Text of the determination
Determination | Case number: 528590 Page 1 of 11
Determination
Case number: 528590 16 January 2019
1 Determination overview
1.1 Complaint
The complainants hold a pleasure craft policy with the financial firm (insurer).
On 10 February 2017, the mast of the yacht failed suddenly and unexpectedly in two
places. The complainants lodged a claim with the insurer, who assessed the damage
and subsequently denied the claim. In doing so, their expert says the mast failed due
to the corrosion of the rigging.
The complainants disagree and seek compensation for the loss.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
Yes. The insurer is entitled to deny the claim on the following grounds:
the complainants have established a valid claim
the metallurgist established the failure was due to fatigue crack associated and
caused by a corrosion pit
the policy expressly excludes corrosion.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to take any further action.
Determination | Case number: 528590 Page 2 of 11
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim?
Complainants have established a valid claim for accidental damage
The complainants are required to show that, on the balance of probabilities, they have
suffered a loss caused by a risk insured against under the policy. This is known as a
valid (or prima facie ) claim.
If the complainants are able to establish a valid claim, then the onus shifts to the
insurer. In such a case the insurer must show, on the balance of probabilities, it is
entitled to:
rely on an exclusion under the policy, or
is otherwise entitled to deny the claim.
The complainants’ policy provides cover f or all risks of physical loss of or damage to
the vessel occurring during the Policy Period subject to the terms, conditions and
exclusions of the policy.
On 10 February 2017, while racing the vessel’s mast broke suddenly in two places.
Given the policy’s broad scope of cover, the panel is satisfied the complainants have
established a valid claim under the policy.
Accordingly, it falls to the insurer to demonstrate, on the balance of probabilities, the
cause of the disputed damage was a factor the policy excludes or it is otherwise
entitled to deny the claim.
The insurer’s liability depends on the proximate cause
In order to determine whether the complainants’ claim falls within the policy, it is
necessary to determine the proximate cause of the loss. What is the proximate cause
of the loss is the question of fact depending upon the circumstances of each case.
It is well established that a proximate cause is not necessarily the first or last or the
sole cause of the loss. It is the effective or dominant or operative cause of the loss. If
there are several causes operating contemporaneously, then each must be examined
for the qualities of predominance and efficiency as the active efficient cause that sets
a relevant train of events in motion.
Courts have said that if one cause would have resulted in the harm in any case and
the other would not have done so in the absence of the first, then the first is the
proximate cause.
Determination | Case number: 528590 Page 3 of 11
The mast was subject to previous dye penetrant testing
The complainants tendered an expert report from shipwright (BT). In the report, BT
says on 2 June 2016 he commenced maintenance work on the subject vessel.
The report outlines the detailed works which BT carried out on the vessel. Relevantly
to the complaint, the cold moulded heads and tip cups on each stay were inspected
using Dye Penetrant Testing (DPT) on 8 June 2016. No visible defects were detected
during this testing process. The complainants say the testing was undertaken in the
D2 stay rod, the area which ultimately failed.
BT says at the time of the dye test, a small section of aluminium covering performed
bend in the rod showed considerable corrosion. Subsequently, BT sent the rod for
further testing. An x-ray test was performed on the two stays where no defects were
noted in the rod rigging beneath the aluminium section.
BT asserts while the rigging was inspected, the mast and boom were re -sprayed and
all fittings were installed using corrosion eliminating treatment. The panel notes this
report was compiled post the loss outlining the maintenance works and due diligence
checks on the racing vessel which was done approximately eight months prior to the
loss.
The complainants say in 2015 the rig testing was a pre-policy inception requirement;
the complainants carried out testing and subsequently the insurer accepted insuring
the vessel. The complainants say the insurer should cover the loss as they have
fulfilled the policy condition.
The complainants provided reports showing the mast was fully inspected in 2014
using DPT and tendered a tax invoice for the work carried out. The complainants say
the test concluded there were no signs of corrosion or reportable defects. Having
reviewed the invoice, the panel notes the dye test was conducted on ‘cracks’. Whilst
the invoice outlines the work which was carried out, it does not report on the condition
of the subject mast.
Relevantly, BT says in June 2016 it tested the cold moulded heads and tip cups on
the stay; there is no mention of the stays having been DPT tested. The complainants
have provided the invoices for the work carried out.
The vessel was subject to a standing ringing backstay failure in October 2016
The complainants say, on 20 October 2016 whilst under full racing load, the standing
ringing backstay has failed suddenly. The complainants say this incident would have
resulted in considerable shock loading to the mast standing rigging.
The complainants did not proceed with their claim for the above incident as the
resultant damage was less than the policy’s deductable. The panel no tes the
Determination | Case number: 528590 Page 4 of 11
complainants tendered an invoice for repairs totalling $987.50, however, it is dated
2 October 2014, being approximately two years prior to this event.
The panel notes the causation for this failure is unknown. Further, the complainants
say such an event would have contributed to and caused the loss subject to this
complaint. The complainants say the incident on 20 October 2016 induced severe
stress into the port side D2 stay initiating a crack, which then failed, creating the
sudden and unexpected failure in February 2017. The complainants did not provide
any substantiation to their proposed theory.
The insurer’s engineer establishes corrosion to be the proximate cause
Following the loss, the insurer engaged a metallurgist (EC). In his metallurgy report
EC says:
examination of the fracture surface revealed the presence of beachlines which
extended to 20 percent of the stay
the origin of the beachlines was associated with a corrosion pit on the surface of
the stay
the balance of the fracture was a fast fracture region.
In addressing the beachlines, EC says it is a typical fatigue failure where it had
initiated from a surface corrosion pit. Given the fatigue crack, the stay was no longer
capable of withstanding the operating load, hence the rest of the fracture was fast in
nature.
Further, there is a secondary crack progressed the same distance into the section of
the stay as was the depth of the beachlines on the main failure.
In addressing the proximate cause of the damage, EC says the stay failed from
fatigue initiated from a corrosion pit on the surface.
The complainants say the rod was examined more than two weeks following its
immersion into salt water and therefore the corrosion started following the incident,
not before.
Given the question of fact in this dispute is the proximate cause and whether it falls
within a policy’s exclusion or not, AFCA requested further comments and clarification
from EC regarding the delays in the assessment.
In his exchanged response, EC says:
the two weeks in the assessment may have resulted in oxidation of the fractured
surface after the failure, however, it did not result in the formation of the corrosion
pit
the subject pit was present prior to the failure
Determination | Case number: 528590 Page 5 of 11
the nitronic 50 material has good corrosion resistance and therefore being in the
water for two weeks is not expected to have shown any significant level of
corrosion
the failure was from a fatigue which was a progressive crack growth mechanism
and requires a notch such as the corrosion pit to initiate
the fracture surface observed would not have occurred whilst the stay was in water
for a period of two weeks as it would not have been under load.
In addressing the nature of the corrosion as to whether it was gradual or sudden, EC
says the corrosion pit would have occurred over a period of time until such point the
size became sufficient for the fatigue crack to initiate.
EC says it is possible the failure could have developed between when BT inspected
the mast in 2016 and the date of the loss. Or conversely, the DPT testing done in
2016 was not done correctly and the subject testing did not detect the corrosion pit.
The complainants refuted EC’s findings and say EC is not qualified to carry out the
inspections and his opinion is questionable. In saying this, the complainants did not
provide any expert report discrediting EC’s findings. In the absence of any other
information, the panel is satisfied EC has established the mechanism of damage and
the causation chain.
The complainants say they were not provided with the tested sample
In outlining the testing procedure, EC says microstructural examination was
performed by sectioning with a water-cooled saw. The complainants say they were
not given the opportunity to have their own suitably qualified expert to make an
independent examination of the sectioned portion of the failed rod on which EC
conducted the testing.
It is not in dispute the insurer provided the damaged rod which was hand delivered to
BT on 7 April 2017.
In his report, EC says:
there was no 100-mm section of the mast stay supplied for testing
the microstructural specimen was returned with the stay
the specimens are not mounted.
Further, EC says there are two fracture surfaces of the same failure and only one side
needed to be investigated. The second fracture surface is saved for future
investigations. The complainants further assert even if they were given the
opportunity, it would be difficult to draw or reach a conclusion.
The panel does not consider the complainants’ position was prejudiced for the
following reasons:
Determination | Case number: 528590 Page 6 of 11
there is no evidence to suggest the other end of the rod was not available
the photographic evidence included in EC’s initial reports shows the beachlines,
corrosion pit and the secondary crack.
Further, the complainants raised concerns regarding EC’s qu alifications. The
complainants say EC is not NATA (National Association of Testing Authorities)
accredited. In addressing the complainants’ concern, EC says NATA ensures
organisations comply with relevant international and Australian standards.
EC says no company holds NATA accreditation for failure analysis of the engineering
component. Relevantly, BT who performed the dye testing, does not hold NATA
accreditation. The panel does not accept such argument.
The policy does not define corrosion
In order to determine whether the relevant exclusion clauses are applicable, it is
necessary to examine the intent and meaning of the clauses. The insurer is seeking
to rely on a policy’s exclusion of any loss or damage, rust, corrosion, oxidation or
gradual deterioration.
The complainants say the policy does not define the word corrosion and therefore
questions the intention of the word’s usage in the context of the exclusion the insurer
seeks to rely on. AFCA will not apply overly technical or jargonistic interpretations of
words and phrases, in contradiction to their standard and commonly understood
meanings, unless there is good reason to do so. This approach is consistent with that
of the courts.
The policy does not define the word corrosion. Therefore, the expressions take its
natural and ordinary meaning, considered in the context of the policy as a whole. The
Macquarie dictionary (onli ne edition), defines the word to mean ‘ the act or process of
corroding.
Macquarie dictionary defines corrode as ‘ chemistry to eat away (gradually) the
surface of a solid, especially of metals, by chemical action ’. The definition implies the
process is gradual in nature and not sudden.
‘Corrosion’ in the context of the clause
The meaning of ‘corrosion’ in the c lause cited by the insurer must be interpreted in the
context of the clause. The expression appears in the middle of the clause, followed by
‘oxidation’ and ‘gradual deterioration’.
The listed terms following corrosion all refer to damage that would be expected to
accrue over time in the absence of any damage caused by extraordinary or
unforeseen event. The term ’corrosion’ should be interpreted as referring to the same
type of damage.
Determination | Case number: 528590 Page 7 of 11
There is no evidence to show the damage to the complainants’ mast was caused by
an external extraordinary and unforeseen event and is beyond the depreciation that
would be expected to occur in the ordinary course of events. Given the definition
above, the panel accepts the claimed damage falls within the ‘corrosion’ clause cited
by the insurer.
The insurer is entitled to rely on the policy’s exclusion
The panel has carefully considered the arguments, exchanged information and expert
reports. As outlined above, the panel is satisfied the complainants have established a
valid claim given the policy’s scope of cover.
The panel notes the complainants have provided the comprehensive history of all the
testing and maintenance work they carried out to the vessel. In saying this, there is no
dispute the vessel was neither not well maintained nor the complain ants’ failed to take
reasonable care of it. Further, it is not in dispute nitronic 50 being the material of the
subject mast is stress corrosion resistant.
The panel accepts the failure of the mast was sudden and unforeseeable. Further, the
panel considers the complainants made every reasonable effort to maintain the rig
and eliminate any risk or possible damage. The panel notes the corrosion was only
identified through a microscopic investigation.
In saying this, the panel accepts EC has established the proximate cause of the
failure, being the corrosion pit initiating the fatigue crack. The panel finds EC’s reports
and comments logical, persuasive and conclusive. The panel notes the following:
the origin of the beachlines was associated with a corrosion pit on the surface of
the stay
the beachlines are typical of a fatigue failure
a secondary crack observed associated with a corrosion pit
EC established the causation chain.
Further, the panel accepts the corrosion occurred during its normal course of events,
and it follows the resultant loss falls within the policy’s exclusion.
The panel notes the complainants’ argument the events of 20 October 2016 might
have contributed and jeopardised the integrity of the mast. In considering this
argument, the panel does not accept such incident to be the proximate cause of the
damage.
Whilst the complainants do not accept the corrosion to be the proximate cause of the
damage, they did not provide any expert evidence to refute EC’s findings. The
complainants say EC did not date the fatigue crack and therefore EC’s argument
should be disregarded. The panel does not consider such proposition as compelling.
Whilst the exchanged information does not date the corrosion, the panel does not
Determination | Case number: 528590 Page 8 of 11
consider it imperative. The panel, ho wever, notes EC described the crack as
progressive.
Relevantly, the complainants provided a comparative test to another rig where it has
taken two years for the pit to form. Further, the complainants say it is highly
improbable the corrosion pit would have been developed since the DPT was carried
out.
Conversely, the complainants say the corrosion on the rod would have developed in
the delayed assessment two weeks period. The policy expressly excludes corrosion
regardless of whether it was gradual or sudde n. In saying this, the panel accepts the
corrosion could have developed following the DPT conducted in 2016.
The panel accepts the insurer is entitled to deny the claim and is not required to take
any further action.
Determination | Case number: 528590 Page 9 of 11
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
a pplicant complainant
financial services provider financial firm
dispute complaint
claim claim
AFCA approach to this dispute
We prioritised this dispute in line with the Operational Guidelines of our Terms of
Reference because of the nature of this dispute. It has progressed directly to a
determination by a panel, consisting of an Ombudsman, and advocates with
extensive experience in consumer complaints, and insurance industry practice.
We shared all information in this determination with the parties, and the parties had
the opportunity to respond. We also reviewed all material supplied in response to
make our determination. While the parties raised many issues, we have only
commented on those directly relevant.
We decided this dispute on its merits, considering the relevant law, good industry
practice, codes of practice, and previous AFCA decisions where relevant.
3.2 Policy Wording
This insurance does not cover:
1. Any loss or damage directly or indirectly caused by osmosis, blistering,
fibreglass or surface coat blistering, electrolysis, rust, corrosion, oxidation, rot,
fungus, mould, infestation, change of temperature or humidity, gradual
deterioration or inhere nt vice;’
Determination | Case number: 528590 Page 10 of 11
3.3 Specific Terms
Term Meaning
Corrosion 1. the act or process of corroding.
2. corroded condition.
3. a product of corroding, as rust
corrode 1. to eat away gradually as if by gnawing.
2. chemistry to eat away the surfac e of a solid, especially of metals, by
chemical action.
3. to impair; deteriorate
4. to become corroded, as by oxidisation.
3.4 Key Documents
Record Key points
Financial Firm ’s metallurgist
( EC )
31 - 03 - 2017
Examination of the fracture surface revealed the presence of beachlines
which extended approximately 20 % across the section of the stay
No areas of mechanical damage were observed on the stay to suggest a
prior incident had contributed to the failure
The balance of the fracture was a fast fracture region with a shear lip at
the final fracture area
Examination of the fracture surface indicated the presence of beachlines
which had originated from a corrosion pit on the surface and progressed
approximately 20 % across the section of the stay
Beachlines are typical of a fatigue failure and in this case which had
initiated from a surface corrosion pit
The balance of the fracture was fast fracture because of the fatigue crack
having reached a critical size and th e stay no longer being capable of
withstanding the operating loads. The final failure region of the fracture
possessed a shear lip.
A secondary fatigue crack was observed below the fracture surface and
was associated with a corrosion pit
The secondary crac k had progressed the same distance into the section
of the stay as was the depth of the beachlines on the main failure
It was concluded that the stay had failed from fatigue initiated from a
corrosion pit on the surface.
Financial Firm’s M arine
C onsultant (CMC)
04 - 04 - 2017
Bureau of Meteorology have verified ESE wind gusts of up to 26 knots (48
km/h) have been recorded in the area at the time of the loss on 10/02/17
M ast damage consistent with the mast having collapsed whilst the vessel
was under sail
Base d on our on - site assessment, we can confirm that mast, some
running rigging, standing rigging and associated wiring/electrics have all
been damaged beyond repair
The vessel’s port side D2 stay wire swage has failed approximately 50
millimetres below the ri gging cup that connects to the mast just below the
upper spreader bar
Further to the Insured’s above statement, the Insured has presented a
report from BH dated 20/02/2017 that details the work scope carried out
Determination | Case number: 528590 Page 11 of 11
Record Key points
by their workshop in June 2016. We note that the report confirms that dye
penetrant testing (DPT) was carried out to the failed D2 stay wire in the
section that has since failed.
The corrosion detailed by EC is as either of two alternatives:
The corrosion was not detected by dye testing in June 2016 as the testing
was not performed properly.
The corrosion has developed after June 2016 and the testing in June
2016 did not reveal corrosion as it was not prevalent at that time.
Financial Firm ’s metallurgist
(EC)
Supplementary Comments
05 - 07 - 2018
The two weeks delay in the assessment may have resulted in oxidation of
the fracture surface after the failure but did not result in the formation of
the corrosion pit that was present prior to the failure
The failure was from fatigue which is a progressive crack growth
mechanism and requires a notch (such as the corrosion pit) to comm ence
initiation and propagation
The fracture surface observed would not have occurred whilst the stay
was in the water for a period of two weeks because it would not have
been u nder load nor would there have been any cy clic loading during this
period
The cause of the failure is the corrosion pit the mode of failure is fatigue
which initiated from the pit
I hold this view based on the fracture topography and the fact that the
beac hlines which are a characteristic of fatigue failure have emanated
from the corrosion pit which was present on the surface of the rod
The corrosion pit formation would have occurred over a period of time
until such point that the size became sufficient for the fatigue crack to
initiate
No as in 2016 the corrosion pit may have not been evident during the test
and therefore not detected. It may have been shallow in depth at the time
of the inspection and therefore would not have been detected
The failure was not sudden but had occurred over a period of time which
cannot be determine accurately but would have between the time MIS
inspected the stay and the failure, this is because it is a progressive
failure mechanism which occurs in a cyclic manner
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.