Home / Financial Firm (Unknown - Insurer) / Determination 532425

Determination 532425

Strata policy claim for shower leak damage declined as gradual deterioration

FirmFinancial Firm (Unknown - Insurer)
Decided2019-02-01
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$14,190
SourceAFCA PDF

Summary

A villa owner under a strata title policy claimed $11,190 for sub-floor water damage plus $3,000 professional costs. The insurer denied the claim as gradual deterioration and excluded defective construction. AFCA upheld the denial and declined to order professional fee reimbursement.

The proximate cause of loss is the dominant or operative cause; here gradual deterioration of grout and membrane was the effective cause, which is excluded from cover.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 532425 Page 1 of 8 Determination Case number: 532425 1 February 2019 1 Determination overview 1.1 Complaint The complainant owns a villa which forms part of a complex which is insured by the body corporate under a strata title insurance policy with the financial firm (insurer). The complainant lodged a claim under the policy after discovering water damage to the sub-floor of his bathroom in March 2018. The insurer denied the claim on the basis that the damage to the sub-floor was not ‘ sudden and unexpected damage ’ caused by an event which occurred within the period of cover. The insurer also says the damage was caused by factors which are excluded under the policy, such as defective construction and/or gradual deterioration. The complainant disputes the insurer’s decision and seeks cover for the cost of repairing the damage to the sub-floor ($11,190). The complainant also seeks compensation for professional costs associated with pursuing the complaint. 1.2 Issues and key findings Is the insurer liable for the water damage to the property? The available information establishes that the proximate cause of the damage to the complainant’s property was gradual deterioration, which is excluded from cover under the policy. Accordingly, the insurer is not liable for the damage. Is the complainant entitled to payment of professional fees? The insurer is not required to reimburse the complainant for his professional fees. Determination | Case number: 532425 Page 2 of 8 1.3 Determination This determination is in favour of the financial firm (insurer). The insurer is not liable for the damage to the complainant’s property and is not required to take any further action. Determination | Case number: 532425 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer liable for the water damage to the property? Policy provides cover for property damage subject to exclusions The complainant is required to show that, on the balance of probabilities, he has suffered a loss caused by a risk insured against under the policy. This is known as a valid (or prima facie ) claim. If the complainant is able to establish a prima facie claim, then the onus shifts to the insurer to show that, on the balance of probabilities, it is entitled to rely on a n exclusion under the policy to deny the claim. The strata title insurance policy provides cover for sudden and unexpected damage to the property caused by an event which occurs during the period of insurance. However, this cover is subject to a number of exclusions. Relevantly, the policy excludes cover for damage caused by:  wear and tear or gradual deterioration  an error or omission in design, plan or specification, or  faulty materials or workmanship. Complainant has established a prima facie claim The complainant lodged his claim in March 2018, after a plumber (LT) and builder (IN) discovered water damage to the yellow tongue sub -floor underneath his upstairs shower. Leak detection tests confirmed that the shower recess was leaking. Due to the nature and location of the damage, it was not visible to the complainant (as the leaking water had not yet affected the ceiling below). The damage was only discovered because the body corporate appointed IN to investigate, after several other villas in the complex suffered water damage to the same area. The insurer says the water damage is not covered under the policy because it was not ‘sudden and unexpected’. The insurer also says the damage was not caused by an event which occurred during the period of cover (which commenced on 30 November 2016). Given the damage was not visible, it is not possible to determine exactly when it commenced. The builder (IN) considered that the damage had been occurring over an extended period of time and was more likely to have occurred during 2017, than in the early months of 2018. Determination | Case number: 532425 Page 4 of 8 Given the timeframe indicated by IN (and the fact that water had not yet affected the ceiling), I am satisfied that, on the balance of probabilities, the leak from the shower recess commenced during the period of cover under the policy. I am also satisfied that, from the complainant’s perspective, the damage was ‘sudden and unexpected’. The fact that other villas at the complex had experienced similar issues does not establish that the complainant (or the body corporate) was aware that the complainant’s shower recess was also leaking. In these circumstances, I consider the complainant has established a prima facie claim, given the broad scope of cover for property damage provided under the policy. Insurer says damage was caused by excluded factors As the complainant has established a prima facie claim, the insurer bears the onus of showing that, on the balance of probabilities, it is entitled to deny the claim based on a policy exclusion. The insurer says it is not liable for the damage to the sub -floor because the damage was caused by one or more of the following factors, which are excluded from cover under the policy:  defective building work – namely, the failure to install a drainage flange to the floor waste in the shower recess  gradual deterioration of the tile grout and waterproof membrane, which has allowed water to leak from the shower recess into the sub-floor cavity. The insurer can only deny the claim if it can show that, on the balance of probabilities, the proximate cause of the damage was one or more of the factors outlined above. It is well established at law that the proximate cause of a loss is not necessarily the first (or the last) or the sole cause of the loss. It is the effective or dominant or operative cause. In any particular case, the proximate cause of the loss is a question of fact to be determined based on the surrounding circumstances. Where there are several causes operating, each must be examined for the qualities of predominance and efficacy in relation to the resultant damage. Available information does not establish construction was defective The insurer says the water proofing arrangements for the shower recess were defective because the builder failed to install a drainage flange to the floor waste. The Australian Standard for waterproofing which applied when the property was constructed in 2001 required the installation of a ‘drainage flange’ in waterproofed areas above a suspended timber floor. It appears the A ustralian Standard was later amended to specify the installation of a ‘puddle flange’. Determination | Case number: 532425 Page 5 of 8 The report provided by the body corporate’s builder (IN) following his inspection of property in March 2018 stated that a puddle flange had not been installed. However, in an email response to the complainant after the repairs were completed, IN stated that ‘there was a drain flange / floor waste installed’. The insurer’s building consultant (SW) has advised that a ‘puddle flange’ and a ‘drainage flange’ are the same item and are used for the same purpose (being to seal the waterproof membrane where it meets the waste pipe). However, the complainant says that a puddle flange and a drainage flange are different. The differing use of each term by the builder (IN) appears to support this, although his more recent email is slightly ambiguous. The Australian Standard which applied when the property was constructed required the installation of a ‘drainage flange’ . The builder (IN) who completed the repairs has indicated that a drainage flange was installed (in addition to the floor waste). The insurer has not provided any information to refute IN’s statement. In these circumstances, I am not satisfied that the ins urer has shown that the waterproofing of the shower recess failed to comply with the relevant building requirements. Accordingly, the insurer is not entitled to rely on the policy exclusions for faulty workmanship or design to deny the complainant’s claim. Damage was caused by gradual deterioration As outlined above, the construction of the shower recess complied with the waterproofing requirements at the time the property was built. In particular, a drainage flange was installed to seal the waterproof membrane at the juncture with the floor waste (as depicted in the extracts from the Australian Standard provided). The builder (IN) has also confirmed that the waterproof membrane returned down into the drainage pipe. Accordingly, the waterproofing was compliant when the property was built. Further, if it is accepted that the water damage to the sub-floor did not occur until after 30 November 2016, then it appears the waterproofing remained effective for a period of approximately fifteen years. In these circumstances, it is necessary to identify what change occurred (ie what event took place during the policy period) which resulted in the water damage to the sub-floor. Determination | Case number: 532425 Page 6 of 8 The plumber (LT) who carried out leak detection testing identified a crack in the grout between the tiles and advised that the water proofing membrane appeared to have failed. The crack in the grout would cause water to enter the area under the tiles, while the failure of the water proof membrane would allow the leaking water to reach the ti mber sub- floor. The available information does not identify any other ‘event’ which would have resulted in the damage observed. The builder (IN) has advised that the water damage was caused by the absence of a puddle flange. However, if this were the case, then the damage would be expected to have commenced from the time of construction (as no puddle flange was ever installed). For the reasons outlined above, I consider the proximate cause of the damage to the sub-floor was the gradual deterioration of the grouting and the waterproof membrane which allowed water to penetrate to the timber below. Insurer is not liable for damage The policy excludes cover for damage caused by gradual deterioration. Accordingly, the insurer is not liable for the damage to the complainant’s property. 2.2 Is the complainant entitled to payment of professional fees? Insurer is not required to pay professional fees Under clause 9.4 of the FOS Terms of Reference, AFCA may require an insurer to reimburse a complainant for professional costs incurred during the course of their complaint. The complainant seeks payment of $3,000 towards his broker’s costs in pursuing this complaint. It is not clear whether the complainant has in fact been charged any fees by his broker. AFCA (and previously FOS) aims to provide a dispute resolution process which is accessible to complainants, without the need for professional advisors. Accordingly, professional costs will only be reimbursed where external advice is reasonably required, given the nature of the dispute. In the present case, I am not satisfied that it is appropriate to require the insurer to reimburse the complainant for professional costs. Determination | Case number: 532425 Page 7 of 8 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 AFCA approach to this complaint This complaint was the subject of a recommendation issued on 6 November 2018. The recommendation was rejected by the complainant. This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. During the course of this complaint, the complainant has been represented by his broker. For the purposes of this determination, submissions made by the complainant’s broker have been treated as if they had been made by the complainant himself. 3.3 Key policy terms Subject Terms Cover for property damage This Section covers …. Physical loss or destruction of or damage to Ins ured Property caused by an Event occurring during the Period of Insurance and not Determination | Case number: 532425 Page 8 of 8 Subject Terms otherwise excluded … Event … Occurrence or accident causing or resulting in sudden and unforeseen, physical loss or destruction of or damage to Insured Property. Exclusions We will not cover loss, de struction or damage caused by or arising directly or indirectly from: …  wear and tear … gradual deterioration …  error or omission in design, plan or specification or failure of design,  faulty materials or workmanship …