Determination 530140

Storm water damage claim declined under exclusions; claim decision delay alleged

FirmFinancial Firm (Unknown - Insurer)
Decided2019-01-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$100,000
SourceAFCA PDF

Summary

The complainant claimed for storm-related water damage, alleging the insurer's delay caused further loss. AFCA upheld the decline and found the earlier $4,244.75 payment compensated the delay, but ordered the insurer to assess the separate damaged door claim.

The loss was caused by excluded earth movement and lack of maintenance, and the complainant contributed to the delay, so no further compensation is due.

Issues

Subjects and remedies

home or building damagereassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 530140 Page 1 of 14 Determination Case number: 530140 9 January 2019 1 Determination overview 1.1 Complaint The complainant held a home and contents insurance policy with the financial firm (insurer). The complainant lodged a claim under his policy on 31 October 2017 for water damage sustained to his home following a storm. The insurer denied the claim on the basis the damage was not caused by the storm, but by factors excluded under the policy, including gradual damage, wear and tear and lack of maintenance. However, the insurer paid the complainant $4,244.75 in acknowledgement of the time taken to provide a claims decision. The complainant maintains the damage resulted from the storm and alternatively that delays in the insurer’s decision making has led to further loss . 1.2 Issues and key findings Does the loss fall within the terms of the policy? I am satisfied based on the available information that the insurer was entitled to refuse payment of the complaina nt’s claim for damage arising from the storm on 31 October 2017. Did the insurer’s delays cause further loss? I am not satisfied based on the available information that the complainant has established the delay in determining liability in this matter has caused additional loss as claimed by the complainant. I am satisfied the insurers’ payment of $4,244.75 is sufficient to cover any liability for loss caused as a result of the delays. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to pay further compensation in respect of the complainant ’s claim , save for addressing the claim for the damaged door. Determination | Case number: 530140 Page 2 of 14 2 Reasons for determination 2.1 Does the loss fall within the terms of the policy? Claimed loss fell within policy exclusions The complainant ’s policy provides cover for listed events including storm damage. While the policy offers accidental damage as an optional cover, the complainant has not opted to take this cover. Under its cover for storm damage, the policy excludes loss or damage caused by an opening that was not created by storm. The policy also excludes cover for any loss or damage caused by earth movement, lack or maintenance and gradual deterioration. The available material supports the insurer ’s finding tha t water entered the complainant ’s property due to cracked tiles and failed water proof membrane in the balcony. The insurer ’s expert RC found the cracks in the balcony were a result of differential ground movement, which is excluded under the policy (unless it occurs within 72 hours as a direct result of certain events including storm). An engineering report from CE dated 5 February 2018 supports this view. The complainant has not provided any contradictory reports. On the basis of the available information, I am satisfied the water damage claimed by the complainant does not fall within the terms of the policy on the basis the cause of damage resulted from events the policy excludes. 2.2 Did the insurer’s delay cause further loss? Complainant says insurer’s delay in settling claim caused further loss The complainant says that water entering the property caused damage including mould, which was contained within barriers installed by the insurer as part of a make- safe measure, to prevent it spreading. The complainant says the insurer is liable for further damage because:  the mould was made worse by the insurer ’s delay in providing a claims decision  if the insurer had informed him of the source of the problem earlier, he could have fixed it and prevented further damage. The complainant has provided photos of the area affected by mould, which is still sealed off. He says the insurer has not arranged to remove the protective material, and that the mould is now toxic and presents a health hazard to him and his family. He also says the carpets are mouldy and smelly and the ceiling is caving in because of further damage caused due to the insurer ’s delay in advising him of the source of the problem. Determination | Case number: 530140 Page 3 of 14 Complainant ’s unavailability contributed to delay in assessing claim The complainant ’s policy provides that in the event of a claim, an insured person must allow the insurer or its representative/s to enter the home to investigate the cause of the loss or damage. A timeline of the events is set out under section 3.3 of this determination. The complainant lodged the claim on 31 October 2017. The available information shows the insurer arranged a make-safe to be undertaken on 20 November. The insurer ’s claim notes, however, suggest the insurer and its appointed trades had a problem communicating with the complainant about his claim. The insurer appointed a builder (TC) on 6 November, to assess the property. However, TC was unable to assess the property until 9 January 2018. This is due to the following reasons as outlined in the insurer ’s claim notes:  TC unsuccessfully attempted to contact the complainant on 7, 13 and 17 November 2017 to make an appointment and left messages for the complainant  the insurer unsuccessfully attempted to contact the complainant on 7 and 15 November 2017 to inform him TC was attempting to contact him  when the complainant called the insurer on 16 November 2017, it advised him that TC was trying to contact him to arrange an assessment  TC attended the property on 28 November 2107 as arranged with the complainant, but was refused entry by the occupier (the complainant was not present)  TC arranged a site visit with the complainant for 19 December 2017, but the complainant cancelled the appointment on the day, due to an emergency. Further, the claim notes show the insurer arranged a restorer (OL) and make-safe trades to attend on 20 November 2017. It did this following a call from the complainant the same day informing the insurer that another heavy rain event had caused further damage in the same areas as well as the carpet. OL attempted to contact the complainant on 20 and 23 November 2017, before attending the property on 2 December 2017. The claim notes also show a roofing expert had difficulty contacting the complainant to arrange an assessment, while the insurer also advised the complainant that its trades were unable to contact him. Having carefully considered the information provided by the parties, I am satisfied the complainant contributed to the delays in progressing his claim. Insurer compensated the complainant for delays The insurer acknowledged that the time taken for it to reach a decision on the claim was lengthy. While it says the complainant ’s lack of availability contributed to the Determination | Case number: 530140 Page 4 of 14 delay in assessing the claim, it made a payment of $4,244.75 to the complainant in recognition of its delay. The insurer confirms this amount represented the cost to repair the internal damage as per the initial scope of works provided by the builder on 9 January 2018. While there was an initial delay in the complainant ’s property being assessed by a builder (TC), I am satisfied the claim progressed within a reasonable timeframe after TC attended on 9 January 2018. This is because the relevant information shows:  on 10 January 2018, TC provided its report to the insurer with a recommendation that it obtains an engineer’s report  on 10 January 2018, the insurer appointed an engineer (CS)  on 16 January 2018, CS attended and sought insurer ’s authority for a plumber to provide a leak detection test  on 1 February 2018, a plumber performed a leak detection test. The available information highlights the following in relation to how the insurer communicated its decision to the complainant:  on 8 February 2018, it advised the complainant by phone, that the claim was a possible decline based on the findings of its expert reports  on 10 February 2018, it made the decision to deny the claim and drafted a claim denial letter to the complainant  on 14 February 2018, it attempted to call the complainant to inform its decision, but was unsuccessful  on 20 February 2018, its decision letter was still awaiting review  on 24 February 2018 it called the complainant to advise of its claim decision and sent him a letter advising the same.  The insurer says it did not send its letter to the complainant immediately after it was drafted, because its claims department usually attempts to contact a complainant three times by phone, before issuing a letter. The notes also show the complainant emailed the insurer around the same time, saying:  he was advised just after Christmas that the matter would be settled with a cash settlement  he was told on numerous occasions that his claim was approved and that it was just a matter of agreeing to terms, while the damage worsened  requesting the insurer advise him via return email of the outcome of the investigation. Given the circumstances of the claim, and the complainant ’s request for an update, it is not clear why he was not informed of the claim decision until 24 February 2018. Determination | Case number: 530140 Page 5 of 14 Complainant has not established insurer advised him his claim was accepted The complainant asserts that during various stages of the claim, the insurer advised him on several occasions that his claim had been accepted. A review of the relevant correspondence, call recordings and claim notes, however, do not support this assertion. Further, the complainant has not provided any other information to establish that his claim was accepted. Insurer entitled to investigate claim before determining liability An insurer is entitled to investigate and determine the veracity and extent of a claim. An insurer’s decision to investigate a claim can result in some delay and inconvenience. Some delay is unavoidable if an insurer is to have a fair opportunity to investigate, as long as it conducts its enquiries within a reasonable timeframe. The complainant says that if the insurer had told him about the cause of damage earlier, he would have fixed the source of water entry and prevented further damage. While he carried out the necessary repairs to prevent further water entry, the complainant says the insurer ’s delay in notifying h im of its claim decision, caused further structural damage. I accept given the nature of this claim that it was reasonable for the insurer to obtain appropriate expert evidence to determine the cause of damage and liability. I accept that in obtaining this expert evidence there was some delay however this delay was contributed to by both parties. Complainant is not entitled to further compensation Whilst the complainant believes that the insurer should remove the protective bags that were installed by OL to prevent further mould growth information on file indicates that when OL attended the property to remove the bags the complainant requested the bags remain in place. The complainant now says that the cost to repair the damage including the removal of the mould is approximately $100,000. No quotation has been obtained to substantiate this nor is there any information to suggest that the retention of the protective bags has caused the mould to spread. The insurer has agreed to pay the complainant the cost to repair the internal damage as per the initial scope of works provided by its builder on 9 January 2018. It is done so it says as a gesture of good faith because of the initial delays with the claim. I am satisfied given the information provided that in paying for the cost to repair the internal damage of $4,244.75 the insurer has fairly and reasonably compensated the complainant for the delays associated with the assessing of the claim. I am satisfied the complainant is not entitled to further compensation in these circumstances as: Determination | Case number: 530140 Page 6 of 14  the complainant contributed to the delay in processing his claim  the complainant has not provided information to show the delay caused further loss  the payment made by the insurer in recognition of its delay in providing a decision is commensurate with the complainant ’s experience. Other matters During the course of the complaint with us, the complainant has submitted there was additional damage caused to a stained-glass door, when he slipped and knocked his elbow against it. The complainant says this occurred during the same time as the claim for water damage to his property. The claim notes show the complainant advised the insurer of this damage in a phone call on 12 December 2017. The available information does not, however, show that the insurer has addressed this aspect of the claim. The insurer is to assess the claim for the damage to the door and provide the complainant with an outcome in relation to this damage. Determination | Case number: 530140 Page 7 of 14 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financia l services provider financial firm dispute complaint claim claim 3.2 Relevant policy provisions Record Key points Insured events Page 8 - 11 This section describes the insured events you are covered for, and the conditions and exclusions that specifically apply to each insured event. They should be read with the general exclusions on pages 29 - 32. 5. Accidental breakage of glass, ceramic and sanitary fixtures When your home is insured, this includes: …  fixed glass in any window, door… 6. Storm and rainwat er Including loss or damage from:  the escape of rainwater from any water pipe, drain or gutter  surface run - off rainwater from surrounding areas that occurs within 24 hours of a storm or heavy rain Including loss or damage caused by erosion, subsidence, landslide, mudslide or any other earth movement that occurs within 72 hours of a storm or heavy rain and as a result of that storm or heavy rain. We will NOT cover: Determination | Case number: 530140 Page 8 of 14 Record Key points …  loss or damage caus ed by rain, h ail, wind or dust due to: o a design fault, structural defect or faulty workmanship o lack of maintenance (a defect that you knew about or should reasonably have known about and did not fix) o an opening that was not created by the storm o building additions, reno vations or alteration work. General exclusions Pages 29 - 31 We will not cover: Consequential loss  Cons equential or indirect loss, inconvenience or expense, including but not limited to loss of profit, costs arising from any business interruption or the intellectual or sentimental value of an item. Earth movement  Loss or damage or the incurring of legal liability caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement. But subject to the po licy terms and conditions, we will cover loss or damage caused by earth movement that occurs within 72 hours and as a direct result of the following insured events: o Earthquake o Explosion, or o Storm and rainwater. Gradual deterioration  Loss or damage c aused by rust, corrosion, rot, mould, rising damp, mildew, gradual deterioration, wear, tear or fading. Making a claim Page 35 What you must do If your home or contents are lost or damaged, or an incident occurs that may result in a claim, you must: …  allow us, or our representative to enter the home to investigate the cause of the loss or damage 3.3 Relevant timeline Date Action 31 - 10 - 2017 Complainant lodged claim with insurer Determination | Case number: 530140 Page 9 of 14 Date Action 6 - 11 - 2017 Insurer appointed builder (TC) to perform assessment 20 - 11 - 2017  Complainant called insurer to advise of another heavy rain event which caused furt her damage to the same areas and the carpet.  Insurer appointed restorer (OL) to assess carpet and trades to attend to make - safe.  Make - safe trades attended property. 28 - 11 - 20 17 TCC attended property for assessment as arranged but the complainant was not present and TC was refused ent ry by the occupier. 02 - 12 - 2017 OL attended property and installed a local containment barrier to prevent mould spreading. 06 - 12 - 2017  OL contacted ins urer to advise mould present and asking whet her claim is authorised because the mould requires invasive work.  Insurer advised OL claim not authorised.  OL advised carpets are restorable. 08 - 12 - 2017  TC contacted complainant and arranged a s ite attendance for 19 December 2017. 11 - 12 - 2017  Roof specialist (RC) attended to inspect the roof.  Insurer arranged OL to re - attend due to complainant ’s concerns about mould as the plastic protection installed by OL had come away. 12 - 12 - 2017  OL re - attended to inspect and contain mould. 18 - 12 - 2017  Insurer contacted complainant to confirm TC booking for 19 December 2017 and provided an update on claim.  Insurer advised complainant that water was entering through the cracks in the balcony as per report from OL.  Insurer advised complainant that a builder’s report was required to determine sourc e of water entry.  Complainant asked the insurer about carpet replacement and insurer advise d it would look to replace the carpet or obtain quotations from the complainant .  Complainant contacted TC and cancelled its attendance due to an emergency.  A new appointment was scheduled for 9 January 2018. 19 - 12 - 2017  Insurer attempt to call the compla inant wit h an update was unsuccessful. Determination | Case number: 530140 Page 10 of 14 Date Action  Insurer notes it needs to review the builder’s report aft er builder attends on 9 January 2018, before it can make a claims decision. 28 - 12 - 2017  Insurer attempt to call the complainant wit h an update was unsuccessful.  Insurer notes it needs to review the builder’s report aft er builder attends on 9 January 2018, before it can make a claims decision. 09 - 01 - 2018  TC attended complainant ’s property. 10 - 01 - 2018  TC provided a report to insurer recommending an engineer be ap pointed.  Insurer appointed engineer (CS).  Insurer advised complainant that CS will call to arrange a time to attend. 16 - 01 - 2018  CS attended property. 17 - 01 - 2018  CS requested permission from insurer to arrange leak detection test by plumber as it believed there could only be two reasons for cracking in the home – tree roots and leaking pipe.  Insurer advised CS to proceed with leak detection test. 18 - 01 - 2018  Insurer advised complainant an engineer’s report could take 2 - 3 weeks and the insurer can review the claim once received. 25 - 01 - 2018  Complainant contacted the insurer for an updat e.  Insurer followed up with the engineer who said it was awaiting aut hority from insurer to perform lea k detection test. insurer advised engineer authority was already provided and sent approval to engineer in writing.  Insurer advised complainant that the engineer is awaiting a plumber’s report before issuing his report.  Complainant enquires about damaged carpet and tiles and insurer informs him that it can have a look at it for him if it is a result of the claimed incident. 01 - 02 - 2018  Plumber attended. 06 - 02 - 2018  All reports received and claim reviewed by insurer .  Insurer recommended claim be denied.  Insurer attempted to call the complainant but was unsuccessful, so left a message and sent an SMS. 08 - 02 - 2018  Complainant contacted insurer Determination | Case number: 530140 Page 11 of 14 Date Action  Insurer advised complainant : o possible claim decline based on the findings of the reports o if declined, it will send him a decline letter, copies of all reports and details of IDR department o a claim handler will call him with the outcome. 10 - 02 - 2018  Insurer Management reviewed claim and made decision to deny claim.  Insurer claim file notes decline letter requires amendment. 14 - 02 - 2018  Complainant emailed insurer requesting the outcome of the investigation via email and saying insurer previously advis ed him the claim would be settled via cash settlement.  Insurer claim file notes awaiting a Team Leader to review decline letter before issuing to complainant with relevant reports. 20 - 02 - 2018  Claim file not es decline letter requires amendment and referred to claim handler to review complainant ’s concerns. 24 - 02 - 2018  Insurer a dvised complainant of claim decision.  Insurer advised a determination and report used to determine outcome will be sent to the complainant . 26 - 02 - 2018  Complainant requested the removal of bags used for mould containment.  Insurer arranged OL to attend and remove bags. 01 - 03 - 2018  Complainant requests call recordings from insurer as he was advised on multiple occasions that his claim was accepted.  Insurer offered to pay the complainant the cost of the resultant internal damage $4,2 44.75 (including 20% margin and 10% GST) and waive the excess, in recognition of the length of time taken to provide a claim decision.  OL advised insurer it attended the site to remove the bags, but the complainant instructed it to leave mould containment i n place. 08 - 03 - 2018  Insurer emailed the complainant about his concerns and confirmed the claim is not accepted, but that it would make a payment of $4,244.75 for the delay in making a claim decision. 03 - 05 - 2018  Complainant requests insurer attend the pro perty and Determination | Case number: 530140 Page 12 of 14 Date Action remove the protective mould coverings it had installed. 13 - 05 - 2018  Complainant followed up wit h insurer as he did not receive a response to his email of 3 May 2018. 16 - 05 - 2018  Insurer emailed the complainant advising it would arrange OL to return and remove the bags, but that OL would not be undert aking any mould remediation given the claim was not accepted.  The complainant denied this request and OL was no appointed.  Complainant emailed insurer saying that when OL attended previously, it advised him that the bags could not be removed without removing the mould, which is now a health hazard. 3.4 Supporting documents Record Key points Insurer ’s expert (RC) Roof report 13 - 12 - 2017  Area where rainwater ingress is occurring int o the lounge room is covered by a ceramic tiled balcony.  Given there is a waterproofing membrane installed under the ceramic tiles, common sense and logic dictate that the only way rainwater penetration can occur is if there is damage or deter ioration of the membrane.  Applications of sealant type products across the tiles on the balcony are consistent with addressing extensive cracking of the tiles – the result of building movement.  Rainwat er ingress that is occurring onto the ceiling of the lo unge room is entering int o the house via balcony.  Rainwat er leakage has occurred because the wat erproof membrane to the balcony has been damaged by considerable building movement.  Inspection of the roof of the house and in particular the balcony found no evidence of storm damage or storm created openings.3 Insurer ’s expert (IP) Leak det ection report 01 - 02 - 2018  Testing revealed no evidence of a water leak.  The tiles on the balcony are cracked in areas.  There are two balcony drains connected which run onto the veranda roof at the front of the house.  CCTV of these drains found no visible cracks or breaks in the drain at this inspection.  There were no visible cracks or breaks found in the main drain which runs under the cent re of the house.  A hole was located in the top of the branch drain which runs to the downpipe on the eastern side of the house. It Determination | Case number: 530140 Page 13 of 14 Record Key points is unknown if there is a hole in the bottom of the drain in this area due to the debris in the drain. Insurer ’s expert (CE) Engineer’s report 1 05 - 02 - 2018  The c ause of cracking damage is differential ground movement  There are no trees or sewer pipes in close proximity to the balcony area, so we have eliminated trees and leaking sewer pipes as a cause of ground movement.  The Insured’s water supply is not leaking s o we have eliminated this as a cause of damage.  Whilst a hole was detected to a storm - water pipe at the northeast corner of the residence, the hole was at the top of the pipe and has not resulted in water escaping from the storm - water pipe.  Further leak d etection may reveal the presence (or otherwise) of a leak/hole in the bottom of the storm - water pipes that would contribute to ground movement.  The cause of water ingress to the lounge room ceiling is failure of the balcony water proofing system. Because o f the balcony not being waterproof, water ingress has occurred during each rainfall event (not limited to a one - off storm Event).  We were unable to inspect the balcony water proofing system as it is currently hidden by cladding/tiles.  Ground movement (caused by the factors listed above) has caused cracks in the balcony tiles and water proofing system (if there is one).  The cracks in the balcony have facilitated water ingress into the lounge room ceiling, res ulting in mould in the zone 1 area. Insurer’s expert (OL) Completion summary Date not provide  [OL] was engaged by [insurer] to restore the rain water affected carpets in the lounge room and entry of the property  Following a storm in October last year, rain water has entered the pro perty resulting in mould contamination.  There appear to be a number of cracks in the roof of the balcony upstairs and which could possibly be the point of ingress.  The leaks have damaged the plaster ceiling in the downstairs lounge room along the front por tion of the room and both sides of ceiling in the entrance area.  Black organic growth is visibly present.  As a result of water ingress, damage has been sustained to the entry/front lounge room.  We attended the site on 2 December 2017 and completed the foll owing works:  inspection and report including scope of works.  Installed a local containment barrier to the visible mould Determination | Case number: 530140 Page 14 of 14 Record Key points growth on the ceiling, affected wall and cornice to prevent further spread of contamination.  We re - attended the site on 12 December and re - instated containment barrier to secure containment of mould growth.  On 26 February 2018 we were advised by your office, that the claim had been cancelled and therefore we were not required to complet e any additional works.  We were instructed to return the property to remove the containment barrier however the insured advised they would prefer the containment was left in place due to ongoing healt h issues.