Home / Financial Firm (Unknown - Insurer) / Determination 530107

Determination 530107

Settlement of storm/flood water damage claim: roof cavity, range-hood and stove top

FirmFinancial Firm (Unknown - Insurer)
Decided2019-02-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$31,518
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The insured complainant disputed how a storm and flood water claim was settled. AFCA ordered cash settlement of the range-hood and stove top and a cash offer for roof cavity remediation, but could not order roof replacement because of a court order on the house sale.

The insurer may choose its settlement method but must act reasonably; AFCA cannot make an order that contravenes an existing court order.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 530107 Page 1 of 6 Determination Case number: 530107 17 December 2018 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) for water damage to her house after a significant storm / flood event in May 2018. The insurer determined poor construction and design of the roof was the proximate cause of the leaking. The report states the roof needs to be replaced prior to completion of internal works. The complainant accepts this finding and is willing to have the roof replaced at her own cost (pending ceiling cavity remediation works). However, the complainant is unable to do so as her ex-husband (a co-insured on the policy but not a co- complainant) is refusing to have the roof replaced, as he would be liable for half this cost and the house is to be sold under a court order. Issues and key findings Can AFCA rule to replace the roof prior to the sale of the house? The complainant wishes to have the roof replaced prior to the sale of the house. Given the binding federal court order, this is pre-dominantly a civil legal matter and the jurisdiction of AFCA does not extend to making an order in this regard. Is the insurer obliged to replace or cash settle the remaining items? The insurer reserves the right to decide if it will repair, rebuild, or pay what it would cost it (the insurer) to repair or rebuild the building. Given this, the insurer is to advise both parties of its preferred method of settlement for the remaining items. It is then up to the co-insureds and/or their legal representation to agree on the settlement details. 1.2 Determination This determination is partially in favour of the complainant. Within 14 days of the complainant accepting this determination, the insurer is to:  propose an offer of settlement to the co-insureds for the roof cavity remediation works. This may be an approximate cash settlement figure to be finalised once Determination | Case number: 530107 Page 2 of 6 exact costings are known, but a quote was supplied by the insurer’s building consultant in August 2018 for $23,647.07  cash settle the co-insureds for the range-hood in the amount of $3,063.23 and stove top in the amount of $4,808.10. The insurer is not required to conduct mould remediation work in the living room area or the kitchen area. Determination | Case number: 530107 Page 3 of 6 2 Reasons for determination 2.1 Can AFCA rule to replace the roof prior to the sale of the house? AFCA cannot make a determination that contravenes an existing court order The complainant has not been able to live in the house since June 2018. The insurer has paid for temporary accommodation while building and contents remediation / restoration works have been carried out. The complainant has health issues and says her ex-husband and daughter want to sell the house so she can be put into a retirement home. There is no doubt this experience has been distressing for the complainant and I empathise with her. However, the ex-husband has the same rights under the policy as the complainant, and for this reason I cannot compel the insurer to settle the claim in a manner more favourable to the complainant than the ex-husband. The ex-husband does not want to spend $40-50,000 replacing the roof when the house is to be sold shortly thereafter. As per the current federal court order issued 15 June 2018, ‘On or before 27 April 2019, the property situated at….will be placed on the market for sale and the Husband and Wife will do all acts and sign all documents necessary to give effect to the sale’. The jurisdiction of AFCA does not e xtend to requiring the complainant’s ex -husband to agree to replacement of the roof. 2.2 Mould remediation in the kitchen and living areas The mould remediation report (dated December 2018) from the Occupational Hygiene and Safety Consultant (FR) appointed by the insurer confirms no visible mould growth was observed in the kitchen and living areas. FR advised, however, that mould was detected at low levels in all areas tested. Significantly though, FR noted that the results indicate that no mould remediation is required in the areas tested. On the basis of FR’s report, I accept that the insurer is not required to carry out mould remediation in the kitchen and living areas. 2.3 Is the insurer obliged to replace or cash settle the remaining items? The insurer has in good faith proposed various settlement options I am satisfied that during the course of the complaint, the insurer has acted in a commendable manner. The challenging circumstances of the complaint itself (and the needs of the complainant) have been addressed in a caring and professional manner. Determination | Case number: 530107 Page 4 of 6 Of relevance, to expedite the matter, the insurer offered to replace the com plainant’s roof as a priority and was then willing for the complainant to reimburse it for this cost. In an attempt to resolve the complaint, the insurer has advised AFCA it is prepared to replace or cash settle the outstanding items, including the range-hood and stove-top. In my view these offers are more than reasonable in circumstances and in the case of the roof, is above and beyond the scope of cover afforded under the terms of the policy. The insurer has agreed to roof cavity remediation and should make a cash settlement offer that adequately reflects the likely cost of such remediation, noting that the exact cost cannot be ascertained until the work is undertaken and the work cannot be undertaken until the roof is replaced or rectified. The offer should reflect the fact that the complainant will be taking on the risks associated with the remediation work. In regard to the range-hood and stove top, I note the insurer offered to cash settle the complainant the amounts of $3,063.23 and $4,808.10 for the range hood and the stove top. The quotations provided by the insurer include the costs to disconnect, remove and dispose of the existing items; the supply and installation of new matching items; and a builder’s margin. The insurer should pay the complainant these amounts to finalise its obligations in this regard. Determination | Case number: 530107 Page 5 of 6 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 Our approach to the determination This complaint has not been the subject of a recommendation. Due to the nature of the dispute, it has been referred directly for determination, in line with the Operational Guidelines to the FOS Terms of Reference. I decided this case based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. I reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, I restricted my commentary to those issues I consider directly relevant to the outcome only. 3.3 Policy wording How we settle building claims If we agree to pay a claim for loss, theft or damage to the building, we will decide if we will:  repair damage to the building Determination | Case number: 530107 Page 6 of 6  rebuild the building  pay you what it would cost us to repair of rebuild the building Record Key po ints Federal Court document Court order 15 - 06 - 2018  Order made that house be placed on market by 27 April 2019 . Financial Firm Engineer report (M) Report 04 - 07 - 2018  Roof is poorly constructed with inadequate fall .  Roof as installed is below minimum recommended pitch .  Box gutters nearly 50% less depth that current standard . Co - insured emails to and from insurer, 2 - 24 October 2018 Emails 02 - 10 - 2018  Refuses to allow insurer to proceed wit h plans to replace roof .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.