Home / Financial Firm (Unknown - Insurer) / Determination 535643

Determination 535643

Cash settlement adequacy for leaking-pipe building damage and claimed loss of rent

FirmFinancial Firm (Unknown - Insurer)
Decided2019-04-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$58,400
Non-financial loss$2,000
Amount claimed$40,000
SourceAFCA PDF

Summary

Owner-occupiers claimed for leaking-pipe damage to their home and sought lost rental income during a prolonged claim. AFCA found the cash settlement of $60,400 fair, rejected the rent claim, and ordered $2,000 for non-financial loss.

The settlement amount reflected reasonable repair costs, and loss of rent was not payable because the home was only uninhabitable while temporary accommodation was already paid.

Issues

Subjects and remedies

home or building damagepay claimpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 535643 Page 1 of 11 Determination Case number: 535643 3 April 2019 1 Determination overview 1.1 Complaint In April 2014, the complainants lodged a claim under their home insurance policy for cracking and movement damage to their home caused by water leaking from a broken pipe in their main bathroom. The insurer delayed repairs for over two years to allow the soil to dry out. During this period, the kitchen waste pipe was also found to be leaking. In November 2016, the insurer appointed a new engineer who recommended a further 12 month drying out period. The insurer has accepted liability for damage to the home caused by the leaking pipes and has offered to cash settle the complainants for $60,400 (including $2,000 as compensation for non-financial loss). The insurer has also paid the complainants $20,800 in temporary accommodation benefits. The complainants are dissatisfied with the settlement offer as they consider it does not fully compensate them for the losses they have suffered during the claim process. In particular, the complainants seek payment for the loss of rental income from the property during the lengthy period for which the repairs were delayed. 1.2 Issues and key findings Is the insurer’s settlement offer for building repairs appropriate? The cash settlement amount for the building repairs reflects the reasonable cost to the complainants of repairing the damage to their property caused by the leaking pipes. Accordingly, the insurer is not required to increase this amount. Are the complainants entitled to further payment for loss of income? While the insurer handled the claim poorly, it has paid the complainants temporary accommodation benefits for the period during which their property was uninhabitable. The insurer is not required to compensate the complainants for loss of rent during the period while the property was able to be lived in. Determination | Case number: 535643 Page 2 of 11 1.3 Determination This determination is substantially in favour of the financial firm (insurer). The insurer is required to pay the complainants the amount of $60,400 in full and final settlement of their claim. Determination | Case number: 535643 Page 3 of 11 2 Reasons for determination 2.1 Is the insurer’s offer of settlement appropriate ? Claims process has been long and protracted The complainants’ claim has been ongoing for a number of years. A brief summary of the key events which occurred during the claim process is set out below. Further details are provided in section 3.3 . In April 2014, the complainants lodged a claim for cracking and movement damage caused by a water leak. The pipe under the shower in the main bathroom had separated from the shower riser, allowing water to leak under the house . The insurer accepted the claim but delayed the repairs to the cracking and movement damage on the advice of its engineer (MP), who recommended that a suitable period be allowed for the soil to dry out. The initial twelve month drying out period recommended by the insurer’s en gineer (MP) was extended by another six months in April 2015 and a further six months in November 2015. During this period, the complainants did not repair the leaking pipe but used their en suite bathroom instead. Prior to any repairs being carried out, a leaking sewer pipe was discovered under the floor of the storeroom next to the main bathroom. The insurer accepted that the second leak may have been related to the initial leak. Accordingly, the insurer agreed to repair the sewer pipe and to cover any additional damage to the home caused by the second leak. In June 2016, the insurer’s engineer (MP) advised that the bulk of the cracking and movement damage had been caused by seasonal earth movement, rather than by the leaking pipes. In response to the co mplainants’ concerns about MP’s advice , the insurer appointed a second engineer (MB) to attend the property and report on the cause of the damage. MB was critical of MP’s methodology and disagreed with his findings. In summary, MB concluded that most of the cracking and movement damage to the south side of the house had been caused by the leaking pipes. After a further twelve month drying period which ended in November 2017, MB prepared a scope of works for the repair of the claim-related damage. The insurer obtained a quotation from its builder (UT) for the necessary repairs. In response to the complainants’ concerns that UT’s quotation did not include all of the damage caused by the leaking pipes, the insurer appointed MB to carry out a further inspection. Determination | Case number: 535643 Page 4 of 11 In May 2018, MB provided a detailed report outlining his conclusions as to the cause of damage for each of the additional items raised, together with a revised scope of works. The insurer’s builder (UT) provided a revised quotation of $41,716 for the repairs. Insurer has offered to cash settle claim for $60,400 As outlined above, the insurer has accepted liability for damage to the property caused by the leaking pipes. During the course of this complaint, the insurer offered to cash settle the claim for a total of $60,400. This offer represented a significant increase from the initial offer of $39,650 made in August 2018. The insurer says the claim should be cash settled because its builder is unable to guarantee the claim-related repairs due to pre-existing issues with the property (including its ongoing susceptibility to naturally occurring earth movement). The insurer’s cash settlement offer of $60,400 included:  the amount of $41,716 quoted by UT for the claim-related repairs  a builder’s margin of 19%  an additional allowance of 20% to allow for any unforeseen expenses  an amount of $2,000 as compensation for delays experienced during the claim. Complainants consider offer for building repairs is appropriate When the complainants initially lodged their complaint, they wanted the insurer to carry out the repairs to the property. Among other things, the complainants were concerned that:  the scope of works approved by the insurer did not include all of the damage to the property caused by the leaking pipes, and  the settlement amount offered would not be sufficient to cover the costs to them of engaging their own contractors to complete the repairs (and co-ordinating this process). As noted above, the insurer subsequently increased its offer to include a builder’s margin of 19% and an additional allowance of 20%. In response, the complainants confirmed that they considered the insurer’s revised offer of $60,400 to be appropriate to cover the cost of repairs, as well as the additional stress and inconvenience associated with arranging the repairs. However, the complainants rejected the settlement offer because it did not include any additional amount for loss of rental income. Determination | Case number: 535643 Page 5 of 11 Settlement offer for building repairs is fair and reasonable Having carefully reviewed the available information, the panel considers the insurer’s settlement offer for the building repairs is fair and reasonable in the circumstances. The panel accepts that it is appropriate for the claim to be cash settled, given the evidence of pre-existing cracking and movement damage to the property. As outlined above, the insurer’s engineer (MB) confirmed that the leaking pipes under the bathroom and the storeroom floor had caused cracking and movement damage to areas in the immediate vicinity. However, MB also observed prior repairs to cracks in the lounge and dining rooms, as well as additional damage in areas which were remote from the leaking pipes. While the complainants said the scope of works should be expanded to include this damage, MB concluded it had not been caused by the leaking pipes. MB advised that the property will continue to be affected by long-term seasonal earth movement, due to the manner in which it has been constructed (using non-articulated brickwork on concrete strip footings) and the reactive clay foundation soils. The panel is satisfied that the scope of works approved by the insurer generally reflects the extent of the damage caused by the leaking pipes, which is confined to the south side of the property (being the shaded area shown in the diagram included in MB’s report s). It is reasonable for the repair of the claim-related damage to include the cornices and cracking to the reverse side of the affected walls. However, the panel is not satisfied that all of the other items of damage identified by the complainants were caused by the leaking pipes (for example, the sagging of the store room ceiling and the cracking and movement in the master bedroom and front entry). T he complainants’ builder (OR) has confirmed that there was no further movement of the underpins that had been installed in 2011. However, this does not of itself establish that all of the current damage to other areas of the property was caused by the leaking pipes. The panel accepts the conclusion s of the insurer’s engineer (MB) regarding the cause of damage to the disputed items. MB’s reports provided a detailed and logical explanation of how the disputed damage occurred, which is consistent with the observed facts. The panel considers the quota tion provided by the insurer’s builder (UT) provides a reasonable basis for the insurer’s cash settlement offer. The quotation was originally provided in circumstances where it was envisaged that UT would undertake at least some (if not all) of the repairs. Based on the available information, the panel is satisfied that the location of the property (75 kilometres from Adelaide) will not significantly increase the costs of the repairs, given the nature of the works involved. Determination | Case number: 535643 Page 6 of 11 Having regard to the factors outlined above, the panel considers that the additional buffer of 20% (in addition to the builder’s margin) included in the settlement offer is appropriate to provide for any extra costs the complainants may incur due to the claim being cash settled. Such costs may include:  any minor items of claim-related damage which have not been included in the scope of works (together with any other variations which may be required during the course of the repairs)  the additional costs to the complainants of engaging their own contractors, in the absence of the volume discounts and rebates available to the insurer  the fact that the complainants will not have the benefit of the life time guarantee which would have applied under the policy, had the insurer carried out the repairs, and  any increase in costs since UT ’s revised quotation was provided in May 2018. Accordingly, the insurer is not required to increase the cash settlement offer for the building repairs. 2.2 Are the complainants entitled to further payment for loss of income? Insurer paid complainants temporary accommodation benefits for 12 months The policy provides cover for temporary accommodation costs where the damage to the property caused by an insured event is so extensive that the policyholder is unable to live in it. Under the terms of the policy, temporary accommodation costs are payable for the time it takes to repair the property, up to a limit of twelve months from the date the damage occurred. The complainants remained living in the property after the leaking water pipe from the bathroom shower was discovered in April 2014. The leak became apparent after the complainants started using the main bathroom while undertaking renovations to their en suite. The claim notes reflect that the complainants rejected the insurer’s offer of a temporary en suite and used the outdoor shower instead, until the renovations to the en suite had been completed. They did not repair the leaking pipe in the main bathroom but continued to use the en suite. After the leaking sewer pipe was discovered in April 2016, the complainants moved out of the property into an unoccupied property owned by their parents (the V Property). The complainants have continued to live in the V Property and have not returned to their own property, even after the insurer repaired the sewer pipe in March 2017). Determination | Case number: 535643 Page 7 of 11 The insurer has paid the complainants temporary accommodation benefits of $20,800. This amount reflects their maximum entitlement under the policy, based on the estimated market rental of $400 per week for the V Property. Complainants seek additional payment for loss of income The complainants say the amount paid by the insurer does not fully compensate them for the loss of income they have suffered due to the delays experienced during the claim process. The complainants say the insurer and its contractors mishandled the claim during the initial two year period (from April 2014 to 2016). Among other things, the complainants say:  the insurer failed to act on the recommendations provided by its original engineer (MP) to test all pipes at the property (to identify any further leaks) and to carry out level surveys to provide a baseline against which to monitor future movement, and  the subsequent brickwork surveys undertaken by MP were inaccurate and his inconsistent advice and recommendations for extended drying periods further delayed the claim. The complainants say that, as a result of the extended delay in resolving their claim, they have lost an additional amount of approximately $40,000 in rent, due to their inability to rent out the insured property (or the V Property). While the policy limits the maximum amount payable for temporary accommodation, this does not preclude the award of an additional amount for losses suffered as a result of the insurer’s poor claims handling (rather than the insured event itself). Poor claims handling contributed to delays The insurer has acknowledged that it failed to act on MP’s recommendation to carry out a full inspection of the pipes in April 2014. However, the effect of this failure is unclear. It is possible the leaking sewer pipe would have been discovered had further testing been carried out at the time. However, it is also possible the leak did not occur until later (given the bad smell which precipitated the discovery of the leak did not become apparent until April 2016). The panel also accepts that the advice provided by MP was i nconsistent and inaccurate. A proper analysis of the damage caused by the leaking pipes was not carried out until after MB was appointed in November 2016. Given the nature of the damage, it is likely that an extended drying out period would have been required before the internal repairs could commence. Nevertheless, the panel considers the inadequate advice provided by MP has further delayed the resolution of the claim. Determination | Case number: 535643 Page 8 of 11 Complainants are not entitled to additional payment for loss of income The panel is satisfied that the complainants have suffered additional stress and inconvenience as a result of the manner in which the insurer handled the claim. The insurer’s cash settlement offer of $60,400 includes an amount of $2,000 as compensation for the non-financial loss suffered by the complainants. The panel considers this amount is appropriate. However, the panel is not satisfied that the complainants have suffered a loss of rental income due to the delay in resolving their claim. As outlined above, the complainants were living in the insured property as owner occupiers when the damage occurred. There is no information to suggest they were intending to sell or lease this property. The complainants moved into the V Property when the insured property became uninhabitable due to the broken sewer pipe. The sewer pipe carried kitchen waste, which meant the kitchen could not be used until the pipe was repaired. The insurer arranged for the sewer pipe to be repaired in March 2017, which meant the property was once able to be lived in again from this date. The cracking and movement damage caused by the leaking pipes was not such as would make the property uninhabitable. On this basis, the property was only uninhabitable from April 2016 until March 2017. The insurer has paid the complainants temporary accommodation benefits for this period (reflecting the market rent payable for the V Property). Once the sewer pipe was repaired, the complainants could have moved back into the insured property (which would have left the V Property available for rent). The insurer is not liable for any loss of income which occurred as a result of the insured property being left empty in circumstances where it was able to be lived in. Accordingly, the insurer is not required to pay the complainants any additional amount to compensate them for loss of income. Determination | Case number: 535643 Page 9 of 11 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previ ously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 Our approach to this complaint This complaint has not been the subject of a recommendation. Due to the nature of the complaint, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the FOS Terms of Reference. The panel consists of an Ombudsman and two representatives with consumer and insurance experience. The panel has decided this complaint based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. 3.3 Chronology of key events Date Action Determination | Case number: 535643 Page 10 of 11 Date Action Late 2011  Complainants underpinned the area around the chimney at the front of the property to address cracking and movement issues.  These works were undertaken on the advice of the complainant’s engineer (SH) who concluded that the chimney footings were too small. No insurance claim was lodged. April /May 2014  Complainants lodged claim under home insurance policy for cracking and movement damage caused by leak from pipe under shower in main bathroom. Insurer accepted claim.  Insurer’s engineer (MP) recommended a t welve month drying out period, testing of all pipes at the property and level surveys to provide a baseline for monitoring of future movement. May 2015  Insurer’s engineer (MP) re - attended property and carried out perimeter brickwork level surveys.  MP advised the soil had not yet dried out and therefore the building had not yet stabilised. He queried whether the leak was the cause of the damage and recommended a further six month drying out period. November 2015  Insurer’s engineer (MP) re - attended property an d carried out a further perimeter brickwork level survey. He advised the building had not yet stabilised from the potential influence of the bathroom leak.  MP considered the movement at the property was being caused by a number of factors and recommended a further six month drying out period. April 2016  Complainants notified insurer of bad smell. Insurer’s plumber (PP) identified a broken sewer drain under the floor of the store room next to the main bathroom.  Complainants moved out of home into an unoccu pied property owned by a family member . June 2016  Insurer’s engineer (MP) re - attended and carried out a furt her perimeter brickwork level survey. He advised that there had been minimal additional movement over the previous thirteen months.  MP concluded that the bulk of the cracking and movement damage had been caused by naturally occurring eart h movement due to seasonal changes in the moisture content of the surrounding soils (and not by the leaking pipes). October 2016  The complainants ch allenged the findings in MP’s report that the bulk of the damage to the property was caused by seasonal earth movement. They provided a report from their builder (OR), stating that no additional movement had occurred in the area which was underpinned in 20 11 prior to the leak being discovered in 2014. November 2016  The insurer appointed a second engineer (MB), who disagreed with MP’s findings. MB carried out a floor level survey and confirmed that the leaking pipes had caused cracking and movement damage t o the property.  M B prepared a scope of works which he considered should be completed as ‘a bare minimum’ to address this damage.  MB noted that there was ongoing dampness to the soil, even though the property had been vacant for some time. He recommended a further drying period be allowed before repairs commenc ed. Determination | Case number: 535643 Page 11 of 11 Date Action March 2017  The insurer’s plumber (PP) repaired the broken sewer drain. November 2017  The insurer’s engineer (MB) re - attended the property and carried out a further floor level survey.  MB conc luded that the movement caused by the leaks had stabilised and therefore repairs could be carried out (although movement caused by the long - term effects of seasonal variations in the moisture cont ent of the soil would continue to occur).  MP prepared an upd ated scope of works for the repair of the cracking and movement damage caused by the leaking pipes. January 2018  The insurer’s builder (UT) prepared a scope of works and quotation of $39,650 for the claim - related repairs, which excluded certain items of damage. UT also advised that it was unable to warrant some of the repairs due to pre - existing issues, including seasonal eart h movement. March/April 2018  The insurer’s assessor (JL) and engineer (MB) carried out a further assessment of the property, after the complainants raised concerns about various items omitted from UT’s scope of works. May 2018  The insurer’s engineer ( MB ) prepared a report setting out his conclusions as to whether each of the additional items of damage raised by the complainants had been caused by the leaking pipes.  MB provided an updated scope of works for the claim - related repairs, reflecting his conclusions about the cause of the damage.  The insurer’s builder (UT) prepared an updated scope of works and quot ation for $41,716 for th e claim - related repairs. June /July 2018  Insurer paid complainants $20,800 for temporary accommodation benefits.  Insurer offered to complete claim - related repairs which could be guaranteed by its builder and cash settle complainant for estimated cost of co mpleting remaining claim - related repairs. August 2018  Insurer provided revised offer to cash settle complainants for the estimated cost of completing all the claim - related repairs ($36,650) .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.