant about when to commence works  providing update to complainant about moving forward wit h repairs. 04 - 02 - 2016 Conciliation call attended. Complainant said:  downpipe has already been redirected and sort ed.  she will arrange for a concreter to rectify the footpath within 4 weeks. Terms of agreement state the concret e path repairs to be completed are those identified by Calliden during its assessment of claim HH xxxxxx 11. Insurer said it will:  authorise repairs directly to the repairers and not offer cash settlements. However, they would like the insured to rectify the issues regarding the downpipe and the gap in the footpath.  authorise repairs ( as per quote xxx/ 1CC ) once concrete has been rectified.  authorise repairs ( as per quote 18138 ). 08 - 02 - 2016 Settlement terms issued to bot h parties. Insurer email to complainant:  confirming its receipt of terms of agreement  JL sent complainant approval paperwork to discuss with repairer about when the works can commence  PB has sent authority for her to complete and return to PB with policy excess payment of $300  insurer believes these are the three main areas covered by the agreement and all actions have been attended to as required by the insurer  insurer invit es complainant to contact it if repairer has not contacted her, as well as if there are any unreasonable delays in getting the works underway. 08 - 02 - 2016  Insurer confirmed it provided authority to repairer per quote 1CC. Repairer claims Determination | Case number: 537421 Page 10 of 14 Date Activity it sent complainant approval paperwork for work to discuss/commence.  Builder claims it sent complainant documents on 03 - 02 - 2016 to be complet ed and returned with $300 excess payment. 12 - 04 - 2016  Insurer moisture report obt ained. 18 - 04 - 2018  Insurer‟s claim notes indicate it authorised mould remediation works and flooring replacement to commence. 26 - 04 - 2016  Insurer‟s email to complainant confirming insurer regularly updated on the progress of works being attended to. 16 - 06 - 2016  Insurer‟s claim notes indicate complainant email enquiry to have bedroom carpet assessed as part of wat er damage claim.  PB certificate of satisfaction signed by complainant: I/We hereby certify that the reinstatement of damage situated at (address) has been carried out by PB to my/our satisfaction… 27 - 06 - 2016  Insurer‟s claim notes indicate JL waiting for walls to dry before painting. 15 - 09 - 2016  Insurer ‟s claim notes indicate it emailed JL seeking update of walls drying out and if complainant has done anything in this regard. 29 - 09 - 2016  Insurer‟s claim notes indicate JL plan to attend the natural drying of the wall, anticipates not going well given the wet weather.  In response, insurer requests JL to enquire with complainant what they intend to do with the external wall, if anything. 07 - 10 - 2016  JL still waiting for wall to dry before painting and replacing cupboards.  Next inspection due 05 - 10 - 2016. 10 - 10 - 2016  Insurer‟s claim notes indicate JL attended site, wall still damp, arranged R to attend and take further readings to det ermine if it is decreasing since last report. 22 - 12 - 2016  Insurer‟s claim notes indicate JL advised best to wait until next year to finish the job as moisture levels are still too high. 02 - 02 - 2017  Insurer‟s claim notes indicate updat ed report from JL received. 06 - 03 - 2017  Insurer obtained moisture report. 07 - 03 - 2017  JL email to insurer: on hold for nine months, awaiting moisture levels to drop.  Moisture report shows readings remain elevated.  Without some form of waterproofing the issue will exist at all times of the year.  JL are unable to carry out the works – suggests cash settlement per R report. Determination | Case number: 537421 Page 11 of 14 Date Activity 08 - 03 - 2017  Insurer‟s email to J L: complainant rejects cash settlement offer.  Insurer requests further details about the recommended waterproofing. 11 - 04 - 2017 Insurer email re wat erproofing: “ Can you please refer this back to JL to source a waterproofing contractor and obtain a quot e pleas e as this will be the only way we can finalise this work s and both close our files. Once I hear back I will tak e this to the insured and advise/recommend that we will be arranging for the water proofing to be applied so that the internal painting can be finish.” 19 - 04 - 2017  Insurer follow up to JL for waterproofing quote.  JL confirmed unsuccessful call to complainant made in attempt to attend to complete quote this week. 27 - 04 - 2017  JL email to insurer confirming voice message left for complainant and await return call to arrange inspection for next week hopefully. 11 - 05 - 2017  JL repairer report/quote obtained. 12 - 05 - 2017  Insurer email to complainant re waterproofing: not covered, i.e. maintenance related work.  Insurer not willing to pay $30k+ for waterproofing.  Insurer suggests a cash settlement to settle the claim. 02 - 06 - 2017  Complainant email to insurer to commenc e (previously mentioned) repairs. 05 - 06 - 2017  Insurer seeking complainant‟s clarification about what works she refers to.. 21 - 06 - 2017  Insurer follow up email to complainant for clarification. 03 - 07 - 2017  Complainant email to insurer seeking copy of original JL scope of works agreed upon to be completed. 03 - 07 - 2017  Insurer‟s email to complainant providing copy of quote. 31 - 07 - 2017  Insurer claim notes state: Due to no waterproofing of the external wall, internal wall will always contain level of moisture. We have waited for 6 months and it remains the same so JL cannot finish what they quoted - mainly painting and cupboards. I have a dvised insured that we will cash settle the balance… 06 - 09 - 2017  Insurer update to complainant re no response regarding quote.  Insurer proposes cash settlement considering of length of time passed. Determination | Case number: 537421 Page 12 of 14 Date Activity 16 - 10 - 2017  Complainant email to insurer demanding it to c omplete the work.  No works started or completed in the downstairs area since June/July 2014. 16 - 10 - 2017  Insurer email to complainant explaining the reason for settlement offer.  Insurer will raise payment in settlement of complaint. 16 - 10 - 2017  Complainant email to insurer rejecting cash settlement offer. 17 - 10 - 2017  Insurer acknowledging complainant‟s rejection of $8,000 payment but was unable to cancel it through the system.  Insurer inviting refund of payment if complainant maintains settlemen t offer. 3.4 Reports relied upon Report Key points A ( insurer ) Assessment report 16 - 07 - 2014  Complainant‟s son identified section of concret e paving had subsided considerably, dislodging from the original concret e paved section.  Discovery of water damage in adjacent rumpus room.  Identified disconnected downpipe/stormwat er connection allowing stormwat er discharge into surrounding soil areas, and flowing with the gradient of the concrete to the collapsed concrete path section.  Pungent musty odour apparent in ru mpus room.  Extensive efflorescent salt growth apparent and in line with the gradient of the land against the external side of wall.  Salt growth presents as aged with extensive “y ellowing” apparent – damage has been occurring for at least 2.5 months.  Simila r findings in the adjoining water closet.  Similar, but less severe, findings on the eastern wall.  Moisture readings show high to off the scale to all areas of salt growth.  Results consistent with rising damp.  Waterproofing member not installed to perimeter brickwork of the rumpus room, and likely no drainage, at time of construction.  Disconnected downpipe was major contributing factor to the severity of salt growt h and exceedingly high moisture content in brickwork.  Inspection of kitchen cabinetry located on east wall shows extensive and severe deterioration of back panel, further indicating moisture penetration has occurred for an extended period of time.  Garage pres ents with similar results (less severe than rumpus room); disconnected downpipe as major contributing factor.  Absence of waterproofing to sub - terrain habitable rooms is not uncommon for a home of this era.  External concrete path has subsided approximately 150mm.  Nil mesh reinforcement apparent below concre te paving.  Original concreted area also showing subsidence, and no sealant Determination | Case number: 537421 Page 13 of 14 Report Key points applied along the join to prevent surfac e water ent ry.  Repairs completed by previous owners apparent, suggesting moisture has been present and ongoing for a long time.  Disconnected downpipe below conc rete level is not visually accessible.  All evidence shows excessive moisture is penetrating through rumpus room east wall, originating from surrounding soils.  East rumpus room wall is exposed to far more water than any other lower level area.  Below ground stormwater pipe disconnection has discharged large volumes of water into surrounding soils, damaging walls and cabinetry.  internal damages to East and North walls and associated cabinetry cannot be rectified until appropriate waterproofi ng membrane and agricultural drainage is installed to all lower level perimeter walls below ground level as a matter of general maintenance.  Internal walls will not dry and damages will invariably reoccur unless these work s are undertak en.  All other remaining walls show minor to moderate efflorescent salt growth, attributable to rising damp and abs ence of waterproofing membrane and agricultural drainage.  Evidence of musty odour suggests microbial contamination is present in rumpus room. R (insurer) M oisture report 12 - 04 - 2016  Property had plumbing fixed and new conc rete laid at side of dwelling.  High moisture level detected on wall adjac ent to external concret e area.  Mould growth identified in carpet underlay.  Carpet and toilet vanity deemed unsalvageable due to mould growth.  Heavy treatment of mould affected vanity completed onsite.  Toilet wall adjacent to stairs has high moisture reading.  Recommend removal of carpet and associated parts and install dehumidifie rs and air movers for 5 - 7 days.  Unless appropriate drainage/waterproofing is in place moisture will continue to migrate through external rumpus wall.  Heavy mould growt h present on underside of upstairs ens uite flooring.  Area required to be cont ained off.  Upstairs ens uite tested – ensuit e floor has sunk and has a bounce. All trades to be provided safety precautions.  Structural drying and mould remediation required for upstairs ens uite.  Extensive scope of works listed for upstairs ensuite and bedroom – inclu des removal, remediation and disposal of non - salvageable walls, floors and finishes.  Builder should not commence work until post remediation verification report is provided.  Photographs attached. R (insurer) Moisture report  Service provided on behalf of JL to undertake moisture readings to bri ckwork: determine if levels increased since May 2016 and Oct 2016.  Moist walls remain elevated in moisture readings. Determination | Case number: 537421 Page 14 of 14 Report Key points 06 - 03 - 2017  Walls will not dry due to the ground level outside being higher than the basement walls.  Hydrostatic pressure forces the moisture from the ground to be pushed through to the brick.  Mechanic al drying in the sub floor void will only be a temporary solution.  Structural design issue identified.  Recommend paint to be stripped fr om the brick, water - proofing to be applied over the brickwork. JL (insurer) Repairer report 11 - 05 - 2017  Variation report requested due to no waterproofing of external wall.  Detailed required works listed.