Text of the determination
Determination | Case number: 530140 Page 1 of 14
Determination
Case number: 530140 9 January 2019
1 Determination overview
1.1 Complaint
The complainant held a home and contents insurance policy with the financial firm
(insurer). The complainant lodged a claim under his policy on 31 October 2017 for
water damage sustained to his home following a storm.
The insurer denied the claim on the basis the damage was not caused by the storm,
but by factors excluded under the policy, including gradual damage, wear and tear
and lack of maintenance. However, the insurer paid the complainant $4,244.75 in
acknowledgement of the time taken to provide a claims decision.
The complainant maintains the damage resulted from the storm and alternatively that
delays in the insurer’s decision making has led to further loss .
1.2 Issues and key findings
Does the loss fall within the terms of the policy?
I am satisfied based on the available information that the insurer was entitled to
refuse payment of the complaina nt’s claim for damage arising from the storm on 31
October 2017.
Did the insurer’s delays cause further loss?
I am not satisfied based on the available information that the complainant has
established the delay in determining liability in this matter has caused additional loss
as claimed by the complainant. I am satisfied the insurers’ payment of $4,244.75 is
sufficient to cover any liability for loss caused as a result of the delays.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to pay further compensation in respect of the
complainant ’s claim , save for addressing the claim for the damaged door.
Determination | Case number: 530140 Page 2 of 14
2 Reasons for determination
2.1 Does the loss fall within the terms of the policy?
Claimed loss fell within policy exclusions
The complainant ’s policy provides cover for listed events including storm damage.
While the policy offers accidental damage as an optional cover, the complainant has
not opted to take this cover.
Under its cover for storm damage, the policy excludes loss or damage caused by an
opening that was not created by storm. The policy also excludes cover for any loss or
damage caused by earth movement, lack or maintenance and gradual deterioration.
The available material supports the insurer ’s finding tha t water entered the
complainant ’s property due to cracked tiles and failed water proof membrane in the
balcony. The insurer ’s expert RC found the cracks in the balcony were a result of
differential ground movement, which is excluded under the policy (unless it occurs
within 72 hours as a direct result of certain events including storm). An engineering
report from CE dated 5 February 2018 supports this view. The complainant has not
provided any contradictory reports.
On the basis of the available information, I am satisfied the water damage claimed by
the complainant does not fall within the terms of the policy on the basis the cause of
damage resulted from events the policy excludes.
2.2 Did the insurer’s delay cause further loss?
Complainant says insurer’s delay in settling claim caused further loss
The complainant says that water entering the property caused damage including
mould, which was contained within barriers installed by the insurer as part of a make-
safe measure, to prevent it spreading.
The complainant says the insurer is liable for further damage because:
the mould was made worse by the insurer ’s delay in providing a claims decision
if the insurer had informed him of the source of the problem earlier, he could have
fixed it and prevented further damage.
The complainant has provided photos of the area affected by mould, which is still
sealed off. He says the insurer has not arranged to remove the protective material,
and that the mould is now toxic and presents a health hazard to him and his family.
He also says the carpets are mouldy and smelly and the ceiling is caving in because
of further damage caused due to the insurer ’s delay in advising him of the source of
the problem.
Determination | Case number: 530140 Page 3 of 14
Complainant ’s unavailability contributed to delay in assessing claim
The complainant ’s policy provides that in the event of a claim, an insured person must
allow the insurer or its representative/s to enter the home to investigate the cause of
the loss or damage.
A timeline of the events is set out under section 3.3 of this determination.
The complainant lodged the claim on 31 October 2017. The available information
shows the insurer arranged a make-safe to be undertaken on 20 November.
The insurer ’s claim notes, however, suggest the insurer and its appointed trades had
a problem communicating with the complainant about his claim.
The insurer appointed a builder (TC) on 6 November, to assess the property.
However, TC was unable to assess the property until 9 January 2018. This is due to
the following reasons as outlined in the insurer ’s claim notes:
TC unsuccessfully attempted to contact the complainant on 7, 13 and 17
November 2017 to make an appointment and left messages for the complainant
the insurer unsuccessfully attempted to contact the complainant on 7 and 15
November 2017 to inform him TC was attempting to contact him
when the complainant called the insurer on 16 November 2017, it advised him that
TC was trying to contact him to arrange an assessment
TC attended the property on 28 November 2107 as arranged with the complainant,
but was refused entry by the occupier (the complainant was not present)
TC arranged a site visit with the complainant for 19 December 2017, but the
complainant cancelled the appointment on the day, due to an emergency.
Further, the claim notes show the insurer arranged a restorer (OL) and make-safe
trades to attend on 20 November 2017. It did this following a call from the
complainant the same day informing the insurer that another heavy rain event had
caused further damage in the same areas as well as the carpet. OL attempted to
contact the complainant on 20 and 23 November 2017, before attending the property
on 2 December 2017.
The claim notes also show a roofing expert had difficulty contacting the complainant
to arrange an assessment, while the insurer also advised the complainant that its
trades were unable to contact him.
Having carefully considered the information provided by the parties, I am satisfied the
complainant contributed to the delays in progressing his claim.
Insurer compensated the complainant for delays
The insurer acknowledged that the time taken for it to reach a decision on the claim
was lengthy. While it says the complainant ’s lack of availability contributed to the
Determination | Case number: 530140 Page 4 of 14
delay in assessing the claim, it made a payment of $4,244.75 to the complainant in
recognition of its delay. The insurer confirms this amount represented the cost to
repair the internal damage as per the initial scope of works provided by the builder on
9 January 2018.
While there was an initial delay in the complainant ’s property being assessed by a
builder (TC), I am satisfied the claim progressed within a reasonable timeframe after
TC attended on 9 January 2018. This is because the relevant information shows:
on 10 January 2018, TC provided its report to the insurer with a recommendation
that it obtains an engineer’s report
on 10 January 2018, the insurer appointed an engineer (CS)
on 16 January 2018, CS attended and sought insurer ’s authority for a plumber to
provide a leak detection test
on 1 February 2018, a plumber performed a leak detection test.
The available information highlights the following in relation to how the insurer
communicated its decision to the complainant:
on 8 February 2018, it advised the complainant by phone, that the claim was a
possible decline based on the findings of its expert reports
on 10 February 2018, it made the decision to deny the claim and drafted a claim
denial letter to the complainant
on 14 February 2018, it attempted to call the complainant to inform its decision, but
was unsuccessful
on 20 February 2018, its decision letter was still awaiting review
on 24 February 2018 it called the complainant to advise of its claim decision and
sent him a letter advising the same.
The insurer says it did not send its letter to the complainant immediately after it
was drafted, because its claims department usually attempts to contact a
complainant three times by phone, before issuing a letter.
The notes also show the complainant emailed the insurer around the same time,
saying:
he was advised just after Christmas that the matter would be settled with a cash
settlement
he was told on numerous occasions that his claim was approved and that it was
just a matter of agreeing to terms, while the damage worsened
requesting the insurer advise him via return email of the outcome of the
investigation.
Given the circumstances of the claim, and the complainant ’s request for an update, it
is not clear why he was not informed of the claim decision until 24 February 2018.
Determination | Case number: 530140 Page 5 of 14
Complainant has not established insurer advised him his claim was accepted
The complainant asserts that during various stages of the claim, the insurer advised
him on several occasions that his claim had been accepted. A review of the relevant
correspondence, call recordings and claim notes, however, do not support this
assertion.
Further, the complainant has not provided any other information to establish that his
claim was accepted.
Insurer entitled to investigate claim before determining liability
An insurer is entitled to investigate and determine the veracity and extent of a claim.
An insurer’s decision to investigate a claim can result in some delay and
inconvenience. Some delay is unavoidable if an insurer is to have a fair opportunity to
investigate, as long as it conducts its enquiries within a reasonable timeframe.
The complainant says that if the insurer had told him about the cause of damage
earlier, he would have fixed the source of water entry and prevented further damage.
While he carried out the necessary repairs to prevent further water entry, the
complainant says the insurer ’s delay in notifying h im of its claim decision, caused
further structural damage.
I accept given the nature of this claim that it was reasonable for the insurer to obtain
appropriate expert evidence to determine the cause of damage and liability. I accept
that in obtaining this expert evidence there was some delay however this delay was
contributed to by both parties.
Complainant is not entitled to further compensation
Whilst the complainant believes that the insurer should remove the protective bags
that were installed by OL to prevent further mould growth information on file indicates
that when OL attended the property to remove the bags the complainant requested
the bags remain in place.
The complainant now says that the cost to repair the damage including the removal of
the mould is approximately $100,000. No quotation has been obtained to substantiate
this nor is there any information to suggest that the retention of the protective bags
has caused the mould to spread.
The insurer has agreed to pay the complainant the cost to repair the internal damage
as per the initial scope of works provided by its builder on 9 January 2018. It is done
so it says as a gesture of good faith because of the initial delays with the claim.
I am satisfied given the information provided that in paying for the cost to repair the
internal damage of $4,244.75 the insurer has fairly and reasonably compensated the
complainant for the delays associated with the assessing of the claim. I am satisfied
the complainant is not entitled to further compensation in these circumstances as:
Determination | Case number: 530140 Page 6 of 14
the complainant contributed to the delay in processing his claim
the complainant has not provided information to show the delay caused further loss
the payment made by the insurer in recognition of its delay in providing a decision
is commensurate with the complainant ’s experience.
Other matters
During the course of the complaint with us, the complainant has submitted there was
additional damage caused to a stained-glass door, when he slipped and knocked his
elbow against it. The complainant says this occurred during the same time as the
claim for water damage to his property.
The claim notes show the complainant advised the insurer of this damage in a phone
call on 12 December 2017. The available information does not, however, show that
the insurer has addressed this aspect of the claim.
The insurer is to assess the claim for the damage to the door and provide the
complainant with an outcome in relation to this damage.
Determination | Case number: 530140 Page 7 of 14
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financia l services provider financial firm
dispute complaint
claim claim
3.2 Relevant policy provisions
Record Key points
Insured events
Page 8 - 11
This section describes the insured events you are covered
for, and the conditions and exclusions that specifically apply
to each insured event. They should be read with the general
exclusions on pages 29 - 32.
5. Accidental breakage of glass, ceramic and sanitary
fixtures
When your home is insured, this includes:
…
fixed glass in any window, door…
6. Storm and rainwat er
Including loss or damage from:
the escape of rainwater from any water pipe, drain or
gutter
surface run - off rainwater from surrounding areas that
occurs within 24 hours of a storm or heavy rain
Including loss or damage caused by erosion, subsidence,
landslide, mudslide or any other earth movement that occurs
within 72 hours of a storm or heavy rain and as a result of
that storm or heavy rain.
We will NOT cover:
Determination | Case number: 530140 Page 8 of 14
Record Key points
…
loss or damage caus ed by rain, h ail, wind or dust due to:
o a design fault, structural defect or faulty workmanship
o lack of maintenance (a defect that you knew about or
should reasonably have known about and did not fix)
o an opening that was not created by the storm
o building additions, reno vations or alteration work.
General exclusions
Pages 29 - 31
We will not cover:
Consequential loss
Cons equential or indirect loss, inconvenience or expense,
including but not limited to loss of profit, costs arising from
any business interruption or the intellectual or sentimental
value of an item.
Earth movement
Loss or damage or the incurring of legal liability caused by
erosion, vibration, subsidence, landslip, landslide,
mudslide, collapse, shrinkage or any other earth
movement.
But subject to the po licy terms and conditions, we will
cover loss or damage caused by earth movement that
occurs within 72 hours and as a direct result of the
following insured events:
o Earthquake
o Explosion, or
o Storm and rainwater.
Gradual deterioration
Loss or damage c aused by rust, corrosion, rot, mould,
rising damp, mildew, gradual deterioration, wear, tear or
fading.
Making a claim
Page 35
What you must do
If your home or contents are lost or damaged, or an incident
occurs that may result in a claim, you must:
…
allow us, or our representative to enter the home to
investigate the cause of the loss or damage
3.3 Relevant timeline
Date Action
31 - 10 - 2017 Complainant lodged claim with insurer
Determination | Case number: 530140 Page 9 of 14
Date Action
6 - 11 - 2017 Insurer appointed builder (TC) to perform assessment
20 - 11 - 2017 Complainant called insurer to advise of another heavy
rain event which caused furt her damage to the same
areas and the carpet.
Insurer appointed restorer (OL) to assess carpet and
trades to attend to make - safe.
Make - safe trades attended property.
28 - 11 - 20 17 TCC attended property for assessment as arranged but the
complainant was not present and TC was refused ent ry by
the occupier.
02 - 12 - 2017 OL attended property and installed a local containment
barrier to prevent mould spreading.
06 - 12 - 2017 OL contacted ins urer to advise mould present and asking
whet her claim is authorised because the mould requires
invasive work.
Insurer advised OL claim not authorised.
OL advised carpets are restorable.
08 - 12 - 2017 TC contacted complainant and arranged a s ite
attendance for 19 December 2017.
11 - 12 - 2017 Roof specialist (RC) attended to inspect the roof.
Insurer arranged OL to re - attend due to complainant ’s
concerns about mould as the plastic protection installed
by OL had come away.
12 - 12 - 2017 OL re - attended to inspect and contain mould.
18 - 12 - 2017 Insurer contacted complainant to confirm TC booking for
19 December 2017 and provided an update on claim.
Insurer advised complainant that water was entering
through the cracks in the balcony as per report from OL.
Insurer advised complainant that a builder’s report was
required to determine sourc e of water entry.
Complainant asked the insurer about carpet replacement
and insurer advise d it would look to replace the carpet or
obtain quotations from the complainant .
Complainant contacted TC and cancelled its attendance
due to an emergency.
A new appointment was scheduled for 9 January 2018.
19 - 12 - 2017 Insurer attempt to call the compla inant wit h an update
was unsuccessful.
Determination | Case number: 530140 Page 10 of 14
Date Action
Insurer notes it needs to review the builder’s report aft er
builder attends on 9 January 2018, before it can make a
claims decision.
28 - 12 - 2017 Insurer attempt to call the complainant wit h an update
was unsuccessful.
Insurer notes it needs to review the builder’s report aft er
builder attends on 9 January 2018, before it can make a
claims decision.
09 - 01 - 2018 TC attended complainant ’s property.
10 - 01 - 2018 TC provided a report to insurer recommending an
engineer be ap pointed.
Insurer appointed engineer (CS).
Insurer advised complainant that CS will call to arrange a
time to attend.
16 - 01 - 2018 CS attended property.
17 - 01 - 2018 CS requested permission from insurer to arrange leak
detection test by plumber as it believed there could only
be two reasons for cracking in the home – tree roots and
leaking pipe.
Insurer advised CS to proceed with leak detection test.
18 - 01 - 2018 Insurer advised complainant an engineer’s report could
take 2 - 3 weeks and the insurer can review the claim once
received.
25 - 01 - 2018 Complainant contacted the insurer for an updat e.
Insurer followed up with the engineer who said it was
awaiting aut hority from insurer to perform lea k detection
test. insurer advised engineer authority was already
provided and sent approval to engineer in writing.
Insurer advised complainant that the engineer is awaiting
a plumber’s report before issuing his report.
Complainant enquires about damaged carpet and tiles
and insurer informs him that it can have a look at it for
him if it is a result of the claimed incident.
01 - 02 - 2018 Plumber attended.
06 - 02 - 2018 All reports received and claim reviewed by insurer .
Insurer recommended claim be denied.
Insurer attempted to call the complainant but was
unsuccessful, so left a message and sent an SMS.
08 - 02 - 2018 Complainant contacted insurer
Determination | Case number: 530140 Page 11 of 14
Date Action
Insurer advised complainant :
o possible claim decline based on the findings of the
reports
o if declined, it will send him a decline letter, copies
of all reports and details of IDR department
o a claim handler will call him with the outcome.
10 - 02 - 2018 Insurer Management reviewed claim and made decision
to deny claim.
Insurer claim file notes decline letter requires
amendment.
14 - 02 - 2018 Complainant emailed insurer requesting the outcome of
the investigation via email and saying insurer previously
advis ed him the claim would be settled via cash
settlement.
Insurer claim file notes awaiting a Team Leader to review
decline letter before issuing to complainant with relevant
reports.
20 - 02 - 2018 Claim file not es decline letter requires amendment and
referred to claim handler to review complainant ’s
concerns.
24 - 02 - 2018 Insurer a dvised complainant of claim decision.
Insurer advised a determination and report used to
determine outcome will be sent to the complainant .
26 - 02 - 2018 Complainant requested the removal of bags used for
mould containment.
Insurer arranged OL to attend and remove bags.
01 - 03 - 2018 Complainant requests call recordings from insurer as he
was advised on multiple occasions that his claim was
accepted.
Insurer offered to pay the complainant the cost of the
resultant internal damage $4,2 44.75 (including 20%
margin and 10% GST) and waive the excess, in
recognition of the length of time taken to provide a claim
decision.
OL advised insurer it attended the site to remove the
bags, but the complainant instructed it to leave mould
containment i n place.
08 - 03 - 2018 Insurer emailed the complainant about his concerns and
confirmed the claim is not accepted, but that it would
make a payment of $4,244.75 for the delay in making a
claim decision.
03 - 05 - 2018 Complainant requests insurer attend the pro perty and
Determination | Case number: 530140 Page 12 of 14
Date Action
remove the protective mould coverings it had installed.
13 - 05 - 2018 Complainant followed up wit h insurer as he did not
receive a response to his email of 3 May 2018.
16 - 05 - 2018 Insurer emailed the complainant advising it would
arrange OL to return and remove the bags, but that OL
would not be undert aking any mould remediation given
the claim was not accepted.
The complainant denied this request and OL was no
appointed.
Complainant emailed insurer saying that when OL
attended previously, it advised him that the bags could
not be removed without removing the mould, which is
now a health hazard.
3.4 Supporting documents
Record Key points
Insurer ’s expert (RC)
Roof report
13 - 12 - 2017
Area where rainwater ingress is occurring int o the lounge
room is covered by a ceramic tiled balcony.
Given there is a waterproofing membrane installed under
the ceramic tiles, common sense and logic dictate that the
only way rainwater penetration can occur is if there is
damage or deter ioration of the membrane.
Applications of sealant type products across the tiles on
the balcony are consistent with addressing extensive
cracking of the tiles – the result of building movement.
Rainwat er ingress that is occurring onto the ceiling of the
lo unge room is entering int o the house via balcony.
Rainwat er leakage has occurred because the wat erproof
membrane to the balcony has been damaged by
considerable building movement.
Inspection of the roof of the house and in particular the
balcony found no evidence of storm damage or storm
created openings.3
Insurer ’s expert (IP)
Leak det ection report
01 - 02 - 2018
Testing revealed no evidence of a water leak.
The tiles on the balcony are cracked in areas.
There are two balcony drains connected which run onto
the veranda roof at the front of the house.
CCTV of these drains found no visible cracks or breaks in
the drain at this inspection.
There were no visible cracks or breaks found in the main
drain which runs under the cent re of the house.
A hole was located in the top of the branch drain which
runs to the downpipe on the eastern side of the house. It
Determination | Case number: 530140 Page 13 of 14
Record Key points
is unknown if there is a hole in the bottom of the drain in
this area due to the debris in the drain.
Insurer ’s expert (CE)
Engineer’s report 1
05 - 02 - 2018
The c ause of cracking damage is differential ground
movement
There are no trees or sewer pipes in close proximity to the
balcony area, so we have eliminated trees and leaking
sewer pipes as a cause of ground movement.
The Insured’s water supply is not leaking s o we have
eliminated this as a cause of damage.
Whilst a hole was detected to a storm - water pipe at the
northeast corner of the residence, the hole was at the top
of the pipe and has not resulted in water escaping from
the storm - water pipe.
Further leak d etection may reveal the presence (or
otherwise) of a leak/hole in the bottom of the storm - water
pipes that would contribute to ground movement.
The cause of water ingress to the lounge room ceiling is
failure of the balcony water proofing system. Because o f
the balcony not being waterproof, water ingress has
occurred during each rainfall event (not limited to a one -
off storm Event).
We were unable to inspect the balcony water proofing
system as it is currently hidden by cladding/tiles.
Ground movement (caused by the factors listed above)
has caused cracks in the balcony tiles and water proofing
system (if there is one).
The cracks in the balcony have facilitated water ingress
into the lounge room ceiling, res ulting in mould in the
zone 1 area.
Insurer’s expert (OL)
Completion summary
Date not provide
[OL] was engaged by [insurer] to restore the rain water
affected carpets in the lounge room and entry of the
property
Following a storm in October last year, rain water has
entered the pro perty resulting in mould contamination.
There appear to be a number of cracks in the roof of the
balcony upstairs and which could possibly be the point of
ingress.
The leaks have damaged the plaster ceiling in the
downstairs lounge room along the front por tion of the
room and both sides of ceiling in the entrance area.
Black organic growth is visibly present.
As a result of water ingress, damage has been sustained
to the entry/front lounge room.
We attended the site on 2 December 2017 and completed
the foll owing works:
inspection and report including scope of works.
Installed a local containment barrier to the visible mould
Determination | Case number: 530140 Page 14 of 14
Record Key points
growth on the ceiling, affected wall and cornice to prevent
further spread of contamination.
We re - attended the site on 12 December and re - instated
containment barrier to secure containment of mould
growth.
On 26 February 2018 we were advised by your office, that
the claim had been cancelled and therefore we were not
required to complet e any additional works.
We were instructed to return the property to remove the
containment barrier however the insured advised they
would prefer the containment was left in place due to
ongoing healt h issues.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.