Insurer declined flood-related inundation claim for business contents and stock

FirmFinancial Firm (Unknown - Insurer)
Decided2019-01-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$330
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant's business contents and stock were damaged by water during the March 2017 weather event, and the insurer declined the claim as flood damage excluded under the policy. AFCA found damage up to 160mm above floor level was caused by stormwater runoff and covered, and ordered reimbursement of the $330 report fee but not legal costs.

Where rainwater runoff damaged the premises before floodwater arrived, that damage is covered, while damage caused by later flood water remains excluded.

Issues

Subjects and remedies

natural disastersmall businesspay claimpay compensationpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 529339 Page 1 of 9 Determination Case number: 529339 7 January 2019 1 Determination overview 1.1 Complaint The complainant held a business insurance policy with the financial firm (the insurer). The complainant lodged a claim under the policy, after the business premises were inundated by water on or around 30-31 March 2017, following heavy rain from ex-tropical cyclone Debbie. The insurer argues the inundation was caused by flood, which is excluded from cover under the policy. The complainant disputes this outcome and considers the inundation up to at least 160mm was caused by stormwater runoff. The complainant seeks settlement of its claim on that basis and the award of professional costs. 1.2 Issues and key findings Is the damage covered under the terms of the policy? Based on the available material, rainwater runoff caused some damage to the insured business before flood waters arrived. Accordingly, the insurer is:  required to cover loss resulting from inundation to the level of 160mm above the floor level of the premises  entitled to decline any damage above 160mm, as it would have been caused by flood waters that arrived later. Is the insurer liable for the complainant’s profess ional costs? Given the circumstances of this complaint, the insurer is to reimburse the complainant $330 for the report fee. The insurer is not liable for the complainant’s legal costs. Determination | Case number: 529339 Page 2 of 9 1.3 Determination This determination is partly in favour of the complaina nt.  The insurer is to settle the claim under the terms and conditions of the policy, in respect to loss and damage caused by inundation of water up to the level of 160mm above the floor level at the premises.  Should the insurer cash settle any aspect of the claim, it is to pay interest, in accordance with the Insurance Contracts Act 1984 (the Act), from 3 May 2017 to the date of settlement of the claim.  The insurer is to pay the complainant $330 for the report fee.  The insurer is not required to contribute to the complainant’s legal costs. Determination | Case number: 529339 Page 3 of 9 2 Reasons for determination 2.1 Is the damage covered under the terms of the policy? Complainant is not cover for flood The complainant’s policy provides cover for physical loss or damage to the insured property. The policy schedule indicates this cover is for contents and stock, which are the items in dispute. Flood is defined in the policy as: … the covering of normally dry land by water that has escaped or been released from the normal confines of: 1) any lake, or any river, creek or other natural watercourse, whether or not altered or modified; or 2) any reservoir, canal, or dam. Loss or damage caused by flood is not covered where an insured has not taken the optional cover for flood. The policy schedule does not have any indication this optional cover was taken during the policy period in which the loss occurred. This is not disputed. Complainant argues previous FOS decision should be used as precedent The exchanged material confirms there was a significant weather event across Australia during the latter part of March 2017. A substantial amount of rain fell in the area local to the complainant’s premises during that time. The insurer provided a site specific report from its hydrologist WR, dated 28 April 2017, following an inspection of the business premises on 21 April 2017. WR also provided a supplementary report on 4 July 2018, in response to information regarding the inundation at the property provided by the complainant. The complainant has provided a report from a surveyor (C) dated 13 July 2018, which indica tes the insured property’s floor level is 4.22mAHD. The complainant relies on a previous decision (488209) from the Financial Ombudsman Service (FOS), which says that inundation on the site immediately north of the subject property during the same event was caused by stormwater runoff up to 200mm above floor level. Whilst previous determinations of the Service are not binding, they may be instructive. Determination | Case number: 529339 Page 4 of 9 C says the adjoini ng property’s floor level is at 4.18mAHD. The parties disagree as to the difference in floor levels of the adjoining properties. I accept, on the balance of probabilities and based on the expertise of C as a surveyor, the difference is 40mm. The complainant relies on this information to say at least up to 160mm of the inundation was caused by stormwater runoff and should be covered accordingly. Loss up to 160mm was caused by stormwater runoff The property is located on the eastern side of L Lane. M Creek is about 400m north of the insured property. There is an open drain adjacent to the property to the east. Based on Google Maps, a tributary/drain is 180m west of the property. The same drain channel turns east just south of W Street and passes 60m north of the site. There is no specific information as to the time of initial inundation of the premises. When “W” (a representative of the complainant) arrived in the morning of 31 March 2017, the waters had already receded. As discussed in 488209, a neighbour across the road on L Lane had advised that water entered his property sometime between 12.30am and 6am on 31 March 2017. It is likely that water also inundated the complainant’s premises at or about the same time. The peak rainfall intensity of 67mm/hr was observed in the hour to 1am on 31 March. The result is that I am satisfied that the initial inundation occurred at or about the time of peak rainfall intensity. Having reviewed the exchanged material, having attended on site at the adjacent property and having attended to numerous flood disputes, I am satisfied the insured premises were impacted by rainwater before the arrival of flood waters. I make this finding based on the floor levels as reported by C, the fact there was significant rain at the time and the time of inundation being likely contemporaneous with the peak intensity of rainfall. The insurer is required to meet the complainant’s claim under the terms and conditions of the policy for the damage to the contents and stock, up to a level of 160mm above the floor level of the premises. Any inundation above this level is considered to have been caused by flood waters. The parties are to work together to establish the extent of the loss which is to be covered under the policy. Determination | Case number: 529339 Page 5 of 9 2.2 Is the insurer liable for t he complainant’s professional costs? We may award professional costs in certain circumstances The complainant seeks payment of C’s report fee and legal costs. The complainant has provided an invoice from C for $330. In its submission dated 2 July 2018, the complainant indicates no legal invoices have been issued yet but the legal fees are in the vicinity of $7,000 as of that date. For this determination, which is being issued under the FOS Terms of Refence, the award of legal costs is considered under paragraph 9.4 of the Terms of Reference and the corresponding operational guidelines where applicable. The FOS Terms of Reference provide that we may require a financial firm to contribute to a complainant’s legal costs. However, in doing so, we consider whethe r the complaint raised legal issues which reasonably required legal advice, the complexity of the complaint and whether expert assistance was genuinely required. Insurer is liable for C’s report fee but not for legal costs For this case I am satisfied the complainant required the expertise of a surveyor, in order to identify the difference in floor levels between the property the subject of this complaint and the adjacent property. This in turn assisted in identifying the level of stormwater inundation at the premises the subject of this complaint. Therefore, I am satisfied the expert assistance was genuinely required. The insurer is to reimburse the complainant $330 for C’s report fee. The FOS Operational Guidelines state we will only require a financial firm to contribute to costs after we have received proof of the amount of costs incurred and payment by the complainant. As of 2 July 2018, there is no indication of any invoices for legal costs having been issued or paid by the complainant. Accordingly, I am not satisfied there is any evidence of legal costs having been incurred by the complainant. In any case, even if there were, I am not satisfied the circumstances of the complaint were of a complex legal nature so as to warrant the contribution of legal costs. As such, the insurer is not required to contribute to the complainant’s legal costs. Determination | Case number: 529339 Page 6 of 9 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with FOS . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 Our approach There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions (which are not binding). During this complaint, the complainant has been represented by its solicitor. For the purpose of this determination, submissions made by the solicitor are treated as if they had been made by the complainant itself. Ombudsmen visited affected communities In September 2017, our ombudsmen visited affected communities in Lismore, Murwillumbah and surrounding areas. They reviewed the areas and spoke with many of the affected business owners during the visits. The visits allowed the ombudsmen to better understand the topography of the affected areas and the events leading to the inundation of properties in the areas. The knowledge gained from the visits and discussions with local business owners has been considered across all disputes in the affected communities. Determination | Case number: 529339 Page 7 of 9 Rainwater that mixes with flood water if flood The courts have established that once rainwater mixes with flood water, it is all considered flood water. Where rainwater mixes with flood water and causes damage, a flood exclusion will usually apply to defeat the claim. Accordingly, when deciding complaints, consideration has been given to whether any rainwater runoff damage occurred before the flood water arrived at the insured site. 3.3 Key points on relevant expert material Record Key points Insurer’s loss asse ssor ( CL ) Report 13 April 2017  The insured said on the morning of 1 April 2017, extensive damage was found to contents and stock. The water mark showed the level had reached about 300mm before receding. The water saturat ed all stock on the lower level shelving. All contents in contact with the ground were affected.  The insured believes runoff from the adjac ent Motorway combined with the runoff from the industrial buildings. The drainage in the industrial estate, unable to cope with the large volume of water, subsequently filled.  M Creek is located to the north of the industrial estate. In periods of heavy rain, water in M Creek backs up on the industrial estate and travels south down towards the estate.  The stock throughout is on metal shelves. The lowest shelf is about 100mm above the concrete slab. The stock is in carboard boxes on the shelves. The lower level boxes were saturated.  The weight of boxes on top of water affected boxes has caused a collaps e. These boxes have then fallen into the water.  Cont ents in contact with the ground have also been saturated. This includes office furniture, computers, telephones, welder, refrigerator, pr omotional materials and forklift. Insurer’s hydrologi st (WR ) Report 28 April 2017  The building was inundated to a depth of about 320mm above floor level. These levels are elevat ed above the street level.  M Creek flows in an easterly direction, about 400 m north of the site. In this town, M Creek drains an upstream catchment of more than 30km 2 .  Based on flood debris marks observed, M Creek (southern branch) had overflowed the B Street crossing near the intersection of B and W streets, to a maximum depth of 2m.  At this depth, M Creek floodwater would have travelled all the way east along W Street, past the property. This is consistent with observed debris marks along W Street.  Two small ill - defined tribut aries of M Creek to the south of W Street, with a total catchment area of about 50ha, flow int o a low - lying area located south of the buildings on W Street.  They then flow east through the railway embankment into an open drain, flowing north. It then turns east and eventually discharges into M Creek after crossing W Street.  Another small open drain, which picks up runoff from a small local catchment on the eastern side of the [Motorway], flows north along the eastern boundary of property and joins the other open drain just upstream of its crossing of W Determination | Case number: 529339 Page 8 of 9 Record Key points Str eet.  The floor and carpark levels of the property are elevated well above ground levels on L Lane. There is no external stormwater catchment that would drain stormwat er onto the property.  Y Creek rainfall station is the closest to the property and likely t o represent the total rainfalls at the property. It recorded a peak one hour intensity of 67mm/hr, which occurred in the hour to 1am on 31 March 2017.  Intensities for storm durations of one hour and 48 hours had a 11 - 13 year average recurrence intervals (A RI). Int ensities for storm durations of 2 - 6 hours had a 72 - 95 year ARI. Intensities for storm durations of 12 and 24 hours had a 22 - 28 year ARI.  The closest M Creek water level gauge is at B station, about 0.8km west of the site. Water levels recorded peak ed at 4.47mGH at 2.30am on 31 March 2017. The water level would have peaked at the property a short time later.  The March 2017 peak flood level at the site would be about 0.2 - 0. 4m higher than the 100 year ARI flood level.  W said he was not at the property when the inundation occurred. W arrived at about 8.30am on 31 March 2017 and the water was gone.  W has been at the property for 8 years and has not had any problems with water before. Usually, there are no issues with water during heavy rainfall.  The initi al and maximum inundation at the property was caused by floodwater overflowing from M Creek via L Lane and the open drains to the north and east of the site.  Flood levels at the nearby M Creek at B station reached the BOM “major” flood height at about 1am on 31 March 2017. Based on flood modelling, wat er from M Creek would inundate the property during a major flood event. This is consistent with what occurred during the March 2017 event.  The floor level of the building at the property is elevated above surr ounding ground levels and hence loc al catchment runoff would not have inundated it above floor level before the arrival of M Creek floodwater. Insurer’s hydrologi st (WR ) Report 4 July 2018  The insured says WR’s previous report is incorrect because FOS found that an adjoining property was inundated above floor level by stormwater runoff.  The buildings at the adjoining property are referred to as “buildings 1 - 3”.  Available LiDAR topographic data shows a ground level of about 4.2mAHD near the property and adjoining properties.  Peak inundation depths of 200 - 300mm at buildings 2 and 3 indicate a peak water level of 4.4 - 4.5mAHD at these properties. The subject property had a similar maximum depth of inundation (320mm above floor level), indicating a similar pe ak water level.  This level is very close to the observed peak flood level (4.47mAHD) at M Creek’s stream gauge located to the north of W Street.  A figure shows the extent of inundation of the area based on a level of 4.5mAHD at the M Creek stream gauge, wh ich is close to the maximum recorded level of 4.47mAHD. Flooding at this level inundates a large area and would flood buildings 1 - 3 and the subject property above floor level.  On this basis, there can be no doubt that the subject property and nearby proper ties were inundated above floor level by floodwater from M Creek.  FOS does not explain how its finding of stormwat er inundation of 200mm Determination | Case number: 529339 Page 9 of 9 Record Key points above floor level for nearby buildings was obtained.  The drainage channel on the eastern side of the property, adjacent to the [Motorway] has a catchment area of 12.3ha.  Using the rational method with a conservative high runoff coefficient of 1, and a peak rainfall intensity of 70mm/hr, the peak stormwater flow rate along the drain east of the subject property would be 2.4 m 3 /s.  The drain along the eastern boundary of the property has a triangular cross - section with a depth of about 2m and a top width of 6m, giving a cross - sectional area of about 6m 2 .  Based on a typical stormwater flow velocity of 1m/s, the drain capacity at this location would be 6m 3 /s, which is more than double the estimated peak stormwat er flood rate.  In addition, flow along the drain can overtop W Street at an elevation of 3.2mAHD, about 1m below the floor level of the property.  Based on topography and dr ainage configuration near the property, stormwat er runoff would not have exceeded the capacity of the drain adjacent to the property.  The recorded peak M Creek flood level near the property is higher than its floor level. Hence, there can be no doubt the p roperty was inundated above floor level by floodwater from M Creek.  The open channel along the eastern boundary of the property has more than sufficient capacity to carry the peak stormwat er flow rate that occurred during the event.  For the property to be inundated 200mm above floor level, the water level would have to be 4.4mAHD. Such a high water would flood essentially all the town.  For these reasons, the initial and maximum inundation of the property above floor level was caused by floodwater from M Cre ek.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.