Home / Financial Firm (Unknown - Insurer) / Determination 532792
Determination 532792
Extent of water damage claim and cash settlement amount
Summary
The insurer accepted a water damage claim but disputed the scope and cost of repairs. AFCA ordered a $152,440.84 cash settlement, $16,000 temporary accommodation, up to $500 representative costs and $1,500 non-financial loss.
The policy requires restoring the insured to their pre-loss position, so the cash settlement is based on the fair scope of works plus a 5% buffer, less a further $300 excess.
Issues
- Claim amount dispute primary · upheld“CC's quote of $145,181.75 (excl GST) is fair and reasonable; cash settlement of $152,440.84 ordered including 5% buffer and $300 excess”
- Poor claim handling secondary · upheld“The insurer accepted liability based on CC's scope of works then withdrew it after receiving quotes, causing substantive inconvenience”
Subjects and remedies
home or building damagethird party authoritypay claimpay non financial loss
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination | Case number: 532792 Page 1 of 11
Determination
Case number: 532792 14 February 2019
1 Determination overview
1.1 Complaint
The complainants lodged a claim with the financial firm (the insurer) on 11 May 2017
for building damage after water entered their home following a storm.
The insurer accepted the complainants’ claim. However, the complainants dispute the
extent of the insurer’s obligations and its claims handling.
1.2 Issues and key findings
What is the extent of the insurer ’s liability for the complainants’ claim?
The insurer is responsible for accepting liability for the claimed damage outlined in the
complainants’ expert CC’s scope of works. The insurer can cash settle the claim,
however, it should pay $152,440.84 in full and final settlement. This takes into
account the following:
the scope of works and quote provided by CC
deducting a further excess of $300
allowing a 5% increase for unforeseen extras.
Are the complainants entitled to compensation for other costs?
It is appropriate for the insurer to contribute up to $500 towards the complainants’
representative’s (MP) costs, upon the production of a tax invoice.
The insurer should pay the complainants $16,000 for temporary accommodation.
Should the insurer pay non-financial loss?
The insurer should pay the complainants $1,500 for non-financial losses.
Determination | Case number: 532792 Page 2 of 11
1.3 Determination
This determination is substantially in favour of the complainants.
Within 21 days of the complainants accepting this determination, the insurer is to
settle this complaint by paying the following to the complainants:
$152,440.84 for the repair of the damage claimed
$16,000 for temporary accommodation costs
up to $ 500 for MP’s costs, if the complainants pr oduce a tax invoice
$1,500 for non-financial loss.
Determination | Case number: 532792 Page 3 of 11
2 Reasons for determination
2.1 What is the extent of the insurer’s liability for the complainants’ claim?
Parties dispute the extent of the insurer’s obligations
The complainants are required to show that, on the balance of probabilities, they
suffered a loss caused by an event they are insured for under the policy. This is
known as a prima facie claim.
The complainants’ policy is a home building and contents insurance policy that
provides cover for accidental loss and damage. There is no dispute the complainants’
property suffered accidental damage and the insurer has accepted the claim for
damage.
However, the parties dispute the extent of the insurer’s obligations under the terms
and conditions of the policy.
The insurer made a $10,000 offer to cash settle the claim. The complainants rejected
this offer, because they want the insurer to i nstruct its builder to complete the repairs
in line with the scope of works outlined by their expert CC.
Insurer’s concern s were valid
The information exchanged shows the insurer took issue with the extent of claimed
damage because:
The complainants initially lodged the claim on 11 May 2015, describing the loss as
‘storm water …enter[ing] the premises causing timber flooring to swell and now
[the] front door i[s] hard to open’ [sic].
The insurer’s builder (CS) reported the damage as being limited to the front entry
timber flooring and CS’s scope of works was for 3m 2 of repairs at the entry foyer.
Although the complainants disputed the scope of works, they did not provide
information to suggest the greater extent of damage until 28 December 2015.
The damage in dispute now extends to the dining/kitchen and living area.
The complainants’ expert CC provided a scope of works for add itional damage.
This included repairs to the flooring, skirting boards, walls immediately above
skirting, bulkheads and joinery in the kitchen and stairs; replacement of the kitchen
and buffet; repairing bearers and joist to entry; painting of all internal walls, skirting
boards, architraves and doors on the ground floor; in addition to an alternative
method of repair for the entrance.
The insurer’s engineer (DB) considered the damage to the entire ground floor, the
kitchen, dining and living room area was consistent with water damage. But DB
could not ‘be categorical in … determining that the exhibited damage occurred as a
result of the 21 & 22 April 2015 storm event’.
Determination | Case number: 532792 Page 4 of 11
DB considered the additional damage to the entire lower ground floor due to water
exposur e was omitted from the CS report. DB indicated CS’s prescribed method of
repair was not adequate and CC’s ‘method of repair to the foyer is accurate and
should be adopted as a fair and reasonable method of water damage repair’.
The insurer does not accept that the additional damage forms part of the claimed
storm damage. This is because it says the complainants had not reported the building
defects (identified in CC’s scope of works) at the time they reported the loss.
The panel accepts the complainants’ initial claim did not appear to reflect the claimed
damage in dispute. However, the complainants hold a policy which covers accidental
damage.
Complainants established prima facie claim for additional damage
The policy defines accidental damage to mean damage that is unforeseen and occurs
without intent. For the following reasons, the panel accepts the additional damage is
accidental damage covered under the policy. That is, the complainants have
established a prima facie claim for the additional damage.
Although the insurer’s engineer DB could not definitely determine the April 2015 storm
event caused the additional damage, DB accepted the damage was a result of water
damage.
Therefore, the panel is not satisfied the information clearly establishes, on the
balance of probabilities, that the additional damage occurred as a result of the same
storm event in April 2015 (which caused the damaged at the entry foyer).
However, there is no information to suggest the water damage was intentionally
caused or was reasonably expected by the complainants.
Thus, the panel is satisfied the complainants’ claim for the additional damage is a
result of accidental damage which is covered under the policy.
Insurer’s prejudice is the charge of a fu rther $300 excess
The insurer has not relied upon any policy exclusions to deny or limit its liability for the
claim. However, it alleges the additional damage needs to be fully investigated
through a new claim lodged by the complainants. The complainants refused to lodge
a new claim.
The panel is satisfied the insurer had the opportunity to assess the property and
consider the information submitted by the complainants. This is evident given it
requested the engineer’s inspection and report after reviewing quotes from AB and
BBS. Further, the insurer then sought to appoint a flooring expert after receiving the
engineer’s report.
Determination | Case number: 532792 Page 5 of 11
Although the insurer did not appoint a flooring expert, the complainants arranged for
GS (one of the preferred flooring experts) to review the flooring and provide a report.
Therefore, there is no basis for the insurer to deny the additional damage claimed
because it has been given all the information obtained by the complainants before
making its decision.
However, it is appropriate for the complainants to pay a further excess of $300 for the
additional damage, as this is the only prejudice suffered by the insurer.
Claim should be cash settled
The panel considers a cash settlement to be appropriate in the circumstances, given
the policy allows the insurer to do so and it will bring finality to the complaint between
the insurer and the complainants.
However, the policy indicates the cash settlement may be reduced by any trade
discount it receives or negotiates. The panel does not consider it appropriate for the
insurer to lessen the cash settlement amount for these reasons:
the insurer is required to put the complainants back in the position they would have
been in before the loss occurred
the policy provides cover for additional costs incurred in complying with changed
government or local authority regulations or by-laws and the reasonable costs for
building permits and approvals from local authorities
these do not appear to be allowed for , in the builder’s quotes (AB and BBS)
the quotations would be likely to include a builder’s margin
there may be unknown damage (eg. hidden damage to the sub-floor discovered
once the floorboards are removed) that has also not been allowed for in the
quotes.
CC’s quote of $145,181.75 (excl GST) is fair and reasonable
The panel accepts the scope of works prepared by CC is fair and reasonable in the
circumstances. In this regard, the panel notes the insurer’s engineer DB and the
flooring expert GS both concu rred that CS’s method of repair to the entry foyer
(sanding) may not rectify the water staining.
GS considered the flooring throughout displayed evidence of ‘edge bonding’ and
‘clumping’, which would not be removed or fixed by sanding the top of the floor s.
DB considered CC’s scope of works was ‘fair and reasonable in repairing [the] water
damage [and] should be utilised in repairing the dwelling’.
CC quoted $145,181.75 excluding GST, to complete the repairs per its scope of
works. The insurer does not dispute that this quote accurately reflects the costs of
repairs.
Determination | Case number: 532792 Page 6 of 11
In the absence of any contrary information, the panel accepts CC’s quote is a fair and
reasonable cost to repair the c omplainants’ property.
There must be a 5 % allowance added to CC’s quote
Although this quotation is from the complai nants ’ builder, the panel considers it is
appropriate in the circumstances that the proposed cash settlement amount include a
buffer to allow for the following:
any minor, additional items which may be required in the course of completing the
outstanding repairs.
In this regard, the panel consider an additional 5% buffer should be added to CC’s
quoted amount.
In determining the cash settlement amount, the panel has taken into consideration the
passage of time (having regard to when the various quotations were obtained).
Accordingly, the insurer is not required to pay interest on this amount.
Cash settlement amount represents full and final settlement
As outlined above, the panel considers it is in the interests of both parties that this
determination brings finality to this complaint, given it is now over two and a half years
since the events which gave rise to the original claim.
The panel has given careful consideration to each of the issues raised by the parties.
Further, in the interests of fairness and certainty, the panel has included a small
‘buffer’ in the cash settlement amount.
In these circumstances, the panel considers it appropriate to emphasise that the total
amount awarded under this determination represents the full and final settlement of
the complainants’ claim.
2.2 Are the complainants entitled to compensation for other costs?
Complainants seek compensation for their representative ’s costs
The complainants are represented by a commercial fee-charging representative MP
in their complaint.
They say MP should be paid the amount the insurer paid its legal representatives
($3,285.70) because:
they would not have required MP’s assistance if CS had provided an accurate
scope and method of repair
MP’s prolonged involvement was caused by the insurer’s first decision about the
claim and its engagement of lawyers
MP’s workload increased due to the insurer’s conduct.
Determination | Case number: 532792 Page 7 of 11
In support of MP’s expertise , the complainants submitted a copy of his resume.
AFCA provides a free service to complainants
AFCA can consider whether such costs are payable under paragraph 9.4 of the FOS
Terms of Reference. We may require an insurer to contribute to legal or other
professional costs incurred by complainants in the course of their complaint. An
insurer will generally not be required to contribute more than $3,000 unless
exceptional circumstances apply.
We offer a service that is free for complainants. Usually, if complainants choose to be
represented, they will have to cover the fees themselves. The information shows the
complainants sought this assistance from as early as 15 July 2015, before they
lodged the complaint with us and well before the insurer was represented by
solicitors.
Accordingly, the panel is of the view such costs are not payable for MP’s involvement
before the complainants lodged the complaint on 19 June 2018.
Insurer should contribute up to $500 to MP’s costs
MP has not produced any documents to support the costs which the complainants
have incurred. Instead, MP seeks the same amount of legal fees the insurer has
incurred. The panel does not consider this is a reasonable basis for the insurer to
contribute to such costs.
However, the panel acknowl edges MP’s involvement has assisted the complainants
to resolve their complaint. The panel also notes some of MP’s actions were not what
we would expect of a party acting in utmost good faith (see 2.3 below for further
discussion).
In the circumstances, the panel considers it appropriate for the insurer to contribute
up to $500 towards MP’s costs, upon the production of a tax invoice.
Policy covers temporary accommodation
The parties do not dispute the policy covers the complainants for temporary
accommodation costs given the property is the complainants’ principal residence and
will be unliveable during repairs due to damage covered under the policy.
The policy states the insurer will pay reasonable additional costs incurred, with its
agreement, for similar temporary accommodation until the complainants are able to
live in their property. The amount the insurer will pay is based on the rental value of
the property immediately before the loss or damage occurred.
Determination | Case number: 532792 Page 8 of 11
Insurer to pay $16,000 for temporary accommodation
The complainants require a two-bedroom property for three people for the period of
repairs. The estimated timeframe of four weeks was nominated by the insurer’s
engineer DB.
The complainants advised they required a property as follows:
for the period of four weeks (as advised by their builders AB and RW)
a location 5 minutes from suburbs M or P, close to their work, school and business
quality (like for like)
with two car spaces.
In the information exchanged, the complainants say they were quoted from $16,000
up to $48,000 for a 19-day period (from 22 February 2016 to 13 March 2016).
In March 2016, the insurer obtained quotes of:
$7,200 for an apartment in a nearby suburb Z
$10,100 for an apartment in the city
$16,000 for a suite in the city.
Neither party has submitted updated or actual quotes or details of comparable
properties for the panel’s consideration. The insurer does not dispute the
specifications for the temporary accommodation required by the complainants.
Although the policy indicates the amount the insurer will pay is based on the rental
value of the complainants’ property, neither party has submitted what the value would
be.
In the absence of actual quotes for an alternative property during repairs, and in the
interest of finalising this complaint, the panel considers it is fair in all the
circumstances for the insurer to pay the complainants $16,000 for temporary
accommodation. It would be unfair to take an average of all the amounts mentioned
by the parties without actual proof, given the large difference. This amount was the
upper amount for a property according to the insurer’s own attempts to obtain a
quote.
2.3 Should the insurer pay non-financial loss?
Compensation is awarded conservatively
Under the FOS Terms of Reference, we may award compensation (capped at $3,000)
for non-financial loss suffered by complainants in relation to their claim.
Determination | Case number: 532792 Page 9 of 11
We will only do so when a complainant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
However, we adopt a conservative approach to the award of compensation for non-
financial loss. Compensation is not awarded for the normal degree of inconvenience a
person would expect to suffer when lodging this type of claim or having a problem
with the insurer. Compensation can be awarded though if the insurer’s handling of the
claim was unreasonable.
Insurer to pay $1,500 in non-financial loss
The information s hows the insurer accepted liability (based on CC’s scope of works)
then withdrew it (after receiving quotes). This suggests the insurer accepted liability
for the claim but then decided not to cover the extent of loss based on the quantum.
The panel accepts this caused substantive inconvenience to the complainants.
However, the inconveniences have not all been caused by the insurer.
The complainants were represented by MP during the claim process and AFCA
complaint. From the information exchanged, it is clear MP’s conduct was not
productive at times. For example, some emails show the following:
On 30 March 2016 MP threatened legal action for damages, when the insurer
indicated it would consider a quote from BBS.
On 24 March 2016 MP gave the insurer a deadline of less than an hour to obtain a
revised quote from BBS or for BBS to withdraw the quote.
On 1 April 2016 MP accused a staff member from the insurer as being ‘vindictive’
and ‘malicious’.
MP delayed providing essential information to support the extent of repairs and the
flooring expert’s report to the insurer. This caused the claim to be closed.
Given this, and considering our conservative approach, the panel considers it fair in
all the circumstances for the insurer to pay $1,500 for non-financial loss.
Determination | Case number: 532792 Page 10 of 11
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Our approach to this complaint
This complaint has not been the subject of a FOS recommendation. In view of the
complexity of the issues in dispute, this matter has been referred to a panel for
determination. The panel consists of an Ombudsman and two representatives with
consumer and insurance experience.
The panel has based this determination on what is fair in all the circumstances having
considered all of the information exchanged, the relevant legal principles, terms of the
policy, good industry practice, including relevant codes of practice and prior
determinations where applicable.
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
The panel has reviewed and considered all of the material provided by the parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, the panel has restricted its commentary to those issues that it
considers directly relevant to the outcome only.
The complainants are represented by a commercial fee-charging representative in
this complaint. Any reference in this determination to the complainants includes
reference to their representative. Submissions made by the representative are taken
to have been made on behalf of both the complainants.
Determination | Case number: 532792 Page 11 of 11
3.3 Relevant policy terms
Section Terms
Cover for your home We will cover your home for any accident al loss or damage not
otherwise excluded.
…
If your home suffers accidental loss or damage, we will choose to do
one of the following:
Repair the damaged portion of your home.
Replace your home
Compens ate you for the amount we would have paid for repair or
replacement.
If we repair or replace your home, this includes any additional costs
incurred in complying with changed government or local authority
regulations or by - laws.
Definitions Accidental damage means damage that is unforeseen and occurs
without intent.
Additional benefits to
your home cover
Rebuilding costs
Following loss or damage insured by this policy, we will pay the
reasonable costs of the following:
Demolit ion of your home and r emoval of debris from the site.
Architects, surveyors, engineers and professional consultants fees.
Building permits and approvals from local aut horities.
Temporary accommodation
If your home is your principal residence and becomes unliveable as a
result of loss or damage ins ured by this policy, we will pay the
reasonable additional costs you incur, with our agreement, for similar
temporary accommodation until you are able to live in your home.
The amount we pay you will be based on the rental value of your
home immediat ely before the loss or damage occurred.