Home / Financial Firm (Unknown) / Determination 529675

Determination 529675

Penalty interest on late management fees charged at PIC plus 6% on managed investment scheme growers

FirmFinancial Firm (Unknown)
Decided2019-12-19
ProductInvestments · Managed investment
OutcomeFor the complainant in part
Amount awarded$2,500
Non-financial loss—
Amount claimed$4,700
SourceAFCA PDF

Summary

Growers RB and Company S complained about penalty interest, fees, lot access, information, equal treatment and undisclosed breaches of best horticultural practice in avocado managed investment schemes. AFCA found the penalty interest excessive and ordered recalculation at PIC alone with $2,500 of expenses deducted and six months to pay, but rejected the other claims.

The penalty interest rate of PIC plus 6% is out of proportion to the firm's legitimate interest and is an unenforceable penalty, while the other claims, including BHP non-disclosure, were not established on the evidence.

Issues

Subjects and remedies

small businessdebt waiver or reductionloan or hardship variationpay compensation

Related

All Financial Firm (Unknown) determinations · Find similar determinations

Text of the determination

Determination | Case number: 529675 Page 1 of 22 Determination Case number: 529675 18 November 2019 1 Determination overview 1.1 Complaint The complainants are RB and his related company, Company S. They have made a complaint against the financial firm about investments in managed investment schemes involving projects in avocado production. For the purposes of this Determination the schemes shall be referred to as the Projects. The complainants made investments in 2006 and 2007 Projects. They allege they suffered losses as a consequence of breach of obligations owed to the complainants by the financial firm as the Responsible Entity (RE) of the Projects. They seek compensation. The financi al firm denies the complainants‟ allegations and any responsibility for the alleged loss. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was largely in favour of the financial firm. A copy of the recommendation is attached to this determination. 1.2 Issues and key findings Were the reasons and outcome of the recommendation correct? The reasons and outcome of the recommendation were correct in the main and are adopted in this determination. Further submissions provided after the recommendation have been considered. Is the financial firm entitled to charge interest on late payment of fees? The financial firm has a contractual right to charge interest on late payment of management fees. The rate of interest, however, is excessive and not enforceable. Did the financial firm charge excessive management fees? The complainants have not established that the fees charged were excessive. Did the financial firm deny access to the lots? The complainants have not proved that the financial firm denied access to the lots. Determination | Case number: 529675 Page 2 of 22 Did the financial firm meet information requests? The financial firm was reasonable in meeting information requests. Did the financial firm treat investors equally? The complainants were not treated less favourably than other investors. Did the financial firm fail to disclose a breach of BHP? Evidence has not been shown that there was a failure to disclose a breach of best horticultural practice (BHP). Are the complainants entitled to compensation? The financial firm must recalculate the interest charged and deduct the sum of $1,050 from the monies owing upon production of relevant invoices by the complainants. The financial firm must make certain payments The financial firm should be responsible for part of the expenses incurred by the complainants. This includes $400 for airfares, $850 for failure of service and $1,250 for legal fees. 1.3 Determination I agree with the case manager‟s reasons for the recommendation and the recommended outcome in the main. This determination is substantially in favour of the financial firm. The financial firm has applied an interest rate that is unjust and should make a partial deduction of expenses incurred. Within 14 days of acceptance of this determination, the financial firm must recalculate the penalty interest rate at a reduction of 6% and deduct the expenses of $2,500 incurred. It should then allow the complainants six months in which to pay the monies then owing under the terms of the original agreement between the complainants and it, other than the unenforceable interest rate component. Determination | Case number: 529675 Page 3 of 22 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case having regard to what is fair in the circumstances, the relevant law, good industry practice, codes of practice and previous AFCA decisions. The complaints centre upon investments in a 2006 Project, a 2007 Project and a post June 2007 Project. They followed upon the financial firm seeking to recover monies, said to be owing by the complainants, that included unpaid fees and interest. The complainants deny that they should be liable for any of these charges, that they should be refunded certain monies and be paid compensation for their losses. The complainants and the financial firm have provided voluminous submissions and responses, both prior to and subsequent to the recommendation. Submissions have been made by RB, his wife KB (a director of Company S) and a solicitor acting on behalf of the complainants. All submissions will be treated as being made by the complainants and shall be referred to as such. RB and Company S have made claims for individual losses, but I shall refer to them as the complainants in this determination, except where it is applicable to distinguish the conduct of RB and KB. The Financial Ombudsman Service (FOS) made an Outside of Terms of Reference Ruling The initial complaint lodged by the complainants‟ solicitor made allegations of breaches of legislative requirements and unconscionable behaviour. The complainants‟ claims are in respect of breaches of obligations by the RE of the Projects. They allege that there had been failures of disclosure, misleading and deceptive conduct (including due to the silence on the interest issue and other matters), failures of service and breaches of duty of care during the period leading up to and after the financial firm becoming the RE of the managed investment scheme responsible for the Projects. This includes matters said to be the direct result of the conduct of the financial firm as the RE or as a result of it taking over the responsibilities of previous REs under the Corporations Act 2001 (as amended). There were two other REs involved in this previous period, TC and H. It raised, amongst a number of others, four primary issues. The first two issues were broadly in relation to the final firm‟s interest charges in respect to the two Projects; the third was in relation to the financial firm‟s negligence under 22 headi ngs, and the fourth was in relation to a lack of commercially responsible management under 17 headings. Determination | Case number: 529675 Page 4 of 22 The complainants sought refunds of interest charges, overcharged fees, expenses incurred as a result of the financial firm‟s poor service in respect to allowing access to the Projects‟ lots and misrepresentation due to the failure to provide information. They, in addition, seek compensation for direct loss and loss of opportunity because: (a) The complainants should have had their contracts terminated in 2009 as they were in default, and (b) If the complainants were aware that the financial firm had not performed BHP in 2013, they would have either: (i) exited the investment, or (ii) called a special meeting of the growers to move a special resolution to remove the financial firm as RE and appoint a new RE. The financial firm has responded to the complainants‟ allegations, refuting them as unfounded and not based on the evidence. It argues that the FOS was a process the complainants were using to avoid the interest lega lly payable by them. In view of the breadth of the allegations, the financial firm objected to the complaint on the grounds that it was outside of the FOS Terms of Reference. As a consequence, there was a ruling by FOS on what aspects of the complaint fell within its jurisdiction. This ruling was made on the basis of concerns that the complaint fell outside the FOS jurisdiction. This was because it potentially related to the management of the schemes and/or related to investment performance that may have not been the subject of misrepresentation or non-disclosure. The ruling made it clear that FOS could not consider such complaints. This narrowed the issues before FOS. Significantly, it ruled that FOS could not consider whether the RE engaged in BHP in the management of the Projects. It limited the consideration of BHP to the question of what information the financial firm had provided to the complainants about BHP. I am bound by the FOS ruling and, by way of comment, the AFCA Rules provide similar restrictions on complaints about the management of the schemes and/or related to investment performance that has not been the subject of misrepresentation or non-disclosure. I cannot make a binding finding in respect to any failure to practise BHP, (in the absence of an admission by the financial firm) and consequently any impact it may or may not have on the success of the schemes. A recommendation was made in respect to the complaint After consideration of these issues the recommendation confined itself to issues that fell within the FOS ruling on jurisdiction. The recommendation was detailed, comprehensive and dealt with the issues raised by the parties objectively. The recommendation correctly found that the financial firm is liable under the Act for its actions from when it was appointed as RE. This meant that the financial firm‟s Determination | Case number: 529675 Page 5 of 22 liability for any of the complainants‟ losses commenced on 14 October 2009 for the 2006 Project and 3 March 2010 for the 2007 Project. I am satisfied that the case manager‟s recommendation contains an accurate summary of the complaint based on the information provided at the time, the issues to be determined, any applicable paragraphs of the Rules and any relevant law. The post-recommendation submissions I have considered all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. I note that certain arguments made prior to the recommendation have been regurgitated by the complainants in post-recommendation submissions and the financial firm has responded in kind. Although I have considered and read all post- recommendation submissions, I have not recorded all of them in detail in this determination. I note since the FOS ruling, that the complainants have raised issues in relation to the interpretation of the Projects‟ constitutions, grower agreements, the matter of the use of power of attorney, the quantity and quality of documents provided by the financial firm and the issue of the principal/agency relationship with reliance on judicial authorities. A claim is based on the complainants‟ allegation that BHP was not practised whilst the financial firm was RE and on comparison with S Farms that was better managed and has produced good returns. Such is the breadth of the complaint before me, I have concerns that it now relates to the management of the Projects as a whole. I will nevertheless deal with issues as far as they do not relate to the management of the Projects. I will primarily deal with the issues in the same order that they were in the recommendation. However, I believe it is relevant to identify the roles of RB and KB in relation to entering the investments and their operation in evaluating their evidence. RB, as an authorised representative of TC, would have had relevant documents Although not relevant to the financial firm‟s liability as they occurred prior to it becoming the RE of the Projects, I will deal with issues raised by the complainants in respect to the misrepresentation or lack of disclosure of previous REs. The complainants allege that they had not been provided with required documentation by TC prior to their entering into the 2006 TC Project, which would have included the 2006 TC Project Constitution, the Management Agreement, License Agreement and Grower‟s agreements (the relevant documents). Determination | Case number: 529675 Page 6 of 22 RB was an authorised representative of TC from 12 January 2004 until 16 December 2008. The complainants‟ 2006 TC Project application has RB listed as the adviser. RB, as an authorised representative, had an obligation to understand any schemes that he advised upon in order to determine their suitability for prospective clients. It stands to reason RB would have had these documents available to him in accordance with his responsibility as an adviser. As a consequence of his advisory position, he had to ensure that he had and understood all the documents relevant to the risks and benefits of the 2006 Project before recommending it. I am satisfied that RB, and through him Company S, would have understood the terms and conditions together with the risks associated with managed investment schemes involved in the 2006 Project. They would not have entered the investment without all the relevant documents Company S, and he required from TC. I am also satisfied that the complainants would have been aware of the need to have all the relevant documents associated with the 2007 Project. I find, w ith RB‟s status as an adviser and from his experience, that Company S and he would not have entered the 2007 Project without all relevant documents. KB was involved in the appointment of the financial firm as the RE The complainants‟ submission makes it clear that KB, as director of Company S, had an active role in relation to the involvement of the RE. She was a chairperson of an avocado group and was a chairperson of a committee for citrus growers, many of whom were avocado growers. According to the com plainants‟ submission, she „had also been pivotal to (name of „financial firm‟) taking over the 2006 and 2007 Avocado projects‟ as RE. Further, according to the complainants, the financial firm, without KB‟s support, would have been ousted as RE in January 2013 and February 2014 by growers. These growers had previously been supportive of the financial firm as RE but raised questions about its costings. She, in addition, with others, galvanised growers to vote at meetings so the financial firm could control the chair at meetings. This included the financial firm paying KB‟s travel expenses to have her attend meetings interstate „to galvanise growers and have the numbers to control the meetings and in particular the chair‟. Moreover, KB was involved with the financial firm and the AEP research House through 2009/2010. The financial firm had worked with AEP on assessing and taking on certain projects. The financial firm and AEP and the grower‟s committee, of which RB‟s wife was a member, assisted a bid on purcha sing citrus assets from a liquidator. She also harnessed the support of a former TC responsible manager for the citrus and avocado farms, so that the financial firm had all the information to make a fully informed assessment. Determination | Case number: 529675 Page 7 of 22 The complainants further state that they were not silent or inactive. KB was instrumental in establishing the committee to undertake investigative work, to work on increasing productivity with proactive biodynamic solutions and government funding solutions. They say that the committee went to huge lengths and were particularly driven and active in trying to ascertain and how to resolve and better the situation with the Projects. Such involvement with the RE and the Projects must be weighed with the fact KB was a professionally trained person with accounting and other qualifications. Taking this into account with her Company S director‟s obligations, in conjunction with RB‟s advisory responsibilities, I am satisfied that she would have maintained a close involvement with the financial firm, unless both RB and she had an understanding of:  the weaknesses and strengths of the Projects at the time they invested  the Project‟s fee structures  the information upon which the RE had relied in providing information to the growers  whether there had been any shortfall in the information provided by the RE in respect to fees and BHP  the climatic conditions that affected the Projects in December 2010  their rights and obligations when they could have terminated their investments  the implications of the AEP research report into the Projects when the complainants could have terminated their investments, during the course of their involvement with the Projects. I am also not persuaded that the complainants would have entered the Projects without an understa nding of the Project‟s fee structures or that interest was payable on unpaid fees. I am further satisfied they would not have entered into a repayment schedule with the financial firm if they believed the fees charged were unreasonable. The financial firm charged interest on late payment of management fees The complainants, in post recommendation submissions, have challenged the recommendation‟s conclusions about the provision of documents prior to signing the Application Forms for the 2006 and 2007 Project s, and the complainants‟ knowledge of Penalty Interest Charges (PIC). For the reasons set out above, I am satisfied that the complainants had received the relevant documents prior to making application for the Projects and had been aware of the PIC. I agree with the recommendation that the charge of interest was disclosed and formed part of the agreement between the parties. The recommendation sets out the circumstances in which the financial firm charged and claimed interest. It includes details of the legal proceedings in which the recovery of the 2006 and 2007 Project charges were sought. Determination | Case number: 529675 Page 8 of 22 The complainants accept the recommendation that the penalty interest was excessive but do not accept that any default interest should be applied to the complainants‟ outstanding invoices. The complainants allege that they believed the RE would sell the lots in the event of defaults and there was no reference to default interest in the relevant documents. They allege there was double dipping because of an inbuilt buffer and default costs built into invoices. I note this argument (which is denied by the financial firm), but it is not substantiated by any evidence. They also argue that the financial firm could have mitigated its loss by returning lots, selling lots and carving out lots to remove underperforming lots from the Project. Such decisions quite apparently go to the management of the Projects and should not be considered by me. Nevertheless, I am satisfied they do not derogate from the financial firm‟s right to cha rge interest on the monies owed by the complainants. The PDS‟s disclosed: „Should you be in default under the Grower Agreements, you may be liable for interests and costs.‟ Information in relation to these were set out in the Project Constitutions, the Licence Agreements and the Orchard Management Agreements. The charging of interest formed part of the agreement with the complainants The financial firm has claimed $83,685.15 for fees and penalty interest relating to the 2006 Project. The financial firm has claimed $83,907.31 for fees and penalty interest relating to the 2007 TC Project. The recommendation sets out the basis on which interest could be charged. I agree with its findings, despite the arguments put forward by the complainants in their post-recommendation submission on the interpretation of the law. The financial firm cannot charge excessive interest The recommendation sets out the law in relation to the charging of interest and that the interest should not be excessive. The complainants have made arguments that the interest rate charged was excessive and is a penalty rather than compensation. The financial firm disagrees and has disagreed with the finding in the recommendation that the interest rate was excessive. The recommendation sets out the reasons why the interest rate was excessive. The reasoning is detailed and has merit. The doctrine of penalties does apply to the interest charged by the financial firm, especially as the financial firm has applied the penalty interest in 2017 and backdated it to 2012. The doctrine of penalties provides protection if interest or fees are excessive. I must have regard to what is fair in the circumstances in deciding issues. I accordingly accept the recommendation‟s finding that PIC plus 6% is excessive i n the circumstances and that there should be a recalculation of the interest. Determination | Case number: 529675 Page 9 of 22 The complainants say they were charged excessive fees I am satisfied the complainants received the relevant documents in which all fees including management fees were disclosed. The complainants have asserted that the financial firm overcharged management fees and ha ve provided calculations. The complainants also allege that the financial firm overcharged licence fees and other fees that were excessive for the financial industry. They have queried the financial firm‟s entitlement to fees when it failed to exercise best horticultural practice. The complainants contend that AFCA confused RE fees with management fees in its recommendations. The complainants, in fact, accept that the financial firm was entitled to charge management fees but says there was overcharging. The complainants stated in a letter dated 29 August 2018 that the financial firm charged excessive management fees because: No RE fees were disclosed in the PDS. Therefore any charge for such by [financial firm] for RE fees of necessity exceeded the amount (none disclosed) in the PDS. [Financial firm] also charged in excess of the management fees permitted under the PDS. The management fees stipulated under the PDS were to be 2.2% however the management fees charged were twice that amount . This argument was reinforced by the complainants in their post-recommendation submissions. The complainants initially provided a portion of a table in the PDS in their initial complaint about fees. The financial firm, in correspondence of 18 October 2018, dissected the weakness in the complainants‟ reliance on the table. It addressed the purported charging of fees and provided a table and additional information in the form of invoices t o refute the complainants‟ arguments. It has argued it showed that there was not any unfavourable discrepancy between the fees charged to growers and those set out in table 2, section 4 of the 2006 Project PDS. In response to the complainants‟ further submission, the financial firm‟s letter of 7 February 2019 confirmed the wording in the invoices sent to the complainants and the corresponding terms in the 2006 TC Project PDS together with other issues. It provided a detailed table in support of its explanation. I am persuaded that this table reflects the fees the financial firm charged and was entitled to charge. The financial firm further addressed the issue of excessive fees in correspondence of 12 June 2019 in addressing the complainants‟ post -recommendation submission in seven relevant Roman numeral points. The complainants have had the opportunity to respond to them, but I am satisfied that the financial firm‟s correspondence establishes the financial firm‟s basis for and entitlement to charge the fees it did. I am satisfied the financial firm‟s evidence has: Determination | Case number: 529675 Page 10 of 22  refuted allegations the AEP reported that the financial firm had charged excessive fees  dealt with the purported failure to off-set various items  confirmed it made all relevant deductions in invoices to the complainants and there was no evidence of the existence of any discount monies on rents  reaffirmed it had not admitted that BHP was not practised, and  established the allegations in regard to RE fees and operating costs and management fees were without basis. Further, for the complainants to suggest that a person of RB‟s adviser status with TC and experience would not understand how and what fees would be charged with all the relevant documents and their involvement with the RE and the Projects , cannot reasonably be accepted. I am satisfied that the complainants understood the fees that the financial firm was entitled to charge and were charging. Based on RB‟s advisory experience and KB‟s accounting background, I am satisfied that the complainants would not enter into any of the Projects to pay fees if they believed the financial firm was charging excessive fees. After considering all the evidence, including the detailed arguments provided by the financial firm, I am not satisfied the complainants have established that the financial firm has charged excessive fees. The financial firm reasonably denied access to the lots The complainants have challenged the recommendation‟s findings as to the access to the lots. The complainants have stated that they were prevented from inspecting the lots because the financial firm denied entry on the basis they wished an agent to attend. They submit that an Orchard Management Agreement provided a right for growers to have agents act on their behalf and have access to information. The financial firm has provided emails as evidence that the complainants did not provide the required notice of who was attending the inspection on 30 June 2017. These are set out in the recommendation. The complainants have argued an email was sent too late to prevent persons from travelling to inspect the lots. They allege that approximately $800 was incurred in travel expenses because of the failure to allow access to the lots. This matter turns on wh at parties‟ interpretation of the facts surrounding a proposed visit by the complainants‟ consultant and agronomist on 30 June 2017 to the lots, should be accepted. I agree with the finding in the recommendation. I am satisfied that the financial firm had grounds to deny access on 30 June 2017. The complainants did not respond by Determination | Case number: 529675 Page 11 of 22 the nominated time. Mr C was denied access on 30 June 2017 as a result. An inspection was subsequently arranged. The evidence indicates that the financial firm subsequently allowed access on 14 July 2017. I find that it was not the entire fault of the financial firm that Mr C was denied access to the lots. Access was denied as the complainants failed to provide the required information. This, however, was a technical matter that should have been sensibly settled. I believe that if common sense had prevailed between the parties a negotiated access could have been achieved. In these circumstances I find, in fairness, that the complainants would be entitled to a payment of approximately $400, being 50% of the airfare, upon production of invoices for the claimed costs incurred by the complainants. The financial firm must provide relevant information on request The recommendation sets out rights of growers to access documents under Clause 19.1 of the 2006 TC Project Constitution and the 2007 TC Project Constitution. Orchard Management Agreements contain a provision that allows access to information that includes „any other matter reasonably required by the Participant Grower‟ but have conf identiality requirements. The complainants have made criticisms of the recommendation‟s findings in relation to the provision of information. They contend that the recommendation did not recognize the principal/agency relationship between the financial fir m and the complainants, as well as confusing the financial firm‟s obligations owed to its auditors and those owed to the owners. This issue is relevant to information required by the complainants in 2017 and at an inspection of documents at the financial f irm‟s office on 25 February 2019. These matters were dealt with separately in the recommendation. In view of the commonality of the arguments put forward by the complainants on the issues I will deal with them together in this determination. The complainants argue that there was a principal/agent-agent relationship between the financial firm and the complainants as a successor to TC. They argued as TC‟s successor it was the complainants‟ agent and had an ultimate responsibility to the growers for the operation and management of the Projects. They further contend that the refusal to provide basic source documentation is therefore in breach of its obligations as its agent. The complainants have made this assertion in conjunction with an assertion that the financial firm altered the originality clauses in the 2013 Orchard Management Agreement without growers‟ agreement or consent. They assert that the financial firm cannot negate the original agreements with the growers. Determination | Case number: 529675 Page 12 of 22 They argue that the financial firm canno t deny the complainants access to information based on confidentiality clauses in the Orchard Management Agreement. They maintain that they have rightfully sought basic details of the actual operating costs so that they can undertake an analysis of whether all the costs were actually and reasonably incurred. The financial firm points out that the growers are not parties to the Orchard Management Agreement between it, in its personal capacity, and various orchard managers. It concedes that it had responsibility for the operation and management of the Projects but denies that it acted as agent in appointing managers of the orchards. It maintains that it is bound by the confidentiality clauses in the Orchard Management Agreements. The financial firm also argues that the complainants have failed to establish any criteria where payment of validly invoiced fees is subject to an audit and/or validation of expenditure of the relevant orchard and Project costs. The Project‟s documentation determined the fees which were invoiced to the complainants. It further argues that the complainants were in error in seeking Project accounting records. The reason being that a managed investment scheme, like the Project, is a combination of growers with the sole purpose of receiving and distributing pooled net sale proceeds. The financial records are provided to external auditors and lodged with Australian Securities and Investment Commission (ASIC) to meet its statutory obligations. The financial firm refuted the complainants‟ ar gument that it had negated the original agreement. It pointed to the fact that the Project‟s Constitutions allowed for the Constitution to be modified by a resolution of growers or the RE, if it reasonably considers that the proposed changes to the Constitution does not adversely affect the interests of growers .The financial firm was of the view that no changes were made that adversely affected the complainants‟ interests and there was no evidence to the contrary. I agree with this as the complainants‟ as sertions are not evidence based on the material before me. I note the complainants‟ arguments in relation to the principal/agency relationship between the financial firm and the complainants together with the judicial authority upon which they rely. Leavin g aside the financial firm‟s arguments contesting the financial firm was the complainants‟ agent in respect to the provision of information required by the complainants, I do not accept, in this instance, the financial firm and the complainants‟ relationship allows overriding the terms of the Projects‟ Constitutions. As set out in the recommendation, Clause 19.1 of the 2006 TC Project Constitution and the 2007 TC Project Constitution refers to the growers‟ right to inspect documents and the confidentiality provision. The Orchard Management Agreements had Determination | Case number: 529675 Page 13 of 22 confidentiality provisions. The confidentiality terms have a protective commercial purpose. These are things of which the complainants would have been aware when they invested in the Projects and during their operation. I do not consider it is legitimate that the complainants, being aware of the confidentiality terms of the respective Project Constitutions can now seek to avoid. To do so would give the Constitution‟s protective confidentiality terms for the Projects little or no purpose. The provision of relevant information prior to and in June 2017 In relation to the provision of information, the financial firm has pointed to the fact that KB organised an independent horticultural review of the 2007 Project orchard in late 2013. Further agronomic and production information was provided to the complainants in the lead up to 2006 and 2007 Project meetings. The financial firm has noted that KB had sought a further independent horticultural review of the orchards in July 2015. It contends that significant information was provided to the complainants at that time. It has provided evidence that KB did not ultimately confirm the visit with the landowner. In June 2017 KB, following the financial firm‟s dispatch of t he intention to wind up the 2006 Project, sought further information. The recommendation found the complainants made multiple requests for information on the management of the Projects. The financial firm has provided examples of such a request. The financial firm provided some of the requested information. It responded to the complainants‟ email of 3 July 2017 on 4 July 2017. The financial firm responded to all questions but contended it could not provide some information due to the issue of legal proceedings and commercial confidentiality. Its response is detailed in the recommendation. I am satisfied that the financial firm acted reasonably in responding to the requests for information in these responses but did not provide the service was of a standard that would be expected. The financial firm provided access to information on 25 February 2019 Following the complainants‟ allegations, the financial firm did not meet information requests, the financial firm agreed to let the complainants examine the financial records of the Projects. The financial firm stated the procedure and conditions of inspection in its letter dated 20 February 2019. The inspection was to take place in the office of the financial firm on 25 February 2019. The financial firm offered to allow an inspection of the financial records of the 2006 and 2007 Projects under the terms and conditions which are set out in the recommendation. Determination | Case number: 529675 Page 14 of 22 Following the inspection, the complainants stated that a number of documents were not available. They argued that they, in good faith, made a costly trip to inspect the documents but were greeted with missing documents, missing bank statements and incomplete records. The financial firm responded in its letter dated 8 March 2019, denying the allegation and contending all the documentation detailed in its letter of 20 February 2019 was provided under the fixed terms and conditions. The complainants, in their post-recommendation submissions, have made a range of claims in relation to the documentation that was inadequate or was not provided in accordance with its obligations as an agent of the complainants as growers. The financial firm points out that KB‟s experts refused to sign a confidentiality agreement despite assurances by KB‟s solicitor prior to the inspec tion they would do so. Clause 19.1 states in part „…the Participant Grower will sign a suitable undertaking to keep confidential the document or other information…‟ Despite the complainants‟ arguments to the contrary, I agree with the finding in the recommendation the complainants have not acted in good faith by not having the confidentiality agreements signed. I agree with the finding in the recommendation that the operative word in relation to the provision of information to the complainants, within the bounds of confidentiality, is „reasonable‟. I am satisfied that, although there may have been some shortfall in the information provided by the financial firm, irrespective of any principal/agent relationship, it did not breach its obligations in providing reasonable responses to the information requests. Moreover, I am further satisfied the complainants, with their experience, qualifications and access to information during their involvement in the Projects, were not disadvantaged by any shortfall in the documentation provided by the financial firm. The complainants say they were treated differently to all other investors The complainants, in their post-recommendation submissions, drew attention to the fact that withdrawal offers made in October 2013 were made conditional upon the offers not being open to growers in default and argued the recommendation had largely ignored the different treatment given to the defaulters but not the complainants. The post-recommendation submissions amplified the instances and reasons they believed they had been treated differently. The financial firm continue to deny that the complainants were treated differently to other investors. The complainants allege that the financial firm did not treat all investors the same. The complainants say that after the financial firm became the RE, all contracts in Determination | Case number: 529675 Page 15 of 22 default were terminated except for theirs. The recommendation sets out the complainants‟ argument . The complainants additionally say that the financial firm was informed of RB‟s hea th issues and financial hardship. They argue, despite being aware of these situations, the financial firm chose not to terminate the complainants‟ agreement, as it did with other growers, and allowed them to incur further costs. This was denied by the financial firm. The financial firm, moreover, has provided evidence that the complainants decided to negotiate a repayment plan with the financial firm rather than having their contracts terminated. The recommendation found the complainants negotiated a repayment plan because they were in default when the financial firm became the RE. The complainants had difficulties in meeting the repayment plan. The financial firm has provided emails with the complainants reminding them that they are in arrears with the payments. The complainants responded, asking for more time so that their contracts were not terminated. The recommendation recorded that the complainants were given a withdrawal offer in October 2013, but they did not accept it. I have had access to a range of emails between the complainants and the financial firm. I am satisfied that it was the decision of the complainants to remain in the Projects and not to have their contracts terminated. I do not accept the allegation by the complainants that the financial firm was desperate to retain them as growers. I do not accept the allegation of the complainants that the financial firm did not treat all investors the same. 2.2 Did the financial firm fail to disclose a breach of BHP? Complainants can only claim the financial firm failed to disclose breach of BHP In their letter of 29 August 2018, the complainants stated that the financial firm knew without any doubt in 2013 that BHP was not being practised by the farmers when the farmers signed a new lease and refused to warrant that BHP was implemented under Section 4.1 of the lease. The complainants say the financial firm failed to disclose breaches of BHP in the information provided by the RE which is the „gravamen‟ of the claim for compensation. The complainants assert that the financial firm did not disclose breaches of BHP and their silence constituted a misrepresentation. The complainants stated that BHP was not followed by the financial firm and they have suffered a loss as a result. The complainants stated that if they knew that BHP was not being followed, they would have terminated their ownership. Determination | Case number: 529675 Page 16 of 22 The financial firm denies that BHP was not followed or that the complainants were misled about BHP. AFCA has stated that it cannot hear a claim about a failure to follow BHP, but only a failure to provide information. Following the complainants‟ responses, I questioned how AFCA could make a finding of non-disclosure or misrepresentation of a failure by the financial firm in relation to BHP without making a finding that the financial firm had not practised BHP. The complainants responded that the financial firm and farmers had unequivocally stated that BHP had not been practised but did not disclose it. They reaffirmed the failure to disclose that BHP was not being practised was pivotal to the outcome and choices available to them. The financial firm has denied the farmers and it stated that BHP had not been practised. The complainants, in support of their position that there was misrepresentation by silence, have referenced amongst other things:  an AEP research report 2006/2007  P and S R Expert reports in 2006 and 2007  AAG and AEP Research  the financial firm‟s growers‟ meetings of 12 October 2009  the financial firm‟s representation of 18 December 2009  the QAL PDS 2010, the cashflow attached to the QAL PDS  the financial firm‟s 21 October 2010 representation  the financial firm‟s 15 November 2010 representation  the 2012 AEP report  the actions taken by RB and his wife  the 31 December 2015 Director‟s report, and  th e 31 December‟s Director‟s report. I note the financial firm submits that the QAL PDS 2010 referred to was not a PDS but a prospectus. The import of the documents and actions referred to above, upon which the complainants rely, on the issue they were misled by the financial firm‟s silence on the failure to disclose BHP, are subject to differing interpretations. The interpretations turn upon the wording of clause 4.1 of leases between farmers on whose properties the avocado orchards were grown and the financial firm. The financial firm made a detailed submission, by way of correspondence of 7 February 2019 to the complainants‟ solicitor, in which it identified the issues on which the complainants placed significant weight. The financial firm identified in addition to the fees issue, these as the following: Determination | Case number: 529675 Page 17 of 22  The financial firm purportedly misrepresented that BHP was being performed when it knew that BHP had not been performed.  The financial firm did not disclose to growers in the Projects that BHP was not being performed.  The financial firm told growers that BHP was and had been performed whilst the farmers said that BHP was not performed. The financial firm believed the complainants based these allegations on the wording of clause 4.1 of at least the (F lease) between (Name of Company) and the financial firm. The financial firm asserted that there could be no justification of loss of income or loss of opportunity based on the wording of clause 4.1 of the 2013 leases or generally that it misrepresented that BHP was not being performed. The financial firm argues that the complainants erroneously inferred and extrapolated things from the information provided. It submitted evidence to counter the allegations about the misrepresentations concerning BHP. It provided details of the:  Project Structure and Land Ownership.  Leases between Landowners, and  Purported Lack of Warranty by the 2010 Purchaser. In respect to the last issue, the financial firm made submissions based on the interpretation of Clause 4.1 of leases signed between December 2009 and 2010 and 2013. It argues that there is nothing in the Clause that references the absence or use of BHP in the horticultural operations during the term of the 2006 or 2007 Projects. The financial firm argues Clause 4.1 of each of the leases between property owners between December 2009 and January 2013 does not contain anything that could purport to be a statement that BHP had not been performed. The financial firm has pointed out the involvement of lawyers in the settling a nd amendment of leases in 2013. Amongst the changes the lawyers instigated were amendments to Clause 4.1 based on a disconnect of the ownership of the properties and the inability of the new lessors to affirm actions taken by previous owners of the properties who at the time were in external administration. The financial firm recited the amendments to Clause 4.1 and contends that at no time did the lessor in the 2013 Lease state that the orchards had not been established in accordance with BHP. It says the clause makes no reference to any orchard practices following the establishment of the orchard and does not reference the use of BHP in the use of horticultural operations during the term of the 2006 or 2007 Projects. Despite the complainants‟ submission t o the contrary, I am satisfied that the 2013 Leases do not support findings that: Determination | Case number: 529675 Page 18 of 22  the financial firm misrepresented that BHP was being performed in the 2006 or 2007 Projects  BHP had not been performed in the 2006 and 2007 Projects  the farmers have admitted or stated that BHP was not being performed during the time that it was RE of the 2006 and 2007 Projects. The complainants, in post-recommendation submissions, have continued to make allegations the financial firm did not follow BHP. Although it is not for me to determine whether there was BHP or not, I believe, in fairness to the complainants, to comment that I am not satisfied they have established that BHP was not followed by the financial firm. The complainants‟ arguments conta in an element of the fact the Projects failed that, ipso facto, this meant there was not BHP. The complainants refer to the fact that other avocado farms produced better results. The complainants further allege that the financial firm would not have taken on the role of RE of Projects if they believed it had concerns about the existing standards. Such a submission ignores the reality and risks of agricultural projects that are dependent on rainfall and its effect. I note the P and SR reports state that avocados are „highly sensitive to waterlogging and water stress‟. Some agricultural projects can prosper whilst other may fail in seemingly like conditions. The financial firm, in a submission of 12 June 2019, argued that the complainants did not address the impact of three successive 1-in-100-year climatic events from December 2010, which were addressed by independent experts. I note that many of the documents or representations upon which the complainants rely predated December 2010 when it was reasonable for the statements to be made. The financial firm further submits that it was fallacious to claim that it did not raise concerns about phytophthora damage to avocado trees, saying that on numerous occasions it had discussed the damage as a result of water-logging following the 1-in- 100 years events from December 2010. Upon my reading of the submissions and relevant reports, the Projects had suffered either from the mismanagement of TC or the impact of climatic conditions. Later statements, upon which the complainants rely, are not evidence that BHP had not been followed. I am satisfied, on the evidence before me, there are no grounds for me to find BHP had not been followed. More relevantly for the purpose of this complaint, I find that there was no misrepresentation or failure of disclosure by financial firm in respect to the issue of BHP. Determination | Case number: 529675 Page 19 of 22 Complainants did not terminate when given information on BHP For the sake of completeness, I agree with the conclusion reached in the recommendation on the issue. The co mplainants‟ letter of 28 May 2018 stated 22 ways in which the financial firm failed to meet BHP. The complainants refer to as a source document, the AEP Review dated 30 October 2012. The AEP Review relied on an expert, Dr CS. The complainants challenged the findings in the recommendation. I note the recommendation extrapolated from the AEP Review that it found two-thirds of the combined orchards to be in good condition. Of the remaining one-third, the problems related to the development of the Projects and during the time the former RE, TC, was under administration: While there have undoubtedly been execrating circumstances, many of the issues that are present on the properties reflect the development standards of the properties. Poorly designed and developed properties with, in some cases, inadequate drainage, trees planted on flat ground (rather than mounds) or in areas that should have been known as prone to water logging, have contributed to the current state of the orchards. In addition, the underfunding of farm operations during the administration of [TC] meant critical operations were not carried out, especially in regards to canopy management, which is so critical to maintaining orchard productivity. The AEP Review does not support the allegations of the complainants that BHP has not been followed by the financial firm. The AEP Review, however, does state that BHP may not have been followed by TC. The complainants had information on a probable failure of BHP following the release of the AEP Review. The previous section found that the complainants had the opportunity to exit the 2006 TC Project in an offer expiring 13 November 2013. The complainants did not accept this offer. I agree with the recommendation the complainants have not provided enough evidence that:  the financial firm failed to provide information on a breach of BHP  the complainants would have terminated their ownership if they knew of a breach of BHP. 2.3 Are the complainants entitled to compensation? The complainants are not entitled to compensation for loss The complainants sought compensation for direct loss and lost opportunity because of the financial firm‟s misrepresentation or non -disclosure of its failure to practise BHP. Determination | Case number: 529675 Page 20 of 22 I have found the complainants have not established, on the evidence before me, any misrepresentation or non-disclosure of the failure to follow BHP and therefore no compensation is payable for this claim. The complainants, in addition to the issues discussed above, have provided a range of submissions about the fina ncial firm‟s alleged breaches of its obligations of the relevant Corporations law or the Projects‟ Constitutions, to which the financial firm has adequately responded. The financial firm has claimed that some of the contentions go to the management of the Projects as a whole. Leaving that aside, I am not satisfied such allegations have been established or, even if they were, they would not be causative of any loss on the part of the complainants. I am satisfied there was no misrepresentation on the part of the financial firm in relation to the BHP and the complainants had the opportunity to avoid loss by withdrawing from the investments. The complainants are entitled to a partial payment of legal costs Although I am satisfied there were no breaches of obligations by the financial firm that entitled the complainants to compensation, there was some lack of service in respect to the provision of information. However, again a more common-sense approach must be taken between the parties to resolving issues in dispute. The complainants seek payment in excess of $3,900 for legal fees said to have been incurred in obtaining access to lots and information. I have a limited power to award legal costs under both the AFCA Rules and the FOS TOR and can award compensation where I am satisfied that the financial firm has provided unsatisfactory service that has inconvenienced complainants. I am not persuaded that it would have been necessary to incur this level of fees to obtain access to the lots or other information if there had been a better level of cooperation. I am satisfied that both parties are to blame for this situation. I find, subject to the production of the relevant invoices by the complainants, it is fair to allow $1,250 for such legal costs and require the financial firm to compensate the complainants by way of a payment of $850 because of a failure of service. This is in addition to the $400 allowance for airfares. The financial firm cannot charge excessive penalty interest The financial firm has charged penalty interest that is excessive. The interest rate of 6% above PIC is excessive. The interest rate should not be higher than PIC. The interest component should be adjusted and based on PIC alone. The financial firm must deduct certain of the complainants’ expenses The financial firm shall deduct $2,500 allowance for airfares, lack of service and legal fees from the monies owing to it by the complainants. Determination | Case number: 529675 Page 21 of 22 The financial must allow the complainants time to pay the monies owing The financial firm should advise the complainants of the revised figures for the monies owing within seven days of the date of acceptance of this determination. Although I am satisfied the complainants must pay the monies owing, I find that it is fair, in the complainants‟ circumstances, they be allowed time to pay it. They should be allowed a further six months to pay the monies owing after the recalculation of the interest and deduction of the expenses. The repayment should be made under the terms of the original agreement between the complainants and the financial firm, other than the unenforceable penalty interest rate component. Determination | Case number: 529675 Page 22 of 22 3 Supporting information 3.1 The determination is made taking into account FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with by FOS. This determination took into account the FOS Terms of Reference in relation to its ruling but has followed the AFCA rules in making this determi nation 3.2 The parties made extensive submissions after the FOS ruling Following the ruling, the complainants made a range of submissions and extensive arguments based on TC‟s and F‟s breaches of fiduciary duty, the complainants‟ understanding of the managem ent of the schemes from the financial firm‟s documentation, disclosure of information, service deficiencies, individual management failures together with differing interpretation of the terms of documentation and correspondence common to both parties. The financial firm responded to these allegations denying same. The complainants then made detailed submissions in response, seeking to refute the financial firm‟s arguments. All of the parties‟ submissions including attachments or appendix and tables calculating fees or interest have been considered. The recommendation has been considered. I have adopted certain of the language and findings in the recommendation in this determination. Recommendation | Case number: 529675 Page 1 of 14 Recommendation Case number: 529675 30 April 2019 4 Overview 4.1 Complaint This complaint is about investments in managed investment schemes (MIS). The complainants made investments in 2006 and 2007. The complainants say:  they were denied access to inspect their lots  there was a failure to provide information on request  they were charged excessive fees and excessive interest  all investors were not treated equally in the terminating of investors in default  best horticultural practices (BHP) were not followed. 4.2 Issues and key findings Is the financial firm entitled to charge interest on late payment of fees? The financial firm has a contractual right to charge interest on late payment of management fees. The rate of interest however is excessive and not enforceable. Did the financial firm charge excessive management fees? The complainants have not established that the fees charged were excessive. Did the financial firm deny access to the lots? The complainants have not proved that the financial firm denied access to the lots. Did the financial firm meet information requests? The financial firm was reasonable in meeting information requests. Did the financial firm did treat investors equally? The complainants were not treated less favourably than other investors. Did the financial firm fail to disclose a breach of BHP? Evidence has not been shown that there was a failure to disclose a breach of BHP. Recommendation | Case number: 529675 Page 2 of 14 Are the complainants entitled to compensation? The financial firm must recalculate the interest charged. 4.3 Recommendation This recommendation is substantially in favour of the financial firm. The financial firm has applied an interest rate that is unjust. Within 7 days of acceptance of this Recommendation, the financial firm must recalculate the penalty interest rate at a reduction of 6%. 5 Reasons for recommendation 5.1 Was the financial firm entitled to charge interest on the late payment of fees? The financial firm charged interest on late payment of management fees The complainants fell behind in making payments to the financial firm. A repayment schedule was agreed however the complainants failed to meet their obligation. The financial firm commenced legal action around July 2017. The financial firm charged interest as set out in claims submitted to the Magistrates Court of South Australia. The claim filed 9 August 2017 sets out the claim for the 2006 TC Project. The interest charged from 2012 to 9 August 2017 was stated as $80,737.04. The claim filed 9 August 2017 sets out the claim for the 2007 TC Project. The interest charged from 2012 to 9 August 2017 was stated as $80,952.73. The complainant has not paid any amounts towards the interest claimed. The charge of interest formed part of the agreement with the complainants The Management Agreement and Licence Agreement provide that the financial firm is entitled to charge interest on late payment of the management fees. The complainants stated in their letter dated 28 May 2018 After signing the 8 May 2006 application form and falling behind in their payments to [financial firm] in late 2009 or early 2010 it was put to our clients in August 2017 (being some seven years later later) that Clause 11.9 of the [A Management Agreement] and Clause 7.5 of the Licence Agreement applied. Those clauses stated that in the event of a default, interest was to be charged “at a rate that is no more than 600 basis points above the rate from time to time fixed under Section 2 of the Penalty Interest Rates Act, 1983 (Vic) (“PIC”)”. The complainants have stated that they had not been provided with the following documentation prior to signing the 2006 TC Project application on 8 May 2006: Recommendation | Case number: 529675 Page 3 of 14  2006 TC Project Constitution  A Management Agreement  License Agreement  Grower‟s agreements. The complainants have stated that they should not be bound by these documents because they were not received prior to signing the applications. I note that Mr RB was an authorised representative of TC from 12 January 2004 until 16 December 2008. The 2006 TC Project application has Mr RB listed as the adviser. I am satisfied that the complainants would have been aware of all the documentation associated with the 2006 TC Project. For the reasons set out above, I am satisfied that the complainants had received this documentation prior to signing or would have been aware of PIC. Furthermore, I do not accept the complainants‟ submission that they did not know:  the meaning of 600 basis points  what rate was allowed under the Penalty Interest Rates Act, 1983 (Vic)  where to find that information. On this basis, I am satisfied that the charge of interest was disclosed and formed part of the agreement between the parties. The financial firm cannot charge excessive interest The law of penalties provides that interest or fees charged in response to a breach of contractual obligation must not be excessive. If the charge is out of proportion to the financial firm‟s interest in ensuring compliance with the relevant obligation it will be considered a penalty which is unenforceable at law ( Paciocco v Australia and New Zealand Banking Group Limited) . The interest rate was excessive The complainants have made arguments that the interest rate charged was excessive and is a penalty rather than compensation. The complainants stated:  a rate of 6% above the maximum rate allowed under Section 60 of the Supreme Court of Victoria Act, 1986 (Vic) is extravagant and unconscionable  the financial firm waited for over six years to notify the complainants of PIC  the PIC is out of proportion when compared with the greatest conceivable loss suffered by the financial firm in the event of a default Recommendation | Case number: 529675 Page 4 of 14  the costs of default have already been built into the fees, rent and management costs. The following chart shows the penalty interest rates under the Penalty Interest Rates Act 1983 (Vic) and the PIC rate plus 6%. Date Maximum PIC PIC plus 6% 01 - 09 - 2008 11.0% 17.0% 23 - 02 - 2009 10.0% 16.0% 01 - 02 - 2010 10.5% 16.5% 07 - 10 - 2013 10.0% 16.0% 03/02/2014 11.50% 17.5% 11/08/2014 10.50% 16.5% 01/06/2015 9.50% 15.5% 01/02/2017 10.00% 16.0% The doctrine of penalties does apply to the interest charged by the financial firm, especially as the financial firm has applied the penalty interest in 2017 and backdated it to 2012. The doctrine of penalties provides protection in the event that interes t or fees that are excessive. I accept the complainants‟ argument that PIC plus 6% is excessive in these circumstances. 5.2 Did the financial firm charge excessive management fees? The complainants say they were charged excessive fees The complainants stated in a letter dated 29 August 2018 that the financial firm charged excessive management fees because: No RE fees were disclosed in the PDS. Therefore any charge for such by [financial firm] for RE fees of necessity exceeded the amount (none disclosed) in the PDS. [Financial firm] also charged in excess of the management fees permitted under the PDS. The management fees stipulated under the PDS were to be 2.2% however the management fees charged were twice that amount . The complainant refers to the 2006 TC Project. Recommendation | Case number: 529675 Page 5 of 14 The PDS discloses that the financial firm can charge fees of 2.2% The financial firm‟s letter of 7 February 2019 has confirmed the wording in the invoices sent to the complainants and the corresponding terms in the 2006 TC Project product disclosure statement (PDS). The term used in the invoices is the responsible entity fee. The term in the 2006 TC Project PDS is the management fee. Pages 11 and 12 of the PDS states how the management fee is charged:  the management fee for the first financial year of participation is included in the application monies  the management fees for the 2007 and 2008 financial years have two components, a fixed fee and a deferred fee  the fixed fee (for 2007 and 2008) are $3,000 per year per A Lot  the deferred fee is 1.1% of the net sales proceeds (including GST) in 2007 and 2.2% of the net sales proceeds from 2008 onwards. The complainant has not established that fees exceeded 2.2% The financial firm has disclosed the RE fee in the 2006 TC Project PDS. The complainant has not provided a calculation or evidence that the management fee charged to them was more than the 2.2% allowed under the PDS. 5.3 Did the financial firm deny access to the lots? The financial firm must allow access to the lots The complainants do have rights to inspect their lots. Page 33 of the 2006 TC Project PDS states, „Naturally you will be entitled to visit your [lots] and monitor their progress with prior notice‟. Clause 9.4 of the 2006 A Lot Management Agreement states: Participant Grower‟s Access Provided the Participant Grower first gives [TC] 7 days„ prior notice in writing, [TC] must permit the Participant Grower or its duly authorised representatives to have access, at the Participant Grower‟s expense and risk, at all reasonable times to the relevant [lots] and the facilities located on them. The complainants say the financial firm denied them access to the lots The complainants have stated that they were prevented from inspecting the lots. They say that an inspection with their consultant was arranged for 30 June 2017. The financial firm required a representative of the financial firm to be present. The complainants paid for the airfare of the financial firm‟s representative, Mr CD. The complainants claim that although Mr CD was in attendance, they were still denied access. They claim that they had to pay a legal practitioner to force the financial firm to permit access. The financial firm replied in response: Recommendation | Case number: 529675 Page 6 of 14  access was available to Mr CD, Mr RB and Mrs KB, spouse of Mr RB  access was denied to Mr C, the complainants‟ consultant, on 30 June 2017 as the request for Mr C to attend was not received in time  access was arranged for Mr C, Mr RB, Mrs KB and another representative of the complainants, on 14 July 2017. The financial firm reasonably denied access on 30 June 2017 The financial firm has provided emails as evidence that the complainants did not provide the required notice of who was attending the inspection on 30 June 2017. An email was sent from BD Legal to the financial firm on 29 June 2017. BD Legal are the legal representatives of the orchard managers, D Consultancy. We act on behalf of [D Consultancy] and have been advised that [financial firm] and its nominees are undertaking a site visit on 30 June 2017. Before tomorrow, can you please urgently provide to [Mr MD] and [Mr JD] full details of all the parties who are attending. Specifically, we need to know which members of [financial firm] will be attending and which of its nominees are attending. Email from Mr CD to Mrs KB on 30 June 2017 at 4:36am: [Mrs KB] I have sent you a number of emails and SMS requesting details of who will be attending the farm with you today. Can you please provide that information as a matter of urgency to ensure that there is no risk of any party being denied entry? I need that information before 9am today. [Mr CD] The complainants did not respond by the nominated time. Mr C was denied access on 30 June 2017 as a result. I am satisfied that it was not the fault of the financial firm that Mr C was denied access to the lots. Access was denied as the complainants failed to provide the required information. The financial firm allowed access on 14 July 2017 The financial firm arranged access for Mr C following his denial of access on 30 June 2017. The complainants gave the required notice of who was going to attend. Mr RB, Mrs KB and Mr C were given permission to gain access between 11:30am and 1:00pm on 14 July 2019. 5.4 Did the financial firm meet information requests? The financial firm must provide relevant information on request Clause 19.1 of the 2006 TC Project Constitution and the 2007 TC Project Constitution does state a right for the complainants to request information relevant to the financial firm‟s activities as RE: Each Participant Grower has the right: a) to inspect and copy any document or other information relevant to the activities of the Responsible Entity on its behalf (except for information which is Recommendation | Case number: 529675 Page 7 of 14 confidential because its disclosure could in the reasonable opinion of the Responsible Entity assist competitors or otherwise prejudice the interests of all Participant Growers), provided that on each occasion upon which the Participant Grower seeks to exercise its right under this paragraph the Participant Grower will sign a suitable undertaking to keep confidential the document or other information; and b) to express opinions and to give recommendations relating to any matters the subject of the Grower Agreements or proposed Grower Agreements, and the Responsible Entity will give due consideration to any such opinions or recommendations received in writing. The complainants requested information The complainants made multiple requests for informa tion on the management of the Projects. The complainant‟s solicitor, SR Lawyers, in a letter dated 14 July 2017 noted nine requests for information from 19 June 2017 to 13 July 2017. An example is the complainants‟ email dated 3 July 2017 which listed 12 separate information request items. The items requested were:  detailed expense journals resent on the basis of harvest year, not financial year  copy of [CS Report] and any other reports over the last three years  breakdown on packing costs, ripening costs, commissions and promotional levies  number of bins and weekly pricing details  number of types of avocado trees  explanation of discrepancy in the number of trays recorded  number of staff and wages breakdown  fertiliser breakdown costs for different types/products and is gypsum used  what are leases for and details and who is the leasing party  explanation for variation in expenses  is there fruit still on the trees  last six months to June 30. The complainants‟ email dated 16 July 2017 listed 36 sepa rate information request items. Their request included items such as:  audit reports done every two months  spray diaries  water management plan  insurance details  weekly harvest reports  consultant reports and reviews  sick trees – do they get same or less applications of fertilizer, fungicides, water, etc  soil analysis results, topsoil analysis. Recommendation | Case number: 529675 Page 8 of 14 The complainants have stated that the financial firm has failed to provide all the requested information. The financial firm provided some of the requested information The financial firm responded to the complainants‟ email of 3 July 2017 on 4 July 2017. The financial firm responded to all questions however it could not provide some information due to commercial confidentiality. The financial firm did not provide a response to the complainants‟ email of 16 July 2017. The financial firm has stated why it did not respond: In regard to the information that was requested 16th July 2017, I had previously provided responses to [Mrs RB] that the information was beyond the scope of that covered under the scheme documentation and was primarily information that was subject to confidentiality arrangements. I had on numerous occasions advised that, upon provision of the authority from the third parties consenting to its release, we would provide that information. That written authority has not been provided. At that time a claim was lodged in court against the complaint seeking redress of their outstanding management fees. Further correspondence in the matter was exchanged between the respective legal representatives. The financial firm provided as much information as it reasonably could SR Lawyers letter of 14 July 2017 states the financial firm‟s obligations in providing information. SR Lawyers refers to Clause 13.5(d) of the A Lot Management Agreement, „any other matter reasonably requested by the Participant Grower‟. Clause 13.5 in its entirety refers to the annual reporting that must be provided by the financial firm within four months after the end of each financial year. This clause does not require for ongoing reporting to a participant grower or to respond to all requests. The operative word is reasonable. I am satisfied that the financial firm did not breach its obligations in providing responses to reasonable information requests. The financial firm provided reasonable access to information As well as information on the management of the TC Projects, the complainants allege that they were not provided with financial details. The complainants state that the financial firm has provided invoices but not proof that the invoices have been paid. The complainant wanted to have a forensic review of the books and records of the financial firm. The financial firm agreed to let the complainants examine the financial records of the Projects. The inspection was to take place in the office of the financial firm on 25 February 2019. The financial firm stated the procedure and conditions of inspection in its letter dated 20 February 2019:  the names of the five people to attend, including Mr AV, Mr RT and Ms MM  making available a dedicated room Recommendation | Case number: 529675 Page 9 of 14  the documents available for inspection  documents that are confidential under third party agreements unless the complainants receive the release forms from the third parties will not be available  documents that are confidential to other growers will not be available  confidentiality agreements must be signed by Mr AV, Mr RT and Ms MM. Following the inspection, the complainant stated that a number of documents were not available. The financial firm responded in its letter dated 8 March 2019: We strongly deny the accusations and assertions that [Mrs KB] makes against [financial firm] in her email. All documentation as detailed in my letter of 20th February 2019 were provided at the ins pection. We also note that [Mrs KB‟s] „experts‟ refused to sign confidentiality agreements, despite assurances from [Mrs KB‟s] solicitor prior to the inspection that they would be signed. The email contains several references to information that is related to members of the schemes to which the complainant has no legal or enforceable entitlement. The email also illustrates that the complainant does not understand the accounting limitations of a managed investment scheme, which only receives sales income less sales expenses and distributions of that balance. The complainants have not provided any evidence from their inspections that suggest a breach of obligations by the financial firm. The complainants have not acted in good faith by not signing the confidentiality agreements. Clause 19.1 of the 2006 TC Project Constitution and the 2007 TC Project Constitution refers to the growers right to inspect documents. This clause states in part „…the Participant Grower will sign a suitable undertaking to keep confidential the document or other information…‟ I am satisfied that the financial firm has been reasonable in providing access to information. I further note that financial firm has had annual compliance and audit reports provided by internationally recognized accounting firms. 5.5 Did the financial firm did treat investors equally? The complainants say they were treated differently to all other investors The complainants allege that the financial firm did not treat all investors the same. The complainants say that when the financial firm became the RE of the Projects, all contracts in default were terminated except for theirs. The complainants‟ representative stated in a letter dated 29 August 2018: [Financial firm] took it upon itself to terminate defaulting growers with the exception of our clients. Our clients assert that they were treated differently to other defaulting growers as [financial firm] was desperate to retain [M rs RB‟s] continued support and influence as the Committee Chair with growers and the Committee. In short it was vitally important to [financial firm] to retain our clients and in particular [Mrs RB] as growers. Recommendation | Case number: 529675 Page 10 of 14 The complainants negotiated a repayment plan The complainants were in default when the financial firm became the RE of the Projects. The financial firm however has provided evidence that the complainants decided to negotiate a repayment plan with the financial firm rather than having their contracts terminated. The financial firm made an offer to the complainants in an email dated 10 December 2009: The offer is open for acceptance until 21st December 2009. We are presently in the process of finalising defaulting investors that have not made payments, so it is important to act on this offer promptly so you are not included with this group. The complaints had difficulties in meeting the repayment plan. The financial firm has provided emails with the complainants reminding them that they are in ar rears with the payments. The complainants responded, asking for more time so that their contracts were not terminated. Mr RB‟s email to the financial firm dated 29 September 2012 says: Something is bound to happen. The question is when. You have been exceptionally patient. For this, I am very grateful. I cannot expect that you can continue to support us forever. Therefore and in the meantime, I propose to pay an amount of $ 500.00 monthly, until some of the above problems are resolved. [Mrs KB] is back to her duties now that the [TC] issues fade away. This can only help in securing a decent income so that we can meet our obligations. The complainants were given a withdrawal offer, but did not accept it In October 2013 the financial firm made a conditional offer to all growers in the 2006 TC Project to withdraw from the scheme. The offer was open to 13 November 2013. The complainants did not return the offer of acceptance form despite being in arrears. I am satisfied that it was the decision of the complainants to remain in the Projects and not to have their contracts terminated. I do not accept the allegation by the complainants that the financial firm was desperate to retain them as growers. I do not accept the allegation of the complainants that the financial firm did not treat all investors the same. 5.6 Did the financial firm fail to disclose a breach of BHP? Complainant can only claim that financial firm failed to disclose breach of BHP The complainants have stated that BHP was not followed by the financial firm and they have suffered a loss as a result. The complainants have stated that if they knew that BHP was not being followed they would have terminated their ownership. AFCA has stated that we cannot hear a claim about a failure to follow BHP but only a failure to provide information. Recommendation | Case number: 529675 Page 11 of 14 Complainant did not terminate when given information on BHP The complainants letter of 28 May 2018 stated 22 ways in which the financial firm failed to meet BHP. The complaints refer as a source document, the AEP Review dated 30 October 2012. The AEP Review relied on an expert, Dr CS. The AEP Review found two thirds of the combined orchards to be in good condition. Of the remaining one third, the problems related to the development of the Projects and during the time the former RE, TC, was under administration: While there have undoubtedly been execrating circumstances, many of the issues that are present on the properties reflect the development standards of the properties. Poorly designed and developed properties with, in some cases, inadequate drainage, trees planted on flat ground (rather than mounds) or in areas that should have been known as prone to water logging, have contributed to the current state of the orchards. In addition, the underfunding of farm operations during the administration of [TC] meant critical operations were not carried out, especially in regards to canopy management, which is so critical to maintaining orchard productivity. The AEP Review does not support the allegations of the complainants that BHP has not been followed by the financial firm. The AEP Review however does state that BHP may not have been followed by TC. The complainants had information on a probable failure of BHP following the release of the AEP Review. The previous section found that the complainants had the opportunity to exit the 2006 TC Project in an offer expiring 13 November 2013. The complainants did not accept this offer. The complainants have not provided sufficient evidence that:  the financial firm failed to provide information on a breach of BHP and  the complainants would have terminated their ownership if they knew of a breach of BHP. 5.7 Are the complainants entitled to compensation? The financial firm cannot charge excessive penalty interest The previous section found that the financial firm has charged penalty interest that is excessive. The interest rate of 6% above PIC is excessive. The interest rate should not be higher than PIC. The financial firm commenced legal proceedings on 9 August 2017. The financial firm claimed $83,685.15 for fees and penalty interest relating to the 2006 TC Project. The financial firm claimed $83,907.31 for fees and penalty interest relating to the 2007 TC Project. I understand the interest charged was 6% above PIC. Recommendation | Case number: 529675 Page 12 of 14 The interest component should be adjusted and based on PIC alone. The financial firm should advise the complainants of the revised figure within seven days of the date of acceptance of this recommendation. Recommendation | Case number: 529675 Page 13 of 14 6 Supporting information 6.1 Terms of reference (OTR) Complaint falls under the financial ombudsman service (FOS) TOR The complaint was brought to FOS on 28 May 2018. FOS is the predecessor of AFCA. The TOR applicable on 28 May 2018 apply to this complaint. The complaint was brought to FOS with a number of issues which have been found to be outside our TOR. The items listed below have been excluded from this complaint. Outside TOR Explanation Performance of investment  TOR 5.1(g) excludes investment performance  Can only consider if there is non - disclosure or misrepresentation about the financial investment  Complaints allegation that the investments have performed poorly cannot be heard Management of the scheme  TOR5.1(i) excludes management of the scheme  Complaints allegation that the financial firm misrepresent ed BHP would be followed cannot be heard 6.2 Liability started when the financial firm became the responsible entity (RE) The complainants are SSS and Mr RB. The complainants invested in the growing of avocados and fruit. The investments were made through two MIS. The original responsible entity was TC. The complainants stated that the investments were:  $74,800 paid 8 May 2006 for the 2006 TC Project  $73,250 paid in instalments commencing 14 May 2007 for the 2007 TC Project  $322,300 paid in instalments commencing 26 September 2007 for the Post 2007 TC Project. The RE changed while the investments were held:  the commencing RE for the 2006 TC Project was TC  the financial firm became the RE for the 2006 TC Project on 14 October 2009  the commencing RE for the 2007 TC Project was TC  HM was the RE for the 2007 TC Project from 25 June 2009 until 3 March 2010  the financial firm became the RE for the 2007 TC Project on 3 March 2010. Recommendation | Case number: 529675 Page 14 of 14 The complainants stated that the financial firm should be responsible for the actions of the previous RE‟s. The complainants‟ representative stated in a letter dated 28 May 2018: Pursuant to Section 601FS of the Corporations Act, 2001 (Cth) (“the CAct”) [financial firm] assumed all the rights and responsibilities in relation to the projects with our clients. The AFCA approach is that a financial firm does not necessarily assume liability for the actions of previous RE‟s. The financial firm is liable for its actions from when it was appointed RE. The financial firm‟s liability commenced 14 October 2009 for the 2006 TC Project and 3 March 2010 for the 2007 TC Project. Under the Corporations Act 2001 , sections 601FS and 601GA, the financial firm acquires all the rights and liabilities TC and HM had to the extent and only to the extent those rights were acquired, and liabilities incurred, in the proper performance of TC‟s and HM‟s duties as RE. The issues raised by the complainants have only been considered to the extent that the financial firm is responsible for them. Any issues relating to events that occurred prior to 14 October 2009 (2006 TC project) or 3 March 2010 (2007 TC project), and for which the previous RE retained liability, have not been considered.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.