Adequacy of cash settlement for asbestos contamination of home and contents

FirmFinancial Firm (Unknown - Insurer)
Decided2019-01-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Insurer made a $93,566 cash settlement for asbestos contamination of the home after an adjoining shed explosion. AFCA found the remediation plan sufficient but ordered the insurer to assess and accept affected contents and reimburse an expert report, with no further compensation.

The expert evidence supported the remediation scope, but event-affected contents were unsettled, so the insurer must assess them to return the complainants to their prior position.

Issues

Subjects and remedies

home or building damagepay compensationreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 531411 Page 1 of 9 Determination Case number: 531411 2 January 2019 1 Determination overview 1.1 Complaint The complainants lodged a claim for damage to their home which occurred due to an explosion in a shed at the adjoining property. The shed contained asbestos, and the airborne particles contaminated the property and belongings. The financial firm (insurer) accepted the claim for remedial work and provided a cash settlement of $93,566 consisting of:  scope of works $60,060  additional 10% good will gesture $6,006  further potential remediation costs $5,000  alternative accommodation costs $22,500. The complainants dispute the settlement amount, asserting the scope of works is inadequate and no allowance has been made for contents or ongoing storage. To resolve the complaint, the complainants seek the full sum insured for building and contents. 1.2 Issues and key findings Are the complainants entitled to a further settlement? In the absence of alternate information to refute the insurer ’s expert reports, the panel is satisfied that the insurer offered a fair settlement for the remediation work. However, the insurer is to increase its settlement to accommodate for contents items affected by the claimed event. Are the complainants entitled to compensation? The circumstances of the complaint are appropriate for an award of compensation. However, the panel is satisfied that the additional amounts previously offered by the insurer are commensurate with the complainant s’ experience. Determination | Case number: 531411 Page 2 of 9 1.3 Determination This determination is substantially in favour of the insurer. The insurer is to assess and accept contents items affected by the asbestos contamination. In doing so, the insurer will have met its obligations under the claim. The insurer is to reimburse the cost incurred by the complainants for the report from the expert SR. The complainants are to provide the insurer with an invoice/receipt for this report. Determination | Case number: 531411 Page 3 of 9 2 Reasons for determination 2.1 Are the complainants entitled to a further settlement? Circumstances of the loss The insurer obtained reports from its expert engineer (C) who conducted asbestos testing at the complainant s’ site, subsequently creating an a sbestos risk assessment and remediation plan in conjunction with an asbestos assessment and remediation specialist (GB). These reports were also created in consultation with a Shire of Harvey representative, who expressed the view that the plan was both compliant and risk adverse. The insurer obtained a scope of works quoted at $60,060, for what it believed would adequately address the issues caused by the claimed event. The available information suggests no remedial works were authorised or undertaken by the insurer. Insufficient information establishing breach of compliance requirements The complainants obtained several reports from its expert (ER), which alleged the findings of C were non-compliant with industry regulations and lacking in substance. For this reason, the complainants declined to allow the insurer to proceed with remedial works. While the panel acknowledges that the allegation of non-compliance with industry and legislative standards relating to asbestos remediation is a serious matter, there is no mention in the ER report of the specific regulations C are said to be in breach of. The panel also notes ER did not appear to disagree with the remediation proposal put forward by GB. The panel considers there is insufficient information to substantiate the allegations made in relation to non-compliance. Available information suggests the site remediation plan is sufficient The panel has carefully reviewed the exchanged information. On review of the ER reports, the panel notes that while it states the insurer ’s reports are insufficient, it provides no alternate suggestions as to the method of remediation, nor commentary on the items in the remedial plan or scope. In the absence of specific objections or suggestions in the ER reports, the panel accepts the insurer ’s course of remedial action is appropriate. The exchanged material suggests C conducted comprehensive testing throughout the property, including tape testing, air quality sampling and soil sample testing. It detected asbestos debris in several areas including on the decking, in the shed, in the Determination | Case number: 531411 Page 4 of 9 laundry, in the yard and on clothing items worn by the complainant at the time of the fire. C also noted that further contamination was likely to occur during the demolition of the neighbouring shed. Once this demolition was concluded, it reattended to conduct testing once more and a remediation plan was created in conjunction with GB to return the site to its previous state. In April 2018, the complainant supplied a report by an environmental remediation service provider (SR). This report provided several alternatives to the remedial methodology documented by GB. However, SR did not provide a costing for such works, or explain how GB’s proposal was inappropriate. The insurer subsequently agreed to hold a conference call with SR to discuss and develop a remediation plan that would be acceptable to all parties. Since this time, the insurer says it has made attempts to contact SR, however, it has not received a response to date. Whilst the complainants say that they were not included in the correspondence from the insurer to SR, the panel is satisfied that the efforts to contact SR by the insurer, were reasonable and SR did not respond. The exchanged material confirms that the original engineer from SR has left that company and cannot be contacted. Given the passage of time, the panel does not believe that the introduction of an additional expert would assist the resolution of this dispute. Having reviewed all of the exchanged material the panel is satisfied that the plan created by C and GB is sufficient to return the site to its pre-event condition. Settlement to include contents affected by the claimed event The reports provided by the insurer state that some contents items were contaminated, such as the clothes worn by the complainant on the night of the fire, bedding, garage contents and toys located in the yard. However, the available information suggests no settlement amount has been calculated for contents of any kind. Considering surface, air and soil testing was conducted and certain contents were identified as being contaminated, the panel accepts, on the balance of probabilities, these contents items within the complainant s’ house would also have been affected. In order to return the complainants to the position they were in prior to the event, the insurer must also pay for these contents affected by the said event. Determination | Case number: 531411 Page 5 of 9 The insurer is required to undertake testing to these contents items likely affected as a result of the contamination event and assess its liability with respect to these items. Are the complainants entitled to compensation? We may award compensation in certain circumstances Under the FOS Terms of Reference, we may award compensation for non-financial loss in circumstances where a person experiences an unusual degree of physical inconvenience, time taken or interference with an expectation of enjoyment or peace of mind, up to a maximum award of $3,000. We take a conservative approach to compensation for non-financial loss. It is not awarded for punitive purposes, but to compensate a complainant for their experience. In contemplating whether an award is warranted, consideration is given to a number of matters. These include the circumstances and nature of the claim, as well as the reasonable requirements and actions that need to be taken in order to establish the parties’ obligations and entitlements under the policy. Factors such as accepted industry practice and conduct of all parties involved is also considered. In the present case, distinction needs to be drawn between the events which gave rise to the claim and what impact the actions (or inaction) the insurer had on the complainant s’ experience. Insurer ’s of fer commensurate with its actions The panel accepts that the complainants have experienced an unusual degree of time taken and physical inconvenience as a result of the delays in resolving this matter. The panel also acknowledges the circumstances of the c laim were beyond the complainant s’ control. The panel notes that in its settlement offer, the insurer has included a further $5,000 as a gesture of good will. While the panel acknowledge the complainants have experienced interference with their peace of mind as a result of the claimed event and the amount of time spent pursuing the complaint, the panel is satisfied that the additional amounts offered by the insurer are adequate compensation for such inconvenience. Accordingly, the insurer is not required to pay further compensation. Determination | Case number: 531411 Page 6 of 9 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing complaint s previously lodged with Financial Ombudsman Service (FOS). This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term  applicant  complainant  financial services provider  financial firm  dispute  complaint  claim  claim 3.2 Our approach This complaint has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous decisions. There has been a full exchange of all material information relied on for the purposes of this determination, and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered for the purposes of this determination. While the parties have raised numerous issues in their submissions, for the purposes of this determination commentary is restricted to those issues considered directly relevant to the outcome only. 3.3 Expert reports Record Key points Insurer ’s expert (C) Reports  C has conducted a series of investigations inside the premises located on the property to assess the risk of exposure to asbestos fibres within the residence. As part of those works, C identified and collected localised samples of asbestos containing material (ACM) in the backyard, external to the home.  The scope of w ork involved a visual inspection of the property and neighbouring property and assessing the risk of airborne fibres and Determination | Case number: 531411 Page 7 of 9 Record Key points debris contamination to the property. This included taking confirmation samples of fibre cement sheeting from the shed and debris for analysis, airborne fibre monitoring and tape testing wit hin the house to determine if airborne or residual fibres are present.  The representative samples were subs equently analysed in our third party NATA accredited laboratory by polarised light microscop y (PLM). NATA - endorsed as bestos sample results are provided. All samples were collected in accordance with the Code of Practice for the Management and Control of Asbestos in Workplaces [NOHSC: 2018 (2005)].  The airborne fibre monitoring was conducted in ac cordance with Guidance Note on the Membrane Filter Method for Estimating Airborne Asbestos Fibres 2nd Edition [NOHSC:3003(2005)].  Soil samples were collected using a shovel or hand auger from the upper 100 mm of top soil over an area sufficient to recover a minimum of 500 g of soil for analysis.  Soil sampling and sample preservation conducted in accordance wit h the relevant Australian Standard (AS4482.1 - 2005 "Guide to the sampling and investigation of potentially contaminated soil, Part1: Non - volatile and s emi - volatile compounds") and DoH (2009)  As the debris in the backyard/deck area contains crocidolite (blue) and Chrysotile (whit e) asbestos it is recommended that all visible debris picked in the backyard of the property and have it disposed of as hazardous waste.  The test results indicate that there are no respirable asbestos fibres within the house. However cement bonded non respirable particles were identified on the black sweatshirt on the floor of the master bedroom and to the floor of the laun dry. It is recommended that the sweatshirt be removed as contaminated waste and the master bedroom floor be vacuumed wit h a suitable H - type HEPA filtered vac and wet wiped, paying particular attention to the area occupied by the sweatshirt (between the bed and the window). The floor to the laundry area should also be vacuumed wit h a suitable H - type HEPA filtered vac and wet wiped.  The shed area has shown positive results for bonded asbestos fibre and respirable fibre was identified in one location. Due to t hes e findings it is recommended that the shed area be thoroughly cleaned by an unrestricted or restricted licensed asbestos removalist contractor (LARC). Any items deemed uncleanable by the LARC, need to be disposed of as contaminated waste.  The findings o f the C asbestos risk assessment have determined the crawl space (see Photo 1) to be free of visible suspect asbestos materials. The potential for migration of fibres into the crawl space during the fire event is very low due to the mostly sealed perimeter block foundation of the structure. However, vent openings (see Phot o 2) on each side of the structure, more prominently on the south and eastern sides of the structure do provide openings from the outside environment to the interior of the crawl space.  Co nsidering its proximity and age the crawl space is relatively clean. Determination | Case number: 531411 Page 8 of 9 Record Key points The underside of the floor decking is insulated (See Phot o 3). The potential for fibre migration into the structure from the crawl space is negligible considering the significant lack of pat hway. Previous air testing and dust lift sample analysis results inside the living areas of the residence support this assessment. GB report Report 19 - 01 - 17  Further to instructions received, GBAR Group have been appointed to undertake asbestos removal and remediation works on the residential property located at [ complainant s’ address] WA. Works will be completed both inside the building and on the external property.  Outlined in this ARCP are the steps and procedures to carry out all works in a safe and planned manner and in accordance with the following reference documents. This list is a guide only and is not necessarily all the relevant documentation: ‒ Occupational Safety and Health Regulations 1996 ‒ Occupational Safety and Health Act 1984 ‒ NOHSC:2002(2005) Code of Practice for the safe removal of asbestos ‒ NOHSC:2018(2005) Code of Practice for the management and cont rol of asbestos in workplaces  Guidelines for the Assessment, Remediation and Management of Asbestos Contaminated Sites in Wester n Australia May 2009;  The aforementioned notifications, this control plan and all other documents as required by legislation, shall be maintained on site for the duration of the project and available for inspection by the officers of the regulator, the cli ent and the nominated licensed assessor or appointed competent person.  Prior to the collation of this control plan, we confirm that we have been given a copy of the as bestos sample analysis report as provided by Coffey their reference ENAUPERT05623AAR1A, w e would also confirm that a competent person has attended site and made an assessment as to the nature of the Asbestos containing Materials (ACM’S) to be removed and the extent of works required.  This ARCP is a working document specific to site and may nee d to be assessed and expanded on to meet project changes and OSH legislation Complainant s’ expert (ER)  ER has agreed to assist the [ complainant s] by providing general technical advice on the assessment and clean - up of asbestos which exploded from the fir e source (an asbestos garage shed) and severely impacted the exterior and interior of the home, resulting in an unacceptable human health risk.  With the exception of GB’s provided asbestos removal plan, the remainder of the documented reports for the entir e project has not met regulatory guidelines.  Given rec ent correspondence with the Insurer , it should be clearly noted that ER is not preparing (and cannot prepare) an “assessment Determination | Case number: 531411 Page 9 of 9 Record Key points of the site” (by industry definition). Instead ER is providing expert comment and opinion of the technical approach and merit of the work already carried out and the work proposed. Complainant s’ expert (SR)  Seven tape samples and one bulk sample were taken from eight locations of concern. Five of the eight samples returned a positive result for asbestos.  The tape samples 006 and 007 taken from the South West corner subfloor area was found to be negative for asbestos. However, sample 008 which was taken from the west wall subfloor area wall cavity (adjac ent to subfloor access p oint) returned a positive result for the presence of asbestos.  The exact source of the contamination cannot be determined. However, it can be concluded that air flow through the roof space and wall cavities was sufficient enough to spread free asbestos fib res throughout these areas.  The two soil samples that were collected from the back garden (samples 009 and 010) and returned a negative result for free/los e asbestos fibres being present within the soil.  The rear garden is significantly overgrown. Vacuumin g an organic/porous product will not guarantee asbestos free site. The most plausible solution to remediate an overgrown organic/porous area would be to remove the vegetation completely and conducted a surface scrape of 50 - 100mm. This is to be disposed of as contaminated waste. Subsequent soil sampling should be undert aken to determine whether any asbestos contamination within the soil is either above or below guideline limits.