Determination 537263

Cash settlement amount and scope of water and mould damage repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2019-02-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$36,847
Non-financial loss$3,000
Amount claimed—
SourceAFCA PDF

Summary

An insured sought repairs for water and mould damage after an insurer cash settlement offer of $18,381.48. AFCA ordered a cash settlement of $32,971.30 for property damage, plus $3,000 non-financial loss, laundromat costs of $1,674 and mould report costs of $2,202, totalling $39,847.29.

Where the relationship has broken down, the insurer's discretion to settle by cash must still give enough for the insured to repair, and the insurer failed to properly address mould evidence.

Issues

Subjects and remedies

health or medicalhome or building damagepay claimpay compensationpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 537263 Page 1 of 9 Determination Case number: 537263 14 January 2019 1 Determination overview 1.1 Complaint The complainant lodged a claim under her home insurance policy with the financial firm (insurer), after the washing machine in her laundry flooded in December 2016. The insurer accepted the claim and sought to arrange for the repair of the property. During the assessment process, the insurer’s contractors identified an unrelated leak from a water pipe under the laundry trough which had caused additional damage. The insurer agreed to include the repair of this damage as part of the claim. The complainant and the insurer were unable to agree on the scope of works for t he repairs (including the extent of mould remediation). The insurer offered to cash settle the claim for a total of $18,381.48, based on quotations provided by its contractors. The complainant says the cash settlement offered is not sufficient to repair all of the damage to the property caused by the water leaks. She wants the insurer to undertake the repairs and mould remediation), in accordance with a scope of works prepared by her preferred contractor. 1.2 Issues and key findings Can the insurer cash settle the claim? Given the breakdown of the relationship between parties, it is appropriate that the claim be cash settled . Is the insurer required to increase the cash settlement amount? The insurer is required to increase the cash settlement for property damage (including mould remediation) to $32,971.30, to better reflect the cost to the complainant of repairing the damage caused by the escape of water events. Is the complainant entitled to any other amounts? The complainant is entitled to compensation for financial and non-financial loss, plus reimbursement for the cost of obtaining her mould reports . Determination | Case number: 537263 Page 2 of 9 1.3 Determination This determination is substantially in favour of the complainant. The insurer is required to pay the complainant the amount of $39,847.29 in full and final settlement of her claim. Determination | Case number: 537263 Page 3 of 9 2 Reasons for determination 2.1 Can the insurer cash settle the claim? Policy outlines how claims will be settled Under the terms of the policy, the insurer may settle a claim for damage to the property by:  repairing the damage to the property, or  paying the complainant the reasonable cost of the repairs. It is clear from the terms of the policy that the insurer has the discretion to decide which settlement method to adopt. However, AFCA expects an insurer to act reasonably in exercising the discretion provided under the policy, having regard to the circumstances of the claim. In the present case, the insurer initially elected to repair the damage to the property caused by the escape of water from the washing machine. Accordingly, the insurer arranged for its builder (JP) to attend the property and prepare a scope of works for the repairs. Once an insurer makes an election to repair the insured property (rather than cash settle the policyholder for the cost of repairs), it is generally obliged to complete the repairs in accordance with the terms of the policy. However, particular circumstances may arise which make the conduct of repairs by an insurer untenable. In such cases, it is reasonable for the claim to be cash settled, provided the cash settlement amount is sufficient to allow the policy holder to engage their own contractors to undertake the necessary repairs. Relationship between the parties has broken down As outlined above, the parties were unable to agree on the scope of works for the claim-related repairs. The main issue in dispute concerned the extent of mould remediation required, given the conflicting reports provided by each party’s mould hygienist. In her recommendation issued in November 2018, the AFCA case manager recommended that a further mould assessment be undertaken to confirm the extent of mould contamination to the property, following which the insurer would be required to complete the necessary repairs. Determination | Case number: 537263 Page 4 of 9 The recommendation outlined a process by which the complainant would choose the mould assessor to undertake the further assessment from among three qualified mould assessors identified by the insurer, who had not been involved in the claim to date. The complainant rejected the recommendation because she was not satisfied that any mould assessors nominated by the insurer would be independent and unbiased. She sought to have the further mould assessment conducted by her preferred hygienist. I acknowledge that the complainant holds genuine concerns regarding the conduct of the insurer and its contractors during the course of the claim. However, I am satisfied that the process outlined in the recommendation was fair in the circumstances. Where the insurer undertakes repairs, it guarantees the quality of the repairs for the lifetime of the property. In these circumstances, it is appropriate that the insurer have input into the choice of the contractors involved in the repairs. In any event, having reviewed the claim history, I am concerned that the lack of trust between the parties means that any process which requires their ongoing co- operation is unlikely to lead to a successful resolution of the claim. Claim should be cash settled In the circumstances, I consider that the only feasible manner by which the claim can be resolved is by way of a cash settlement. However, the cash settlement amount should be sufficient to ensure that the complainant is able to engage her own contractors to repair all of the damage to the property caused by the two water leaks. While there is some uncertainty about the extent of the repairs required, I am satisfied it is possible to determine a settlement amount which is fair in all the circumstances, taking into account the various contingencies. 2.2 Is the insurer required to increase the cash settlement amount? Insurer’s settlement offer was based on quotations obtained Among other items, the cash settlement amount of $18,381.48 offered by the insurer included among other things:  $9,217.98, being the estimated cost of repairing the damage caused by both leaks based on a scope of works and quotation prepared by the insurer’s builder (AJ) in September 2017 Determination | Case number: 537263 Page 5 of 9  $3,150, being the cost of replacing the gas central heating ducts throughout the property, based on a quotation provi ded by the complainant’s supplier (MH) in August 2017  $3,975 for the replacement of carpet in the lounge and hallway, based on a quotation provided by the insurer’s carpet supplier (CC) provided in December 2017  $250 for additional costs incurred during the drying process, and  $1,000 for water damage to furniture. The scope of works prepared by the insurer’s builder (AJ) included the replacement of the laundry trough cabinet which had been damaged by the leaking water pipe discovered in April 2017, as well as the section of the wall, tiled splashback and skirting board in the vicinity of the damaged cabinet. AJ’s scope of works also included the removal of the plasterboard wall in the laundry affected by the leak from the washing machine, as well as those sections of the hallway and family room walls that backed onto the laundry. The insurer added the hallway and family room walls to its initial scope of works after the complainant raised concerns about damage to these areas, based on her mould hygienist’s report. The insurer also allowed for the re-ducting of the gas central heating to address possible mould contamination. AJ’s scope of works includes an allowance of $1,000 for mould remediation to the timber stud walls, if mould is discovered following removal of the plaster wall linings. However, the cash settlement offered by the insurer does not otherwise provide for mould remediation. Complainant says cash settlement is insufficient The complainant says the cash settlement amount is not sufficient to repair all of the damage to her property caused by the two water leaks, including mould contamination. The complainant’s submissions suggest the cost of repairing the damage to the property is approximately $35,000, taking into account the costs of safely removing the carpet, painting the walls, replacing the air conditioning ducts and obtaining a post-remediation verification certificate. This estimate is based on various quotations including:  a quotation for $12,800 provided by the complainant’s supplier (DB) for a ‘laundry rebuild’,  a quotation for $7,012.27 for mould remediation provided by the insurer ’s restoration contractor (ST) in June 2017, and Determination | Case number: 537263 Page 6 of 9  the insurer’s quotations for the replacement of the carpet and gas central heating ducts (as referred to above). It is unclear exactly what DB’s quotation includes, as a copy has not been provided. However, it appears that, among other things, the complainant is seeking cover for the cost of gutting and replacing the built-in cupboards in the laundry (as well as the laundry cabinet trough). Insurer is required to pay complainant $32,971.30 for property damage The quotation of $9,217.98 provided by the insurer’s builder (AJ) for the building repairs was not an actionable quotation (that is, it was provided for the purposes of the cash settlement only). In these circumstances, I consider that AJ’s quotati on should be increased by an additional 20% ($1,843.60) to a total of $11,061.58, to more appropriately reflect the cost to the complainant of undertaking these works. The cash settlement amount should also include the quotation for $7,012.27 provided by the insurer’s restoration contractor (ST). ST provided a scope of works and a quotation for remediation works to address the mould growth caused by the leaking pipe under the laundry trough discovered in April 2017. This mould is clearly visible in photographs taken at the time. ST’s quotation includes an allowance of $1,500 for post -remediation verification. However, the total amount quoted by ST is not necessarily sufficient, as he noted that further damage to the laundry may be identified once the works were underway and advice about remediation of the lounge room was also required. The cash settlement amount should also include the amounts of $3,150 (heating ducts), $3,975 (carpets) and $250 (electricity) offered by the insurer. The key additional item which needs to be addressed is the extent of any further repairs required to address mould growth caused by the overflow of water from the washing machine in December 2016. The insurer initially declined cover for mould remediation works based on a report from its mould hygienist (BT). Tests carried out by BT indicated that any mould at the property did not exceed normal levels. However, the complainant’s hygienist (MX) engaged an independent testing laboratory (ML) to test samples of the wall plaster and smooth edge. The results of these tests identified very high levels of mould in these areas. Determination | Case number: 537263 Page 7 of 9 Further, it is unclear why BT’s tests did not identify the presence of mould in the laundry, given the visible mould subsequently discovered on the rear wall of the laundry trough cabinet. The report provided by the complainant’s hygienist (MX) includes comments about the additional works he considered would be required to address the mould issues. However, MX did not provide a detailed scope of works or a quotation for mould remediation. Having carefully reviewed the reports and other information provided, and taking into account the works included in AJ and ST’s scope of works, I consider the cash settlement amount should be increased by an additional $5,000 (to $30,448.85) to take into account any further works required as a result of mould contamination. A further buffer of 5% ($1,522.44) should be included to take account of the fact that the complainant will not have the benefit of the life time guarantee whic h would have applied under the policy (had the insurer carried out the repairs). The insurer is also required to pay the complainant the amount of $1,000 offered for damage to her furniture caused by the overflow of water from the washing machine. Based on the above, the total cash settlement amount in respect of property damage is $32,971.30. The insurer is not required to pay interest on this amount. 2.3 Is the complainant entitled to any other amounts? We may award compensation for financial and non-financial loss The FOS Terms of Reference provides that we can award compensation for non- financial loss (of up to $3,000) where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with a complainant’s expectation of enjoyment or peace of mind. We can also award compensation (capped at $3,500) for consequential financial loss suffered by a complainant in connection with their claim. Complainant is entitled to compensation of $3,000 for non-financial loss Having carefully reviewed the claim history, I am satisfied that the complainant has suffered significant stress and inconvenience due to the insurer’s failure to adequately address the mould issues caused by the escape of water events. As outlined above, the insurer relied on a report provided by BT (a highly qualified mould specialist) which concluded that there was no mould at the property (above normal levels), following the overflow of water from the washing machine. The insurer sought comments from BT on the conflicting report provided by the complainant’s hygienist (MX). However, the insurer (and BT) failed to properly Determination | Case number: 537263 Page 8 of 9 address the fact that laboratory testing of samples from the property had identified mould growth. Further, the insurer had previously informed the complainant that a third mould assessor would be engaged if there was a conflict between the findings of MX and BF. However, the insurer did not comply with its undertaking to appoint a third assessor. The insurer’s contractors subsequently id entified mould growth from the leaking water pipe in the laundry. However, the insurer’s approved scope of works did not provide for mould remediation, contrary to the advice of its restoration contractor (ST). The insurer was aware from early on in the claim process that the complainant was concerned about mould at the property, due to her daughter’s medical conditions. The insurer’s failure to properly address the mould issues delayed the progress of the claim and caused additional stress and inconvenience for the complainant. In these circumstances, the insurer is required to pay the complainant the amount of $3,000 as compensation for non-financial loss. Complainant is entitled to compensation for non-financial loss The complainant seeks compensation of $1,674 ($18 per week) for the costs of using a laundromat while the laundry was unavailable. The insurer has previously offered to pay $585 for a shorter period, reflecting on offer made earlier in the claims process. The washing machine at the complainan t’s property was not replaced, pending completion of the outstanding repairs. In the circumstances, I consider the insurer should be required to pay the complainant the amount of $1,674 claimed, given the delays in progressing the claim. Complainant is entitled to reimbursement of fees Under the AFCA Terms of Reference, we may require a financial firm to reimburse a complainant for professional costs incurred during the course of their complaint. The mould reports and testing of samples obtained by the complainant assisted in identifying the presence of mould at the property, which was subsequently confirmed by the insurer’s contractors. Accordingly, the insurer is required to reimburse the complainant for the total amount of $2,202 incurred for mould reports and testing. Determination | Case number: 537263 Page 9 of 9 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 AFCA approach to this complaint This complaint was the subject of a recommendation issued on behalf of AFCA on 8 November 2018. The complainant rejected the recommendation. This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered (whether or not it is expressly referenced in this determination)