Insurer partly denied burst-pipe ensuite damage and limited liability to vanity unit only
Text of the determination
Determination | Case number: 529707 Page 1 of 6
Determination
Case number: 529707 14 January 2019
1 Determination overview
1.1 Complaint
The complainant lodged a claim on 14 July 2017 on her home and contents policy
held with the financial firm (insurer) for damage caused by a burst pipe in her kitchen.
The insurer accepted liability for the damage including contents damage but disputes
the extent of damage to a bedroom ensuite. The insurer has accepted liability for
damage to the vanity unit that it removed and offered to cash settle the complainant.
The complainant says the insurer is responsible to reinstate the ensuite in accordance
with the terms of the policy. The complainant also seeks compensation for the
inconvenience and stress associated with the claims process.
The Case Manager provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the complainant. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are largely adopted
in this determination. Further submissions provided after the recommendation have
been considered.
Is the Insurer entitled to limit its liability for damage to the ensuite?
The insurer is not entitled to limit its liability for damage to the ensuite and is required
to meet the costs to reinstate the ensuite including the cost to meet current building
regulations.
Is the complainant entitled to compensation?
The claims handling has caused a considerable degree of inconvenience to the
complainant and I determine the insurer pay the complainant $1,000 compensation
for non-financial loss.
Determination | Case number: 529707 Page 2 of 6
1.3 Determination
This determination is in favour of the complainant.
The insurer is to cash settle the claim for the ensuite for $18,150 and pay
compensation of $1,000 for non-financial loss to the complainant.
Determination | Case number: 529707 Page 3 of 6
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
This determination is based on what is fair in all the circumstances having regard to
the relevant law, terms of the policy, good industry practice, codes of practice and
prior determinations. I have considered all the material submitted by the parties, both
before and after the recommendation. I am satisfied that the documentation I have
relied on has been provided to both parties.
I am satisfied that the case manager‟s recommendation contains an accurate
summary of the complaint, the issues to be determined, any applicable paragraphs of
the Rules and any relevant law.
2.2 Is the insurer entitled to limit its liability for damage to the ensuite?
Proximate cause of damage to the ensuite was the escape of water
There is no dispute that a burst flexi pipe in the upstairs kitchen of the complainant‟s
property led to damage to:
the upstairs kitchen, lounge and dining areas
formal dining and lounge room
entry hallway, downstairs hallway, staircase and upstairs hallway
downstairs bedroom, kitchen and lounge areas.
The insurer‟s assessor noted:
the water had spread to the ensuite adjacent bedroom
there were early signs of water marks on the walls of the ensuite
there were above average water metre readings in the ensuite walls.
OR confirmed damage to the vanity, gyprock and framework consistent with the
insured event as well as finding mould which required some immediate remediation
works. OR recommended the immediate replacement of the vanity but could not
determine the extent of the damage until the damage at the back of the vanity was
assessed. In December 2017 OR recommended:
removal of the gyprock wall and immediate remediation of the mould to the
framework behind the wall
the waterproofing on the wall had been breached and a plumber needed to be
engaged to fix the waterproofing and find the cause of the leak.
IB removed the damaged vanity unit. In his report dated 25 January 2018 he notes
that a standard vanity unit will not cover the exposed concrete flooring, that the vanity
Determination | Case number: 529707 Page 4 of 6
cabinet had been tiled in, that is, installed before tiling and that water markings
indicate the non-existence of waterproofing.
I accept given these reports that there was damage sustained to the ensuite vanity
and gyprock that required removal of the vanity and gyprock.
I accept the leak detection report from SLD dated 17 February 2018 shows that there
was a leaking shower recess. I am not satisfied that the report is sufficient to establish
the proximate cause of the damage to the ensuite was the leaking shower recess.
Whilst some damage may have been associated with the leaking shower recess the
majority of the information indicates the water from the burst pipe spread into the
ensuite causing the damage to the vanity and necessitating its removal as well as
removal of some of the gyprock.
The need to reinstate the ensuite is a result of damage to the vanity unit. The insurer
as part of its investigation process and repair process removed the vanity unit. It was
the removal of the vanity unit that has led to the need for significant work to be
performed in the ensuite.
Policy provides cover for the cost of meeting current building regulations
There is no dispute that the waterproofing in the ensuite was either non-existent or
had broken down.
The insurer has argued that it is only responsible for the cost of replacing the vanity
unit and that it is not responsible for repairing the surrounding areas as the insured
event did not cause that damage.
I do not agree with the insurer‟s argument.
The policy provides that in the event there is loss and damage caused to the home
and you need to meet current building regulations to repair and rebuild the part of the
home that was damaged that the insurer will cover those costs.
The available information indicates that to reinstate the vanity unit which was tiled in,
it is necessary to replace the tiles. Photographs confirm that there is damage to some
of the tiles as part of the removal process. If the tiles are replaced then it will be
necessary to meet current building regulations with respect to the waterproofing in the
area.
The insurer says that the internal email of 26 February 2018 relates to the vanity only
I do not accept this. The internal email clearly states as follows:
I also await the costing to bring the bathroom and bathroom (my emphasis) to the
waterproofing standards of today. As the vanity has been removed by CCP it is now
up to us to bring it to code.
I agree with the findings contained in the recommendation.
Determination | Case number: 529707 Page 5 of 6
I am satisfied that an insured event has caused the damage to the ensuite and the
actions by the insurer in removing the damaged vanity unit have caused further
related damage that can only be repaired by meeting current building regulations. I
am satisfied the insurer is liable to reinstate the bathroom to a similar condition to its
pre-damaged state and be brought up to code.
The complainant provided a quote from D for $18,150 to reinstate the ensuite. I have
discussed this quote with the complainant and accept it is a fair quote. The
complainant has expressed the view that she would like to have the complaint cash
settled. I agree that this would be the best approach in this complaint. Accordingly, I
determine the insurer cash settle the complaint for $18,150 in accordance with the
quotation from D.
2.3 Is the complainant entitled to compensation?
AFCA can award up to $3,000 compensation for non-financial loss under the FOS
Terms of Reference as set out in the recommendation. Whilst the recommendation
determined the complainant was not entitled to compensation I do not agree with that
decision.
In my view the insurer had the opportunity in February 2018 to settle the
complainant‟s claim by reinstating the ensuite. The insurer chose at that time to deny
liability based on a policy exclusion. It did so even though it had removed the vanity
cabinet, that it was aware the vanity cabinet had been tiled in, that it was aware that
the vanity unit could not be replaced without altering the tiling and that it was aware
that the policy provided cover to meet current building regulations.
I accept the complainant is expected to be moderately robust and bear a normal
degree of inconvenience. I also accept that an insurer is entitled to form a reasonable
view as to liability.
In my view the insurer‟s handling of this claim has caused an unusual degree of
inconvenience and stress to the complainant. Its decision appears to be based on a
limited view of the terms and conditions of the policy without proper regard to the
circumstances that have led to the damage. Taking from July to the following
February to determine liability is in my view unreasonable. To ignore its own internal
advice in February 2018 is also in my view unreasonable.
In the circumstances I am satisfied the complainant is entitled to compensation for
non-financial loss and determine the insurer pay the complainant $1,000 by way of
non-financial loss.
Determination | Case number: 529707 Page 6 of 6
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with Financial Ombudsman Service (FOS).
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
Recommendation
Case No: 529707 Recommendation Page 1 of 9
Case number: 529707 3 August 2018
1 Overview
1.1 Dispute
Damage occurred to the applicant‟s home following a burst flexi pipe in her upstairs
kitchen. She lodged a building and contents claim with the financial services provider
(FSP). The FSP accepted an escape of water event occurred, causing damage to:
upstairs kitchen , lounge and dining areas
formal dining and lounge rooms
entry hallway, downstairs hallway, staircase and upstairs hallway
downstairs bedroom, kitchen and lounge areas
The contents claim was accepted, and does not form part of this dispute.
A week after lodging the claim, the applicant noticed damage to her ensuite and
reported the findings to the FSP. It approved removal of a damaged vanity unit and
offered a cash settlement for the applicant to buy a replacement vanity unit.
1.2 Issues and key findings
Was a prima facie (valid) claim established?
I am satisfied a prima facie claim was established.
Is the FSP entitled to partially deny the claim?
I have reviewed all material and submissions made by both parties. The FSP is not
entitled to partially deny the claim.
Is the applicant entitled to compensation?
The applicant is not entitled to compensation for non-financial loss.
1.3 Recommendation
This recommendation is in favour of the applicant.
The FSP is liable for all damage to the ensuite, with no further excess payable.
Case No: 529707 Recommendation Page 2 of 9
2 Reasons for recommendation
2.1 Was a prima facie (valid) claim established?
A prima facie claim was established
The applicant is required to show, on balance, she suffered a loss caused by a risk
insured under the policy, i.e., a valid ( prima facie ) claim.
If the applicant establishes a valid claim the onus shifts to the FSP to show, on the
balance of probabilities, it is entitled to rely on an exclusion under the policy or it is
otherwise entitled to deny or limit its liability for the claim.
I am satisfied a prima facie claim was established. The FSP accepted many other
damaged areas of the home due to the same escape of water event.
2.2 Is the FSP entitled to partially deny the claim?
Escape of water event damaged the ensuite
There is no dispute the insured event occurred. The FSP says the ensuite event-
related damage is limited to only the vanity unit.
The FSP‟s initial assessment (LF) confirms the insured event affected the ensuite.
The report acknowledges some damage consistent with the claimed event, being:
flooding spread to the ensuite‟s adjacent bedroom
early signs of water marks on walls in the ensuite
above-average moisture readings in the ensuite walls.
The FSP‟s later assessment report (OR) confirms damage to the vanity, gyprock and
framework is consistent with the insured event. It also reports findings of mould and
completed some immediate remediation works. OR suspects further mould is present
behind the damaged wall and recommends a further inspection.
OR says the existing waterproofing was breached and was the likely cause of the
mould growth. An extensive amount of remediation works was identified, involving
items beyond the damaged vanity unit.
FSP disturbed the original condition of the ensuite
OR‟s initial report confirms the vanity unit was unsalvageable. Prior to authorising
removal of the unit, the FSP was aware the vanity was not of a standard size and
was built into the tiled wall and floor surrounds.
The FSP:
accepted the vanity unit was damaged by an insured event
Case No: 529707 Recommendation Page 3 of 9
authorized removal of the damaged vanity unit
offered a cash settlement for the value of a replacement vanity unit.
By removing the vanity unit, the rest of the ensuite was disturbed from its original
condition. The FSP says it is not responsible for repairing the surrounding areas as
the insured event did not cause any damage to it.
It is reasonable to consider the insured event:
was the proximate cause of damage to the tiled surrounds resulting from
removal of the vanity
such removal disturbed the existing waterproofing.
Therefore, the FSP cannot deny the rei nstatement works on this basis.
Building code at time of construction was met
Upon removal of the vanity unit, the FSP identified waterproofing not up to current
building code standards. It relies on inadequate waterproofing of the ensuite to deny
cover for reinstating the bathroom to its original condition. It provided no evidence to
show the ensuite was not built to the relevant code at the time of construction.
The FSP also put the onus on the applicant to show the ensuite was built to the
relevant code. The onus in fact rests with the FSP to prove this, not the applicant. I
consider its request unfair, and demonstrates a poor claims handling process and
assessment.
Regardless, the applicant obtained material confirming relevant inspections were
undertaken at the time of construction. The material shows no evidence of a failure to
meet the relevant codes at the time.
The FSP cannot rely on this exclusion to partially deny the claim.
On balance, damage to architrave caused by the insured event
Five months post claim lodgement, the FSP arranged an inspection (SLD) to locate
the cause of damage to the architrave between the ensuite and bedroom.
SLD‟s report confirms multiple methods were used to locate a leak within the ensuite.
Non-invasive methods provided no results. Further testing resulted in:
high moisture readings in the walls directly below the kitchen above
lack of waterproofing under the tiles
leaking shower recess.
The FSP maintains its denial to reinstate the ensuite because the policy does not
provide cover for:
water damage from a shower recess
damage resulting from wear tear and deterioration.
Case No: 529707 Recommendation Page 4 of 9
The report of SLD identifies a secondary proximate cause of damage which the FSP
says is excluded under the policy. It refers to a long-standing principle of insurance
law based on Wayne Tank and Pump Co Ltd v Employers Liability Assurance Corp
Ltd [1974] QB 57 („Wayne Tank‟). Under the Wayne Tank principle, where there are
two or more concurrent causes of the loss (one of which is an insured event and one
which is an excluded event) the insurer is not liable to accept the claim.
The applicant says she never experienced any issue with a leaking shower. She also
says it is unrelated to the damage to the vanity unit and its tiled surrounds.
It is reasonable to accept the water damage to the architrave was a result of water
flooding the adjacent bedroom during the original insured event. Photographs from
LF confirms the water inundation to the bedroom was significant, particularly at the
doorway to the adjacent ensuite and architrave.
FSP cannot rely on Wayne Tank principle to deny ensuite damage
I believe the FSP sought SLD‟s report intending to seek a secondary excluded
proximate cause to support its partial denial and avoid liability.
I am not satisfied the FSP acted fairly in seeking SLD‟s report. The assessments
already available at the time of seeking the report sufficiently support:
significant ensuite damage occurred because of the accepted insured event
ensuite damage beyond the vanity unit occurred
ensuite damage was not the result of wear and tear or gradual deterioration
ensuite damage was not the result of faulty design or workmanship.
The FSP says the applicant did not provide anything to challenge its reported
discovery of a shower leak. I am not convinced there was a need for the applicant to
challenge the finding because sufficient material confirming the proximate cause of
ensuite damage existed prior to seeking SLD‟s report.
Therefore, the FSP cannot re ly on the „Wayne Tank‟ principle of law to support its
partial denial.
FSP is not entitled to partially deny the claim
The policy says the FSP will bring damage caused by an insured event up to the
current building code or standard. The FSP case worker also confirmed via internal
email it is up to the FSP to bring the ensuite up to code following the removal of the
damaged vanity unit.
The material provided by both parties satisfies me an insured event caused damage
to the ensuite. The actions of the FSP‟s removal of the damaged vanity unit caused
further related damage.
The FSP is required to accept the full loss for the ensuite. It is required to reinstate
the bathroom to a similar condition to its pre-damaged state, and brought up to code.
Case No: 529707 Recommendation Page 5 of 9
Alternatively, if the applicant wants to upgrade the ensuite:
a detailed scope of works is to be obtained
a cash settlement amount is to be calculated and agreed upon by both parties,
ensuring it is actionable.
2.3 Is the applicant entitled to compensation?
FOS may award compensation for non-financial loss
Under the Terms of Reference, FOS may award compensation (capped at $3,000)
for non-financial loss. FOS may decide an FSP should compensate an applicant for
only where there has been an unusual amount of physical inconvenience, time taken
to resolve a situation, or interference with the applicant‟s expectation of enjoyment or
peace of mind.
FOS takes a conservative approach to compensation for non-financial loss. It is not
awarded for punitive purposes, but to compensate the applicant for their experience.
The applicant is not entitled to compensation
Applicants are expected to be moderately robust and bear the normal degree of
inconvenience experienced when a problem occurs.
In this case, the applicant‟s stress and inconveniences was due to the FSP‟s decision
to partially deny her claim. Whilst the FSP‟s tactic to seek a secondary proximate
cause was unsuccessful, FOS cannot award loss for punitive purposes.
The circumstances do not warrant an award for non-financial loss.
Case No: 529707 Recommendation Page 6 of 9
3 Supporting information
3.1 FOS approach to this dispute
There has been a full exchange of material between the parties and opportunities
provided to address any issues that may have arisen.
This recommendation is based on what is fair in the circumstances, having regard to
information exchanged, the policy, good industry practice and prior determinations
where applicable.
3.2 Policy terms and conditions
The PDS says:
5. General exclusions that apply to your policy
These exclusions apply to all cover under your policy.
What we don’t cover
Loss, damage, injury or death arising from:
rust, corrosion, gradual deterioration, depreciation, wear or tear
compensation for distress, inconvenience or other non-financial loss, except if
covered under liability cover
faulty design or workmanship
you not maintaining your home in good repair and condition. This means your home
must be watertight, structurally sound, secure and well maintained
you not maintaining your site in good repair and condition.
Lifetime guarantee
We provide a ‘lifetime guarantee’ when your home is repaired or rebuilt by one of
our preferred repairers or builders.
This means:
we guarantee the workmanship of repairs that we authorised for the lifetime of your
home
we will fix any defect caused by poor workmanship.
We will decide on what needs to be done to fix any defect.
When you’re not covered by this guarantee
Case No: 529707 Recommendation Page 7 of 9
This guarantee does not apply to:
… wear and tear that is consistent with normal gradual deterioration of your home.
Fittings are any items that can be removed from your home without causing
damage to your home.
Fixtures are any items that are permanently attached or fixed to the structure of
your home that cannot be removed without causing damage to your home.
Policy term Covered Not covered
Water and oil leaks
If loss or damage is
caused by water or oil
leaking or escaping
from an item shown in
this section.
Water leaking or escaping from:
– house gutters, drainpipes or pipes
– sanitary fixtures – eg, bat hs or
toilets
– appliances – eg, washing machines
or dishwashers
– waterbeds
– aquariums
– water tanks
– swimming pools
Oil leaking from a fixed heating
system or sealed portable heater
Costs to locate the cause of damage
(if we agree to pay these costs before
you make any arrangements).
Water leaking or escaping from a:
– shower recess or shower base
– stormwater channel or canal
– stormwater pipe off your site
Costs to repair or replace the item
that the water or oil leaked or
escaped from loss or damage
caused by floo d
loss or damage caus ed by storm
surge
Meeting building
regulations
If a listed event causes
loss or damage to your
home and you need to
meet current building
regulations to repair or
rebuild the part of your
home that was
damaged.
The costs to meet current building
regulations to repair or rebuild the part
of your home that was damaged.
Conditions
We must agree to pay the costs
before you make any arrangements.
Costs to meet building regulations:
– that were already in place when
your home was buil t, renovated or
altered
– for undamaged parts of your
home – eg, installing ins ulation in
ceilings that were not damaged.
3.3 Reports relied upon
Report Summary of content
LF (FSP)
Assessment report
14 - 09 - 2017
Broken flexi pipe in upstairs kitchen.
Home is in a damp environment.
Grey water affecting entire room.
Case No: 529707 Recommendation Page 8 of 9
Builder‟s report not required to ascertain claimable event.
No mould infestation at the property that could impact the
insureds health or safety.
Reported det ails are consistent with the claimable ev ent.
Rooms affected:
Upstairs kitchen, upstairs lounge/dining combined
Formal dining room, formal lounge room
Entry hallway, upstairs hallway, downstairs hallway
Staircase
Downstairs kitchen/lounge combined
Bedroom, ensuit e
Is any of the structure excluding the sub floor, for example the
walls or ceilings affected by moisture? “Yes”
Structural drying required.
Assessment report (FSP)
Assessment report
25 - 09 - 2017
Early signs of water marks on walls directly beneath kitchen.
Water still dripping fro m architraves.
Carpet in master bedroom has been flooded due to water leaking
in the kitchen above.
Early signs of water marks on walls in ensuite.
Damage is consistent with defined event.
Water still dripping from architraves in playroom below kitchen.
Mo isture readings of 25% on gyprock walls downstairs in the
hallway, bathroom and master bedroom.
It is still early stages to determine the extent of the damage.
OR (FSP)
Assessment report
Undated and unsigned
Engaged by IAL to report on mould growth – ensuite inspected.
Damage to inside of vanity is consistent with claimed event.
Vanity is unsalvageable and requires replacement.
Attended the site on 21 December 2017 .
Images and measurements taken by Oriel.
Mould cleaned by Oriel as much as possible.
Pro posed scope of works: inspect behind vanity for mould, and
advis e on mould remediation.
Recommendation of immediat e replacement of vanity – highly
suspect mould is growing below the vanity and beneath it which
can cause a large issue in the future.
Cannot provide cost estimate until extent of damage is assessed
at back of vanity.
OR (FSP)
Progress report
Undated and unsigned
Attended the site on 27 (sic?) December 2017 :
Photographs taken
Report done for a job record
Measurements taken
Inspect behind the vanity for mould
Advise on mould remediation
Reattended on 29 January 2018 and removed the vanity to
inspect subfloor and gyprock.
Waterproofing on wall has been breached and shows elevated
moisture content – believed to be reason for the mould growth.
Actions required: inspect behind vanity and clean/disinfect the
area with microbial.
Case No: 529707 Recommendation Page 9 of 9
Recommend:
Removal of gyprock wall.
Remediat e mou ld to framework behind the wall
Sand and remediate framework
Dry effected subfloor and interior wall
Engage plumber to fix water proofing and find cause of leak
Assessment of ensuite complete but if mould is found to have
spread behind walls on the frame a n updat e will be provided.
Estimated costs to attend to above: $2,009.51 (incl. GST).
IWB (FSP)
Plumber report
25 - 01 - 2018
Confirms removal of damaged vanity unit.
Vanity cabinet tiled in (installed before tiling).
Waterproofing applied only at wall/ floor strip.
Water markings in shower area indicate non - existence of
waterproofing or breakdown.
Standard vanity unit will not cover exposed concrete flooring.
SLD (FSP)
Leak det ection report
17 - 02 - 2018
Inspection requested to locate water source causing the sl ight
water damage to ensuite architrave surrounding the doorjamb.
Observes the ensuite vanity previously installed within the tiled
bed has been removed by a third party.
No leaks detected using thermal non - invasive, tracer gas and
acoustic methods.
Moistu re registered in bedroom architrave and carpet outside the
ensuite upon spray testing the shower recess.
Water appears to be permeating through the tiled shower bed
and tracking under the aluminum angle at the doorway most
likely causing the damage.
90% an d higher moisture readings detected within the lower
section of gyprock walls in dining room and bedroom surrounding
the ensuite shower recess before and after completing the
testing.
Moisture readings progressively decrease higher up the wall.
The WC appears to be leak free.
Shower recess failed flood testing, causing dampness to the
architrave and damp bedroom carpet.
Tiled floor appears to be insufficiently waterproofed.
Case Assessor (APP)
Internal email
26 - 02 - 2018
I also await the costing to bring the bathroom to the
waterproofing standards of today. As the vanity has been
removed by CCP it is now up to us to bring it to code.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.