Liability for further damage to en suite following claim-related resin injection repairs
Text of the determination
Determination | Case number: 535425 Page 1 of 10
Determination
Case number: 535425 26 February 2019
1 Determination overview
1.1 Complaint
The complainant’ s home was damaged when a motor vehicle accidentally collided
with the front of the house in June 2012. The damage was repaired by the insurer of
the motor vehicle, after the complainant sought to recover from the driver.
In May 2014, the complainant lodged a claim under his home insurance polic y with
the financial firm (insurer) for cracking and movement damage to his house. The
insurer accepted the claim, on the basis that the damage had been caused by water
leaking from a storm water pipe which was broken during the accident in 2012.
The insurer arranged for the repair of the cracking and movement damage, including
resin injections to stabilise the foundations in the affected area. A second set of resin
injections were carried out in mid-2017, after further cracking occurred.
The complainant says the property has suffered additional damage since the second
set of resin injections were completed. He wants the insurer to repair the damage and
take further works to minimise any further issues in the future. The complainant is
also dissatisfied with the insurer’s handling of his claim.
1.2 Issue and key findings
Is the insurer liable for the additional damage to the property?
On the balance of probabilities, the damage to the en suite was caused by the resin
injections (based on the reports provided and given the nature, location and timing of
the damage). As the resin injections were carried out in the course of the claim-
related repairs, the insurer is liable for the additional damage.
Is the insurer required to undertake further works?
The reports provided indicate that resin injections (in the manner used at the property)
create a risk of future differential movement between the treated and untreated
sections of the foundations. Given the ongoing damage to the property and the advice
provided, the insurer is liable for the cost of installing articulation joints to address this
risk.
Determination | Case number: 535425 Page 2 of 10
Is the complainant entitled to any additional amounts?
The complainant is not entitled to any additional amounts, given the co mpensation
paid by the insurer to date.
1.3 Determination
This determination is in favour of the complainant.
The insurer is liable for the cost of repairing the additional damage to the en suite and
installing articulation joints at the property. The insurer is to cash settle the
complainant for these amounts, as determined in accordance with the process set out
in sections 2.1 and 2.2 below.
Determination | Case number: 535425 Page 3 of 10
2 Reasons for determination
2.1 Is the insurer liable for the additional damage to the property?
Insurer accepted liability for damage to master bedroom in 2014
The claim lodged by the complainant in May 2014 concerned cracking and movement
damage to the master bedroom, which is situated in the south-west corner of the
home.
The insurer’s engineer (CC) concluded that the damage had occurred due to
foundation movement caused by the effects of water leaking from a broken
stormwater drain located directly adjacent to the master bedroom.
The insurer’s plumber (MC) advised that the terra cotta storm water drain would not
break easily and referred to photographs taken in May 2012, which showed bricks
dislodged by the motor vehicle accident scattered around the affected pipe.
Based on CC and MC’s reports , the insurer accepted that the damage to the pipe had
been caused by the accident in May 2012. Accordingly, it accepted liability for the
cracking and movement damage to the master bedroom.
The insurer did so even though photographs taken at the time of the accident
indicated there was pre-existing cracking and movement damage to this area of the
home. Given the date of the photographs, the damage shown could not have been
caused by the accident.
After allowing a suitable drying period, the insurer’s contractors completed repairs to
the affected area. The repairs included resin injections underneath sections of the
perimeter foundations at the affected corner of the house, as well as cosmetic repairs
to the internal and external walls.
Complainant says resin injections caused damage to en suite
In February 2016 (approximately six months after the repairs had been completed),
the complainant notified the insurer of a squeaky floor in the master bedroom. The
in surer’s builder (AB) attended the property and advised that the issues with the floor
may be related to the resin injections.
Several months later, the complainant noticed minor cracking to the internal wall
linings in the master bedroom. The insurer’s engineer (CC) advised that this damage
had most likely been caused by minor settling of the foundations following the resin
injections.
The insurer accepted CC’s recommendation that a seco nd set of resin injections be
carried out in the same area to further stabilise the foundations. These injections were
Determination | Case number: 535425 Page 4 of 10
completed in July 2017, following which the insurer’s builder ( AB) repaired the
cracking damage to the master bedroom.
While AB was completing these repairs he noticed damage to the en suite bathroom ,
which is directly adjacent to the master bedroom.
This damage included fractured grout lines in the shower recess which had allowed
water to leak, causing efflorescence to the floor tiles. There was also a cracked wall
tile near the window. AB advised that the en suite would need to be stripped out and
replaced.
During the course of this complaint, the complainant advised that there has been
further cracking damage to the en suite. He considers all of the current damage has
been caused by the second set of resin injections carried out by the insurer in July
2017.
The complainant says the insurer should be required to rectify the damage to the en
suite and undertake further works (under the guidance of an independent structural
engineer) to ensure that any future movement will be negligible.
The insurer says it is not liable for repairing the damage to the en suite or undertaking
any further rectification works, because the additional damage was not caused by the
resin injections.
The insurer says the cracking damage to the wall tiles was due to naturally occurring
earth movement, while the damage to the floor was caused by inadequate water
proofing of the shower. The policy excludes cover for damage caused in this manner.
Consultants have provided conflicting opinions about cause of damage
After the complainant sought cover for the damage to the en suite, the insurer
appointed an engineer (JE) and a building consultant (CM) to determine the cause of
the damage.
The insurer’s consultants advised that the cracking damage to the wall tiles had been
caused by differential foundation movement due to naturally occurring changes in the
moisture content of the soils at the property. They noted that the internal damage was
consistent with cracks in the external brickwork.
JE advised that changes in the moisture content of the soil were due to poor surface
drainage affecting the area outside the en suite. JE noted that the brick paving
outside the en suite contained gaps, allowing water to penetrate the surrounding soil.
The paving also sloped towards the building, allowing water to enter the sub-floor
area through the wall vents.
JE initially identified a tree on the nearby nature strip as contributing to the differential
earth movement, due to the drying effect of tree roots on the surrounding soils.
Determination | Case number: 535425 Page 5 of 10
However, he has since accepted that the tree is unlikely to have had any impact,
based on the results of soil testing carried out by the complainant’s geotechnical
engineer (GC).
The insurer’s building consultant (CM) concluded that the damage to the floor tiles
had been caused by the design and construction of the en suite, following renovations
several years earlier.
CM advised that the building work was defective because the builder had failed to
install a water stop angle to the base of the shower screen or incorporate a hob or
step down into the shower recess. HCM considered that these defects had caused
the shower to leak, resulting in damage to the floor tiles.
The complainant disputes the findings in JE and CM’s reports and says all of the
damage to the en suite was caused by the resin injection s carried out by the insurer’s
contractors. The complainant has provided a report from his engineer (CS) in support
of his position.
In his report, CS states that the damage to the en suite has most likely been caused
by differential settlement between the sections of the foundations in the area where
the resin injections had been carried out (the master bedroom) and those where they
had not (the adjacent en suite).
CS advised that, where resin injections are carried out to one section of the
foundations, differential settlement can occur between different parts of the same
foundations. CS explained that resin injections create different soil conditions which
can affect the foundations, particularly in older buildings with no articulation joints.
The complainant’s geotechnical engineer (GC) also identified differential movement
between the treated and untreated sections (and a lack of articulation joints) as
possible causes of the damage to the en suite. GC did not identify any other possible
causes of the damage.
Additional damage occurred in close proximity to resin injections
The complainant’s consultants (CS and GC) have explained how differential
movement can occur in these circumstances, particularly in an older property (such
as the co mplainant’s) which does not have articulation joints.
The nature and location of the damage to the en suite is consistent with this damage
having been caused by the resin injections.
The floor level surveys carried out by the insurer’s engineer (JE) in Nov ember 2017
identified a higher point along the western wall of the master bedroom (near the en
suite) which may have contributed to differential movement.
Determination | Case number: 535425 Page 6 of 10
JE considered that the damage was too distant from the resin injections for there to
be a causal connection.
JE stated that, given their age, the concrete footings would not be capable of
spanning the 6.5 metre distance with infinite stiffness. He also noted that no other
damage had occurred between the south-west corner of the house and the en suite.
However, the scopes of work for both sets of resin injections indicate that the
injections started at the south-west corner of the house and continued along the full
length of the western wall of the master bedroom, until the junction with the en suite.
Accordingly, there would have been a distance of only two metres or so between the
end point of the resin injections and the damage to the en suite. In these
circumstances, I am not satisfied that the assumptions on which JE based his
conclusions were correct.
Additional damage occurred following resin injections
The timing of the damage to the en suite is also consistent with this damage having
been caused by the resin injections.
The complainant has advised that he did not observe any damage to the en suite until
after the second set of resin injections were carried out. His statements are consistent
with a report provided by the insurer’s builder (AB) , who was involved throughout the
duration of the claim.
AB was initially appointed in early 2015 to carry out the repairs to the master
bedroom, which were completed later that year. He attended the property again in
February 2016 (to investigate the squeaky floor) and during late 2017 (to repair the
further cracking to the master bedroom)
AB has advised that, when he first attended the property, he noticed a fracture in the
grout line of the wall tiles on the left hand side of the window (which has since been
repaired). However, he did not observe any other damage to the en suite , either at
this time or during his subsequent inspection in February 2016.
AB says he first noted cracks and efflorescence in the floor tile grout lines when he
inspected the property in October 2016, after the second set of resin injections had
been completed. It appears the cracked tile near the window was identified at around
the same time.
Insurer is liable for damage to en suite
As outlined above, the insurer says the damage to the en suite was caused by
naturally occurring earth movement due to poor surface drainage along the external
wall of the property.
Determination | Case number: 535425 Page 7 of 10
The complainant acknowledges that the property has been subject to minor cracking
and movement during its lifetime. However, based on the reports provided by his
consultants, he considers the current damage is directly l inked to the insurer’s repairs.
As outlined above, the insurer accepted the complainant’s claim for damage caused
by the leaking pipe, despite there being evidence of pre-existing earth movement. The
insurer also accepted liability for subsequent cracking damage to the same area, on
the basis that this damage had been caused by the resin injections.
In his initial report prepared in 2014, the insurer’s original engineer (CC) noted the
drainage conditions around the perimeter walls. However, he observed that the
foundations of the property had remained relatively stable over its 100 year life,
despite these conditions.
The insurer relies on reports provided by its second engineer (JE) and its building
consultant (CM), who have become involved with the claim more recently.
JE advised that the damage to the en suite was more consistent with having been
caused by naturally occurring earth movement due to poor drainage, than by the resin
injections. However, he did not refute CS’s contention that resin injections to one
section of perimeter foundations can also give rise to differential movement.
Given the nature, location and timing of the damage to the en suite, I am satisfied
that, on the balance of probabilities, this damage was caused by the resin injections
carried out in the course of the claim-related repairs (and not by the excluded factors
identified by the insurer’s consultants) .
While the insurer’s building consultant (CM) has referred to deficiencies in the
construction of the shower, its builder (AB) did not observe any damage to the floor of
the en suite until late 2017.
Given the nature of the differential movement that can result from resin injections, it is
quite possible that this movement has affected the sealant applied to the junction of
the shower recess, causing it to leak.
For the reasons outlined above, I consider the insurer is liable for the current damage
to the en suite.
Insurer is required to cash settle complainant for cost of repairs to en suite
Where further damage has resulted from claim-related repairs, an insurer would
usually be required to rectify the damage, in accordance with the lifetime guarantee
provided under the policy.
However, in the present case, it is likely that the property will continue to be subject to
naturally occurring earth movement due to seasonal variations in the moisture content
of the foundation soils, exacerbated by the drainage conditions.
Determination | Case number: 535425 Page 8 of 10
In these circumstances, it is not appropriate that the insurer be required to provide a
lifetime guarantee for the repairs.
Accordingly, the insurer is required to cash settle the complainant for the estimated
cost of undertaking the repairs, to be determined in accordance with the following
process:
the insurer will appoint an appropriately qualified building consultant (who has not
been involved in the claim to date) to prepare a scope of works for the repair of the
damage to the en suite which has been identified in the complainant’s submissions
(and any associated damage)
the insurer will obtain quotations for the repairs set out in the scope of works from
at least two contractors with appropriate experience to undertake the works, who
are prepared to do so directly on the complainant’s behalf, and
the insurer will cash settle the complainant for the amount of the lowest quotation
obtained.
2.2 Is the insurer required to undertake further works?
Insurer is liable for installation of articulation joints
The reports provided by the complainant’s (CS and GC) consultants establish that the
use of resin injections to one section of the perimeter footings gives rise to the
potential for differential movement at the junction with the untreated section.
Both CS and GC have advised that articulation joints could be installed at these
junctions, in order to minimise the risk of future movement.
Given the multiple issues which have occurred since the resin injections were
completed, I consider the installation of articulation joints represents a reasonable
method of rectifying the original repairs.
However, for the reasons outlined above, I consider that in the circumstances, it is not
appropriate that the insurer be required to provide a lifetime guarantee of these
works.
Accordingly, the insurer is required to cash settle the complainant for the estimated
cost of undertaking the works, to be determined in accordance with the following
process:
the insurer will identify three appropriately qualified engineers (who have not been
involved with the claim to date)
the insurer will provide the names and curriculum vitae of the three identified
engineers to the complainant
the complainant will select which of the three engineers will be engaged to prepare
a scope of works for the installation of articulation joints
Determination | Case number: 535425 Page 9 of 10
the insurer will obtain quotations for the installation from at least two contractors
with appropriate experience to undertake the works, who are prepared to do so
directly on the complainant’s behalf, and
the insurer is to cash settle the complainant for the amount of the lowest quotation
obtained.
2.3 Is the complainant entitled to any additional amounts?
AFCA may award compensation
Under the FOS Terms of Reference, AFCA can award up to $3,500 in compensation
for consequential financial loss suffered by a complainant in connection with their
claim.
AFCA can award an additional amount (of up to $3,000) as compensation for non-
financial loss where there has been an unusual amount of physical inconvenience,
time taken to resolve a situation, or interference with expectation of enjoyment or
peace of mind.
However, AFCA takes a conservative approach to assessing compensation for non-
financial loss. AFCA expects complainants to be moderately robust and tolerate a
normal degree of inconvenience when making a claim.
Complainant is not entitled to additional compensation
During the course of this complaint, the insurer paid the complainant the amount of
$3,000 as compensation for non-financial loss suffered during the claims process.
The insurer has also reimbursed the complainant for the cost of CS and GC’s reports.
I consider that the amounts paid by the insurer are appropriate to compensate the
complainant for his non-financial loss and costs incurred in relation to the claim.
AFCA does not generally award costs for time spent by a complainant in pursuing
their complaint. Accordingly, the complainant is not entitled to additional
compensation on this basis.
Determination | Case number: 535425 Page 10 of 10
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 AFCA approach to this complaint
This complaint has been expedited to an Ombudsman for determination in
accordance with the FOS Terms of Reference, due to the nature of the complaint.
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered (whether or not it is expressly referenced in this determination)