Home / Financial Firm (Unknown - Insurer) / Determination 528653
Determination 528653
Insurer limited storm water damage claim to 70% of repair cost
Summary
The complainants' home and driveway were damaged by a failed stormwater system, and the insurer offered 70% of the repair cost, limiting its liability for contributing causes. AFCA ordered the insurer to settle the claim for $90,000 but declined to require repair of the leaking pipes.
The insurer's 70% offer did not account for the transfer of repair risk to the complainants in a cash settlement, so an additional allowance is fair, while the policy excludes repairing the item that leaked.
Issues
- Claim amount dispute primary · upheld
“The insurer is required to settle the claim in the total amount of $90,000, adding an allowance for transfer of risk beyond the 70% offer.”
- Claim denial secondary · not upheld
“The insurer is entitled to deny the claim for the cost to repair the leaking pipes, as the policy excludes the item that leaked.”
Subjects and remedies
home or building damagepay claim
Text of the determination
Determination | Case number: 528653 Page 1 of 7
Determination
Case number: 528653 3 January 2019
1 Determination overview
1.1 Complaint
The complainants have made a claim under their listed events Home Insurance
Policy, for damage at the insured property.
The financial firm (insurer) has accepted the claim but seeks to limit its liability to the
complainants as it says part of the damage is excluded from coverage under the
policy.
1.2 Issues and key findings
What is the extent of the insurer’s liability to the complainant s under the terms
of the policy?
The insurer is required to settle the complainants ’ claim in the total amount of
$90,000, to finalise its obligations to the complainants under the terms and conditions
of the policy.
1.3 Determination
This determination is partially in favour of the complainants.
The insurer is required to settle the complainants ’ claim in the total amount of
$90,000, to finalise its obligations to the complainants under the terms and conditions
of the policy.
Determination | Case number: 528653 Page 2 of 7
2 Reasons for determination
This complaint has been the subject of a recommendation issued by the Service on
13 November 2018.
It was the case analy st’s recommendation that the insurer was entitled to limit its
obligations to 70% of the total repair, in the amount of $81,086, including the driveway
repairs.
The case analyst also recommended that the insurer was not required to repair the
leaking pipes.
The complainants have disputed the recommendation.
I have carefully considered all of the material provided both before and after the
recommendation in the preparation of this determination.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
2.1 What is the extent of the insurer’s liabil ity to the complainants under the
terms and conditions of the policy?
Coverage of the policy
The coverage provided by the complainants ’ listed events Home Insurance Policy is
detailed within the Product Disclosure Statement (PDS).
The PDS details:
…
Determination | Case number: 528653 Page 3 of 7
This coverage is subject to the exclusions which are also detailed within the PDS.
The PDS details:
…
It is accepted insurance law that the complainants carry the initial onus to establish a
loss covered by the terms and conditions of the policy.
The insu rer’s obligation is to establish the application of an exclusion upon which it
seeks to rely to deny or limit the claim.
The insurer has accepted the complainants ’ claim but seeks to limit its liability, relying
upon the exclusions within the policy coverage.
The onus therefore is upon the insurer to show the application of an exclusion to limit
its liability to the complainants.
Determination | Case number: 528653 Page 4 of 7
Circumstances of the loss
The complainants contacted the insurer to lodge their claim on 8 March 2016.
As detailed by the case analyst, the complainants told the insurer that they identified
cracking and movement damage in the kitchen, meals and family room at the north-
west corner of the property.
A number of helpful photographs show flooding at the complainants’ property and it i s
clear that the stormwater drainage systems backed up and are not functioning
properly.
The complainants say that the damage at the property is the result of the failure of the
stormwater system which is covered under the listed event of water or liquid damage,
as detailed above.
The insurer accepts that there has been escape of water from the stormwater drain
which has contributed to the damage at the property, but the insurer also says that
drying tree roots and seasonal changes in moisture in the foundation material,
together with long term settlement, has contributed to the damage at the property.
The insurer appointed an engineer (HC) to advise and the complainants appointed an
engineer (SE) to advise.
I am satisfied that the recommendation provided b y the case analyst contains an
accurate summary of the findings of the two engineers, together with their
conclusions.
The case analyst included within the recommendation a helpful summary of the key
points, which I repeat here:
Expert Key points
HC The tree root drying from the large tree at the rear north - west corner accent uated the
seasonal changes in the moisture content of foundation material.
Damage not related to the blocked council drain.
Stenciled concrete paving cracking has resulted from long t erm settlement of the sub -
base.
Cracking and movement is a result of differential settlement of the footings.
Seasonal changes in the moisture content of the foundation material.
The escape of water from the storm water drain.
SE Water from storm water drains reach the foundation material, and could be
contributing to extreme changes in the moisture content of the foundation material.
Saturation of the foundation material during rainfall and the subsequent drying out of
saturated foundation material.
Defective council drainage has not allowed the storm water drainage to discharge.
The defective council drains and cracked storm water pipes have been the main
Determination | Case number: 528653 Page 5 of 7
Subsequent to the recommendation, the complainants say that their home was
insufficiently assessed by HC, as other problems were found by the insurer’s own
trades people.
The complainants understand that pipes were broken on the west side and also on
the east side, making the whole perimeter around the home subject to stormwater
damage.
It is the complainants ’ belief that the footings of the home have suffered severe
flooding over a period of time, as a result of stormwater influence, causing a number
of issues at the home.
Discussion
As detailed above, the complainants listed events Home Insurance Policy only
provides coverage for loss or damage as a result of incidents listed within the PDS.
This means that not all loss and damage is automatically covered, but rather only loss
or damage as a result of the event listed within the policy and, as also detailed above,
subject to the exclusions for coverage within the policy.
I have had the opportunity to carefully review all of the exchanged material.
Whilst there is no doubt that the failure of the stormwater system has contributed in a
substantial way to the damage at the property, on the basis of the exchanged expert
reports, I am also satisfied that excluded factors such as seasonal changes in
moisture, have contributed to the damage at the property.
In considering whether the cause of the damage is covered by the terms of the policy,
it is necessary to consider the proximate cause of the damage.
The proximate cause is the effective or dominant or operative cause of the damage.
In my view, there are two separate causes which have separately contributed to the
cause of the damage.
The failure of the stormwater system is the major cause, but drying tree roots,
seasonal changes and long-term settlement, have also contributed to the loss.
HC attributed 60% of the cracking at the home to the leaking pipes and 50% of the
damage to the driveway to the leaking pipes.
contributing factor in differential settlement of the footings.
Determination | Case number: 528653 Page 6 of 7
HC contributed the balance of the damage to tree roots, seasonal movement and
long-term settlement.
In an effort to resolve the matter, the insurer indicated it was prepared to offer
$81,586.40, being 70% of the damage at the property.
Whilst I regard the 70% assessment as reasonable, given the respective expert
reports and their conclusions, I am also concerned that the result of a cash settlement
is that the risks associated with repairs are transferred from the insurer to the
complainants.
In my view, it is fair that any offer contains an allowance for this transference of risk.
I do not accept that the increase in the percentage offered from 60% for the home a nd
50% for the driveway, to 70%, takes account of this transfer of risk.
In my view, based on the expert reports exchanged, the insurer’s obligation to the
complainants under the terms of the policy, is in respect of 70% of the damage
caused.
Thus, an additional amount needs to be paid to account for this transfer of the risk.
I am satisfied that in the circumstances of this complaint and given the exchanged
material, it is fair that the insurer pays the complainants the total amount of $90,000 to
finalise its obligations to the complainants under the terms and conditions of the
policy. This amount accounts for both the damage at the property and the driveway.
Given that an additional allowance has been made for the transfer of the risk, I am
satisfied that interest is not payable on this amount.
Repair of the damaged pipes
The policy coverage, detailed above, makes it clear that the policy does not cover the
cost of repairing the item that caused the escape of water or liquid.
In my view, the insurer is entitled to deny the complainants’ claim f or the cost to repair
the pipes.
Determination | Case number: 528653 Page 7 of 7
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.