The insurer accepted an earthquake damage claim but disputed its ongoing liability, including quality concerns with its builder's repairs. AFCA ordered a further independent scope of works, with the insurer to repair or cash settle plus a 20% uplift, and $500 for non-financial loss.

Cash settlement transfers repair risk to the complainant and loses the insurer's workmanship guarantee, so a 20% uplift on the new quotation is fair, while pre-existing non-covered causes limit the insurer's liability.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 533657 Page 1 of 7 Determination Case number: 533657 9 January 2019 1 Determination overview 1.1 Complaint The complainant lodged a claim in March 2016 under her Home Insurance Building and Contents Insurance Policy held with the financial firm (insurer), following damage to the home as a result of an earthquake. The insurer accepted the claim but a dispute continues as to the extent of the insurer‟s liability to the co mplainant under the policy. 1.2 Issues and key findings What is the extent of the insurer’s liability to the complainant? The insurer is to meet the complainant‟s claim in accordance with the terms of this determination. 1.3 Determination This determination is partially in favour of the complainant. The insurer is to meet the complainant‟s claim within the terms of this determination. Determination | Case number: 533657 Page 2 of 7 2 Reasons for determination This complaint has been the subject of a recommendation issued by the Service on 22 November 2018. It wa s the case analyst‟s recommendation that the insurer was to make arrangements for a further assessment and preparation of a further scope of works and quotation. The insurer was required to arrange for repairs in accordance with the scope of works or alter natively at the complainant‟s discretion to cash settle on the basis of the quotation. The insurer has disputed the recommendation. I have carefully considered all of the material provided both before and after the recommendation in the preparation of this determination. This determination follows consideration of all of the information exchanged and is based on what is fair in the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice and where applicable, prior determinations. 2.1 What is the extent of the insurer’s liability to the complainant under the terms of the policy? The exchanged material confirms that the insurer accepted the complainant‟s claim and engaged a builder to carry out repairs. The parties agree that there are concerns with the quality of the repairs. Within its post recommendation submission, the insurer makes it clear that it is not attempting to resile from its original decision to accept the claim for earthquake damage. However, the insurer says that in addition to the damage caused by the earthquake and in addition to the concerns regarding the quality of the repairs completed by its builder, there is evidence to suggest that the cracking at the home will continue, for reasons that are unrelated to the earthquake or repairs and the reasons are associated with pre-existing issues at the property. The insurer maintains that it is not reasonable for it to be obliged to issue a warranty and therefore accept liability for further cracking, when the cracking is at least partly due to factors that are not covered by the policy. Further, the insurer says that it is not reasonable for it to have ongoing liability to repair cracking that may occur in the future, when the evidence strongly suggests that cracking is not solely attributable to the quality of repairs. Determination | Case number: 533657 Page 3 of 7 The insurer agrees and there can be no doubt that it is responsible for the damage caused by the earthquake and the concerns that have arisen in relation to the quality of the repairs completed by its builder. However, having reviewed all of the exchanged material, I am satisfied that the expert evidence supports the position that there are issues at the property not related to the earthquake or the repairs and are not covered under the terms and conditions of the policy. These issues include, but are not limited to:  footing movements  long term drainage problems from the adjacent property  subfloor shows evidence of long-term moisture. The details of these issues have been included with the supporting information attached to the recommendation and for the purposes of completeness, I repeat the details here within 3.3 of this determination. On the basis of the expert material exchanged, I am satisfied that the home is likely to have ongoing issues unrelated to the earthquake or the repairs and not covered by the terms of the policy. The case analyst proposed a resolution of the complaint for which there is substantial agreement between the parties save and except for whether the insurer should complete the repairs or cash settle on the basis of the new scope of works and the new quotation obtained. In my view, given the likely damages the result of causes not covered by the terms of the policy, the insurer should be entitled to cash settle the claim, in the circumstances of this complaint. However, it is also appropriate to have regard to the case analyst‟s commentary within the recommendation regarding the insurer‟s discretion to pay the cost of reinstating or replacing the building. I note the case analyst‟s commentary to the extent that when the insurer repairs the building, it guarantees a quality of materials and workmanship of the work. If a defect arises because of poor quality workmanship or incorrect materials, then the insurer should rectify the problem. However, a cash settlement means the complainant gives up the guarantee provided under the insurer‟s policy. Further, a cash settlement transfers all the risk from the insurer to the complainant for any unforeseen damage and any additiona l work required once repairs commenced. Determination | Case number: 533657 Page 4 of 7 As a result, it is fair that in addition to a cash settlement based upon the new scope of works and the new quotation obtained, the insurer‟s payment to the complainant should include a 20% uplift from the quotation obtained. The result is that upon acceptance of this determination by the complainant, the complaint is to be resolved as follows:  The insurer is to identify two independent repairers who are suitably qualified to undertake a comprehensive examination of t he complainant‟s property and provide a scope of works and quotation for the remaining damage attributable to the earthquake and the repairs completed by the insurer‟s builder.  The insurer is to email the complainant with details and qualifications of the proposed repairers within 14 days of this determination being accepted by the complainant.  Upon receipt of these details, the complainant is to advise the insurer within 14 days by return mail of her preferred repairer.  Upon receipt of the complainant‟s ad vice as to her preferred repairer, the insurer is to arrange for this repairer to complete its scope of works and quotation within 28 days. This scope of works and quotation is to be made available to both parties within a further 7 days.  Once the parties have agreed upon the appropriate scope of works and quotation, the insurer, at its discretion, is to elect to either complete the repairs in accordance with the scope of works and quotation, or alternatively to cash settle the complainant on the basis of the new scope of works and quotation.  If the insurer elects to cash settle on the basis of the new scope of works and quotation, the insurer is to pay an additional 20% of the quotation amount to finalise its obligations under the terms and conditions of the policy.  Either party may come back to the Authority in respect to the new scope of works and new quotation.  Within 7 days of the insurer accepting this determination, the insurer is to pay the complainant an additional amount of $500 for non-financial loss compensation (as agreed by the insurer). Determination | Case number: 533657 Page 5 of 7 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 Terms of the policy Record Key points Lifetime guarantee We provide a „lifetime guarantee‟ when your home is repaired or rebuilt by one of our preferred repairers or builders. This means: - we guarantee the workmanship of repairs that we authorised for the lifetime of your home - we will fix any defect caused by poor workmanship. We w ill decide on what needs to be done to fix an y defect. What we pay for – Buildings Insurance If we agree to cover your claim under Buildings Insurance, then we will: - pay the cost to repair or rebuild the part of your home that was damaged (whichever is lower) - pay for an y e xtra costs we cover under 'other cover'. 3.3 Expert reports Record Key points Insurer’s expert (MJ) Report 4 - 04 - 2017 Earthquake occurred in area on 10 February 2016 with magnitude of 3.1 (ML). Location falls within the outer edges of the predicted “felt” radius of 25km. Indicates there would have been a vibration at the site Given the good condition of the surface drainage, surrounds and subfloor and that all damage appears recent, it is likely the damage is caused by the Determination | Case number: 533657 Page 6 of 7 Record Key points earthquake I nsurer’s expert (IC) Report 5 - 04 - 2017 Repaired right side wall does not have visible new cracks. Some areas where gaps between the bricks are wider than 10 - 12mm. Repaired area of front wall has some fine shrinkage cracks. The cracks are along bedding mort ar which was patched over old mortar. There are fine shrinkage cracks horizontally along the top of the subfloor ventilation grilles below floor level. Shrinkage stepped cracks present in the sub floor brick wall near the entry stairs. No signs of previous repairs to bedding mortar. Vertical crack in the porch front brick wall. Is along the previously repaired bedding mortar. Shrinkage stepped cracks are present near left side porch front brick wall. No signs of previous repairs to bedding mortar. Vertical shrinkage crack at left corner of porch brick wall There are signs of previous repairs to bedding mortar. Porch tile at left corner has shifted slightly. Grout sealant is separated to one tile. Shrinkage stepped cracks are present in left side brick wall. There are previous repair works above cracks but no signs of previous repair to new cracks. Slight vertical shrinkage crack along chimney corner and right brick wall. No cracks or separation under porch concrete slab. Timber floor framing is in reasonable condition with no signs of shifting or movement in timber floor framing. Separation crack is present at front left corner of the lounge room. Slight separation present at ceiling cornice corner. Slight separation in floor skirting at front door. Vertical c rack is present at the front corner of bedroom near entry door. This was repaired previously. Main entry door stone sill is cracked. All observed cracks are in front half of the building and mostly in the area of previous repairs. Most of new cracks are fi ne hairline shrinkage cracks resulting from differential drying rate of cement mortar mix used to repair original cracks. Cracks are visible where thin layer of mortar mix is used but not present where thicker bedding mortar is used. Shrinkage cracks were caused by the use of thin layer cement mix. Some of the new cracks in the area of the previous repairs. As there are no signs of previous repairs to the new cracks, it is likely these cracks were very fine and readily visible and hence not repaired. It may be possible the cracks were not repaired by the builder when the original repairs were done. No evidence of new cracks or damage in sub floor brick walls or floor framing under lounge room. No signs of any shifting of the porch concrete slab over the supp ort brick wall. No cracks or separation were noticed in any of the engaged piers. The gap was present before the earthquake. Insurer’s expert (XP) Report 6 - 11 - 2017 Significant previous repairs 30 years ago. Moisture damage to eaves line from gutter overflow. New cracking is old and not recent. Tree adjacent to the building. Construction of underpin around the building is consistent with old repairs at rear of building. Determination | Case number: 533657 Page 7 of 7 Record Key points Concrete edge is part of underpinned footing installed. Old crack on mid wall. Old repairs at kitchen window which have corresponding internal cracks. Partial new repairs adjacent to chimney. Shrinkage stepped cracks are present near left side porch front brick wall. No signs of previous repairs to bedding mortar. Vertical shr inkage crack at left corner of porch brick wall There are signs of previous repairs to bedding mortar. Porch tile at left corner has shifted slightly. Brick veneer skin constructed around perimeter. Underpinning installed around perimeter of building for brick veneer except for front walls and steps. Pre vious issues with movement and cracking Long term drainage issues. Run off from neighbour property to flow into the property Mo veme nt and cracking history with previous repair Re verse cycle air conditioner without drip tray and drainage. Close proximity of trees. No movement in brick veneer skin. Brick veneer wall supported on different foundation. No brick ties c onnecting brick veneer to original building. Insurer repairs involved installing brick ties. Original brick skin was constructed without articulation.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.