Determination 532854
claim_amount_dispute
Summary
After a fire, the complainant disputed the building settlement scope and the handling of temporary accommodation. AFCA ordered a 15% contingency increase of $14,793.90, reimbursement of a $3,975 expert report, further temporary accommodation up to the remaining policy limit (not quantified), and $1,250 non-financial loss.
The complainant's quote was reasonable against the insurer's own estimates, the temporary accommodation benefit must run until repairs finish, and the insurer's handling caused unusual inconvenience.
Issues
- Claim amount dispute primary · upheld
“The insurer is required to increase its settlement, including a 15% contingency of $14,793.90 on the complainant's quote.”
- Claim denial secondary · not upheld
“The insurer is not required to pay for the caravans as the policy does not cover this type of loss.”
- Poor claim handling secondary · upheld
“Aspects of the claim were not reasonably handled, including cleaning, the contents delay and temporary accommodation.”
- Delay secondary · upheld
“There was a delay in settling the contents claim; the balance was not paid until more than a year later.”
Subjects and remedies
home or building damagepay claimpay compensationpay non financial loss
Text of the determination
Determination | Case number: 532854 Page 1 of 8
Determination
Case number: 532854 11 July 2019
1 Determination overview
1.1 Complaint
The complainant lodged a claim under her home policy after a fire damaged her
property on the evening of 15 September 2016.
The complainant disputes the insurer’s proposed settlement for the building damages.
She is also seeking additional temporary accommodation benefits and has
complained about the insurer’s handling of the claim.
1.2 Issues and key findings
Is the insurer required to increase its settlement?
The insurer is required to increase its settlement in line with section 2.1. This includes
reimbursi ng the complainant’s expert report fee as this assisted her position.
Should the insurer pay non-financial loss?
There were aspects of the insurer’s claims handling that caused an unusual degree of
inconvenience and interference. The insurer should pay the complainant $1,250
compensation for this.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is required to increase its settlement as set out in section 2.1 and
contribute to the complainant’s professional costs. The insurer should also pay $1,250
in non-financial loss.
Determination | Case number: 532854 Page 2 of 8
2 Reasons for determination
2.1 Is the insurer required to increase its settlement?
Complainant established a valid claim
The complainant is required to show that, on the balance of probabilities, she has
suffered a loss caused by a risk insured against under the policy. This is known as a
valid or prima facie claim.
If the complainant can establish a prima facie claim, then the onus shifts to the insurer
to show that, on the balance of probabilities, it is entitled to rely on an exclusion under
the policy or is otherwise entitled to deny the claim.
The complainant’s policy provides cover for damage caused by the events listed in
the policy, including the insured event of fire. These are subject to the exclusions and
conditions set out in the policy.
As there is no dispute the property was damaged by fire, I am satisfied the
complainant established a valid claim.
Building damages
The dispute was primarily about the scope of works to the building and the insurer’s
proposed cash settlement offer of $88,162.80.
The complainant submitted a quote from R dated 30 November 2018 for a total
amount of $98,626. She provided this quote to AFCA on 31 December 2018.
The insurer subsequently agreed to pay this quote and paid this to the complainant on
3 May 2019.
In a telephone conversation with the AFCA case analyst on 29 April 2019, the
complainant did not agree to this amount and believed the cost would have increased
to $140,000. No documentation was provided to confirm this.
The insurer has obtained two other quotes or estimates for the damage based on S’s
scope of works. These totalled $111,274.16 (AJ) and $100,304 (S).
In context of this, it appears the complainant’s quote is reasonable. However, her
quote also contained the following qualification:
This is an estimation as the extent of damage is unknown until flooring and
framing have been exposed
Given the range of costs and this qualification, I consider it is fair that a contingency
amount of 15% towards the complainant’s quote be allowed. This is to account for
Determination | Case number: 532854 Page 3 of 8
any possible variations or complications that may arise in the works. It also accounts
for the likely increas e in costs in the insurer’s quotations given they were obtained
more than one and a half years ago.
Therefore, the insurer should contribute an additional $14,793.90 in full and final
settlement of the building damages.
Complainant is seeking temporary accommodation
The complainant requests the insurer settle her for 51 weeks of temporary
accommodation costs. She says the insurer refused to offer her accommodation for
eight months and she was only received cover for a solitary week.
The insurer disagrees and says the complainant did not require temporary
accommodation as she obtained a caravan from a family member.
Page 32 of the Product Disclosure Statement (PDS) sets out the additional benefit for
temporary accommodation. The relevant parts say:
If We have paid or agreed to pay a claim for damage to Your Home We pay:
• the reasonable cost for You and Your Family to rent a comparable house in a
nearby location; or …
We pay the greater of $15,000 or the amount shown on the Certificate of
Insurance for ‘Temporary accommodation or loss of rent’ towards the cost of 52
weeks rental costs or 52 weeks loss of rent.
We stop paying for alternative rental accommodation or loss of rent once We
replace, reinstate or repair the damage to Your Home or pay You to do so or Your
Home becomes habitable.
There is no dispute the property is uninhabitable. It is not clear how long the repairs
will take. However, given the extensive amount of works and the quoted amounts, it is
fair to allow at least six months for this.
I note the policy provision says the insurer can stop paying alternative
accommodation when it cash settles the claim. It does not appear the insurer is
relying upon this. Even if it did, I do not accept it applies as it would be neither fair,
reasonable nor consistent with the principles of utmost good faith.
This is because if an insurer decides to cash settle the claim when a property is
uninhabitable, it can effectively leave an insured in a situation where they must incur
temporary accommodation costs during the repair process if a claimed event left their
property uninhabitable.
Determination | Case number: 532854 Page 4 of 8
This would be inconsistent to the purpose of the benefit. It is also inconsistent with the
other examples which say:
if the insurer was to repair the property, it commits to paying temporary
accommodation until the repairs are completed
costs will be paid until the property is habitable
In its email dated 29 March 2019, the insurer says six weeks accommodation is about
$20,000. The complainant disputes this. Neither party has provided evidence to show
what is the rent for a comparable home or what options are available for the
complainant.
The maximum limit of this benefit is $15,000. The insurer has already paid for one
week and is entitled to deduct this from the above amount.
Therefore, for this additional benefit, the insurer is required to settle it in either of the
following ways:
pay out what is left of the $15,000 limit, or
find alternative accommodation available to the complainant and consistent with
the policy, then pay the complainant six months’ worth of this accommodation (if it
is less than the remaining policy limit)
Insurer is not required to pay for the caravan
The complainant says that as the insurer never offered her accommodation, she had
to purchase two caravans totalling $11,000.
I do not accept the insurer is liable to reimburse these costs for the following reasons.
The complainant has not provided evidence showing she paid for two caravans. The
only evidence she provided of purchasing a caravan is a written receipt of what is
either a cheque or deposit book noting $4,000 and dated 1 October 2016. Further, the
name next to this is not hers.
In addition, the policy does not cover this type of loss.
Therefore, the insurer is not required to pay for these caravans.
Electrical costs
The complainant provided invoices for disconnecting the power to her house, putting
two power points into the metre box and then reconnecting the power.
The placing of two power points and reconnecting power appear to be associated with
her alternative accommodation arrangements. The insurer is only liable to pay for this
if she does not exhaust the $15,000 limit.
Determination | Case number: 532854 Page 5 of 8
Regarding the cost for disconnecting the power to her home, I accept this is part of
the cost to repair the damage. However, this can be included in the additional 15%
variation allowed on her quote.
Insurer is liable to reimburse the complainant’s expert costs
The complainant is seeking to be reimbursed for the building report she obtained for
the fire damages, which was $3,975.
AFCA may require an insurer to contribute to a complainant ’s professional costs. In
doing so, AFCA considers the complexity of the dispute and whether the expert
assisted the complainant’s position.
I accept the issues required the assistance of a technical expert. Further, the report
assisted the complainant’s position given it showed the insurer’s initial scope was not
complete.
AFCA will normally require the insurer to contribute up to $3,000 per report unless
exceptional circumstances apply. Exceptional circumstances may apply if the issue is
particularly complex.
The issue here was identifying the scope of works to a substantively damaged
property. The report provided was particularly detailed as it addressed all the items
with comments and photographs in support as well as providing a scope of works.
I agree that exceptional circumstances apply in such a context and it is fair for the
insurer to reimburse the cost of this report.
2.2 Has the insurer correctly managed the claim?
Complainant says the insurer has not correctly managed the claim
The complainant says the insurer has not correctly managed the claim. She has
highlighted several issues, including the following:
she requested for a new assessor to be allocated but this was refused
cleaning done to the property was insufficient
it took weeks/months to settle the emergency payment
the scope provided by the insurer was inadequate to cover all damages
temporary accommodation was not provided for eight months and only one week
was allowed in total
two caravans were purchased after the insurer refused to provide accommodation
the insurer’s settlement figure was incorrect
she had to speak to multiple people and calls were not returned
it took eight or nine weeks for the first inspection to take place.
Determination | Case number: 532854 Page 6 of 8
The insurer disagrees with the above. The insurer says delays were experienced due
to the complainant failing to advise the insurer of her concerns with the scope of
works.
Approach to non-financial loss
We may award compensation (capped at $3,000) for non-financial loss where a
complainant has suffered an unusual degree or extent of physical inconvenience, time
taken to resolve the situation or interference with their expectation of enjoyment or
peace of mind.
We take a conservative approach to compensation for non-financial loss. It is not
awarded when a person suffers the normal degree of inconvenience when a problem
occurs.
Aspects of the claim were not reasonably handled
I do agree the following aspects of the claim were not reasonably handled:
the complainant has provided photos to show the cleaning of the premises did not
appear sufficient
there was a delay in settling the contents claim – the insurer’s assessor
recommended settling this based on the sum insured around 6 October 2017, yet i t
did not appear the balance was paid until more than a year later
the complainant has shown the initial scope of works was insufficient and required
a fair degree of adjustment – this also affected the amount initially offered
The complainant had initially arranged her own temporary accommodation. It was not
until 12 July 2017 that she requested for the insurer to arrange temporary
accommodation. I note the insurer only allowed one week at this point. This was
because the complainant had delayed in explaining why the scope of works were
inadequate.
However, the complainant did provide a copy of the builder’s report on 19 July 2017.
This particularised in extensive detail her position. This triggered a review of the
scope of works and identified the initial assessment was not complete. Yet the insurer
did not appear to touch base with the complainant to extend her temporary
accommodation whilst this was being reviewed or make any efforts to do so
afterwards.
I do not consider this was reasonable.
I accept these matters would have caused the complainant to suffer an unusual
degree of inconvenience and interference.
Determination | Case number: 532854 Page 7 of 8
Not all aspects of the claim were unreasonably handled
For the emergency payment, I note the claim was accepted on 14 November 2016,
and on 16 November 2016, the complainant was requested to attend the office to
complete a banking authority. On 21 November 2016 the complainant informed the
insurer no funds had been received. Payment was raised and issued that day. I do
not consider this was unreasonable.
Part of the delay in inspecting the property was due to the insurer investigating the
claim. I do not consider two months investigating the claim is unreasonable. It is also
within the four-month timeframe generally allowed in the General Insurance Code of
Practice.
The insurer provided a copy of its claim notes. This shows regular communication
with the complainant. I also note that part of the delays was caused by the
complainant. For instance, works were stopped by the complainant’s repr esentative
around 6 December 2016 due to concerns about the scope of works. However, the
builder’s report relied upon by the complainant was not provided until more than
seven months later.
There were aspects that the insurer reasonably handled. This included engaging a
building consultant (S) to work out an improved scope of works which the available
information has not shown is insufficient.
Insurer to pay $1,250 in non-financial loss
In reviewing the insurer’s handling of the claim, it is appropriate t o consider the overall
claims experience rather than focusing on specific individual events in isolation.
There were aspects of the insurer’s claims handling that were unreasonable. These
would have impacted the complainant. However, I acknowledge the claim was a large
and complex one. Further, there were aspects of the claim that was reasonably
handled which would have mitigated matters to a degree.
Given this, and considering our conservative approach, I consider it fair in all the
circumstances that the insurer pays $1,250 in non-financial loss.
Determination | Case number: 532854 Page 8 of 8
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint