Determination 532525

Claim for stolen blocks and cost to demolish and rebuild wall denied

FirmFinancial Firm (Unknown - Insurer)
Decided2019-02-21
ProductGeneral Insurance · Other general
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$13,608
SourceAFCA PDF

Summary

The complainant claimed $13,608.38 for demolishing and rebuilding a partly built wall after 100 blocks were stolen from its construction site. AFCA found no physical damage to the wall and that the claimed loss was excluded consequential loss.

The wall was not physically damaged, and the rebuild cost is consequential loss from the theft, which the policy clearly excludes.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case number: 532525 21 February 2019 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) for 100 stolen blocks from a construction site. The insurer accepted the theft occurred but denied the claim because there was no physical loss or damage to the partly built existing wall. Further, it relied on policy exclusions regarding consequential loss and undiscovered theft. The complainant disagrees with the insurer’s decision and seeks the insurer indemnify it for the costs of demolishing and rebuilding the wall. The case analyst provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the insurer. As the complainant did not accept the recommendation, the complaint has been referred to me for determination . 1.2 Issues and key findings Is the insurer entitled to deny the claim? The available information establishes on the balance of probabilities there has been no physical loss or damage to the blocks which were not stolen and no physical loss or damage to the partly built wall. While the concrete works include the wall, the wall has not been damaged. As the complainant has not established a prima facie claim, the insurer is entitled to deny the claim. Further, the insurer is not liable for any losses consequent upon the insured loss, being the theft of 100 blocks. As consequential loss is excluded under the policy, the insurer is also entitled to rely on this policy exclusion to deny the claim. Determination | Case number: 532525 Page 2 of 7 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to deny the complainant’s claim and is not required to take any further action in relation to the complaint or the claim. Determination | Case number: 532525 Page 3 of 7 2 Reasons for determination I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous decisions. I have considered all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. The complainant is represented. Reference in this determination to the complainant includes reference to the complainant’s representative. No new material provided after the recommendation After the recommendation was rejected, the complainant made further submissions in which it essentially reiterated its position. No new material was provided. 2.1 Is the insurer entitled to deny the claim? Complainant must establish a prima facie or valid claim The complainant must establish on the balance of probabilities it has suffered a loss caused by an event to which the policy responds. This is known as a valid or prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities an exclusion applies if it seeks to deny or limit its liability for the loss. The complainant’s claim The complainant claims $13,608.38 as set out in the claim form. This is said to be the cost of demolishing a partly constructed wall and supply of new blocks. The available material establishes 516 blocks were delivered to the complainant on 14 August 2017. In the claim form, the complainant says:  the blocks were delivered to a secure site, so it could construct three feature walls and a column  it was not until it started to build the structures on or about 29 January 2018, that it realised some of the blocks had been stolen  516 blocks were ordered and delivered, and it estimated 100 blocks were stolen  it did not have enough blocks to finish the wall because it could not obtain more blocks in the same colour  to complete the wall, it must demolish the wall and order a new batch of blocks. Determination | Case number: 532525 Page 4 of 7 The insurer’s submissions The insurer does not dispute 100 blocks were stolen. However, it argues the policy does not respond. The insurer says:  the insuring clause has not been triggered as there is no physical loss, destruction or damage to the wall as per the policy definition of damage  there is no cover for the cost to demolish and rebuild the partially built (but undamaged) wall when the wall cannot be completed due to the lack of matching blocks  the policy does not respond to the cost of replacing blocks because others of t he same colour are not available  the inability to complete the wall is a consequence of the theft  the policy terms exclude consequential loss  the loss was not discovered until about five months after delivery of the blocks  undiscovered theft is also excluded under the policy  while the stolen blocks are covered because this is a physical loss, the cost to replace the 100 stolen blocks ($509) falls under the applicable policy excess ($1,000) and so there is no claim under the policy. The complainant’s s ubmissions The complainant contends:  the theft of the blocks (building materials) is a sudden physical loss of building materials and so the claim falls under the definition of damage in the policy  the contract works (which include the wall) have been damaged by the theft of the blocks because the partly built wall cannot be completed as the matching blocks are not available  to complete the contract works, the wall must be demolished and rebuilt  the theft is to an item specified in the contract, so the theft is not consequential loss  it is not sufficient to merely state consequential losses are excluded, the categories of loss must be expressly defined  a proper analysis of the consequential loss exclusion means the claim cannot be denied  it is moot to rely on the undiscovered theft exclusion because if the stolen blocks had been above the excess the insurer would have covered the difference  it was only when the matter came to AFCA, the insurer denied the claim relying on both policy exclusions. Complainant has not established a prima facie or valid claim The policy provides cover for material damage. The insurer will indemnify the complainant for damage to the insured contract works from any cause not excluded, occurring at the contract site during the construction period. Determination | Case number: 532525 Page 5 of 7 It is not in dispute there was theft of 100 blocks from the contract site during the construction period. The insurer does not dispute the theft of the blocks is a physical loss and the policy responds to the claim for 100 stolen blocks. However, this admission is not determinative of the outcome. This is because the dispute relates to the cost to replace all blocks required to rebuild the wall and the cost of demolishing the wall, so the wall can be rebuilt. There has been no physical loss or damage to the blocks which were not stolen. There has been no physical loss or damage to the partly built wall. In the circumstances, I do not accept there has been damage to the contract works. I accept the concrete works include the wall, but the wall has not been damaged. I am not satisfied the complainant has established a prima facie claim. Insurer is not liable for consequential loss Even if I were to accept a valid claim exists, the policy says the insurer shall not be liable for consequential loss. The complainant argues a proper analysis of the consequential loss exclusion and case law means the insurer cannot rely on this policy exclusion. However, I am satisfied the policy terms are clear and unambiguous. The insurer is not liable for several losses including consequential loss. In other words, the insurer is not liable for any losses consequent upon the insured loss. The insured loss was the theft of the 100 blocks. Because of the theft, the complainant had to replace the 100 blocks to complete the wall. The complainant could replace the 100 stolen blocks, but they would not match the blocks in the partly completed wall. In consequence of the theft and inability to simply replace the 100 stolen blocks, the complainant is required to dismantle the wall and buy new blocks to rebuild the wall. Insurer is entitled to deny the claim I am satisfied this claimed loss is sustained because of the theft of the 100 blocks. I am satisfied the claimed loss is consequential loss. As consequential loss is clearly excluded from the cover, the i nsurer is entitled to deny the claim. Application of the other policy exclusion is not determinative of the outcome The insurer also says it is entitled to deny the claim because it shall not be liable for undiscovered theft. The policy says the insurer shall not be liable for damage discovered only at the time an inventory is taken. Determination | Case number: 532525 Page 6 of 7 The complainant says the insurer cannot rely on this exclusion as it only raised this exclusion when the complaint came to AFCA. However, the insurer relied on this policy term in its final decision letter. It is not in dispute the theft was discovered some several months after the blocks were delivered to the complainant. However, on my analysis of the policy response, this policy exclusion is applicable to the theft of the 100 blocks only. And as the policy deductible is greater than the cost to replace the 100 stolen blocks, the application of this policy exclusion is not relevant to the outcome of the claim which is to replace all the blocks, demolish the wall and rebuild the wall. Determination | Case number: 532525 Page 7 of 7 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 Our Approach It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.3 Relevant policy extracts The relevant policy extracts are referred to in the correspondence between the parties, the parties’ submissions and in the insurer’s Notice of Response dated 10 July 2018. Both the policy document and the Notice have been exchanged with the complainant. 3.4 Other relevant material considered and relied on  parties’ submissions and emails both before and after the recommendation  correspondence between the parties  claim form, photographs, correspondence between the complainant and the supplier of the blocks  policy schedule.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.