Home / Financial Firm (Unknown - Insurer) / Determination 529915

Determination 529915

Partial decline of storm cracking claim; further building, contents and accommodation claims

FirmFinancial Firm (Unknown - Insurer)
Decided2019-04-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$12,406
Non-financial loss—
Amount claimed$45,000
SourceAFCA PDF

Summary

A homeowner disputed the insurer's partial decline of a 2016 storm claim, seeking about $45,000 for building cracking plus contents, toilet and accommodation costs. AFCA required the insurer to pay the $11,406.01 contents settlement and $1,000 excess refund and cover toilet leak damage, but found footing settlement caused the cracking and no further compensation was payable.

Gradual footing settlement was the dominant and operative cause of the cracking, which falls within the subsidence and settlement exclusions, and the claim handling delays were reasonable.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimrefund fees or charges

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 529915 Page 1 of 6 Determination Case number: 529915 4 April 2019 1 Determination overview 1.1 Complaint The complainant held home building and contents cover with the financial firm (insurer). She lodged a storm claim, which the insurer partially declined. The complainant believes the insurer is responsible for further property damage and should cover that. The case manager provided the parties with a recommendation on the issues in dispute. A copy of the recommendation, substantially in favour of the insurer, is attached to this determination. The complainant did not accept that. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were correct and are adopted in this determination (except to the extent that subsequent events, as noted in this determination mean some recommended steps can no longer reasonably be taken). Further submissions provided after the recommendation have been considered. Is the insurer required to accept further liability for the storm claim? The available evidence does not establish the storm or insurer’s handling of the claim caused further building or contents damage. The insurer is not required to accept further liability for the storm claim (beyond $11,406.01 for accepted contents cover). The insurer is not required to further consider whether damage occurred to a solar panel or from a toilet leak. It cash settled costs for a report confirming solar panel damage, but the complainant has not yet provided one. As the complainant says the home building has subsequently been destroyed by fire, the insurer is no longer required to inspect the toilet leak. The insurer is also not required to consider theft of saddles and accessories under the storm claim, which the complainant requested after the recommendation was issued. Determination | Case number: 529915 Page 2 of 6 1.3 Determination This determination is substantially in favour of the insurer. Within 14 days of the complainant accepting this determination, the insurer, if it has not already done so, is required to cash settle the $11,406.01 for accepted contents and refund the $1,000 excess. If the complainant confirms with the insurer she wants to proceed with a separate theft claim for other missing items, the insurer is required to deal with that claim in accordance with the policy terms and conditions. Determination | Case number: 529915 Page 3 of 6 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous decisions. I have considered all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. I am satisfied the case manager’s recommendation of 8 November 2018 contains an accurate summary of the complaint, the issues to be determined, any applicable paragraphs of the Rules and any relevant law. Claim and complaint history involve a storm claim Following a storm in 2016, the complainant claimed under her home building and contents cover. The insurer cash settled the applicant for some of the building and contents damage, but declined most of the claim based on its view that policy exclusions applied to the cracking and structural issues. The complainant disputed this because she felt flooding rains and high winds caused the building to crack, and she wants the insurer to cash settle the estimated $45,000 cost of that damage. She said the property was uninhabitable. She also argued the insurer handled the claim unreasonably, causing further property damage and significant inconvenience. The recommendation was substantially in favour of the insurer. It required the insurer to cash settle the accepted contents (totalling $11,406.01) and refund the excess ($1,000) as it had previously offered. The recommendation also required the insurer to indemnify the complainant, under certain conditions, for further possible damage (to a solar panel and from a toilet leak) highlighted in the available reports. 2.2 Is the insurer required to accept further liability for the storm claim? Subsequent fire means no longer possible for further damage to be confirmed The reports noted potential damage to a solar panel and from a toilet leak. The recommendation stated the insurer should cover this only if the complainant took certain steps confirming the extent of that damage (if any). The insurer paid the complainant costs to obtain a report on the solar panel in previous cash settlements. Despite having had reasonably sufficient time to do so, the complainant has not provided any confirmation the solar panel sustained storm damage. So the insurer is not required to indemnify the complainant for the panel. Determination | Case number: 529915 Page 4 of 6 The complainant now states the home building is fire-damaged. She has told us the whole house was destroyed by a fire in October 2018, for which she lodged a separate insurance claim. The fire claim is not considered in this determination. No further information has been provided confirming whether any damage had occurred from the toilet leak. Given the complainant now says the building was destroyed by fire, the insurer is not reasonably able to inspect or further consider the toilet leak claim, and so no action is required on that. Under the circumstances, the insurer is not liable for and is not required to take any further steps with regard to the claimed solar panel or toilet damage. No new information to show insurer should be liable for building damage In responding to the recommendation, the complainant provided excerpts from three experts’ reports. These reports had previously been provided to this Authority and were taken into account in the recommendation. I have considered the reports in detail and am satisfied the evidence establishes, on balance, that gradual footing settlement was the proximate cause of the building damage which the insurer has declined to cover. In other words, the building was already damaged and compromised by the footing settlement. Any further cracking damage which might have occurred during the storm would not have happened if not for the settlement issues. The policy broadly excludes loss or damage arising from gradual deterioration, subsidence, and settling of foundations. I am satisfied that gradual footing settlement falls within the scope of the exclusions. Since that was the dominant, effective and operative cause of the damage, the insurer is not required to pay the claim for the cracking damage to the property. The complainant has also not provided any evidence to refute an engineer’s (MP’s ) conclusion that the property was not structurally unsafe. She has also says, in any case, that she had a granny flat on the property which she could move into. I do not consider she has established an entitlement to alternative accommodation costs under the policy. Theft claim not required to be considered within storm complaint The complainant noted in her response to the recommendation that her engineer’s ( HE’s ) report states ‘doors were sticking’, which she argues supports a claim for stolen goods (presumably by suggesting the doors were not secure, and so a thief had gained access that way). She has provided a list of the missing items, which I understand she reported to the police. I have seen nothing to establish that any theft arose because of the actions or inaction of the insurer, and that it should be responsible for the loss on that basis. Determination | Case number: 529915 Page 5 of 6 In the course of this complaint, the insurer stated it would consider a theft claim separately from the storm claim. The complainant has expressed concern that making ‘too many claims’ might affect her credibility. However, if she feels she has a v alid claim for theft under the policy, then she is entitled to make that claim, and the insurer is required to properly investigate and deal with it. Subject to the complainant confirming she wants to proceed, the insurer is required to deal with the com plainant’s separate theft claim in line with the terms and condition of its policy. This determination makes no findings on the merits of any such claim. No evidence insurer handled claim unreasonably I appreciate there were some delays in the progress of the claim. However, the evidence indicates this was at least in part because of the need to arrange further inspections to address the concerns the complainant raised during the course of investigations. The insurer offered to refund the policy excess of $1,000, in acknowledgement of some delays. I consider that fair in the circumstances. I appreciate the storm event and the loss the complainant suffered will have been upsetting. However, I do not consider that the insurer can reasonably be held responsible for all the concern and inconvenience which a claim is likely to entail. I do not consider further compensation is warranted. Fire claim not considered in this determination Correspondence has been received from the complainant’s legal representative about her fire claim made in October 2018. This determination does not deal with the fire claim or any dispute the complainant may have with the relevant insurer about that claim. Determination | Case number: 529915 Page 6 of 6 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with Financial Ombudsman Service (FOS). This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim Terms of Reference Rules Recommendation | Case number: 529915 Page 1 of 10 Recommendation Case number: 529915 8 Nov 2018 4 Overview 4.1 Complaint The complainant lodged a storm claim for buildings and contents. The financial firm (the insurer) partially accepted the claim. It declined structural damage to the home building, based on its view policy exclusions defeated the claim. The complainant is dissatisfied with this decision and the claims handling and argues the storm caused the home building to crack. She wants the insurer to accept further building and contents damage, including damage she says its claims handling caused. She further says the property is uninhabitable. 4.2 Issues and key findings Is the insurer required to accept further liability for storm damage? The insurer is not required to accept further liability. Available reports support the footings settled over time, causing the masonry to crack in high winds, and:  available materials do not establish the building is uninhabitable  the complainant did not challenge the $11,406.01 the insurer offered for contents  available materials do not establish the insurer’s claims handling caused further building damage or loss of contents, and the policy excludes vermin damage  the complainant’s engineering report did not refute the insurer’s report. Did the insurer handle the claim reasonably? The insurer handled and decided the claim reasonably overall. It recognised delays by offering to refund the excess amount. While acknowledging distressing events caused the claim, in these circumstances compensation for non-financial loss is not warranted. Recommendation | Case number: 529915 Page 2 of 10 4.3 Recommendation This recommendation is substantially in favour of the insurer. Within 14 days of both parties acceptance of this recommendation, the insurer is to:  (if it has not already done so) cash settle $11,406.01 offered for contents and $1,000 for the excess refund  contact the applicant to arrange inspection for resultant damage from toilet leaks  if the complainant provides the necessary information (solar panel report) or access (toilet inspection), cash settle the accepted damage within 14 days of receiving the relevant reports. Recommendation | Case number: 529915 Page 3 of 10 5 Reasons for recommendation 5.1 Is the insurer required to accept further liability for storm damage? The insurer partially accep ted the complainant’s building claim The complainant lodged a building claim for structural and other building damage after high winds immediately following heavy rains around 11 July 2016. The policy covers storm damage and the parties agree a severe wind event occurred. The parties agree the complainant established a prima facie (valid) storm claim. The insurer partially accepted the claim as follows: Area of the property Item(s) the insurer accepted Brick fence Repair costs (cash settled $4,016 on 19 January 2017). Home building, carport, hayshed Costs for repairs to r oof trims, windows and frames, fly screens, a ceiling, wall painting and one cornice mould . C osts to repair plastic and (if damaged) solar panel array (cash settled $16,931.64 14 November 2017). Cont ents Bookshelf, swimming pool cover, camera & accessories, tarpaulins, TV, recliner, outdoor pool blinds, indoor blinds, food spoilage, fridge, binoculars, lamps (offered to cash settle $11,406. 01 on 27 June 2018). The insurer refused cover for the home building’s cracking damage because it said:  foundations and footings settled in the soil over time, causing existing cracks  without these, the severe winds would not have further cracked the building  the policy excludes cover for damage caused this way. The complainant is dissatisfied with this decision and wants the insurer to accept liability for all building repairs. She says flooding rains, immediately followed by high winds, damaged the structure. The complainant also wants the insurer to cover:  damaged contents items she says it has not yet indemnified  alternative accommodation, as she says the property is uninhabitable  plumbing/toilet and electrical wiring damage  an engineer’s report she provided in support of her claim. The parties dispute the policy’s conditions limit the cracking damage claim All insurance policies provide cover for loss or damage subject to various conditions and exclusions. These are outlined in the insurer’s policy’s product disclosure statement (PDS). When an insured person establishes a valid claim, the onus shifts to Recommendation | Case number: 529915 Page 4 of 10 the insurer to show whether the policy excludes or limits the claimed damage. The insurer is required to establish this on the balance of probabilities. In this complaint, the insurer says it is entitled to deny the claimed cracking damage based on its engineer’s (MP’s) report the cause is long -term footing and structural movement. The insurer relies on policy exclusions, contained in the PDS and section 3.2 below, which state there is no cover for damage caused by subsidence, gradual deterioration and settling, shrinkage or expansion in b uildings and foundations. The complainant argues the insurer is not entitled to limit the claim, because she provided an engineer’s (HC’s) and builder’s (GE’s) report confirming high winds cracked the masonry. The complainant also provided a newspaper report (contained in section 3.3), community letters of support and photographs which she says confirm the storm caused the cracks, and:  rain inundated not only her property but the local area  winds in the local area were sufficiently strong to crack the building. As the parties disagree on how the damage occurred, the proximate cause of damage must be considered. Proximate cause is not necessarily the last event before the damage Proximate cause is a question of fact depending on the circumstances in each complaint. The proximate cause is not necessarily the first or last or the sole cause of the damage. It is the effective, dominant or operative cause of the damage. If there are several causes operating at the same time, AFCA will consider each one to determine which cause set the train of events in motion. Courts have said that if one cause would have resulted in the harm in any case and the other would not have done so in the absence of the first, then the first is the proximate cause. Gradual footing settlement allowed building to crack in high winds I closely reviewed all the reports, which are contained in section 3.2, and all other materials the parties provided. While I accept GE is a licensed builder, and the rain and high winds occurred as the complainant described, I give greater weight to the views of the qualified engineers regarding the cause of the building’s structural damage. Of these, I am more convinced by MP’s views than HC’s. HC conclu ded it reasonably probable the winds caused the ‘recent cracks in the brick veneer of the residence’. However, he did not link this view to an explanation, reasons or observations, beyond the presence of recent damage and occurrence of winds. Recommendation | Case number: 529915 Page 5 of 10 In contrast, MP’s reports detail the reasoning, tests, measurements and observations relied on in reaching conclusions. MP agreed there were some recent cracks, but stated the cause was the building’s strip footing beams gradually settling in the soil, long before the storm. Due to this settling, MP concluded the building was susceptible to cracking in the high winds of July 2016. MP observed several persuasive factors suggestive of foundations settlement over time, including the:  shrinking of clay soils (a soil type HC also confirmed)  construction style  water discharge points next to the building  previously existing cracks and previous cracking repairs. Both MP and HC’s reports confirm the soil type lacked collapse potential, refuting the complainant’s argument the rains caused sudden footing movement, allowing the building to crack in the winds. Insurer is entitled to decline cracking damage based on policy exclusions For the above reasons, I am persuaded the available material establishes the proximate cause of structural damage was gradual footing settlement. The insurer is therefore entitled to refuse liability for the further building damage claimed, based on the policy exclusions outlined in section 3.2. The insurer is entitled to decline most other claims If the insurer has not yet cash settled the complainant the $11,406.01 it offered for accepted storm-damaged contents on 27 June 2018, it should do so immediately. The insurer is entitled to decline most the complainant’s other claims, because: Claim Reason th e insurer i s entitled to refuse the claim Wiring/electricity The policy wording excludes damage caused by vermin (per section 3.2). Alternative accommodation MP’s reports state the property is not structurally unsafe. The complainant did not provide information challenging this or establishing it is otherwise uninhabit able, due to an insured event. Carport These costs (plastic sheeting and a report on whet her solar panels work) are included the repair scope of works, upon which a previously paid cash settlement is based. Cont ents The complainant did not provide det ails of storm damaged contents items she says the insurer has not yet paid. The complainant said horse - related contents were stolen due to the ins urer’s poor/delayed claims handling, but no information was provided to support this caused the theft. Shipping container The complainant did not challenge the insurer’s argument it cash settled a container (19 January 2017), or provided sufficient proof of purchase, such as Recommendation | Case number: 529915 Page 6 of 10 Claim Reason th e insurer i s entitled to refuse the claim a receipt, if the claim is for a different container. Engineer’s report HC’s report does not challenge or overt urn the insurer’s decision. Building repair costs The complainant provide d no quotes to challenge the insurer’s. In the absence of available material challenging the above, the insurer is entitled to decline the complainant’s further claims. However, regarding the stolen items, during the course of this complaint the insurer stated it would consider a theft claim (separately from this complaint). If it has not already done so, AFCA expects the insurer to do so in line with the terms and condition of its policy. Further, a scope of works (upon which building repair cash settlement was based) allows for costs of obtaining a report on whether the carport’s solar panels still work. If the complainant provides a such a report, which confirms these are damaged because of the claimed event, the insurer is required to cash settle their replacement cost in line with the terms and conditions of its policy. Policy includes cover for resultant damage from leaks The complainant also claims for toilet damage, which the insurer refuses based on its view the damage is unrelated to a storm event. The insurer’s plumber’s (AA’s) report confirms there are toilet leaks. The policy wording contained in section 3.2 includes cover for these leaks. In the absence of any available information challenging the leak claim, the i nsurer is required to accept the leak claim. If this has not already occurred, the insurer is to cash settle repair costs for damage (if any, and if this exceeds the applicable policy excess) caused by the:  leak from the pan cone rubber on the toilet  leak from the toilet (backflushing caused by the blocked sewerage tank). 5.2 Did the insurer handle the claim reasonably? AFCA takes conservative approach to non-financial loss compensation The complainant is dissatisfied with the claim experience and timeframe and says the insurer refused to discuss her complaint. We may require the payment of compensation for non-financial loss. AFCA may decide a financial firm should compensate a complainant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the applicant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation for non-financial loss. Recommendation | Case number: 529915 Page 7 of 10 On balance, delays occurred due to need for inspections Regarding delay, it was reasonable for the insurer to investigate the cause of damage and to arrange further inspections when responding to the complainant’s disputes about the claim decisions and amounts. For these reasons, delays occurred in finalising the claim. The insurer offered to refund the policy excess ($1,000), acknowledging some delays, which I consider fair in the circumstances. If this refund has not already occurred, the insurer is required to make this payment within 14 days of both parties accepting this recommendation. I accept the circumstances giving rise to the damage were distressing for the complainant and the claim outcome was likely disappointing. While understandably stressful from the complainant’s point of view, section 2.1 outlines the insurer decided the claim correctly for almost all the issues the complainant raised. In the circumstances, overall the claims were decided correctly and delays occurred from reasonable causes (issues raised by the complainant, requiring cont ractors’ attendance), which the insurer previously recognised. It would therefore not be fair to require the insurer to pay further compensation for non-financial loss. Recommendation | Case number: 529915 Page 8 of 10 6 Supporting information 6.1 The recommendation is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This recommendation is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this recommendation the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 6.2 Policy Exclusions for all cover These exclusions apply to all cover under your policy. What we don’t cover : Loss, damage, injury or death arising from … g radual deterioration … subsidence or landslide unless it happens immediately as a result of … a storm … What we don't cover: the settling, shrinkage or expansion in buildings, foundations, walls … Water and oil leaks If loss or damage is caused by water or oil leaking or escaping from an item shown here. Covered: water leakin g or escaping from … house gutters, drainpipes or pipes … sanitary fixtures – for example, baths or toilets … Not covered: … costs to repair or replace the item that the water or oil leaked or escaped from. Recommendation | Case number: 529915 Page 9 of 10 Animal damage Not covered: loss or damage caused by … vermin and insects. 6.3 Reports Record Key points Local newspaper Opinion editor 14 - 06 - 2016  We have been hit by a double - barrel winter barrage [locally] and right across the state, with winds of more than 100 kilometres per hour with continuous rainfall, along with hail. I have lived [here] all my life and I cannot remember a week like it. The ferocity of the wind has been so relentless …  July 12 was the busiest day for SES in their history, attending to more than 1000 jobs.  On Ju ly 11, SES responded to more than 400 call outs bet ween 3am and 3pm and most were in our region. Insurer’s expert (MP) Engineer Report 03 - 11 - 2016  T he wind force acting during the 11/ 12 July 2016 is not the originating cause of the masonry cracking.  It is possible some movement did occur during the wind event as there is some indication of recent fresh surfac e movement.  The cracking to the masonry was inevitable and its origin is not a consequence of the July 2016 wind.  The home's strip footing beams ha d settled due to soil movement which did not originate as the result of the wind e vent … had the strip footing beam and masonry not been in a susceptible structural condition to the onset of movement prior to the wind gust, the July 2016 wind gust would no t have been strong enough to initiate the observed masonry damage from an un - cracked condition, and therefore result in the Sept ember 2016 observed cracking and movement.  Given the extent of external cracking to the home, we undertook a perimeter masonry level survey of the home's brick coursing [survey diagram provided] … The results indicate settlement of the perimeter strip footing beam, a maximum to the south - eastern corner, the location of maximum movement (and gaps between materials) to the dwelling and wide stepped cracking to the gable end rear elevation.  The curvature change in the footing beam across the kitchen window is also consistent with the observed cracking in that location. The historical repair to the arch opening's cracking is consisten t with damage associated with differential footing beam movement. Complainant’s expert (HC) Civil and structural engineer Report 28 - 04 - 2017  An inspection of the damaged brickwork at the above address was carried out on 8 February 2017 ... [with] some phot os taken shortly after the storm. Our brief was to comment on a report [MP] … In particular, to inspect the cracked brickwork and advise if any damage could be attributed to the storm event during 11 / 12 July 2016.  The significant cracking at the south - e astern wall is clean and appears to be new — wit h some horizontal displacement occurring at the crack site. Cracks over the arches are old and dirty with dust and Recommendation | Case number: 529915 Page 10 of 10 Record Key points cobwebs, while those on the southwestern wall were clean and appeared to be recent. Lateral di splacement suggested a horizontal force (wind) could have been the cause of the damage.  While gusts of up to 109km/h and 104 km/h were recorded at the Bureau of Meteorology Daily Weather Observations [at nearby locations] for 11 / 12 July 2016 (copy attach ed), it is likely that wind gusts might have been stronger locally.  The Owner's photos show the underfloor area flooded following the storm. Soil testing was carried out to determine if this could have led to the lime rich soils becoming saturat ed and coll apsing leading to the recent cracking. The soil profile, while extremely reactive, was not typical of a collapsing soil.  It is reasonably probable that the storm event of 11 / 12 July 2016, which resulted in extensive damage to trees, buildings and road si gns in the area, also caused the recent cracks in the brick veneer of the residence. MP Engineer Report 30 - 06 - 2017  Soil testing confirmed the home’s footings are subject to shrink and swell movements from reactive clay soil.  The soil does not have a collapse potential subject to saturation.  Based on the non - destructive available evidence, the home is not structurally unsafe. Insurer’s expert (AA) Plumber Test and report 31 - 07 - 2017  We advise that the plumber has advised that the pan cone rubber on the toilet has cracked and is leaking.  There is also a leak at the rear of the toilet when this is flushed. The plumber has also advised that this is leaking as the drain to the septic tank is blocked. The plumber has advis ed that t he septic tank needs to be pumped out.  We advise that the leak at the bottom of the toilet is due to the septic tank 'back flus hing' under pressure causing the leak. Complainant’s expert (GE) Licensed builder Report 14 - 08 - 2018  On the 14 th July 2018 I inspected the property … It is evident to me that there was lifting and movement of the house caused by the strong winds which blew through the house when the windows were blown out.  I conducted further inspection underneath the hous e and upon this inspection I noticed the tie down rod was bent and this further indicates to me a force upwards which would have been caused by the strong winds. I also sighted photos of the water which was lying around the property after the heavy downpours of rain at the time of the storm incident which has caused damage to the property.  It is my opinion as a general builder that the cracking in the brickwork was caused by the flooding at the time of the storm incident, especially on active clay.  There is signifi cant gaps from the movement which have allowed rodent movement within the premises and evidence of damage to wiring from chewing.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.