Determination 533773

Storm damage roof repair quality

FirmFinancial Firm (Unknown - Insurer)
Decided2019-05-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Complainant disputed the quality of storm roof repairs arranged by his home insurer and alleged fraud by the building surveyor and contractor. AFCA ordered the insurer to replace the roof sheeting and downpipe with Colorbond Ultra and ensure compliance with building standards, but found no evidence of fraud.

The insurer's own expert found Colorbond Ultra required given proximity to the marine environment, and the policy requires reasonable attempts to match materials.

Issues

Subjects and remedies

home or building damagenatural disasterrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 533773 Page 1 of 6 Determination Case number: 533773 31 December 2018 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer). The insurer accepted a claim in relation to storm damage to the complainant‟s home. The repairs included a replacement of his roof. H owever, the complainant subsequently expressed dissatisfaction with the repair of the roof, such as the product used, amongst other matters. He also made allegations about the conduct of the builder surveyor and the insurer‟s contractor. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was partially in favour of the complainant. A copy of the recommendation is attached to this determination. The recommendation was issued by the Financial Ombudsman Service (FOS) Australia. The Australian Financial Complaints Authority (AFCA) has replaced FOS. AFCA is responsible for managing FOS complaints lodged prior to 1 November 2018. While this determination is issued by AFCA we have applied the FOS Terms of Reference. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were correct and are adopted in this determination. Further submissions provided after the recommendation have been considered, but these do not warrant a change in the outcome. Were the repairs carried out to the required standard? The insurer is required to provide the complainant with a roof of „Colorbond Ultra‟ and a downpipe in the same material. Determination | Case number: 533773 Page 2 of 6 Was there any misconduct by persons involved in the repairs? There is no probative evidence of inappropriate or fraudulent conduct alleged by the complainant. If the complainant believes he has evidence of criminal activity he should be taking the matter to the police. 1.3 Determination This determination is partially in favour of the complainant. I agree with the case manager‟s reasons for the recommendation and the recommended outcome. The insurer is required to replace the roofing material with „Colorbond Ultra‟ roof sheets, provide a new downpipe in the same material and ensure the repairs fully comply with the relevant building standards. Determination | Case number: 533773 Page 3 of 6 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous AFCA decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. I am satisfied the case manager‟s recommendation contains an accurate summary of the complaint, the issues to be determined, any applicable paragraphs of the Rules and any relevant law. 2.2 Were the repairs carried out to the required standard? Complainant expressed dissatisfaction with repairs The insurer accepted the complainant‟s claim after a storm had caused damage to his house. The insurer arranged repairs to be carried out, which included replacing his roof. However, the complainant later contacted the insurer because he was dissatisfied with the roof repairs, saying the entire roof sheeting was inappropriate for his house‟s location (within 50 metres of the sea). He also raised other issues about the repair work. Insurer asked experts to examine repairs The insurer asked RC, a roof tiling and roof plumbing consultant of more than 35 years‟ experience , to examine the roof. RC attended the property on 20 February 2018 and concluded (report dated 12 March 2018) the minimum acceptable roof cladding for a house positioned within 100 metres of a benign marine environment would be „Colorbond Ultra‟. RC could not determine the material type the insurer‟s repairers had used. RC also said there were a few minor installation shortfalls and faults. These included non-compliant flashing lap join assemblies, insufficient mechanical fastenings of barge end flashings and sheet turn down issues. RC also suggested using „Colo r bond Ultra‟ instead of a „galvanised‟ product for the downpipe. PB, a plumber, attended the property on 29 April 2018 and concluded the roofing system had been installed to an overall high standard. PB said a visual inspection found no evidence of debris blocking the flow of water, so it was not likely any water ingress resulted from that cause (an issue which the complainant had raised). PB also provided reasons why there would be no gutter overflows. Insurer required to replace roofing tiles RC did not recommend the roofing sheets the insurer‟s repairers had used (RC had not been able to identify the sheeting used, although the product was later identified Determination | Case number: 533773 Page 4 of 6 as a different product which did not have all the necessary qualities). Instead, RC recommended the use of „Colorbond Ultra‟, as this was appropriate for a roof that close to the sea. RC has the appropriate experience, knowledge and expertise to assess whether the repairs comply with the required standards and make appropriate recommendations to correct any issues. Given RC‟s findings, the insurer is required to replace the roof sheets with „Colorbond Ultra‟ and provide a new downpipe in the same material. The insurer is also required to ensure these repairs fully comply with the relevant building standards. In this regard, the insurer should appoint RC to check the repairs on completion. Complainant provided further submissions The complainant rejected the recommendation that was partially in his favour and provided further submissions in support (some submissions are dealt with in the following section, 2.3 because they relate to that issue). The complainant wants the determination to be delayed because he wants an inspection carried out on his roof. Another reason is there may be criminal proceedings initiated in relation to the roof repairs, although he has provided no proof of this. The complainant has provided no compelling reason why the determination should be delayed. He also raised the issue about AFCA carrying out an inspection of his roof before determinin g the matter. AFCA‟s process requires the parties to produce relevant material in support of their respective positions. In this regard, the complainant would need to provide a report from a suitably qualified tradesperson (such as a roofer or similar) to support his assertions. He said he spoke with a roofing company which indicated the repairers had used the „wrong grade of roofing‟. He said he should be entitled to „Colorbond Stainless‟ because it provides a 25-year warranty, whereas „Colorbond Ultra‟ only provides a 10- year warranty. However, PB provided information that indicates „Colorbond Ultra‟ also has a 25-year warranty. The complainant commented on why he should be entitled to „Colorbond Stainless‟. However, he has provided nothing in writing from the roofing company that supports his comments and has provided no compelling reasons that contradict RC‟s findings. The compl ainant‟s further submissions do not warrant a change in the outcome in the recommendation. As such, RC‟s recommendation that „Colorbond Ultra‟ be used is to apply. Determination | Case number: 533773 Page 5 of 6 2.3 Was there any misconduct by persons involved in the repairs? Complainant alleged misconduct by certain persons The complainant made serious allegations about the building surveyor and the insurer‟s contractor, using the term „ fraudulent action ‟. He said he had „hard primary evidence‟, however he has failed to provide it to substantiate these serious allegations. Any allegation of fraudulent conduct is a serious matter. Definite proofs should be provided to making such an adverse finding. The available information shows no probative evidence upon which I could make a finding of fraudule nt conduct as alleged by the complainant. If the complainant believes he has evidence of criminal activity he should be taking the matter to the police. Complainant provided further submissions As indicated previously, the complainant provided further submissions after rejecting the recommendation. He still maintains he has „hard evidence‟ of misconduct but has not provided it. He also asked whether the determination should proceed, given the police will want to view the roof for evidentiary purposes. However, there is no indication the police are involved and actively pursuing the matter. There are no compelling reasons for holding up the issuing of this determination. The complainant‟s further submissions on this issue add nothing new and therefore do not warrant a change to the outcome in the recommendation. Determination | Case number: 533773 Page 6 of 6 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with Financial Ombudsman Service (FOS). This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim Recommendation Case No: 533773 Recommendation Page 1 of 5 Case number: 533773 24 October 2018 1 Overview 1.1 Dispute The applicant holds a home insurance policy with the financial services provider (FSP). The applicant lodged a claim with the FSP for storm damage to the roof of his house. The FSP arranged for the repairs to be completed, however the applicant was dissatisfied with the quality of the repairs. The applicant also alleged that the certificate from the building surveyor is fraudulent and is concerned that criminal activity has taken place. 1.2 Issues and key findings Have the roof repairs been completed to the required standards? I do not consider that the repairs to the roof have been completed to the required standards:  the roof inspection report completed by the roof tiling and plumbing consultant commissioned by the FSP (RC) clearly states that “Colorbond Ultra” roofing material (as opposed to regular Colorbond) needs to be used, given the very close proximity of the property to a marine environment  the FSP‟s repairer used a different roofing material called Apdeck 700  the FSP has provided specifications for Apdeck 700 and while it may be somewhat comparable to regular Colorbond material, no evidence has been provided to support that it is the same as Colorbond Ultra. Is there any evidence to support that fraudulence has occurred? I do not consider that there is any evidence to support that fraud or criminal activity has occurred. 1.3 Recommendation This recommendation is partially in favour of the applicant. Should the parties accept the recommendation, the FSP is obliged to replace the roofing material that was in stalled on the applicant‟s house with genuine “Colorbond Ultra” roof sheets and also to provide a new downpipie, flashings and eaves gutters in “Colorbond Ultra” material, as per RC‟s recommendations. Case No: 533773 Recommendation Page 2 of 5 2 Reasons for recommendation 2.1 Have the roof repairs been completed to the required standards? FSP’s own expert states that “Colorbond Ultra” roofing material is required Following the applicant expressing dissatisfaction with the repairs that were carried out to his roof, the FSP engaged a roof tiling and plumbing consultant (RC) to attend the property and inspect the repairs. In the report from March 2018, RC clearly states that Colorbond Ultra roofing material should be used given the proximity of the property to a benign marine environment (in this case, the ocean). RC states that any property within 100 metres of the high water line should have Colorbond Ultra fitted. As part of its inspection, RC lifted several roof sheets but was unable to find any production stamp to confirm what type of roofing material had been installed. RC noted that products of a similar type usually have a production stamp. FSP has been unable to provide evidence that the roofing material is adequate The FSP confirmed to me that the roofing material that was installed is a product called Apdeck 700. The FSP provided specifications for Apdeck 700 and while this confirms the product may be similar to regular Colorbond, there is no evidence that Apdeck 700 is of equivalent specification to Colorbond Ultra. The distinction between Colorbond Ultra and regular Colorbond roofing material is a crucial one. In addition to the report from RC, I have conducted my own online research and have come to the same conclusion as RC – given the close proximity of this property to a marine environment (th e applicant‟s house is within approximately 50 metres of the high water line), Colorbond Ultra roofing material should have been used. Colorbond Ultra possess a thicker zinc coating than regular Colorbond products in order to provide better corrosion protection in close proximity to marine environments where there might be salt in the air. The specifications provided by the FSP for Apdeck 700 make no mention of whether or not there is a zinc coating, and if so, how thick the zinc coating is. I have conducted my own online research into this as well, and I have been unable to locate any evidence that Apdeck 700 possesses the same thickness zinc coating as Colorbond Ultra. Page 34 of the product disclosure statement (PDS) states that the FSP will make “reasonable attempts” to match materials. This means that the FSP is not technically obliged to match materials but should make the effort to. Given that the original fibro cement sheeting that was previously fitted to the house could have potentially contained asbestos, this would not be a suitable material to use in line with current building codes. Hence, the FSP needs to provide a suitable alternative. It has been established by the FSP‟s expert that Colorbond Ultra is the most suitable alternative, and my online research also indicates this to be the case. Online searches confirm that Colorbond Ultra is currently available. I am therefore of the opinion that it is Case No: 533773 Recommendation Page 3 of 5 reasonable to request the FSP the replace the roofing material that has been installed with Colorbond Ultra roofing material, as recommended by RC, in order to provide adequate corrosion protection. I am also of the opinion that the FSP should provide a new downpipe, flashings and eaves guttering in matching Colorbond Ultra material as per the recomm endations in RC‟s report. Other issues with the roof repairs The report from RC also identified several other issues with the repairs that had been made to the roof. Among these were a lack of a continuous overflow system to the gutters, non-compliant flashing lap join assemblies, insufficient mechanical fastenings of barge end flashings and failure to turn down some roof sheets. The evidence that has been provided, such as the subsequent roof inspection report from PB, indicates that the FSP has now eithe r rectified or is waiting on the applicant‟s agreement to rectify these issues (such as in the case of turning down of some of the roofing sheets). Given that I have recommended that the existing roofing material needs to be replaced, the FSP will need to ensure that the new Colorbond Ultra roofing material is installed in line with the recommendations made in RC‟s report. I note that the applicant said that there was water ingress into his property as a result of the changes made to his roof plumbing. The applicant has not provided any evidence to show that there was any water ingress into his property, or that any water ingress was due to alterations made to his roof plumbing. Therefore, I consider it reasonable for the FSP to adhere to the recommendations set out in RC‟s report when replacing the roofing material without the need for any further alterations. 2.2 Is there any evidence to support that fraudulence has occurred ? Applicant alleged that fraudulence and criminal activity has occurred The applicant alleged that the certificate issued by the building surveyor is fraudulent and that criminal activity may have occurred. The applicant indicated that he had “hard primary evidence” to support this when he lodged his dispute with FOS. No evidence to support that fraudulence or criminal activity has occurred The applicant has not provided any evidence to support that fraudulence or criminal activity has occurred, nor has the applicant provided any of his own reports. Fraud carries a high burden of proof – the applicant would need to show that a dishonest act or omission with an intention to deceive to obtain a material advantage has occurred. The applicant has not been able to show that this is the case, nor do I consider that there is any evidence to suggest that this is the case. I am therefore satisfied that the issue of fraudulence and/or criminal activity as alleged by the applicant does not require any further consideration by FOS. Case No: 533773 Recommendation Page 4 of 5 3 Supporting information 3.1 Policy wording Page 34 of the Product Disclosure Statement (PDS) Buildings – what we will and won’t pay We will, at our option, choose whet her to:  repair or rebuild your buildings, or  pay the reasonable cost of repairing or rebuilding your buildings. … If we choose to repair your buildings, we will:  make reasonable attempts to match the materials used when your buildings were built or last renovated … Where we are unable to match materials, we will use or pay for materials which we believe to be of a similar kind or quality 3.2 Expert reports Record Key points FSP’s expert (RC ) Report 12 March 2018  The house is constructed in very close proximity to a marine environment, indeed only approximately 50 metres from the high water line.  The relevant paragraph [of Standards Australia H B 39 the Installation Code for Metal Roofing and Wall Cladding] specifically references Port Phillip Bay and requires that a higher performanc e coating system is required for long - term protection when a house if constructed within 100 metres of the beach such as this hous e is.  I then refer to *Metal Roof Cladding Manufacturers “technical manuals”, specifically - *Lysaght / *Bluescope that specify that “Colorbond Ultra” – should be installed to a building in a benign marine environment, such as Port Phillip Bay, where this buildi ng is constructed within 100 metres of the high water line.  I recommend requests are made to the builder and plumbing contractor to provide documentary evidenc e that Colorbond Ultra roof cladding, flashings and eaves gutters were installed to the roof of t his house.  If it is determined that only “standard” Colorbond material has been installed to the roof of this house then the existing roof cladding needs to be replaced with Colorbond Ultra mat erials due to the close proximity to a benign marine environmen t. Applicant’s expert (PB ) Report 29 May 2018  Visual inspection found no evidence of debris blocking the flow of water, it is therefore unlikely that any water ingress occurred as a result of any debris.  Overflows in gutter? No (10mm spacing[s] have been provided at the back of gutter as per current day standards [and] codes, this Case No: 533773 Recommendation Page 5 of 5 acts as a breaker to ensure wat er doesn‟t overflow into the dwelling. Rear right hand stop end of gutter has also been cut lower than fascia board to ensure wat er will overflow a t this point.)  The roofing system has been installed to an overall high standard.