Home / Financial Firm (Unknown - Insurer) / Determination 532453

Determination 532453

Kitchen leak claim denied and burst-pipe mould and rot settlement

FirmFinancial Firm (Unknown - Insurer)
Decided2019-06-24
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insurer's denial of a gradual kitchen leak claim was upheld. For the burst-pipe claim AFCA ordered further mould and water-damage remediation, vent rectification and reimbursement of two expert report fees, with no stated figure.

The gradual-escape exclusion applied to kitchen damage, but insurer delays and defective subfloor vents extended the burst-pipe damage for which it is liable.

Issues

Subjects and remedies

home or building damagepay compensationreassess claimrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 532453 Page 1 of 8 Determination Case number: 532453 12 June 2019 1 Determination overview 1.1 Complaint The complainant had two recent claims with the financial firm (insurer); the first in October 2017 for a leaking sink trap under the kitchen sink, and the second in January 2018 for a burst main pipe under the hallway floor boards. With respect to the first claim, the complainant noticed that there was mould growth under her sink and believed it to be linked to the leaking sink trap. The insurer denied the claim due to policy exclusions for gradual escape of liquid or gradual loss or damage of any kind. With respect to the second claim, the complainant requested the insurer accept mould remediation and repairs to water affected timbers and flooring throughout the property. The complainant says this was caused by the insurer delaying the claim and inadequate rectification of subfloor vents. The complainant is also dissatisfied with the level of service provided by the insurer for the claims. A case manager provided the parties with a recommendation on the issues in dispute. The recommendation was partially in favour of the complainant. The complainant rejected the recommendation and provided further reports for consideration. A copy of the recommendation is attached to this determination. 1.2 Issues and key findings Is the insurer entitled to deny the first cla im? The insurer is entitled to deny damage to the kitchen flooring and subfloor timbers. This is because the damage was most likely caused by the leaking sink trap over time. Is the complainant entitled to further settlement for the second claim? The insurer has accepted mould and rot remediation as well as resulting floorboard damage caused by the burst pipe located under the hallway flooring. This should include all mould and rot remediation throughout the property excluding the kitchen Determination | Case number: 532453 Page 2 of 8 area. This is because delays and inadequate rectification of the subfloor vents have likely caused the damage to become widespread since the burst pipe in January 2018. The insurer is also liable for the cracking damage identified and to repaint the bathroom ceiling. Shoul d the insurer contribute to the complainant’s professional costs? The insurer should pay for the reports from H and F as they were reasonably incurred and assisted the complainant’s position. 1.3 Determination This determination is partially in favour of the complainant. The insurer has accepted mould and rot remediation as well as resulting floorboard damage caused by the burst pipe located under the hallway flooring. The Insurer is to:  take no further action in relation to the first claim  rectify the subfloo r vents to comply with the standards outlined in the engineer’s report within 14 days of the determination being issued  obtain a new scope of work for mould, rot, related damage to flooring throughout the property (excluding the kitchen), cracking observed and bathroom ceiling damage within 14 days of the determination being issued, and proceed with the repairs observing any required drying periods  provide temporary accommodation to the complainant until a mould expert accepts the mould covered by this decision has been remediated  reimburse the complainant for the report fees from H and F Determination | Case number: 532453 Page 3 of 8 2 Reasons for determination I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous AFCA decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. I am satisfied that the case manager’s recommendation contains an accurate summary of the complaint, the issues to be determined, any applicable paragraphs of the Rules and any relevant law. 2.1 Is the insurer entitled to deny the first claim? Insurer is not liable for kitchen mould or damage The complainant says the leaking trap pipe under the kitchen sink was a minor event, and the plumber’s report (SR) makes no mention of wetness or mould in the kitchen subfloor during his inspection. While SR’s report does not mention mould in the subfloor, he does descri be the leak as significant given the extent of damage to cabinetry. Further, it is not clear if SR specifically observed the flooring underneath or was focused upon finding the source of the leak. For instance, he said: I inspected the subfloor of the home and found that under the kitchen sink a 65mm sewer pipe runs for approximately 6m before joining back into the main 100mm main run. It is in this 65mm piping where I believe the partial blockage is occurring This indicates the latter. There is one photo o f the subfloor in SR’s report. However, it is dark with only a 65mm waste pipe highlighted. The underside of the flooring is not visible in this photo. D’s report of the assessment shows a photo of the rotted carcass and floor. The floor looks heavily disc oloured with black substance on top. This is consistent with SP’s assessment that the leak was significant. It can also explain any staining or mould underneath this area. IL’s report dated 11 December 2018 does include colour photographs of the underside of the floor. This area showed significant water staining and decay of timber members under the kitchen sink. Such staining was not evident in other parts of the subfloor. Another report by mould expert M says: Mould visible on underside of wooden flooring and floor joists. Only visible area affected is approx 4m x 1m underneath kitchen flooring Determination | Case number: 532453 Page 4 of 8 This report was written in July 2018. Based on the available information, I accept it is reasonable to accept that the mould discovered to the kitchen area, including the floor underneath, is likely related to the first claim. The insurer is entitled to deny the first claim. I concur with the case manager’s recommendation in relation to the first claim. The policy excludes gradual loss or damage of any kind, and the gradual escape of liquid. D’s report is that the leak has been occurring gradually over a period of time, possibly a year. There is no evidence refuting this conclusion. Given the extent of damage, it is likely this leak has been occurring for a long period of time. In rejecting the recommendation, the complainant does not dispute the insurer is entitled to deny liability for the kitchen leak. However, she does not accept the damage extends to the floor underneath and the subfloor. I do not agree. The available information shows any mould in the floor underneath the kitchen is likely due to this leak. This is consistent with the fact SP described the leak as significant and substantive staining was observed proximate to the area that mould and rot was found in the kitchen. Given this, I accept the insurer is entitled to deny liability for the damage to the kitchen, including the damage underneath. 2.2 Is the complainant entitled to further settlement for the second claim? The burst pipe was a significant event This event was significant. Colour photographs submitted by the insurer’s expert Q show the subfloor was inundated with water. While it is not possible to know when the pipe burst, it occurred during a three-week period the complainants were away. Q had to extract about 2,000 litres of water from under the property. Q estimated about 80% of the subfloor was affected with the rest of the soil being muddy. A dehumidifier was installed about a week later and had to be operated for over four weeks to assist in the drying process. However, when IL inspected the subfloor on 18 April 2018, he observed that the subfloor was still completely saturated and ‘very soft under foot’. Determination | Case number: 532453 Page 5 of 8 Subfloor vents not installed correctly The insurer installed subfloor vents in June 2018 to aid in the drying out of the subfloor by improving ventilation. This was in line with IL’s recommendation to assist in the drying out of the subfloor. However, IL identified that the vents along the northern elevation have been installed at the perimeter bearer level. This means that the perimeter bearer is restricting the cross ventilation and should be lowered. According to IL, inadequate subfloor ventilation will cause the retention of moisture and create condensation due to dead air , leading to further mould and timber decay. The insurer attempted to rectify this around March 2019, but the subsequent work also appears non- compliant with IL’s recommendations as the complainant says three vents remain obstructed. The complainant’s view has been provided to the insurer who has not refuted the statement. Damage likely to have progressed due to insurer delays The complainant provided a report from H that said the subfloor has been contaminated. Given the event in question, it is reasonable to accept this is connected to the burst water pipe. The insurer has relied on Q’s report which said that the subfloor issues identified in the kitchen and laundry are unrelated to the burst pipe. This was based on the fact Q expected the issue to be widespread. It is difficult to accept the mould in the subfloor is unrelated to the burst pipe. Particularly when you consider how heavily the subfloor was inundated and the situation being exacerbated by the subfloor installation being inadequate and yet to be properly rectified. On consideration of the above, I accept mould, timber decay and water damage to flooring is likely to have progressed significantly since the original event in January 2018. In its report, the complainant’s expert F says: The floorboards are highly likely to have mould trapped on the underside of the tiles and are non-salvageable and will require to be removed. This is about the laundry flooring, but the principle may be applied to other areas of the home. Given the fullness of the time elapsed, it is reasonable to assume that interior floors and tiled areas may also be affected as this report suggests. Determination | Case number: 532453 Page 6 of 8 Insurer liable for mould remediation and water damage excluding the kitchen There is no accurate way to separate the mould caused by the kitchen leak and the sudden bursting of the water supply pipe. On balance however, I accept that most of the mould was caused by the burst pipe, subsequent water inundation, inadequate installation and unsuccessful rectification of subfloor vents and delays caused by the insurer. As such, I consider it fair in the circumstances that the insurer remediate mould throughout the property with the exception of the kitchen. The insurer is to rectify the subfloor vents in accordance with IL’s recommendations. On completion of this task, the insurer should obtain a current scope of work for mould remediation throughout the property excluding the kitchen. The insurer should then complete the remediation works, observing any drying period that may be required. The insurer may seek a contribution from the complainant if mould remediation cannot be completed without undertaking kitchen remediation as well. The insurer has accepted the replacement of water affected flooring in the hallway. This should be extended to include any other water affected flooring such as the laundry as mentioned in M’s report. The insurer is also to arrange contents storage and temporary accommodation as required during the remediation period. I do not accept it is appropriate the complainant remains at the property with the amount of mould discovered. Insurer is liable for internal cracking The complainant provided a copy of an email exchange with IL. IL said that the minor cracking should be attributed to the claim. Therefore, this should be included as part of the insurer’s liability. Insurer is liable for the bathroom ceiling The complainant says Q applied masking tape to the bathroom ceiling to contain mould as part of a make safe. When the tape was removed, the ceiling paint peeled off. The insurer has not refuted this statement. As such, the insurer is to repaint the bathroom ceiling to rectify the damage caused by the make safe. Determination | Case number: 532453 Page 7 of 8 2.3 Should the insurer contribute to the complainant’s report costs? The insurer should contribute towards H and F’s reports The complainant is seeking to be reimbursed for the expert report costs she has incurred. We may require the insurer to contribute to the professional costs incurred by a party. Normally, this would be awarded if the professional costs were reasonably incurred and assisted the complainant’s position. The complainant engaged H and F to support her position about the mould and rot within the subfloor. I agree that they assisted her position and were reasonably incurred. The insurer should reimburse these fees. The complainant had also engaged M and C in July. However, I do not consider their reports substantively assisted her position. Therefore, I do not accept the insurer is required to reimburse those report costs. Determination | Case number: 532453 Page 8 of 8 3 FOS terms of reference 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with Financial Ombudsman Service (FOS). This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint Recommendation | Case number: 532453 Page 1 of 7 Recommendation Case number: 532453 31 January 2019 4 Overview 4.1 Complaint The complainant had two recent claims with the financial firm (insurer); the first in October 2017 for a leaking sink trap under the kitchen sink, and the second in January 2018 for a burst main pipe under the hallway floor boards. With respect to the first claim, the complainant noticed that there was mould growth under her sink, and believed it to be linked to the leaking sink trap. The complainant requested urgent remediation of all mould as she was concerned about the impact on her family’s health. The insurer denied the claim in full due to policy exclusions for gradual escape of liquid, and gradual deterioration of any kind. With respect to the second claim, the insurer used a dehumidifier to dry the soil under the house as part of the completed work. The complainant says the use of this equipment significantly increased her power bill, and she was unhappy that the insurer would not accept this cost, as it says the policy specifically excludes consequential loss. The complainant also wants the insurer to accept liability for the presence of mould and rot under the floors and throughout the property, which she believes was caused by its delays in responding to the event. The complainant further states that she is dissatisfied with the level of service provided by the insurer for the claims. 4.2 Issues and key findings Is the insurer entitled to deny the first claim? The insurer is entitled to deny the claim for damage caused by the faulty kitchen sink trap, as the available information shows the damage has occurred gradually over an extended period of time. Recommendation | Case number: 532453 Page 2 of 7 Is the complainant entitled to further settlement for the second claim? The insurer has accepted mould and rot remediation as well as resulting floorboard damage caused by the burst pipe located under the hallway flooring. The complainant is entitled to further settlement with regard to the second claim for contingencies. 4.3 Recommendation This recommendation is partially in favour of the complainant. The insurer has offered $3,000 for non-financial compensation and increased electricity costs. The complainant has accepted this offer. The insurer:  need take no further action on the first claim  is to pay the complainant $7,439.51 for mould remediation works on the second claim as outlined in section 2.2  is to settle the complainant for repairs made necessary by the second claimed event, as outlined in section 2.2 and 2.3 below. Recommendation | Case number: 532453 Page 3 of 7 5 Reasons for recommendation The parties have agreed on appropriate compensation for non-financial loss The circumstances of the complaint are appropriate for an award of compensation for poor service and increased electricity bills. However, the insurer made an offer of $3,000 for these items, which the complainant has accepted. As such, I am satisfied that this issue has been resolved and therefore not subject to further consideration. 5.1 Is the insurer entitled to decline the first claim? The complainant has established a valid claim The complainant bears the onus of establishing a valid claim (also called a prima facie claim) for which the policy responds. The complainant’s home suffered damage in the kitchen. On discovering the leak, the complainant contacted emergency service R who repaired a leaking sink trap. The complainant has established a valid claim because the policy covers loss or damage due to an escape of liquid. The insurer relied on policy exclusions to deny the claim. As such, the insurer bears the onus of establishing the application of those exclusions. The policy excludes damage caused by gradual leaks On consideration of the insu rer’s reports, I note that the information suggests the leak had been occurring over an extended period of time. The insurer appointed its expert D to assess the cause and extent of the damage. In its initial report, D says it observed mould and the kitchen carcass had rotted away to approximately two or three lineal metres. From this assessment and a leak detection test performed by a licenced plumber, D concluded that the leak had been present for approximately one year. On review of the policy, I note that it contains a general exclusion for gradual loss or damage of any kind. Under the heading ‘ Escape of Liquid ’, it also excludes loss or damage caused by any gradual escape of liquid. The insurer is not liable for mould caused by the first event The complainant has called for immediate remediation of mould contamination as she is concerned for the health of her family due to delays caused by the insurer. It is not in dispute that significant delays have occurred, and the insurer has made an offer for compensation which the complainant has accepted. Recommendation | Case number: 532453 Page 4 of 7 While the insurer has a duty of care to remove imminent dangers, I consider that it has correctly declined the first claim and should not be held liable for issues arising from that cause. This however does not permit the insurer to delay acting on the second claim, which it has accepted. The insurer is entitled to deny the claim for kitchen damage In addition to the reports provided by the insurer, colour photographs have also been provided. These photos show extensive mould and deterioration to the cabinetry under the kitchen sink. I accept this would not have occurred in a short period of time. On consideration of the information available to me, I accept that the kitchen damage has occurred over an extended period of time, and that the policy specifically excludes such damage. Consequently, the insurer is entitled to deny the first claim. 5.2 Is the complainant entitled to further settlement for the second claim? There are ongoing issues related to the kitchen leak The complainant has provided a report from expert M which states the cause of the mould throughout the property can be attributed to several issues. The primary cause being the leak in the kitchen, and secondary causes such as a previous roof leak and subfloor water pooling exacerbated by a lack of subfloor ventilation. A second report provided by the complainant’s expert C acknowledges the burst pi pe under the hallway floor. M’s report notes that the subfloor under the kitchen sink is still damp, which could indicate that there is an ongoing leak, or that the subfloor cannot properly dry out without improved ventilation. As M’s report was completed in July 2018, it is reasonable to assume the damage may have progressed since then. The ventilation system needs to be reinstalled The insurer acknowledges that it installed the subfloor vents incorrectly. The insurer’s engineer IL has said the vents were installed too high and are blocked by bearer joists under the floor boards. The insurer has agreed to rectify the ventilation system by lowering the vents. The insurer has accepted damage caused by the burst pipe under the hallway floor The insurer has agreed to remediate mould and wood rot in the kitchen and hallway subfloor. In addition, it has accepted the second claim in full, and agreed to pay for all damage resulting from this claim. Recommendation | Case number: 532453 Page 5 of 7 C’s report states timber floorboards have been damaged in the loun ge, hallway and bedrooms due to elevated levels of moisture. While it does not comment on causation, it lists the kitchen leak as the main cause of subfloor rot and mould throughout the property. The insurer’s reports confirm the burst pipe under the hallw ay flooring has caused damage to the hallway, and the leak was attended to in a short space of time. As such, I accept that this leak would be unlikely to have caused damage or mould in other areas of the property in the absence of leaks in the kitchen and roof. However, significant delays and the incorrect installation of the subfloor would likely have allowed the mould to progress. Insurer to provide contingency for mould remediation costs The insurer has provided a costing for mould remediation which is broken down room by room, and have agreed to pay $6,331.50 for subfloor mould remediation as a make-safe. As previously stated, it has also accepted any damage caused by the burst pipe under the hallway floor. While I accept the insurer is only liable for the areas it has accepted, I consider it fair in the circumstances to increase settlement for these areas by 17.5% to account for risk transference, margins, the passage of time resulting in changing pricing and other contingencies. This means the total settlement the insurer needs to make is $7,439.51. In paying this sum to the complainant, I am satisfied the insurer has discharged its obligations for the second claim in full for mould issues on the second claim. Insurer to cash settle claim liability with contingencies On consideration of the available information provided by both parties, I accept that the insurer is only liable for damage and mould caused by the burst pipe under the hallway floor. Furthermore, I am satisfied that the information shows o n balance that this damage would reasonably only affect the hallway itself. IL provided a scope of works in its report of 11 December 2018, which limited leak related damage to the property master bedroom and ensuite. I consider it fair in the circumstances to increase the scope of works to also include the hallway flooring. In the interests of finalising both the claim and complaint, given the insurer’s election to cash settle mould remediation works, I propose the following steps, subject to the parties accepting this recommendation: ‒ the insurer extends the scope of works to include the necessary hallway flooring repairs ‒ the insurer obtains quotations for repairs from UB and D, based on this revised scope of work. These quotations are to include margins, provisional Recommendation | Case number: 532453 Page 6 of 7 costs and GST, and are to include confirmation the repairers can conduct the works privately for the complainant at the proposed cost ‒ the insurer is entitled to nominate its preferred repairer, subject to the criteria above being met, and settle on their quotation ‒ the insurer is to provide a further 17.5% of the total quotation in recognition of the complainant absorbing all risk, and for any unknown issues. Should the parties accept this proposal, and on payment by the insurer to the complainan t, I am satisfied the insurer’s liability for the claim will be exhausted. However, should both UB and D be unwilling, or unable to complete the repairs, the complainant will be entitled to nominate their own repairer, who is to provide a quotation based on the above scope of works. The insurer will be required to apply the 17.5% contingency amount to the complainant’s quotation, should this occur. 5.3 Other matters Mould on the ceiling is unrelated to either claim The information shows that mould has appeared on the ceiling in some rooms due to roof water ingress. I understand that this was caused by bent flashing and several tiles that were out of place, and these issues have now been rectified, and a third claim has been lodged. I encourage the parties to continue an open dialogue in relation to this claim. Insurer to address ducted vacuum unit In its report, the complainant’s expert C talks about the ducted vacuum unit under the house showing signs of rust due to water damage. This item does not appear to be addressed in previous reports provided by either party, and it is unclear which event has caused the damage. In order to avoid potential future issues from developing, the insurer is required to assess the damage to the ducts and discuss an appropriate course of action with the complainant within 21 days. Should the issue of the ducts not be satisfactorily resolved, the Service can be re- engaged to review this aspect of the complaint. Recommendation | Case number: 532453 Page 7 of 7 6 Supporting information Record Key points Insurer’s expert (D) Report 16 October 2017  The kitchen carcass has rotted away to the middle section of the kitchen approximately 2 - 3LM. There is mould to the carc ass therefore reusing any material to the kitchen is not possible.  Damages resulting from gradual leakage causing rotting and mould build up to the carcass.  Due to the extent of the rot, we estimate that this leak has been occurring for approximately a year. Complainant’s expert (M) Report 23 July 2018  Main cause: a previous water leak from a burst pipe under the kitchen sink, which has since been repaired.  Secondary causes: Subfloor water pooling.  Observations: Previous roof leak causing centralised mould growth on the bedroom ceiling.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.