Home / Financial Firm (Unknown - Insurer) / Determination 531388

Determination 531388

Storm damage cash settlement and air conditioning claim

FirmFinancial Firm (Unknown - Insurer)
Decided2019-03-13
ProductGeneral Insurance · Other general
OutcomeFor the complainant in part
Amount awarded$10,000
Non-financial loss—
Amount claimed$88,000
SourceAFCA PDF

Summary

Investment property owner disputed a $84,950 storm cash settlement as made under duress and sought $48,000 more for top deck damage, and separately claimed for a failed air conditioning system. AFCA kept the settlement and refused the top deck claim, but ordered a $10,000 contribution to the air conditioning replacement.

The settlement was negotiated at arm's length with a broker and lawyer, and the top deck damage was excluded gradual deterioration and faulty construction; the air conditioning contribution reflects the insurer's failure to inspect the second condenser unit.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensation

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 531388 Page 1 of 12 Determination Case number: 531388 12 March 2019 1 Determination overview 1.1 Complaint The complainant lodged a claim under his insurance policy with the financial firm (insurer) for damage to his tenanted investment property, following storms associated with Cyclone Debbie in March 2017. In April 2018, the parties negotiated to cash settle the claim for $84,950. However, the complainant says he agreed to the cash settlement under duress. The complainant seeks payment of a further $48,000 for additional damage he says was caused by the storms. In January 2018, the complainant lodged a separate claim, after the ducted air conditioning system at the property broke down. The complainant says the damage was caused by a power surge. The insurer denied the claim on the basis the damage to the air conditioning system was caused by corrosion, which is excluded from cover under the policy. The complainant disputes th e insurer’s decision and seeks cover for the cost of replacing the ducted air conditioning system. 1.2 Issues and key findings Should the cash settlement for the storm damage claim be increased? The cash settlement amount is fair and reasonable. The insurer is not liable for the additional amount sought by the complainant for damage to the top deck, as this damage was caused by gradual deterioration which is not covered under the policy. Accordingly, the insurer is not required to increase the settlement amount. Is the insurer liable for the damage to the air conditioning system? While the available information establishes that the larger condenser unit failed due to corrosion, there is conflicting information about the condition of the smaller unit . As the insurer did not fully investigate this aspect of the claim, it should contribute to the cost of repairs. Determination | Case number: 531388 Page 2 of 12 1.3 Determination This determination is partially in favour of the complainant. The insurer is not required to increase the cash settlement amount for the storm damage. However, the insurer is required to pay the complainant the amount of $10,000 as a contribution to the cost of replacing the air conditioning system. Determination | Case number: 531388 Page 3 of 12 2 Reasons for determination 2.1 Should the cash settlement for the storm damage claim be increased? Cash settlement amount was negotiated by the parties The complainant lodged a claim for storm damage in July 2017, approximately two months after the storm occurred. The insurer appointed an engineer (IE) to inspect the property and determine the cause of the damage claimed. Based on IE’s report, the insurer accepted liability for the internal water damage to the property. However, the insurer denied liability for other damage which IE advised had been caused by factors which are excluded under the policy (such as gradual deterioration and faulty construction). The insurer’s builder prepared a scope of works for the repair of the internal water damage and quoted $28,702 to complete the works. After the complainant raised concerns about various items, the scope of works was expanded and the quotation was increased to $53,178. The complainant expressed concern that the amount offered would not allow him to engage his own contractors to undertake the works. In response, the insurer subsequently increased the cash settlement offer to $67,370.60. This amount included allowances for contingencies, including an additional 10% for unforeseen damage. In early March 2018, the complainant requested that the cash settlement amount be increased by an additional $48,000 to cover external damage to ‘the top deck’. This amount was based on a report and quotation provided by the complainant’s builder (NC). The insurer advised the complainant that NC’s report di d not alter its position that the damage to the top deck had been caused by excluded factors. However, the insurer advised it was willing to increase the cash settlement offer to $80,000 for a limited period, in order to finalise the dispute. The complainant sought a further increase in the cash settlement amount to $90,000. However, in mid-April 2018, he agreed to accept a cash settlement of $84,950 (which included costs incurred in obtaining expert reports). The cash settlement amount was paid shortly thereafter. Settlement was not entered into under duress Where the parties have reached a settlement to resolve a dispute, AFCA will generally be reluctant to depart from the terms of that settlement. Determination | Case number: 531388 Page 4 of 12 However, there are certain circumstances which will jus tify doing so – for example, if the complainant was not fully informed or misunderstood the terms of the agreement or if the settlement was entered into under duress. In the present case, the complainant says he entered into the settlement under duress. However, the history of the negotiations between the parties does not support his position. The cash settlement amount was agreed after protracted negotiations between the parties, involving several offers and counter-offers. The complainant was represented by his broker, who was fully involved in the negotiation process. Further, the complainant is a qualified lawyer, who could be expected to understand the implications of agreeing to cash settle his claim for an agreed amount. For the reasons outlined above, I am not satisfied that the complainant was acting under duress when he accepted the insurer’s offer to cash settle the claim for $84,950. Waterproofing failure was caused by excluded factors As outlined above, the complainant is seeking an additional amount of $48,000 for the repair of damage to the ‘top deck’ of the property, which includes an in -ground swimming pool. This amount of $48,000 was identified in NC’s report as the cost of replac ing the waterproof membrane on the top deck, including removing and replacing paved areas so these works could occur. The insurer denied liability for the repair of waterproofing to the top deck. The insurer says the issues with the waterproofing have been caused by gradual deterioration and/or faulty construction and maintenance, which is excluded from cover under the policy. The insurer’s engineer (IE) reported that the waterproofing of the top deck was inadequate, due to the use of incorrect methods and non-compliant installation. IE confirmed that the intensity of the rain experienced during the storm would not have caused the waterproofing to fail. The building consultant (DB) appointed by the complainant also identified defects in the waterproofing which he considered had allowed rainwater to enter during the storm. DB advised that:  the construction of the top deck and wall junctions was not consistent with best industry practice at the time of construction Determination | Case number: 531388 Page 5 of 12  waterproofing protection was provided by the use of a cosmetic sealer applied to the deck (instead a proper water barrier), which DB described as an ‘unacceptable construction methodology’  the cosmetic sealants had deteriorated and were nearing the end of their useful life at the time of the storm. In his report, the complainant’s builder (NC) noted that the waterproofing of the property relied on coatings and sealants, which would deteriorate over time following exposure to the elements. NC commented that further leaks may have occurred following the storms. However, I am not satisfied that his report establishes that the storms caused the waterproofing to fail, given the nature and extent of the pre-existing issues identified. Based on the reports and photographs provided, I am satisfied that the waterproofing issues affecting the top deck were caused by gradual deterioration and faulty construction. While the complainant may have carried out maintenance to this area, these works were not sufficient to ensure the waterproofing remained effective. Damage caused by gradual deterioration and faulty construction is excluded from cover under the policy. Accordingly, the insurer is not liable for the additional amount of $48,000 incurred in replacing the waterproof membrane. Insurer not required to increase cash settlement amount The policy provides cover for loss which occurs subsequent to damage caused by excluded factors. Accordingly, the insurer is liable for damage caused by water entering through the failed waterproofing membrane (even though damage to the membrane itself is excluded). The cash settlement paid by the insurer includes the cost of repairing internal water damage to the property. As outlined above, the settlement amount for the internal repairs was negotiated by the parties. For the reasons outlined above, the insurer is not liable for the damage to the top deck. There is no information to show that the settlement is otherwise unfair or unreasonable. Accordingly, the insurer is not required to increase the cash settlement amount. 2.2 Is the insurer liable for the damage to the air-conditioning system? Policy provides cover for physical damage subject to exclusions The complainant is required to show that, on the balance of probabilities, he has suffered a loss caused by a risk insured against under the policy. This is known as a valid (or prima facie ) claim. Determination | Case number: 531388 Page 6 of 12 If the complainant is able to establish a prima facie claim, then the onus shifts to the insurer to show that, on the balance of probabilities, it is entitled to rely on a policy exclusion or otherwise deny the claim. The complainant’s policy provides cover for ‘physical loss or damage’ to the insured property, subject to the conditions and exclusions set out in the policy. The policy contains a general exclusion for damage caused by wear and tear, gradual deterioration, rust and corrosion. Complainant says air conditioning system was damaged by a power surge The complaina nt’s cla im is for the replacement of a multi inverter, ducted air conditioning system (AC system) which cooled the top floor of his property. The system comprised two outdoor condenser units located on the rooftop (with capacity of 19.9kW and 12kW respectively), together with seven ceiling mounted ducted evaporators located in various rooms of the property. The complainant lodged a claim for the breakdown of the AC system in January 2018. In his claim form (signed on 20 January 2018), the complainant described the cause of damage as ‘fusion of motors’. The claim form attached a brief report and quotation from the complainant’s air conditioning specialist (AA) dated 4 January 2017. AA confirmed the ‘air conditioning systems’ had failed and noted that the entire system needed to be replaced because the existing internal units were not compatible with newer condensers. AA’s initial report did not identify the cause of damage to the AC system. However in an updated report provided in late February 2018, he stated that the systems were reported to have failed from a power surge to the property. In a further report provided in early March 2018, AA stated that:  the 12kW condenser had failed due to the fusion of the AC compressor  he was unable to provide the model number as the unit had been removed from the site, and  the damage to the condenser had been caused by a power surge that had also damaged the other (19.9kW) unit. The complainant says both the 12kW unit and the 19.9kW unit were damaged by a power surge. Insurer’s experts say damage was caused by corrosion The insurer’s loss adjuster (PG) and air conditioning technician (EE) attended the property in April 2018 to determine the cause of the breakdown. They inspected the 19.9kW condenser and reported that: Determination | Case number: 531388 Page 7 of 12  the AC system was showing a fault code indicating low gas pressure  testing identified that the unit had very low pressure (30psi) and a gas leak  the condenser unit was extremely deteriorated due to severe corrosion  testing of the AC system did not identify any other issues. EE concluded that the failure of the AC system had been caused by a gas leak from the unit coil, which had been damaged by severe corrosion as a result of long-term exposure to severe weather conditions. EE advised that the failure was not consistent with having been caused by a power surge, as the PCBs and compressors remained functional. Further, there was no evidence of damaged components or wiring in the unit (as would be expected had a power surge occurred). The complainant disputes PG and EE’s findings. He has provided a further report from his air conditioning specialist (AA) prepared in May 2018. In this report, AA states that the PCBs wer e found to be ‘locked up’ after the power surge. While AA acknowledges the system was low on gas, he says this was not the cause of the failure. However, AA has also provided a subsequent report dated 10 December 2018 which states that the damage to the A C system occurred ‘due to general operation’ (and does not refer to a power surge). While AA confirmed he had carried out regular maintenance to the condenser units, I am not satisfied this was sufficient to prevent corrosion developing, given the environment to which the units were exposed. AA noted that, while he carried out electrical testing of the units, he was unable to identify whether internal components of the refrigeration system might fail. Air conditioning system was not damaged by power surge Having carefully reviewed the available information, I consider it is inconsistent with the damage to the AC system having been caused by a power surge. The testing carried out by the insurer’s contractors (PG and EE) establishes the presence of a gas lea k. Further, the close up, colour photographs included in PG’s report support their statements about the extent of the corrosion to the unit and the absence of damage to the wiring. While AA states that the damage was caused by a power surge, he has provided relatively little information to support his conclusions. During the course of the claim, the insurer asked the complainant to provide evidence that a power surge had occurred. In response, the complainant provided a letter from Determination | Case number: 531388 Page 8 of 12 his energy supplier (EE) confirming there was storm related damage affecting the electricity supply the property on 26 February 2018. However, the claim for the damage to the AC system was lodged on or after 20 January 2018 (and AA provided his initial quotation on 4 January 2018). Accordingly, the incident referred to in EE’s letter cannot have caused this damage. The complainant has not provided any information from his energy supplier which indicates there was a power surge to the property around the time the damage occurred. The complainant says the fact the insurer accepted his claim for damage to the internal lift at the property establishes there was a power surge. However, the insurer’s contractors found no evidence that the lift had been damaged by a power surge. The insurer accepted the lift claim on the basis the damage had been caused by water entry during the storms in March 2018 (which occurred after the failure of the AC system). Damage to 19.9kW unit was caused by corrosion Based on the available information, I am satisfied that the damage to the 19.9kW condenser unit was caused by a gas leak due to corrosion (as identified by PG and EE). PG and EE’s reports provide a logical and rational explanation of how the damage occurred, which is consistent with the observed facts. EE’s testing revealed a gas leak from the corroded condenser and did not identify any other issues which might have caused the failure. Condition of 12kW unit is unclear There is conflicting information about whether (and if so, how) the 12kW condenser unit was damaged. As outlined above, the complainant’s air conditioning specialist (AA) advised that both condenser units had been damaged by a power surge. However, there is no evidence of a power surge around the time the AC failure occurred. It is also unclear whether the damaged 12kW condenser unit remained available for inspection when PG and EE attended the property in April 2018. In March 2018, AA advised that the damaged 12kW unit had already been removed from the property. When the insur er’s contractors attended the property in April 2018, they only inspected one condenser unit (which appears to have been the larger, 19.9kW unit). Determination | Case number: 531388 Page 9 of 12 However, photographs taken at the time show a smaller unit alongside the larger one (although the smaller unit appears to have been disconnected from the power supply). It is unclear whether this is the damaged unit referred to by AA. Insurer’s failure to inspect 12kW unit has prejudiced claim As outlined above, the complainant’s policy provides cover for physical damage to his property. To establish a valid (or prima facie ) claim, the complainant need only show damage has occurred – he is not required to establish the cause of the damage. If the complainant can establish there is physical damage to the propert y, the insurer is required to show that, on the balance of probabilities, the damage was caused by excluded factors. The available information establishes that the 19.9kW condenser unit was damaged and was not capable of being repaired. The damage to this unit was caused by corrosion and therefore is excluded from cover under the policy. The damage to this unit is sufficient to necessitate the full replacement of the AC system. There is insufficient information to determine whether the 12kW unit has been damaged (and, if so, to identify the cause of the damage). While AA stated the unit had been damaged, his report is unreliable as he wrongly identified the cause of the damage and was apparently mistaken as to whether the unit had been removed from the property. Further, AA later advised the unit had failed due to normal operation, which is suggestive of the cause being general wear and tear. Nevertheless, while AA’s advice was confusing, the insurer was clearly made aware of the complainant’ s belief that there was damage to both of the condenser units. PG’s report dated 12 March 2018 noted that both units were reported to have failed due to a power surge. In these circumstances, the insurer’s contra ctors should have confirmed whether the 12kW unit was available for inspection when they attended the property. The contractors’ failure to do so has potentially prejudiced the complainant’s ability to claim for damage to this unit (in the event the damage was not caused by excluded factors). Insurer is required to contribute $10,000 to cost of repairs The complainant has provided invoices totalling $30,000 for the replacement of the ducted AC system. He has advised he spent an additional $10,000 on building works required for the installation. While the complainant has not substantiated these costs, they do not appear unreasonable, given the previous quotations provided. Given the insurer’s failure to fully investigate the condition of the 12kW condenser unit, I consider it should be required to contribute to the cost of the repairs. Determination | Case number: 531388 Page 10 of 12 However, in considering the amount of the insurer’s contribution, I have had regard to the known damage to the 19.9kW condenser, as well as the uncertainty resulting from the inconsistent information provided by the complainant and his repairer. In the circumstances, I consider the insurer should be required to contribute $10,000 to the cost of the repairs. The insurer is not required to pay interest on this amount. Determination | Case number: 531388 Page 11 of 12 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with Financial Ombudsman Service (FOS). This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint 3.2 Our approach to this complaint We have considered it appropriate to expedite this complaint in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the complaint. Accordingly, this complaint has not been the subject of a preliminary assessment and has proceeded directly to determination. This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All of the material provided by the parties has been reviewed and considered. The complainant has been represented by his broker. For the purposes of this determination, submissions made by the complainant’s broker have been treated as if they had been made by the complainant himself. 3.3 Scope of this determination Insurer accepted liability for lift claim During the course of this complaint, the complainant referred to a separate claim lodged in May 2018, following the breakdown of an internal lift at the property. The complainant said the lift was damaged by a power surge. Determination | Case number: 531388 Page 12 of 12 Based on the findings of its consultants, the insurer disagreed that the damage had been caused by a power surge. However, the insurer settled the claim on the basis that the damage had been caused by water entry during the storm in March 2018. The complainant has confirmed that his claim for the lift has now been resolved. Accordingly, it is unnecessary to consider this aspect of the complaint any further. Loss of rent claim is outside scope of determination During the storm damage claim, the complainant advised the insurer he had reduced the rent payable by his tenant as a result of the damage to the property. However, a claim for loss of rent did not progress at this time. After this complaint was lodged with AFCA, the complainant confirmed that he wanted to pursue his claim for loss of rent. The insurer agreed to consider the claim, subject to the complainant providing further information. The parties agreed that the claim for loss of rent would be treated as outside the scope of this determination.