Text of the determination
Determination | Case number: 530193 Page 1 of 11
Determination
Case number: 530193 2 November 2018
1 Determination overview
1.1 Complaint
At the relevant time, the complainant held a household insurance policy with the
financial firm (the insurer).
In February 2012, a flash flood flowed underneath the complainant‟s property, which
is supported on timber and steel stumps. Following this, in July 2013 and again in July
2017, the complainant lodged claims fo r „flash flood and storm water run - off‟ related
damage.
The insurer first denied the claim saying the flash flood did not result in any
substantial damage and/or building movement.
In 2017, the complainant contacted the insurer saying ground movement related
damage had worsened and asked for the claim to be re-opened. Following re-
assessment of the claimed damage, the insurer identified a washing machine leak
and accepted the damage resulting from it. However, the insurer maintained its
decision to deny t he complainant‟s claim for other damage caused by the flash flood
in 2012.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the complainant. As the insurer did not
accept the recommendation, the complaint has been referred to me for determination.
1.2 Issues and key findings
Is the insurer required to accept the remaining damage?
The available material establishes on the balance of probabilities the damage was
caused by the flash flood and stormwater run-off. The available material does not
establish the damage was probably caused by faulty workmanship, earth movement,
or wear and tear. In the circumstances, the insurer is required to accept the remaining
claimed damage.
Determination | Case number: 530193 Page 2 of 11
1.3 Determination
This determination is in favour of the complainant.
The insurer is to settle the complainant‟s claim for the remaining claimed damage
pursuant to the terms and conditions of the policy.
Determination | Case number: 530193 Page 3 of 11
2 Reasons for determination
I have decided this case on its merits, having regard to the relevant law, good industry
practice, codes of practice and previous FOS decisions. I have considered all the
material submitted by the parties, both before and after the recommendation. I am
satisfied the documentation I have relied on has been provided to both parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
Some new material provided after the recommendation
After the recommendation was rejected, the insurer made further submissions and
provided a claim summary dated 7 February 2013. Where relevant, this new material
and submissions will be referred to in the determination.
2.1 Is the insurer required to accept the remaining damage?
Each party bears a different onus of proof
The complainant must establish on the balance of probabilities she has suffered a
loss caused by an event to which the policy responds. This is known as a prima facie
claim.
The complainant must establish the claimed damage was caused by flash flood and
stormwater run-off in February 2012.
Once so established, the onus shifts to the insurer to prove on the balance of
probabilities an exclusion applies if it seeks to deny or limit its liability for the loss.
The insurer must establish the claimed damage was caused by defective or faulty
workmanship, erosion or earth movement, or wear and tear.
It is not in dispute there was a significant weather event in the region of the insured
property in February 2012.
The available material shows the complainant first contacted the insurer on
7 February 2013 advising there were leaking pipes under the house. The claim was
not pursued.
Later, in July 2013, the complainant made further contact reporting movement
throughout the house as a result of the 2012 flash flood.
After investigation by an assessor, plumber and an engineer, the claim was denied.
In July 2017, the complainant contacted the insurer again to advise the walls of the
property had started moving away from the back of the property. She said it was
caused by flash flood in the February 2012 weather event. She said she had
engineer‟s advice the water run -off in February 2012 caused the claimed damage.
No expert report has been provided by the complainant.
Determination | Case number: 530193 Page 4 of 11
Consideration of expert reports
The insurer arranged for a number of experts to investigate the claims.
In July 2013, its assessor inspected and photographed the property. The complainant
told the assessor flooding had caused a crack to the wastewater pipe work which was
leaking. The assessor said the exposed pipe work was PVC plastic, but the
underground waste pipes are “urbanware.”
Photographs taken in July 2003 show the PVC pipes and a washing machine under
the house. The house stands on stilts. The ground appears dry but rutted.
The assessor found no leaking/cracked water or drainage piping. The assessor said if
there were broken pipes underground, the pipes were broken due to old age.
A plumber was engaged. The plumber photographed under the house which showed
evidence of rushing water. The plumber found the sewer drain was blocked and
because of this, effluent was coming back out the overflow relief galley. He said this
could be a factor which allowed water to flood the premises and caused the ground to
swell and crack the old clay pipes.
The plumber pressure tested water lines but found no leaks.
The plumber was generally supportive of the complainant. He recommended an
engineer be engaged but concluded:
The old clay drainage may have been a problem before the flooding event,
but the flooding may have also made the problem worse. The flooding of
water has moved some of the stumps on the house and put them on an
angle. It has also lifted up the concrete slab outside.
The insurer‟s file notes show it was waiting for a CCTV plumbing investigation.
The assessor obtained a “CCTV pipe cam” from the local Council which contained no
commentary. It did not advise the location of where the camera was put into the
sewer pipe. The assessor reviewed the video noting a blockage some 21m along the
pipe run. The assessor concluded the pipe blockage was because of long-term
movement in the supporting soil structures which allowed the ingress of roots into the
sewer pipes causing a blockage.
The available material does not show the CCTV footage was shown to the plumber.
An engineer RC was engaged. He inspected and photographed the property in
September 2013. The complainant said the basis of her claim was not specifically
related to the broken pipe work but to building movement which had caused the
jamming of doors and unevenness in the suspended timber floor. She said this was
because water ran through and under the property in February 2012. She said water
ponded under the house for at least six weeks.
The house is supported on steel and timber posts. The engineer said most of the
timber posts were replaced with steel posts about 10 to 15 years before the
Determination | Case number: 530193 Page 5 of 11
inspection. The engineer noted the water flow and that an external row of steel posts
on the left-hand side of the house were out of plumb.
The engineer inspected above and below the house, took photographs and prepared
a floor level survey. He referred to a plumber who had visited the site. He said the
plumber had removed tree roots to clear blockages in the sewer pipe work.
The engineer made several observations and comments namely:
the floor level is about 50mm out of vertical alignment
the floor was probably not level prior to the weather event
the steel posts on the left-hand side of the house were out of plumb but this was
because of poor construction
the storm waters passed diagonally from the back left-hand corner to the front right
hand corner and washed away softer soil around the top of the posts
some minor contribution to movement probably occurred in the first 24 to 48 hours
after the flooding
as the ground under the house is not free draining, a large amount of water ponded
in a depression for about six weeks which would have caused the soil to heave
upwards and cause building movement
although moisture did pond under the building, the current floor levels were
reasonable and there is no resultant damage which can be related to flooding
although plumbing may be leaking, this is probably because the earthenware pipes
are in highly reactive clay soils and so would not remain watertight indefinitely
there are other issues which promote soil moisture related ground movements
including the trees around the house, the garden bed at the front of the house, the
subfloor space not being adequately drained and the leaking sewer drainage
(caused by tree roots).
The engineer concluded:
The flooding event does not appear to have had any significant long-term
effect upon building movements. Subfloor space has dried out and it would
appear there are no long-term detrimental effects associated with the 2012
flooding event.
In 2017, the complainant continued to claim that during the weather event in February
2012 a large amount of water flowed underneath the house. She says the house has
moved on the stumps and the damage previously claimed has got slightly worse.
The insurer arranged for a further inspection by a loss adjuster in July 2017. The loss
adjuster observed movement and cracking mainly towards the rear of the house.
The loss adjuster recommended a reserve of $25,000 but no assessments or scopes
of work are available.
The loss adjuster appointed an engineer to advise on causation.
Determination | Case number: 530193 Page 6 of 11
Another engineer (CR) inspected and photographed the property in August 2017. He
also undertook a floor level survey which now shows substantial subsidence (not
heave) at the front of the house.
He made similar observations to the first engineer regarding the mature trees in the
front and rear of the house, the reactive soil, lack of drainage under the house and the
leaning stumps on the south side of the house.
He also observed a leaking washing machine in the south-west corner of the house.
He referred to and photographed several locations where packers had been
previously installed between bearers on the top of the stumps to level the floor. He
does not say when the packers were installed.
CR described the damage and attributed the damage as follows
the stumps had moved and the ceiling had cracked in the bedroom off the kitchen
because of the mature trees
the damage to the facia and timber above the rear deck was because of faulty
workmanship as it was not secured adequately
the walls separating in the toilet and the wall separating from the house on the
back right-hand side of the rear patio are caused by the leaking washing machine.
He concluded the general movement in the house was not caused by the flash flood
in February 2012 but was because of the normal expansion and contraction of highly
reactive soils made worse by moisture absorption from the large and mature trees.
The insurer has accepted the damage caused by the leaking washing machine. In this
regard, the insurer‟s file notes show the complainant lodged a claim in late May 2018.
This complaint deals with the other damage described and recorded by the engineers.
The complainant has established a prima facie claim
Having reviewed all the available material, it is apparent there are several factors to
consider including not only the flash flood in February 2012 but the leaking pipes
reported in February 2013 (referred to after the recommendation), the blocked sewer
drain and the issues referred to by the engineers.
In 2013, the assessor found no leaking or cracked water or drainage piping. The
plumber pressure tested water lines and found no leaks.
The only issue with plumbing which was identified in 2013 was the blocked sewer
drain. While the assessor reviewed the CCTV footage, I do not consider the
conclusions of the assessor are sufficiently persuasive. This is because the CCTV
footage contained no commentary, the location where the camera was put into the
sewer pipe was not known, it is not conclusive the blockage was o n the complainant‟s
property and the CCTV footage was not shown to the plumber who would have been
more qualified than the assessor to comment.
While the assessor concluded there was a pipe blockage which was caused by long-
term movement in the soil allowing roots to come into the sewer pipe, the plumber
Determination | Case number: 530193 Page 7 of 11
concluded the flooding may have made the problem with the old clay drainage worse.
He also concluded the flooding had moved some of the stumps under the house and
lifted a concrete slab.
This opinion of the plumber, coupled with the conclusion by the engineer (RC) that the
floor level was out of vertical alignment by 50mm contributing to movement in the first
days after the claimed event, leads me to accept that on balance the complainant has
established a prima facie claim.
On balance, damage was not caused by earth movement
In 2013, RC said a large amount of water ponded in a depression under the house for
about six weeks. He says this caused the soil to heave upwards which caused
building movement. The floor levels RC identified show substantial heave in the area
where the water ponded. This area is at the front of the house. Save for the
floorboards of the front veranda and a board on the top of the front stairs lifting, the
damage identified in 2017 is mostly at the rear and sides of the house.
Both engineers took floor level surveys. In 2013, the floor level surveys were elevated
in the general region where water had ponded under the building following the
claimed event. This survey was undertaken in September 2013 some 19 months after
the claimed event. The complainant told the engineer the water ponded under the
house for a period of at least six weeks. In 2013, the engineer noted the soils were
extremely cracked. This area of the house is away from sewer pipe in the bathroom
and away from the location of the washing machine.
RC says the subfloor space beneath the front right-hand region of the house is low-
lying and does not drain freely. This may explain the elevated floor level surveys at
the front of the house in September 2013.
However, I am not satisfied sufficient consideration has been given to the reason why
the subfloor space at the front right-hand side of the house is low-lying. Although the
complainant was not present when the floodwaters ran through the property in 2012,
she describes the flow of water from the back-left hand corner to the front right-hand
corner of the house which peaked at a level just below the height of the timber floor.
The soil was washed away. The complainant describes a dramatic event which could
be responsible for low-lying space under the house.
RC says the garden bed at the front of the house prevents free drainage away from
the house and that the subfloor space is not adequately drained which would allow
water to pond. However, RC described the soil as dry. The house is on stilts. I accept
air currents would generally be sufficient to dry the soil.
Trees are close to the front of the house. RC says tree root drying causes localised
subsidence. However, there is no subsidence at the front of the house in 2013.
Further, by the size of the trees, I accept the trees were present for some time prior to
2012. There is no reported damage before then.
The steel posts which are out of plumb are beneath the bathroom. RC says the bolts
which attached the timber to the steel posts have been installed at an angle which
suggests the steel posts were constructed out of plumb.
Determination | Case number: 530193 Page 8 of 11
While CR observed the stumps were leaning, he makes no similar observation about
the cause. In any event, the insurer has accepted the damage under the bathroom
was caused by the leaking washing machine.
CR undertook a floor level survey in August 2017 more than five years after the
claimed event. The 2017 floor level survey is almost exactly the opposite to the
survey undertaken in 2013. By 2017, the front of the house has substantially
subsided. The readings at the back of the house, particularly where the leaking
washing machine is located, are elevated.
On the other side of the rear of the house under the kitchen and sunroom, there is
slight subsidence. This is also the location of some large trees.
By 2017, the surface under the house was very dry. Both engineers described the
class of soil on the site to be “reactive clay.” No actual soil analysis was undertaken.
In several places, packers were described and photographed installed between
bearers and the top of stumps to level the floor. The engineer does not state when the
packers were installed.
CR sites CSIRO recommendations regarding planting trees. According to those
recommendations, the trees located close to the house are too tall to be so near the
house. It is said the root system of the trees around the house dries out the soil over a
period of about 18 months; the packing of the steel stumps indicates necessary work
to accommodate the movement of the house; and the transition in levels from the
front of the house to the back and across the rear has resulted in the damage.
However, I am not satisfied the engineers‟ analysis are sufficiently persuasive as:
they do not take sufficient account of the significance of the flash flood and its
impact on the low-lying area under the house
they do not take sufficient account of the 50mm movement identified in 2013
the trees were present for some time before 2012 without reported damage
it is not known when the packing was installed
no analysis is made of the impact by the leaking washing machine
there was no actual soil analysis.
Having reviewed the available material, I am not satisfied the insurer has established
on the balance of probabilities the remaining claimed damage in the house was
caused by earth movement or by wear and tear.
Submissions made after the recommendation do not affect the outcome
After the recommendation, the insurer argued if the flash flood caused the damage it
is likely the damage would appear shortly afterwards. I acknowledge there is a gap
between the time of the claimed event and the time of the claim. However, I do not
accept this establishes when the damage was known to the complainant particularly
in circumstances where the property was tenanted.
Determination | Case number: 530193 Page 9 of 11
I also ackn owledge the insurer‟s submission after the recommendation that the levels
were different in 2017 as compared with the 2013 levels. The insurer argues this
confirms there is ongoing earth movement and the earth movement continues to be
influenced by causes other than the claim event in 2012. If this was the case, as set
out above, the engineers‟ reasoning is insufficiently persuasive to explain the different
levels. Moreover, the second engineer provides no explanation about the first
engineer ‟ s level survey. Furthermore, if the claim was one for acceptance in 2013,
then I do not accept it is fair in the circumstances for the insurer to rely on events
which may have occurred since then.
On balance, damage was not caused by faulty workmanship
As for the damage to the top of the skillion connection at the north-west corner of the
house, CR says the vertical framing of the roof was not originally secured adequately.
Because of this, and because of flexion in the structure under normal conditions, he
says this came apart. CR attributes the cause of the long -term damage to the skillion
connection as faulty workmanship in the original construction of the connection.
CR estimates the house is over 100 years old. He does not describe the building
regulations in place at the time of the original construction to justify his opinion.
The floor level survey undertaken by CR shows a heave in the area around the
leaking washing machine and a subsidence at the other end of the rear of the house.
CR does not address how this differentiation in levels could have impacted the
damage to the facia and timber above the rear deck.
Having reviewed the available material, I am not satisfied the insurer has established
on the balance of probabilities the damage to the facia and timber above the rear
deck was because of faulty workmanship.
Determination | Case number: 530193 Page 10 of 11
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
complaint s previously lodged with Financial Ombudsman Service (FOS).
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
complainant complainant
financial services provider financial firm
complaint complaint
claim claim
3.2 Approach
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie claim. Once so
established, the onus shifts to the insurer to prove on the balance of probabilities that
an exclusion applies if it seeks to deny or limit its liability for the loss.
3.3 Case law and proximate cause
Case law establishes:
The proximate cause of the loss is the dominant or effective or operative cause of
the loss whether or not that be the last in time or the sole cause.
If there are several causes operating contemporaneously, each must be examined
for the qualities of reality, predominance and efficiency as the active, efficient
cause that sets a relevant chain of events in action. If one cause would have
caused the harm in any case, and the other would not have done so in the
absence of the first, the first is the proximate cause.
A common-sense approach is taken to determine proximate cause.
Determination | Case number: 530193 Page 11 of 11
3.4 Relevant policy extracts
The relevant policy extracts are referred to in the insurer‟s Notice of Response . Both
the policy document and the Notice have been exchanged with the complainant.
PDS page number PDS excerpt
9 Words / terms with special meanings
…
Flash flood and stormwater run - off
A sudden flood caused by heavy rain that fell no more than 24 hours
prior to the flash flood or stormwater run - off.
57 - 58 When you are not covered
- general exclusions
…
Defective or faulty workmanship
The inherent defect or defective or faulty workmanship, design or
manufacture
…
Erosi on, landslide
Erosion, landslide, subsidence, earth movement (except eart hquake),
earth shrinkage or expansion no matter how caus ed.
…
Wear , tear, rust, mould
Wear, tear, rust, corrosion, rot, mould, action of light or
atmospheric or climatic conditions including damage caused by
wind, rain or sand happening over an extended period of time.
3.5 Other relevant material considered and relied on
Parties‟ submissions both before and after the recommendation.
Insurer‟s claim notes.
Engineers‟ reports and level surveys.
Assessors‟ reports.
Plumber‟s report.
Photographs.
C orrespondence between the parties .