Further claim for sewage odour and contamination after escape of liquid

FirmFinancial Firm (Unknown - Insurer)
Decided2018-10-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicant claimed again for ongoing sewage odour and contamination after an earlier escape of liquid claim was repaired. AFCA found no evidence of ongoing contamination or new damage and held the FSP was entitled to deny the second claim.

The applicant bears the onus to show on the balance of probabilities that damage arose from an insured event, and the independent inspections found no contamination.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 533789 Determination Page 1 of 8 Case number: 533789 17 October 2018 1 Overview 1.1 Dispute The applicant lodged a claim under his home insurance policy for damage sustained to the property from a leaking sewage pipe underneath the bathroom floor in 2012. The financial services provider (FSP) accepted the claim and completed repairs including treating and cleaning the affected areas. The applicant lodged a further claim in 2013, saying the subfloor foundations still exhibited evidence of contamination from the original event, in particular, strong sewerage smells. Following investigation, the FSP denied liability on the basis there was no evidence of contamination or any new damage to the property. The applicant disputes the FS P’s findings, saying:  the ongoing contamination is due to inadequate repairs conducted by the FSP in response to the first claim  he has suffered ongoing illness as a result of the contamination. 1.2 Issue and key findings Is the FSP required to undertake further repairs in relation to the claim? The FSP is not required to undertake further repairs in relation to the claim. This is because:  the available evidence does not reveal any contamination. 1.3 Determination This determination is in favour of the FSP. The FS P is not required to take any further action in relation to the applicant’s claim. Case No: 533789 Determination Page 2 of 8 2 Reasons for determination 2.1 Is the FSP required to undertake further repairs in relation to the claim? Applicant must show the damage was caused by an insured event The applicant is required to show that, on the balance of probabilities, he has suffered a loss caused by a risk insured against under the policy. If the applicant is able to establish a valid claim, then the onus shifts to the FSP to show that, on the balance of probabilities, it is otherwise entitled to deny the claim. The applicant’s policy provides cover for damage caused by the events listed in the policy, subject to the conditions and exclusions set out in the policy. Circumstances of the claim The first claim lodged by the applicant (in 2012) was under the insured event of ‘escape of liquid’. He lodged the claim following damage sustained to his property from a leaking sewage pipe under the bathroom floor. While the FSP initially denied the claim it subsequently accepted it following further investigation. As the leak caused sewerage to disperse over the area, the FSP engaged a restoration company (WR) to restore the affected area, which included cleaning and treating the subfloor. Once the works were completed, the applicant signed a certificate of completion confirming his satisfaction. A short time after the works were completed, however, the applicant told the FSP he was dissatisfied with the work it completed. He said the damaged area was still contaminated as there was an odour emanating from the subfloor. The FSP arranged a further inspection by WR, which did not reveal any further contamination. The applicant lodged another claim with the FSP in 2013, saying the odour continued to emanate from the subfloor and caused him to be ill. The applicant submitted the ongoing contamination was due to inadequate repairs undertaken by the FSP following the first claim. He further submitted the property was unliveable because of the odour and requested the FSP provide temporary accommodation. Following further investigation and testing, the FSP denied the applicant’s claim, saying there was no evidence of contamination and the property was normal and acceptable for habitation. Case No: 533789 Determination Page 3 of 8 Available information shows there was no contamination or further damage The applicant says that when WR attended his property after the initial claim, the work completed was inadequate. He says this is because:  WR only removed the surface solids and left the majority of the spill partially covered with a thin layer of lime  as the spill was left uncovered and not contained, it dispersed into the rest of the dwelling  although WR said it pressure-cleaned the space underneath the house with hot water, it is doubtful this occurred. Following re-attendance at the insured property, WR concluded there was no further effluent under the house and the lime was still in place. It conducted swab-tests which confirmed good readings on the property. WR’s report also suggested the likely rea son for the odour was from an open storm water vent in the property which appeared to be blocked. It believed the vent could overflow during heavy rain and cause fluids to disperse into the grounds of the property. WR supported this submission with the fi ndings of a swab test of the brick work in the area. The test indicated high bacteria readings in the area. WR therefore recommended the applicant clear the vent to prevent further overflowing. The applicant, however, disputes the findings, saying they are old gully traps in perfect working order and it is only to be expected there will be water and sewage in them. He further says that even if they had overflowed, they would only affect external areas and not the space under the floorboards. I noted that in the course of the dispute with FOS, however, the applicant has mentioned that every time it rains the levels come up along with the sewage. Having reviewed the parties’ submissions, I am not s atisfied that the information establishes there is ongoing contamination or further damage to the property. This is because, in addition to WR’s findings in 2012, another repair specialist (PI) who inspected the property in 2013, found:  there was no offensive odour evident at the time of inspection  there was no new damage to the property evident at the time of inspection  there was no visible damage to the property as a result of the previous leak in the toilet waste pipe  the leak in the toilet waste pipe appears to be repaired. PI did, however, recommend the FSP undertake further investigation to determine the toxicity of the subfloor soil and contamination of the building. Further to its recommendation, tests conducted on the soil from the subfloor surface in the affected area found:  acceptable levels of E-coli at tested sites  the identified levels were considered acceptable for habitation. While PI found the odour was most likely produced by the presence of hydrogen sulphide, it maintained that the levels at the time of inspection were not above acceptable levels. Its report concluded it could offer odour testing subject to Case No: 533789 Determination Page 4 of 8 authorisation by the FSP, however, the information does not show further testing occurred. While the applicant argues that PI only obtained swab samples from the surface in the area with lime and not other parts of the property, he has not provided independent information or arranged testing. Conclusion The applicant advised FOS that there has been a significant impact on his health due to ongoing contamination resulting from the leak in the waste pipe. He also reports a noticeable improvement in his health when he is working away from home. While I acknowledge the applicant’s submission that the subfloor is still contaminated from the original leak, he is required to provided information to substantiate his position. I note the applicant has provided links to websites about the dangers of contaminated building materials, particularly contamination associated with raw sewage and human waste. The applicant has, however, not provided any expert evidence or other information to support:  further damage to the property associated with the original claim  ongoing contamination in the relevant area  the spread of contamination to other areas of the property  the initial repairs completed by the FSP were inadequate  his medical conditions are related to the reported contamination. Having carefully reviewed the submissions and reports provided by the parties, I am not satisfied that the information as provided is sufficient to establish a claim that falls within the terms of the policy. The applicant bears the onus to establish on the balance of probabilities that the damage arose as a result of an insured event. For the reasons set out above, I am not satisfied the applicant has established the damage was caused by an event to which the policy responds. In the circumstances, the FSP is entitled to deny the applicant’s claim. Case No: 533789 Determination Page 5 of 8 3 Supporting information 3.1 Relevant policy provisions Section Relevant wording Escape of liquid Page 20 We will cover Loss or damage caused by accidental escape of liquid from any:  fixed pipe … We will also pay for the reasonable exploratory costs in locating the source of the damage, provided we have agreed to pay for the loss or damage caused by the escape of the liquid. We won’t cover  loss or damage to the item from which the liquid escaped and, if the liquid escaped from a shower  recess, the cost of re - tiling the walls or floor of the shower recess … Emergency accommodation Pa ge 25 We will cover the costs of similar alternative accommodation for you and any persons currently permanently living in your home, provided your home is unliveable. This expense will only be paid if you actually pay for emergency accommodation and only whil e your home remains unliveable. How to make a claim Page 61 You may only make a claim if an event included in one of the policies or options you have chosen (or any variations we have agreed to) occurs during your period of insurance. 3.2 Supporting information Record Key points FSP’s expert (MK ) Building inspection report 20 - 08 - 2012  We noted a clay pipe connected to the PVC pipe from the toilet that had broken away at the underside of the timber flooring and had been leaking for some considerable time with a build - up of calcification at its base evident.  No evidence of any damage to the dwelling from the effluent leaking onto the ground other than an odour.  To the exterior of the dwelling we noted movement cracks to the brickwork and it is our bel ief that this movement of the dwelling along with gradual deterioration has caused the waste pipe to drop.  There has been no resultant damage to the dwelling as a result of the leaking pipe and the pipe requires rectification as a maintenanc e item.  We expl ained to the insured that soil is not part of the building and that the damage to the toilet waste pipe is the result of movement and gradual deterioration over many years and has not been damaged by an insurable event. Case No: 533789 Determination Page 6 of 8 FSP’s expert (WR ) Restoration quota tion 10 - 09 - 2012  Effluent overflow cleaning make - safe Suggested scope of works  Ventilate under house, install 2 x Hepa air scrubbers  Supply personal protection equipment, manual remove effluent debris. Bag and dispose at Council Approved tip.  Spray enzyme c leaning solution to building surfaces.  Hot water pressure clean flooring joist and brick work.  Supply air less sprayer and treat flooring and joist with antimicrobial.  Supply 60kg of lime, spread over ground under house.  Leave site clean and tidy. FSP’s expert (CL ) Assessment report 1 1 1 - 09 - 2012  On or around 5 August 2012 the applicant noticed a pungent smell within the property prompting an ins pection of the void beneath the hous e.  A PV waste pipe leading from the base of the toilet had broken/detac hed f rom the base of the toilet that was allowing raw sewerage to disperse throughout the sub - house void.  We identified sewerage had dispersed over an area measuring approximately 26 to 30m ².  Sewerage was still seated on or against the sewer pipe leading throug h the sub - house area as well as on/ against timber bearers/floorboards and brick piers and walls.  Areas of the ground are also covered in dry raw sewerage.  There is a distance of approximately 4 lineal meters from the manhole to the detached pipe and it wil l be nec essary for that entire surrounding area to be cleared/sanitised to allow the approved contractor to gain safe access to the outlined ‘building’ damages. Loss/Damage : Building:  Professional removal of sewerage from sub - house void  Associated air purification prior to the above (to allow safe work environment)  Treatment of affected building surfaces with enzyme solution prior to hot water pressure cleaning of the affected floor joists and brick work/sewerage pipe  Treat cleaned areas with antimicrob ial  Utilize lime to return ground to pre - loss ‘safe’ level  Associated tip/disposal fees  Final swab test to confirm building has been restored to acceptable levels. Policy liability :  The affected sewerage pipes, timber bearers, floor boards and brick piers/ walls are all considered to be ‘building’ items as per the policy definition.  We recommend accepting the cost to clean/disinfect/reinstate the sewerage affected building items in addition to the cost to remove sewerage/contaminated earth in the affected ar eas between the manhole and the broken sewerage pipe to enable the covered repairs to be completed. FSP’s expert (WR ) Inspection report 20 - 11 - 2012  Our inspection did not reveal any further effluent under the house.  The lime still in place on the ground.  We Hygenia swab tested the bearers and obtained a reading of 93 RLM which is good.  The external areas surrounding the house have gotten wet during the storms over the last week however there was no odour or visible soiling. Case No: 533789 Determination Page 7 of 8  There is an open storm water vent in the south west corner - just outside the premises.  Photo’s 039 and 045 appear to indicate that this vent is blocked and could overflow during heavy rains. A swab test of the brick work below a window in this a rea indicated high bacteria readings. This could be common for this location however we would suggest it be cleaned and treated (photo 048).  It is our opinion that the odour has come from fluids which have overflowed from the storm - water water vent onto t he surrounding grounds around the house.  The storm - water vent should be cleared to prevent further problems. FSP ’s expert ( PI ) Repair specialist report 1 30 - 10 - 2013  The applicant advised that loss adjuster CL had previously attended the property to scrape away the waste solids form beneath the suspended floor and spread lime over the surface in September 2012.  Inspection of property beneath the floor shows lime is spread over the sand beneath and black plastic laid down for clean access.  No offensive smell was evident at the time of inspection.  No damage to the property as a result of the claimed event was evident at time of inspection.  Further investigation should be undertaken to determine the toxicity of the sub floor soil and contamination of the building elements including brick piers, supporting walls, plasterboard wall linings, timber floor etc.  We recommend up to 10 swabs be taken for testing from: o Floor joists o Underside of floor boards o Floor beams o Brick piers supporting the dwelling structure o Internal wall surfaces  We recommend a test be conducted on the soil (sand) from the subfloor surface in the affected area beneath the WC.  The leak in the toilet waste pipe appears to be repaired with cracked tiles in the WC floor which may have been caused either before or during or as a result of repairing the pipe.  Silicone had been applied by others in an attempt to seal the floor surface.  The insured indicated he did no t desire to have these repaired.  No other issues related to the claimed event were id entified as maintenance. Resultant damage:  Inspection of the property reveals there is no visible damage sustained to the property as a result of the previous leak in the toilet waste pipe.  We have recommended testing of toxicity by insurer to determine if the impact of the leak from the WC waste pipe has extended beyond the sub floor soil area. FSP ’s expert ( PI ) Repair specialist report 2 18 - 11 - 2013  Testing of the swabs (as recommended in previous report) has been conducted.  Results indicate that levels of E - Coli infection at each swab site was less than 10.  The results indicate the E - Coli levels identified at the property in the areas tested, are at levels considered acceptable for habitation.  No foul odour was noticeable at the time of inspection Case No: 533789 Determination Page 8 of 8 althou gh insured indicated that it is wet weather that seems to cause a foul odour to arise as the natural water table level rises beneath the footings of the property.  The odour is most likely produced by the pres ence of hydrogen sulphide - a natural by - product of natural breakdown by bacterial action of human faeces and urine waste.  At the time of inspection there was no noticeable foul odour, indicating if hydrogen sulphide were present then the levels were below 0.00047 parts per million (t he threshold at whi ch 50% of human panel participants can detect the typical rotten egg odour of hydrogen sulphide).  We recommend that the current levels of hydrogen sulphide were not above acceptable levels at time of inspection, though we do not comment either way whether such a gas was previously experienced by the insured at the property.  We would be able to provide a quot e at insurer’s authorisation, for odour testing of up to 4 locations – 2 under the house in the affected area; 1 in the affected WC area of the property ; 1 in an external unaffected area to establish a base - level.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.