Text of the determination
Determination | Case number: 531411 Page 1 of 9
Determination
Case number: 531411 2 January 2019
1 Determination overview
1.1 Complaint
The complainants lodged a claim for damage to their home which occurred due to an
explosion in a shed at the adjoining property. The shed contained asbestos, and the
airborne particles contaminated the property and belongings.
The financial firm (insurer) accepted the claim for remedial work and provided a cash
settlement of $93,566 consisting of:
scope of works $60,060
additional 10% good will gesture $6,006
further potential remediation costs $5,000
alternative accommodation costs $22,500.
The complainants dispute the settlement amount, asserting the scope of works is
inadequate and no allowance has been made for contents or ongoing storage.
To resolve the complaint, the complainants seek the full sum insured for building and
contents.
1.2 Issues and key findings
Are the complainants entitled to a further settlement?
In the absence of alternate information to refute the insurer ’s expert reports, the panel
is satisfied that the insurer offered a fair settlement for the remediation work.
However, the insurer is to increase its settlement to accommodate for contents items
affected by the claimed event.
Are the complainants entitled to compensation?
The circumstances of the complaint are appropriate for an award of compensation.
However, the panel is satisfied that the additional amounts previously offered by the
insurer are commensurate with the complainant s’ experience.
Determination | Case number: 531411 Page 2 of 9
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is to assess and accept contents items affected by the asbestos
contamination. In doing so, the insurer will have met its obligations under the claim.
The insurer is to reimburse the cost incurred by the complainants for the report from
the expert SR. The complainants are to provide the insurer with an invoice/receipt for
this report.
Determination | Case number: 531411 Page 3 of 9
2 Reasons for determination
2.1 Are the complainants entitled to a further settlement?
Circumstances of the loss
The insurer obtained reports from its expert engineer (C) who conducted asbestos
testing at the complainant s’ site, subsequently creating an a sbestos risk assessment
and remediation plan in conjunction with an asbestos assessment and remediation
specialist (GB). These reports were also created in consultation with a Shire of
Harvey representative, who expressed the view that the plan was both compliant and
risk adverse.
The insurer obtained a scope of works quoted at $60,060, for what it believed would
adequately address the issues caused by the claimed event. The available
information suggests no remedial works were authorised or undertaken by the
insurer.
Insufficient information establishing breach of compliance requirements
The complainants obtained several reports from its expert (ER), which alleged the
findings of C were non-compliant with industry regulations and lacking in substance.
For this reason, the complainants declined to allow the insurer to proceed with
remedial works.
While the panel acknowledges that the allegation of non-compliance with industry and
legislative standards relating to asbestos remediation is a serious matter, there is no
mention in the ER report of the specific regulations C are said to be in breach of. The
panel also notes ER did not appear to disagree with the remediation proposal put
forward by GB.
The panel considers there is insufficient information to substantiate the allegations
made in relation to non-compliance.
Available information suggests the site remediation plan is sufficient
The panel has carefully reviewed the exchanged information.
On review of the ER reports, the panel notes that while it states the insurer ’s reports
are insufficient, it provides no alternate suggestions as to the method of remediation,
nor commentary on the items in the remedial plan or scope.
In the absence of specific objections or suggestions in the ER reports, the panel
accepts the insurer ’s course of remedial action is appropriate.
The exchanged material suggests C conducted comprehensive testing throughout the
property, including tape testing, air quality sampling and soil sample testing. It
detected asbestos debris in several areas including on the decking, in the shed, in the
Determination | Case number: 531411 Page 4 of 9
laundry, in the yard and on clothing items worn by the complainant at the time of the
fire.
C also noted that further contamination was likely to occur during the demolition of the
neighbouring shed. Once this demolition was concluded, it reattended to conduct
testing once more and a remediation plan was created in conjunction with GB to
return the site to its previous state.
In April 2018, the complainant supplied a report by an environmental remediation
service provider (SR). This report provided several alternatives to the remedial
methodology documented by GB. However, SR did not provide a costing for such
works, or explain how GB’s proposal was inappropriate.
The insurer subsequently agreed to hold a conference call with SR to discuss and
develop a remediation plan that would be acceptable to all parties. Since this time, the
insurer says it has made attempts to contact SR, however, it has not received a
response to date.
Whilst the complainants say that they were not included in the correspondence from
the insurer to SR, the panel is satisfied that the efforts to contact SR by the insurer,
were reasonable and SR did not respond.
The exchanged material confirms that the original engineer from SR has left that
company and cannot be contacted.
Given the passage of time, the panel does not believe that the introduction of an
additional expert would assist the resolution of this dispute.
Having reviewed all of the exchanged material the panel is satisfied that the plan
created by C and GB is sufficient to return the site to its pre-event condition.
Settlement to include contents affected by the claimed event
The reports provided by the insurer state that some contents items were
contaminated, such as the clothes worn by the complainant on the night of the fire,
bedding, garage contents and toys located in the yard. However, the available
information suggests no settlement amount has been calculated for contents of any
kind.
Considering surface, air and soil testing was conducted and certain contents were
identified as being contaminated, the panel accepts, on the balance of probabilities,
these contents items within the complainant s’ house would also have been affected.
In order to return the complainants to the position they were in prior to the event, the
insurer must also pay for these contents affected by the said event.
Determination | Case number: 531411 Page 5 of 9
The insurer is required to undertake testing to these contents items likely affected as
a result of the contamination event and assess its liability with respect to these items.
Are the complainants entitled to compensation?
We may award compensation in certain circumstances
Under the FOS Terms of Reference, we may award compensation for non-financial
loss in circumstances where a person experiences an unusual degree of physical
inconvenience, time taken or interference with an expectation of enjoyment or peace
of mind, up to a maximum award of $3,000.
We take a conservative approach to compensation for non-financial loss. It is not
awarded for punitive purposes, but to compensate a complainant for their experience.
In contemplating whether an award is warranted, consideration is given to a number
of matters. These include the circumstances and nature of the claim, as well as the
reasonable requirements and actions that need to be taken in order to establish the
parties’ obligations and entitlements under the policy. Factors such as accepted
industry practice and conduct of all parties involved is also considered.
In the present case, distinction needs to be drawn between the events which gave
rise to the claim and what impact the actions (or inaction) the insurer had on the
complainant s’ experience.
Insurer ’s of fer commensurate with its actions
The panel accepts that the complainants have experienced an unusual degree of time
taken and physical inconvenience as a result of the delays in resolving this matter.
The panel also acknowledges the circumstances of the c laim were beyond the
complainant s’ control.
The panel notes that in its settlement offer, the insurer has included a further $5,000
as a gesture of good will.
While the panel acknowledge the complainants have experienced interference with
their peace of mind as a result of the claimed event and the amount of time spent
pursuing the complaint, the panel is satisfied that the additional amounts offered by
the insurer are adequate compensation for such inconvenience.
Accordingly, the insurer is not required to pay further compensation.
Determination | Case number: 531411 Page 6 of 9
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
complaint s previously lodged with Financial Ombudsman Service (FOS).
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Our approach
This complaint has been decided on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous decisions.
There has been a full exchange of all material information relied on for the purposes
of this determination, and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination commentary is restricted to those issues considered directly
relevant to the outcome only.
3.3 Expert reports
Record Key points
Insurer ’s expert (C)
Reports
C has conducted a series of investigations inside the premises
located on the property to assess the risk of exposure to asbestos
fibres within the residence. As part of those works, C identified and
collected localised samples of asbestos containing material (ACM) in
the backyard, external to the home.
The scope of w ork involved a visual inspection of the property and
neighbouring property and assessing the risk of airborne fibres and
Determination | Case number: 531411 Page 7 of 9
Record Key points
debris contamination to the property. This included taking
confirmation samples of fibre cement sheeting from the shed and
debris for analysis, airborne fibre monitoring and tape testing wit hin
the house to determine if airborne or residual fibres are present.
The representative samples were subs equently analysed in our third
party NATA accredited laboratory by polarised light microscop y
(PLM). NATA - endorsed as bestos sample results are provided. All
samples were collected in accordance with the Code of Practice for
the Management and Control of Asbestos in Workplaces [NOHSC:
2018 (2005)].
The airborne fibre monitoring was conducted in ac cordance with
Guidance Note on the Membrane Filter Method for Estimating
Airborne Asbestos Fibres 2nd Edition [NOHSC:3003(2005)].
Soil samples were collected using a shovel or hand auger from the
upper 100 mm of top soil over an area sufficient to recover a
minimum of 500 g of soil for analysis.
Soil sampling and sample preservation conducted in accordance wit h
the relevant Australian Standard (AS4482.1 - 2005 "Guide to the
sampling and investigation of potentially contaminated soil, Part1:
Non - volatile and s emi - volatile compounds") and DoH (2009)
As the debris in the backyard/deck area contains crocidolite (blue)
and Chrysotile (whit e) asbestos it is recommended that all visible
debris picked in the backyard of the property and have it disposed of
as hazardous waste.
The test results indicate that there are no respirable asbestos fibres
within the house. However cement bonded non respirable particles
were identified on the black sweatshirt on the floor of the master
bedroom and to the floor of the laun dry. It is recommended that the
sweatshirt be removed as contaminated waste and the master
bedroom floor be vacuumed wit h a suitable H - type HEPA filtered vac
and wet wiped, paying particular attention to the area occupied by the
sweatshirt (between the bed and the window). The floor to the
laundry area should also be vacuumed wit h a suitable H - type HEPA
filtered vac and wet wiped.
The shed area has shown positive results for bonded asbestos fibre
and respirable fibre was identified in one location. Due to t hes e
findings it is recommended that the shed area be thoroughly cleaned
by an unrestricted or restricted licensed asbestos removalist
contractor (LARC). Any items deemed uncleanable by the LARC,
need to be disposed of as contaminated waste.
The findings o f the C asbestos risk assessment have determined the
crawl space (see Photo 1) to be free of visible suspect asbestos
materials. The potential for migration of fibres into the crawl space
during the fire event is very low due to the mostly sealed perimeter
block foundation of the structure. However, vent openings (see Phot o
2) on each side of the structure, more prominently on the south and
eastern sides of the structure do provide openings from the outside
environment to the interior of the crawl space.
Co nsidering its proximity and age the crawl space is relatively clean.
Determination | Case number: 531411 Page 8 of 9
Record Key points
The underside of the floor decking is insulated (See Phot o 3). The
potential for fibre migration into the structure from the crawl space is
negligible considering the significant lack of pat hway. Previous air
testing and dust lift sample analysis results inside the living areas of
the residence support this assessment.
GB report
Report
19 - 01 - 17
Further to instructions received, GBAR Group have been appointed
to undertake asbestos removal and remediation works on the
residential property located at [ complainant s’ address] WA. Works
will be completed both inside the building and on the external
property.
Outlined in this ARCP are the steps and procedures to carry out all
works in a safe and planned manner and in accordance with the
following reference documents. This list is a guide only and is not
necessarily all the relevant documentation:
‒ Occupational Safety and Health Regulations 1996
‒ Occupational Safety and Health Act 1984
‒ NOHSC:2002(2005) Code of Practice for the safe removal of
asbestos
‒ NOHSC:2018(2005) Code of Practice for the management
and cont rol of asbestos in workplaces
Guidelines for the Assessment, Remediation and Management of
Asbestos Contaminated Sites in Wester n Australia May 2009;
The aforementioned notifications, this control plan and all other
documents as required by legislation, shall be maintained on site for
the duration of the project and available for inspection by the officers
of the regulator, the cli ent and the nominated licensed assessor or
appointed competent person.
Prior to the collation of this control plan, we confirm that we have
been given a copy of the as bestos sample analysis report as
provided by Coffey their reference ENAUPERT05623AAR1A, w e
would also confirm that a competent person has attended site and
made an assessment as to the nature of the Asbestos containing
Materials (ACM’S) to be removed and the extent of works required.
This ARCP is a working document specific to site and may nee d to
be assessed and expanded on to meet project changes and OSH
legislation
Complainant s’ expert
(ER)
ER has agreed to assist the [ complainant s] by providing general
technical advice on the assessment and clean - up of asbestos which
exploded from the fir e source (an asbestos garage shed) and
severely impacted the exterior and interior of the home, resulting in
an unacceptable human health risk.
With the exception of GB’s provided asbestos removal plan, the
remainder of the documented reports for the entir e project has not
met regulatory guidelines.
Given rec ent correspondence with the Insurer , it should be clearly
noted that ER is not preparing (and cannot prepare) an “assessment
Determination | Case number: 531411 Page 9 of 9
Record Key points
of the site” (by industry definition). Instead ER is providing expert
comment and opinion of the technical approach and merit of the work
already carried out and the work proposed.
Complainant s’ expert
(SR)
Seven tape samples and one bulk sample were taken from eight
locations of concern. Five of the eight samples returned a positive
result for asbestos.
The tape samples 006 and 007 taken from the South West corner
subfloor area was found to be negative for asbestos. However,
sample 008 which was taken from the west wall subfloor area wall
cavity (adjac ent to subfloor access p oint) returned a positive result for
the presence of asbestos.
The exact source of the contamination cannot be determined.
However, it can be concluded that air flow through the roof space and
wall cavities was sufficient enough to spread free asbestos fib res
throughout these areas.
The two soil samples that were collected from the back garden
(samples 009 and 010) and returned a negative result for free/los e
asbestos fibres being present within the soil.
The rear garden is significantly overgrown. Vacuumin g an
organic/porous product will not guarantee asbestos free site. The
most plausible solution to remediate an overgrown organic/porous
area would be to remove the vegetation completely and conducted a
surface scrape of 50 - 100mm. This is to be disposed of as
contaminated waste. Subsequent soil sampling should be undert aken
to determine whether any asbestos contamination within the soil is
either above or below guideline limits.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.