Home / Financial Firm (Unknown - Insurer) / Determination 532659

Determination 532659

Scope of flooring repair and cash settlement method

FirmFinancial Firm (Unknown - Insurer)
Decided2018-12-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A homeowner disputed the insurer's plan to repair only the damaged area of a timber floor rather than replace the whole room, and the cash settlement method. AFCA limited the insurer's liability to the damaged area but ordered a 15% uplift if cash settlement is taken.

The insurer may correct its agent's error where the insured did not rely on it, and unchallenged expert evidence showed the damaged area could be repaired, so undamaged flooring need not be replaced.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 532659 Page 1 of 9 Determination Case number: 532659 19 November 2018 1 Determination overview 1.1 Complaint The complainant holds a home building and contents policy underwritten by the financial firm (the insurer) covering his home address. On or around 17 June 2017, a leak was discovered in the kitchen under the refrigerator and a claim lodged under the policy. The insurer accepted the claim and advised the complainant it would repair the damaged area. The complainant maintains the area cannot be properly repaired and the flooring should be replaced. He further says the insurer is obliged to replace the flooring in the entire room rather than just the damaged section, in accordance with the initial scope of works (SOW) prepared. He believes the insurer is bound by its initial representation to replace the entire floor. 1.2 Issues and key findings Is the insurer bound by the initial SOW? The insurer is not bound by its a gent’s actions in preparing a SOW which include d replacement of the entire floor area. This is because the complainant did not rely on this advice to his detriment and did not suffer any loss as a result. At law, the insurer was entitled to correct the error made. Has the insurer fulfilled its obligations under the policy? The insurer has fulfilled its obligations under the policy because:  the terms of the policy allow the insurer the right to determine the method of settlement of any claim;  this includes both the method of settlement and the scope of the settlement;  the expert evidence confirms the flooring can be safely repaired;  even if it were accepted the damaged flooring was not salvageable, the insurer is not required to replace undamaged areas to match; Determination | Case number: 532659 Page 2 of 9  the insurer would be limited to sourcing materials which match as closely as possible to existing; and  any repairs undertaken by the insurer are afforded a lifetime guarantee under the policy terms. The insurer has offered the complainant the choice of keeping the cash settlement paid, or returning these funds so the insurer can undertake the works so as to avail himself of the attached lifetime repair guarantee . The complainant is to advise the insurer of his preference within 14 days of the date of his acceptance of this determination. In the event the complainant proceeds with the cash settlement, the insurer’s offer and proposed SOW is reasonable and discharges its liability under the policy terms. However, the insurer is to provide a general uplift of 15% on the quoted amount to allow for contingencies and offset the risk the complainant is assuming in taking responsibility for the repairs. 1.3 Determination This determination is substantially in favour of the insurer. The insurer is entitled to limit its liability for the claim to repairing the damaged area of flooring. The insurer’s decision to offer the complainant the choice of settlement method was reasonable in the circumstances. The complainant is to advise the insurer of his preferred method of settlement within 14 days of the date of his acceptance of this determination. In the event the complainant accepts the cash settlement offer, the insurer is to increase the amount in accordance with the directions set out in section 2.2 below. Determination | Case number: 532659 Page 3 of 9 2 Reasons for determination 2.1 Has the insurer fulfilled its obligations under the policy terms? Onus rests with complainant to establish further entitlement There is no dispute the complainant suffered a loss from a risk ins ured against or the insurer accepted the claim and arranged to settle its liability for the damage by way of a cash payment . However, a dispute has arisen between the parties over the insurer’s settlement. Principally, the complainant maintains the floori ng cannot be adequately repaired and must be replaced. Further, he contends the extent of the flooring replacement required is not limited to the damaged area, but extends to the entire open plan room. As the party seeking additional benefits, the onus rests with the complainant to establish he is entitled to them. 2.2 Is the insurer bound by the original SOW? Original SOW included replacement for the entire floor area There is no dispute between the parties that the insurer’s original repairer “HR” scoped to replace the flooring in the entire open plan area. A SOW was sent by HR to the complainant for review, which set out the flooring was to be replaced in its entirety. The complainant says there is no doubt HR was acting as the insurer’s agent and on its authority when it made this representation to him. He says the insurer should be bound by this representation and is therefore required to replace the entire floor. Insurer entitled to correct an error Both at law and under the General Insurance Code of Practice (the Code), the insurer is entitled to correct an error once it becomes aware of it. This is so even where correction of the error is to the complainant’s detriment, providing there has been no reliance on the error by the insured. In this instance, once HR recused itself from the claim as the SOW was in excess of the types of matters it handles, the insurer was required to appoint another builder to the claim. This was builder “BB”. BB then atte nded the property to prepare its own SOW, and considered the floor could be satisfactorily repaired. It then alerted the insurer to this issue, resulting in the insurer seeking further expert opinions as to the viability of repairing the floor. Whilst that issue will be dealt with in detail later in this determination, I am satisfied the insurer was entitled to re-assess its liability under the policy once further and Determination | Case number: 532659 Page 4 of 9 better information became available to it. The insurer ultimately retains its rights as to the final decision on any claim. While it can take its agents’ recommendations into account when settling a claim, it is not bound by them. I accept HR made an error when providing the original SOW to the complainant purporting to proceed with the repairs, despite being aware that it was authorised by the insurer to handle small claims only. However, as HR was the insurer’s agent, the insurer was entitled to correct the error made on its behalf. I am also satisfied the material does not establish the complainant relied on the error to his detriment. He did not take any action as a result of the original SOW nor did he incur any financial detriment as a result. As the complainant has not been prejudiced because of the error, the insurer is not bound by the initial decision. Therefore, the complaint is to be assessed solely on its merits. The complaint will therefore turn on whether it is accepted the insurer’s second SOW is adequate to properly reinstate the area and discharges its liability under the policy terms. Even accepting the above, the complainant maintains the flooring needs to be replaced in its entirety. Expert reports The insurer appointed two flooring experts to assess the floor and comment on the viability of the repair method. Full details of these expert reports are contained within section 3.3 of this determination. The first expert “TF” attended on behalf of BB. TF concluded the affected areas had returned to their natural state of moisture equilibrium since the leak and could safely be re-used. He proposed removal and cleaning of the affected blocks, sanding and then re-laying them. Sanding and polishing of the remaining floor areas would satisfactorily reinstate the area. As the complainant disputed TF’s findings, the insurer agreed to obtain a further independent expert report from timber flooring expert “AT”. Both parties agreed to be bound by AT’s findings. The complainant maintains AT concluded the floor requires replacement and the insurer is therefore reneging from its agreement to accept AT’s findings. However, I disagree. Review of AT’s report shows AT was in agreement with TF that the affected areas could be satisfactorily repaired to reinstate the area. AT did state tha t in the event the blocks could not be re-used and a suitable replacement not able to be sourced, the scope would alter. However, I do not consider that disclaimer to mean AT was in disagreement that the affected area could be satisfactorily repaired. Determination | Case number: 532659 Page 5 of 9 I accept AT and TF are appropriately qualified and have the relevant expertise to comment in this matter. In the absence of any conflicting information, the insurer is entitled to rely on their findings. Complainant has presented no expert evidence of his own As he disagrees with the findings of TF and AT, the complainant was invited to supply evidence in support of his position from a suitably qualified person that the flooring required replacement. However, he has not done so although he has supplied two quotations from flooring repairer “CF” , one for repair and one for replacement of the flooring. However, these are silent as to the viability and preference of each method. Accordingly, the insurer’s evidence is unchallenged. On this basis, the available evidence shows the affected area of the floor can be satisfactorily repaired. The insurer is therefore entitled to limit its liability for the claim to repairing the floors. SOW is reasonable As part of his inspection, AT provided a plan of the area which s hows the visually affected area as well as the area likely to have been exposed to moisture and will require cleaning. Whilst AT does not comment on the actual dimensions of size of the area, the insurer agrees that this plan forms the basis of its proposed repair. TF noted the area to be approximately 2m ², which I accept broadly correlates with AT’s plan. Review of BB’s SOW shows it considers the affected area to be 1m x 1m x 1m. CF’s quotation does not include the specifications of the area it quoted to repair, making a direct comparison difficult. The insurer has agreed to reinstate the area as set out in AT’s report, although it agrees to review this in the event the damage has spread further and/or other unforeseen issues come to light during the repair. In the absence of evidence to the contrary, I accept the insurer’s SOW is reasonable. Insurer not obliged to match materials In the event some of the blocks are not salvageable, the policy commits the insurer to using new materials of the same type, standard and specification in the first instance. Where that is not available, the insurer is obliged to use materials which as closely as possible match the original. Where the complainant is dissatisfied with the match to be achieved, they have the option of paying privately to replace undamaged areas or accepting a cash settlement. However, the insurer is not obliged to repair or replace undamaged parts of the home to create a uniform appearance. Determination | Case number: 532659 Page 6 of 9 Insurer entitled to cash settle for resultant damage The complainant raises issue with the insurer’s decision to cash settle the claim. He says the insurer bullied him into accepting a cash settlement. The complainant does not dispute receiving the product disclosure statement (PDS), therefore I accept he did so. The policy clearly states that the FSP retains the right to determine which method of settlement to utilise when settling a claim. Therefore, its decision to cash settle for the damaged flooring is in accordance with the policy. AFCA expects an insurer to exercise its discretion to do so reasonably, as cash settlement may affect an entitlement to other benefits under the policy terms such as a repair guarantee. However, there is no evidence to suggest the insurer has not done so in this instance. It is generally held to be good insurance practice for an insurer to discharge its liability for a claim as soon as practically possible. This gives the insured the funds to undertake repairs at their leisure. This is so even when there is a dispute over the settlement amount as any settlement could still be accepted on a without prejudice basis. It is clear the parties were at an impasse over the proposed SOW. I accept the insurer obtained AT’s report after the cash settlement was made whereas it could ha ve done so before. However, this of itself does not show the insurer’s actions were unreasonable, particularly in circumstances where AT’s report supported the proposed SOW. Further, it is clear from the material that the complainant did not intend to proceed with repairs realistically until 2019. In the circumstances, the insurer's decision to cash settle in this instance was reasonable. Insurer has now offered complainant options for settlement However, the insurer has now offered the complainant the option of returning the cash settlement funds in order that it can undertake the repairs via BB. This is reasonable in the circumstances. Were the complainant to do so, he would be afforded greater protection under the policy terms, as the policy provides a lifetime repair guarantee on any repairs authorised by the insurer. In the event the repairs were not satisfactory, then the complainant would retain his rights against the insurer. However, he does not have the same protection if he chooses to accept the cash settlement. Cash settlement option to be amended In the event the complainant accepts the cash settlement, then the insurer is to ensure BB’s quotation reflects the dimensions as set out in the AT report, being 2m ² of flooring for repairs (if it has not already done so). BB has confirmed it is prepared it Determination | Case number: 532659 Page 7 of 9 is prepared to undertake the works privately for the complainant at the price quoted, should he wish to engage it to do so. The complainant has not challenged BB’s quotation (or the portion of th e settlement relating to the temporary accommodation), so I accept this reasonably reflects the cost of repairs in the open marketplace. However, in the event the complainant proceeds with the cash settlement option, t he insurer is also to provide a general uplift of 15% on the overall quoted amount by BB. This is to offset the risk the complainant is assuming in managing the repairs himself, as well as the forfeiture of the lifetime repair guarantee. If the complainant elects for a cash settlement, then he is to advise the insurer within 14 days of the date of his acceptance of this determination. In the circumstances, it is not appropriate to consider payment of interest or an award of compensation. Determination | Case number: 532659 Page 8 of 9 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 AFCA approach to this complaint A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All of the provided material has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted only to those issues considered relevant to the outcome. 3.3 Expert reports Record Key points insurer ’s expert (A T ) Timber flooring specialist r eport 3 August 2018  the damage is isolated to small area around the refrigerat or with the remainder of flooring unaffected  the floor is constructed from aged Keruing block parquetry in a herringbone pattern with feature borders  the floor is in good condition  there affect ed area has signs of moisture including cupping and marginal shrinkage  there is evidence of only marginal variations in the timber, as the floor has recovered significantly in the timeframe since the leak occurred  moisture readings show the timber is withi n normal levels and are therefore currently suitable for repair  the floor remains structurally sound Determination | Case number: 532659 Page 9 of 9 Record Key points  it is likely the only effective form of amelioration of the affected area would involve isolated repair followed by re - sanding, filling and refinishing of the greater floor area  however, if the existing timber in the damaged area cannot be reinstated or replacements not sourced, the required works may escalate significantly. Insurer’s expert ( TF ) Timber flooring specialist r eport 15 February 2018  the parquetry flooring is Keruing laid in a double herringbone pattern with border  the floor has some raised and loose blocks  the area of concern measures approximately 2m ² but the remainder of flooring is without defect  the insured believes the timber can not be reused once it has become wet  this is incorrect. Timber will absorb and release moisture with changes in humidity  when timber is installed, it will likely have a variation in moisture ranging between 8 - 13% and after a 12 - month period, it will reach an equalised moisture content  the water leak occurred nine months ago and the floor has now returned to an equalised moisture content  some blocks have a slightly raised surface due to the cell structure changing but this does not make them defective  they c an be removed, cleaned and reinstated, with sanding producing a flat surface and finish  this method of repair is normal practice once the floor has returned to equalised moisture cont ent  where there might be gaps, these can be filled in the sanding works. Coating is then applied to produce a finished floor. It is usual to have gaps in parquetry flooring  blocks are re - laid so as to minimise gapping  the existing floor has gaps in it, and the re - laid floor will have less gapping than the original  in conclusion, the floor can be removed and reinstated  this method of repair will produce a finished floor to match the existing  the existing blocks can be re - used without compromising the finished floor.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.