Home / Financial Firm (Unknown - Insurer) / Determination 534413

Determination 534413

Storm and landslide damage repair scope and cost after earlier determination

FirmFinancial Firm (Unknown - Insurer)
Decided2019-04-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$148,979
Non-financial loss$2,500
Amount claimed$149,979
SourceAFCA PDF

Summary

The insurer had accepted that a landslide storm event damaged a support post but disputed a gabion retaining wall needed for repair and offered a cash settlement. AFCA accepted the complainant's engineering and quantity surveyor costs, ordered $147,895.51 plus $1,083.50 expert fees and interest, and awarded $2,500 non-financial loss.

The policy requires repair to as-new condition, and the retaining wall was necessary to repair the insured damage rather than excluded garden retaining wall.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 534413 Page 1 of 11 Determination Case number: 534413 15 March 2019 1 Determination overview 1.1 Complaint The complainant previously lodged a claim with the financial firm (the insurer) for storm damage to her property. That claim was the subject of FOS dispute 485504 in which a final determination was issued. The determination found the insurer liable for storm damage to the support post and any resultant damage. A dispute has now arisen in relation to the correct repair method and the cost for such. Specifically, the complainant says a gabion style retaining wall is required for the repair of the claimed damage. However, the insurer says the policy excludes retaining walls and soil. The complainant also raises concern with the insurer‟s handling of the claim. 1.2 Issues and key findings Is the insurer liable for the cost of the recommended retaining wall? The construction of the gabion style retaining wall is fundamental to the proper repair of the support post. The policy says the insurer will pay for the cost to repair the property to „as new‟ condition when damage is sustained due to an insured event. Given this, I accept in these circumstances the insurer should pay the complainant the estimated cost to repair the support post as provided by her engineer (RA) and quantity surveyor. Is the insurer liable to compensate the complainant further? The insurer is to compensate the complainant $2,500 for her non-financial loss as well as the expert report fees she obtained from CF and RA. Determination | Case number: 534413 Page 2 of 11 1.3 Determination This determination is in favour of the complainant. Within 21 days of being notified of the complainant‟s acceptance of this determination, the insurer is to pay the following in full and final settlement of this dispute:  the sum of $147,895.51 minus any outstanding policy deductions (e.g. excess)  interest on the amount payable above pursuant to section 57 of the Insurance Contracts Act 1984 (the Act) from 10 May 2018 until payment is made  $2,500 in non-financial loss  $1,083.50 for expert fees Determination | Case number: 534413 Page 3 of 11 2 Reasons for determination 2.1 Is the insurer liable for the cost of the recommended retaining wall? The complainant’s claim was the subject of an earlier FOS determination The complainant previously lodged a dispute with the Financial Ombudsman Service (FOS) about the insurer‟s decline of her claim for storm damage. The determination found the complainant‟s property had been d amaged by a landslide from the claimed storm event. The determination found the insurer liable for damage to the support post and any resultant damage. Following the determination, the parties disputed the extent of repairs necessary to give effect to the previous determination. As a result, the complainant lodged a new dispute challenging the insurer‟s decision. The complainant provided reports showing a retaining wall is needed The complainant‟s civil and structural engineer (RA), who initially identifi ed the damage, provided recommendations for remedial works. RA stated additional structural support, such as a soil retention structure, will be required to prevent future erosion of the damaged footing. This recommendation was in addition to the reinstatement of a retaining wall that was previously on the site. The complainant also provided a report from a geotechnical engineer (CF) who had been instructed to: carry out the geotechnical investigation and provide options for rehabilitation of the damage, to reinstate lateral support to the affected footing of the dwelling. CF provided two options for the “remediation of the lateral support to the corner footing”. The options are as follows: 1. a gabion-style reinforced earth fill retaining wall; or 2. a panel and post-style retaining wall. On this basis the complainant provided the insurer with a summary of works and cost estimate for remediation using the gabion-style retaining wall method. The cost estimate provided by quantity surveyors came to $147,895.51. Determination | Case number: 534413 Page 4 of 11 The insurer says most of the cost relates to things that are excluded from cover The insurer refused to accept the complainant‟s cost for repairs as it says the majority of the works are associated with the installation of a retaining wall syste m and soil restoration. These are excluded from cover under the policy. The insurer also says this was noted in the determination of the complainant‟s earlier dispute with FOS. The policy states it does not cover „garden retaining walls‟ or „soil‟ under h ome insurance. Garden retaining walls are also specifically excluded under the insured event of „storm‟. The policy defines „garden retaining wall‟ as: a wall, which is not part of the residential building, designed to hold back or prevent the movement of earth. The complainant says she is not claiming for a damaged garden retaining wall The determination in the complainant‟s earlier dispute said, “the applicant accepts that the replacement of the lost earth and the failure of the retaining wall are not co vered”. The complainant says this related to her garden soil and garden retaining wall that was there before the storm, not the repairs necessary for the successful remediation of the covered storm damage. The complainant does not dispute the exclusion of the garden retaining wall and says she is not claiming for the damage to, or replacement of, that garden retaining wall. The complainant says the proposed retaining structure is the prescribed remediation solution required to stabilise the footing as recommended by two engineers. The complainant says the proposed retaining wall is an “integral and critical component of the footings of the affected pole”. The complainant draws a distinction between the garden retaining wall that was damaged by the landslide and a retaining structure required to support and repair the damaged footings of the house following the landslide. The complainant says the recommended support structure is a „surcharged‟ wall which does not fall within the definition of „garden retaining wall‟ because it supports more than soil, it supports the surcharged load of the insured building. Complainant’s experts say retaining wall is part of the repair cost to post CF‟s report states the two retaining wall options are “concepts for remediati on of the lateral support of the corner footing”. This supports the complainant‟s position that it is a critical element of the repair costs to the support post following the landslide. RA also confirms that Determination | Case number: 534413 Page 5 of 11 The retaining structure, recommended by [CF], the Geotechnical Engineers, is an essential component of the rectification work required to stabilise the foundations of the dwelling. The policy is clear in that it excludes damage to garden retaining walls. However, this is not the issue. The damage being claimed under the policy is to the support post. This was caused by the landslide that significantly impacted this area of the property. There is no dispute the support post is covered by the policy. In such circumstances, the policy says the insurer is required to pay the cost to repair the support post. In this context, the complainant‟s submissions are persuasive as the reports show the construction of the proposed retaining wall forms a fundamental part of the repair process and is distinct from the previous retaining wall. Insurer’s engineer (NJ) also says repairs require a retaining wall The insurer says its engineer (NJ) has confirmed repairs can be carried out without a retaining wall. NJ provided a report on 8 June 2018. In this report, NJ provided recommendations for rectification of the damaged footing. NJ states: we recommend reconstructing the footing founded to competent natural ground and installing a new pole suitably fixed to the existing floor framing…It also includes the implementation of anchor ties between the subject footing and adjacent footings in two perpendicular directions to limit lateral movement to this footing in the future. NJ also states its rectification works are not based on the construction of a gabion style retaining wall, but it says notwithstanding this: a suitable engineer designed retaining wall should be reinstated in conjunction with the works specified by this office. NJ then went on to say: it would be prudent for the building owners to obtain a slope stability assessment report and implement any recommendations made in the report. When reading this, I do not agree NJ says the repairs can be conducted without a retaining wall. In fact, NJ says the opposite. This is further reinforced when the insurer quoted NJ‟s comments in its letter of 4 September 2018 where NJ states: While not recommended, technically if the required surface levels can be achieved without the retaining wall in place, the footing could be constructed first, however the timeframe between this and retaining wall construction would need to be limited to commence as soon as practically possible after footing construction. If the footing is constructed and left for some time without stabilisation of the slope via a retaining wall or other means then it leaves the footing at increased risk of movement occurring. Determination | Case number: 534413 Page 6 of 11 NJ‟s above statement confirms the proper repair of the post is conditional on the prompt construction of a retaining structure. Significantly, NJ also stated: It was specifically recommended in our report conclusions and recommendations that a retaining wall be constructed and the slope stability assessed. We only highlighted the fact that a gabion style retaining wall was not specifically required. The insurer provided a further submission dated 15 October 2018 where NJ outlines the minimum retaining support required. NJ stated: any low height retaining wall constructed to facilitate the construction of the new pole footing would be generally at risk of failure (similar risk to wall that failed). If such a wall was built, it would need to be clearly understood that the wall was a temporary construction wall (to aid construction). Not only does this statement confirm a retaining wall is required for the construction of the new pole footing, but it supports CF and RA‟s proposed repair method of an additional support structure separate and distinct to the garden retaining wall. It also supports the finding that the requirement of this retaining wall was due to the landslide that occurred. The insurer says the complainant would receive a betterment The insurer says the complainant‟s property had pre-existing stabilisation issues and she is looking for the cost of site stabilisation to be covered. The insurer says a four- meter retaining wall was not present before the loss. Therefore, the insurer says that if it is required to cover all these costs, it will place the complainant in a significantly better position. I disagree. The evidence clearly shows that without the proposed retaining wall, the complainant‟s property is in a substantively worse position than prior to the loss. The purpose of the policy is to indemnify the complainant for loss or damage caused by an insured event. I am satisfied the current information shows the site is unstable due to the significant landslide that occurred. Therefore, if the insurer was to exclude the cost of the retaining wall, it would result in an outcome:  contrary to the purpose of the policy  inconsistent with the policy which says the insurer will repair the property to the same standard, specification or quality as it was when it was new, and  unfair in all the circumstances. There is no evidence to show the site had previous stabilisation issues. The complainant notes the property was constructed in 1993 and had no previous issues prior to the landslide that occurred about 24 years later. Determination | Case number: 534413 Page 7 of 11 Even if it is arguable that the retaining wall is betterment, the policy does not exclude this if it is necessary to the repair cost of insured damage. Gabion style retaining wall to be included in the scope of works The insurer has said that if a retaining wall is required, the previously damaged one should be reinstated. This is based on RA‟s previous report as well as a report provided by the insurer‟s engineer (JH) that was first engaged. The current evidence shows this is not an option. Reports from RA and JH preceded CF‟s report. Following CF‟s report and analysis, both RA and NJ agree that the reconstruction of the previous retaining wall would be inadequate. NJ, as quoted in the insurer‟s submission dated 15 October 2018, said: The minimum retaining wall that would allow the footing re-construction would be a similar retaining wall to that was previously present. … If such a wall was built, it would need to be clearly understood that the wall was a temporary construction wall (to aid construction), with a wall designed to stabilise the overall slope required to be built in front of the temporary wall as soon as possible The report from CF provided two different support structures, a gabion style reinforced earth fill retaining wall and a panel and post style retaining wall. CF provided a qualitative comparison of the two options. CF stated: It is our opinion that the panel and post retaining system is more appropriate for this site, given the lesser temporary works disturbance. RA disagreed and advised the gabion style wall is preferred for the following reasons:  comparable construction costs  a four-meter panel and post wall will require council approval – this will likely delay the process, particularly given at least one neighbour is likely to object  ease of access and construction  is amenable to landscaping and would not have a negative impact on the property‟s value . CF, in a letter dated 3 October 2018, acknowledged RA‟s opinion and provided no objection. CF simply stated that works should commence as soon as possible. NJ does not state a preference about which option should be used. NJ suggests there may be a cost saving for a panel and post wall but is uncertain. NJ also does not comment on RA‟s concern that a panel and post wall would require an application to Council and give rise to a possible objection from neighbours. Given this, I accept RA‟s recommendation to be reasonable. The works should proceed with a gabion style retaining wall. Determination | Case number: 534413 Page 8 of 11 Insurer is to pay the complainant the cost estimate from the quantity surveyor The complainant provided a summary of works from RA as well as a cost estimate from a quantity surveyor based on these works. The cost estimate totalled $147,895.51. The insurer has objected to this noting that the summary of works is not a detailed scope and contains no plans or drawings. Further, the cost estimate is provided by a quantity surveyor who specialises in tax related work and cost estimates. However, the insurer has not provided any costing for the full repairs. NJ‟s rep ort and the quote from its builder is inadequate as it does not account for the construction of a retaining wall or any other works necessary. Therefore, based on the available information, it is only the complainant‟s documents that sets out the cost to restore the property to its pre-incident condition. Further, I consider the estimate to be reliable given:  it is based on RA‟s recommendation who is well familiar with the site  RA is a qualified civil and structural engineer  a quantity surveyor is appropriately qualified to estimate the costs of construction given this is their field of expertise The previous determination provided the insurer with the option to either repair the damage or cash settle the complainant. However, I do not consider it is fair in all the circumstances that this remains given:  this claim has been the subject of a second determination  the property has been at risk of further structural damage for a long period of time  there should be finality to this dispute given the history of this claim Therefore, it is my opinion that it is fair in all the circumstances that this claim be resolved by the insurer paying the complainant the sum of $147,895.51 minus any policy deductions owing (e.g. excess). The insurer is also to pay interest on the amount payable pursuant to section 57 of the Insurance Contracts Act 1984 . Interest is payable from 10 May 2017, being two weeks after the insurer received this estimate, until payment is made. 2.2 Is the insurer liable to compensate the complainant further? The complainant says the insurer has caused unreasonable delays Under 9.3 of FOS Terms of Reference (TOR), compensation for non-financial loss may be awarded in certain limited circumstances. That includes for situations where there has been an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the complainant‟s expectation of enjoyment or peace of mind. Determination | Case number: 534413 Page 9 of 11 The complainant says from the date of the claimed event throughout the entire claims proces s and two disputes, the insurer‟s conduct has caused her an extreme level of stress and impacted her life greatly. The complainant says she has suffered loss of income, her health has suffered as a result of the stress and the insurer‟s delay in handling the matter appropriately has caused further instability and damage to the site itself. Throughout both disputes the engineers and builders involved have advised that it is imperative to remediate the damage as soon as possible to prevent any further landslip and damage to the house. The complainant has clearly attempted to do so having to engage engineers and builders to report on the damage and authorising make safe works. In addition, she has spent time during wet days trying to clear the site of water. T herefore, the insurer‟s decisions to first deny the claim and then attempt to offer a substantively reduced settlement would have significantly impacted her. Particularly given she was required to successfully challenge both decisions after providing numerous expert evidence and submissions in support. Further, the complainant was reasonably entitled to expect the insurer to attend to her claim with a manner of urgency and in a professional and reliable manner. Although there were matters which required action by the complainant herself, she still had the avoidable additional upset and concern caused by the insurer‟s handling of her claim and appearance that it was not taking the risk of further damage seriously. Therefore, given all this, it is fair in the circumstances that the insurer pays the complainant $2,500 as compensation for this. The insurer is to reimburse the complainant for the remaining invoices Under 9.4 of FOS TOR an insurer may be liable for the complainant‟s costs in pursuing the matter. The complainant has provided further invoices for expert reports that have not yet been reimbursed by the insurer. That is, the report from CF of 3 October 2018 ($577.50) and the email and report from RA dated 25 June 2018 and 21 September 2018 ($506). I accept these reports assisted her position and were relevant to the issues in dispute. The insurer is to reimburse the complainant for these costs. Determination | Case number: 534413 Page 10 of 11 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term  applicant  complainant  financial services provider  financial firm  dispute  complaint 3.2 Relevant terms of the policy Product disclosure statement Page Key points Definitions Page 3 garden retaining wall - a wall, which is not part of the residential building, designed to hold back or prevent the movement of earth. Insured event Storm and rainwater We will not cover Page 10 loss or damage to : o fences and gates that are not structurally sound or well maintained o artificial grass or turf o garden retaining walls How We Settle Claims Page 36 If we agree to pay a claim for loss, theft or damage to your home, contents or personal effects, we will decide whether to:  repair the damaged property to the same standard, specification or quality as it was when it was new, or  replace the damaged property with the nearest equival ent property available, or  pay you the amount it would cost us to repair or replace the property to “as new” condition. Determination | Case number: 534413 Page 11 of 11 3.3 Expert reports Report Key points Geotechnical Investigation (CF) 26 March 2018  to carry out the geotechnical investigation and provide options for rehabilitation of the damage, to reinstate lateral support to the affected footing of the dwelling  we provide two concepts for remediation of the lateral support to the corner footing  a gabion style reinforced earth fill retaining wall and a panel and post style retaining wall  surcharge loads were incorporated, the point load from the corner footing, uniformly distributed load, ground water loads  the panel and post retention option will have the benefit of the lesser need for temporary excavations and affecting existing footings  qualitative comparison – it is our opinion the panel and post retaining system is more appropriate for this site, given the lesser temporary works disturbance. Consul ting engineers (NJ) 8 June 2018  to provid e recommendations for rectification of the pier footing  significant soil loss occurred adjacent to the pier footing of the timber pole at the deck‟s rear left corner  we recommend reconstructing the footing founded to competent natural ground and installin g a new pole suitably fixe d to the existing floor framing  It also includes the implementation of anchor ties between the subject footing and adjacent footings in two perpendicular directions to limit lateral movement to this footing in the future.  the rect ification works specified by this office are not based on the construction of a gabion retaining wall to ensure future stability of the footing system  notwithstanding this fact it is evident due to the failure of the retaining wall that it was not sufficie nt to cater for the loading conditions present and a suitable engineer designed retaining wall should be reinstated in conjunction with the works specified by this office. RA supplementary report 21 September 2018  the retaining structure recommended by CF the geotechnical engineers is an essential component of the rectification work required to stabilise the foundations of the dwelling  the construction of the retaining wall should be expedited without further delay. With the onset of the wet season, expe cted between Dec & April 2019 and the precarious situation of the house as it is now.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.