Determination 533657
Earthquake damage claim: extent of liability and cash settlement amount
Summary
The insurer accepted an earthquake damage claim but disputed its ongoing liability, including quality concerns with its builder's repairs. AFCA ordered a further independent scope of works, with the insurer to repair or cash settle plus a 20% uplift, and $500 for non-financial loss.
Cash settlement transfers repair risk to the complainant and loses the insurer's workmanship guarantee, so a 20% uplift on the new quotation is fair, while pre-existing non-covered causes limit the insurer's liability.
Issues
- Claim amount dispute primary · upheld
“The insurer's payment to the complainant should include a 20% uplift from the quotation obtained, in addition to a cash settlement on the new scope of works.”
- Repairs or contractors secondary · upheld
“The insurer agrees it is responsible for the concerns that have arisen in relation to the quality of the repairs completed by its builder.”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial lossreassess claim
Text of the determination
Determination | Case number: 533657 Page 1 of 7
Determination
Case number: 533657 9 January 2019
1 Determination overview
1.1 Complaint
The complainant lodged a claim in March 2016 under her Home Insurance Building
and Contents Insurance Policy held with the financial firm (insurer), following damage
to the home as a result of an earthquake.
The insurer accepted the claim but a dispute continues as to the extent of the
insurer‟s liability to the co mplainant under the policy.
1.2 Issues and key findings
What is the extent of the insurer’s liability to the complainant?
The insurer is to meet the complainant‟s claim in accordance with the terms of this
determination.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is to meet the complainant‟s claim within the terms of this determination.
Determination | Case number: 533657 Page 2 of 7
2 Reasons for determination
This complaint has been the subject of a recommendation issued by the Service on
22 November 2018.
It wa s the case analyst‟s recommendation that the insurer was to make arrangements
for a further assessment and preparation of a further scope of works and quotation.
The insurer was required to arrange for repairs in accordance with the scope of works
or alter natively at the complainant‟s discretion to cash settle on the basis of the
quotation.
The insurer has disputed the recommendation.
I have carefully considered all of the material provided both before and after the
recommendation in the preparation of this determination.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
2.1 What is the extent of the insurer’s liability to the complainant under the
terms of the policy?
The exchanged material confirms that the insurer accepted the complainant‟s claim
and engaged a builder to carry out repairs.
The parties agree that there are concerns with the quality of the repairs.
Within its post recommendation submission, the insurer makes it clear that it is not
attempting to resile from its original decision to accept the claim for earthquake
damage.
However, the insurer says that in addition to the damage caused by the earthquake
and in addition to the concerns regarding the quality of the repairs completed by its
builder, there is evidence to suggest that the cracking at the home will continue, for
reasons that are unrelated to the earthquake or repairs and the reasons are
associated with pre-existing issues at the property.
The insurer maintains that it is not reasonable for it to be obliged to issue a warranty
and therefore accept liability for further cracking, when the cracking is at least partly
due to factors that are not covered by the policy.
Further, the insurer says that it is not reasonable for it to have ongoing liability to
repair cracking that may occur in the future, when the evidence strongly suggests that
cracking is not solely attributable to the quality of repairs.
Determination | Case number: 533657 Page 3 of 7
The insurer agrees and there can be no doubt that it is responsible for the damage
caused by the earthquake and the concerns that have arisen in relation to the quality
of the repairs completed by its builder.
However, having reviewed all of the exchanged material, I am satisfied that the expert
evidence supports the position that there are issues at the property not related to the
earthquake or the repairs and are not covered under the terms and conditions of the
policy.
These issues include, but are not limited to:
footing movements
long term drainage problems from the adjacent property
subfloor shows evidence of long-term moisture.
The details of these issues have been included with the supporting information
attached to the recommendation and for the purposes of completeness, I repeat the
details here within 3.3 of this determination.
On the basis of the expert material exchanged, I am satisfied that the home is likely to
have ongoing issues unrelated to the earthquake or the repairs and not covered by
the terms of the policy.
The case analyst proposed a resolution of the complaint for which there is substantial
agreement between the parties save and except for whether the insurer should
complete the repairs or cash settle on the basis of the new scope of works and the
new quotation obtained.
In my view, given the likely damages the result of causes not covered by the terms of
the policy, the insurer should be entitled to cash settle the claim, in the circumstances
of this complaint.
However, it is also appropriate to have regard to the case analyst‟s commentary
within the recommendation regarding the insurer‟s discretion to pay the cost of
reinstating or replacing the building.
I note the case analyst‟s commentary to the extent that when the insurer repairs the
building, it guarantees a quality of materials and workmanship of the work. If a defect
arises because of poor quality workmanship or incorrect materials, then the insurer
should rectify the problem.
However, a cash settlement means the complainant gives up the guarantee provided
under the insurer‟s policy. Further, a cash settlement transfers all the risk from the
insurer to the complainant for any unforeseen damage and any additiona l work
required once repairs commenced.
Determination | Case number: 533657 Page 4 of 7
As a result, it is fair that in addition to a cash settlement based upon the new scope of
works and the new quotation obtained, the insurer‟s payment to the complainant
should include a 20% uplift from the quotation obtained.
The result is that upon acceptance of this determination by the complainant, the
complaint is to be resolved as follows:
The insurer is to identify two independent repairers who are suitably qualified to
undertake a comprehensive examination of t he complainant‟s property and provide
a scope of works and quotation for the remaining damage attributable to the
earthquake and the repairs completed by the insurer‟s builder.
The insurer is to email the complainant with details and qualifications of the
proposed repairers within 14 days of this determination being accepted by the
complainant.
Upon receipt of these details, the complainant is to advise the insurer within 14
days by return mail of her preferred repairer.
Upon receipt of the complainant‟s ad vice as to her preferred repairer, the insurer is
to arrange for this repairer to complete its scope of works and quotation within 28
days. This scope of works and quotation is to be made available to both parties
within a further 7 days.
Once the parties have agreed upon the appropriate scope of works and quotation,
the insurer, at its discretion, is to elect to either complete the repairs in accordance
with the scope of works and quotation, or alternatively to cash settle the
complainant on the basis of the new scope of works and quotation.
If the insurer elects to cash settle on the basis of the new scope of works and
quotation, the insurer is to pay an additional 20% of the quotation amount to
finalise its obligations under the terms and conditions of the policy.
Either party may come back to the Authority in respect to the new scope of works
and new quotation.
Within 7 days of the insurer accepting this determination, the insurer is to pay the
complainant an additional amount of $500 for non-financial loss compensation (as
agreed by the insurer).
Determination | Case number: 533657 Page 5 of 7
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Terms of the policy
Record Key points
Lifetime guarantee We provide a „lifetime guarantee‟ when your home is repaired or rebuilt by
one of our preferred repairers or builders.
This means:
- we guarantee the workmanship of repairs that we authorised for the lifetime
of your home
- we will fix any defect caused by poor workmanship.
We w ill decide on what needs to be done to fix an y defect.
What we pay for – Buildings
Insurance
If we agree to cover your claim under Buildings Insurance, then we will:
- pay the cost to repair or rebuild the part of
your home that was damaged (whichever
is lower)
- pay for an y e xtra costs we cover under
'other cover'.
3.3 Expert reports
Record Key points
Insurer’s expert (MJ)
Report
4 - 04 - 2017
Earthquake occurred in area on 10 February 2016 with magnitude of 3.1
(ML).
Location falls within the outer edges of the predicted “felt” radius of 25km.
Indicates there would have been a vibration at the site
Given the good condition of the surface drainage, surrounds and subfloor and
that all damage appears recent, it is likely the damage is caused by the
Determination | Case number: 533657 Page 6 of 7
Record Key points
earthquake
I nsurer’s expert (IC)
Report
5 - 04 - 2017
Repaired right side wall does not have visible new cracks.
Some areas where gaps between the bricks are wider than 10 - 12mm.
Repaired area of front wall has some fine shrinkage cracks.
The cracks are along bedding mort ar which was patched over old mortar.
There are fine shrinkage cracks horizontally along the top of the subfloor
ventilation grilles below floor level.
Shrinkage stepped cracks present in the sub floor brick wall near the entry
stairs.
No signs of previous repairs to bedding mortar.
Vertical crack in the porch front brick wall.
Is along the previously repaired bedding mortar.
Shrinkage stepped cracks are present near left side porch front brick wall.
No signs of previous repairs to bedding mortar.
Vertical shrinkage crack at left corner of porch brick wall
There are signs of previous repairs to bedding mortar.
Porch tile at left corner has shifted slightly.
Grout sealant is separated to one tile.
Shrinkage stepped cracks are present in left side brick wall.
There are previous repair works above cracks but no signs of previous repair
to new cracks.
Slight vertical shrinkage crack along chimney corner and right brick wall.
No cracks or separation under porch concrete slab.
Timber floor framing is in reasonable condition with no signs of shifting or
movement in timber floor framing.
Separation crack is present at front left corner of the lounge room.
Slight separation present at ceiling cornice corner.
Slight separation in floor skirting at front door.
Vertical c rack is present at the front corner of bedroom near entry door.
This was repaired previously.
Main entry door stone sill is cracked.
All observed cracks are in front half of the building and mostly in the area of
previous repairs.
Most of new cracks are fi ne hairline shrinkage cracks resulting from
differential drying rate of cement mortar mix used to repair original cracks.
Cracks are visible where thin layer of mortar mix is used but not present
where thicker bedding mortar is used.
Shrinkage cracks were caused by the use of thin layer cement mix.
Some of the new cracks in the area of the previous repairs.
As there are no signs of previous repairs to the new cracks, it is likely these
cracks were very fine and readily visible and hence not repaired.
It may be possible the cracks were not repaired by the builder when the
original repairs were done.
No evidence of new cracks or damage in sub floor brick walls or floor framing
under lounge room.
No signs of any shifting of the porch concrete slab over the supp ort brick wall.
No cracks or separation were noticed in any of the engaged piers.
The gap was present before the earthquake.
Insurer’s expert (XP)
Report
6 - 11 - 2017
Significant previous repairs 30 years ago.
Moisture damage to eaves line from gutter overflow.
New cracking is old and not recent.
Tree adjacent to the building.
Construction of underpin around the building is consistent with old repairs at
rear of building.
Determination | Case number: 533657 Page 7 of 7
Record Key points
Concrete edge is part of underpinned footing installed.
Old crack on mid wall.
Old repairs at kitchen window which have corresponding internal cracks.
Partial new repairs adjacent to chimney.
Shrinkage stepped cracks are present near left side porch
front brick wall.
No signs of previous repairs to bedding mortar.
Vertical shr inkage crack at left corner of porch brick wall
There are signs of previous repairs to bedding mortar.
Porch tile at left corner has shifted slightly.
Brick veneer skin constructed around perimeter.
Underpinning installed around perimeter of building for brick veneer except
for front walls and steps.
Pre vious issues with movement and cracking
Long term drainage issues.
Run off from neighbour property to flow into the property
Mo veme nt and cracking history with previous repair
Re verse cycle air conditioner without drip tray and drainage.
Close proximity of trees.
No movement in brick veneer skin.
Brick veneer wall supported on different foundation.
No brick ties c onnecting brick veneer to original building.
Insurer repairs involved installing brick ties.
Original brick skin was constructed without articulation.