Yacht mast failure claim declined for corrosion exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2019-01-16
ProductGeneral Insurance · Boat
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants' yacht mast failed suddenly and the insurer declined the all-risks claim, attributing the failure to corrosion. AFCA found a corrosion pit was the proximate cause and the policy's corrosion exclusion applied, so the insurer was entitled to deny the claim.

The policy's corrosion exclusion applies whether corrosion is gradual or sudden, and the insurer's metallurgist established the causation chain from a corrosion pit to fatigue failure.

Issues

Subjects and remedies

no remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 528590 Page 1 of 11 Determination Case number: 528590 16 January 2019 1 Determination overview 1.1 Complaint The complainants hold a pleasure craft policy with the financial firm (insurer). On 10 February 2017, the mast of the yacht failed suddenly and unexpectedly in two places. The complainants lodged a claim with the insurer, who assessed the damage and subsequently denied the claim. In doing so, their expert says the mast failed due to the corrosion of the rigging. The complainants disagree and seek compensation for the loss. 1.2 Issues and key findings Is the insurer entitled to deny the claim? Yes. The insurer is entitled to deny the claim on the following grounds:  the complainants have established a valid claim  the metallurgist established the failure was due to fatigue crack associated and caused by a corrosion pit  the policy expressly excludes corrosion. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action. Determination | Case number: 528590 Page 2 of 11 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? Complainants have established a valid claim for accidental damage The complainants are required to show that, on the balance of probabilities, they have suffered a loss caused by a risk insured against under the policy. This is known as a valid (or prima facie ) claim. If the complainants are able to establish a valid claim, then the onus shifts to the insurer. In such a case the insurer must show, on the balance of probabilities, it is entitled to:  rely on an exclusion under the policy, or  is otherwise entitled to deny the claim. The complainants’ policy provides cover f or all risks of physical loss of or damage to the vessel occurring during the Policy Period subject to the terms, conditions and exclusions of the policy. On 10 February 2017, while racing the vessel’s mast broke suddenly in two places. Given the policy’s broad scope of cover, the panel is satisfied the complainants have established a valid claim under the policy. Accordingly, it falls to the insurer to demonstrate, on the balance of probabilities, the cause of the disputed damage was a factor the policy excludes or it is otherwise entitled to deny the claim. The insurer’s liability depends on the proximate cause In order to determine whether the complainants’ claim falls within the policy, it is necessary to determine the proximate cause of the loss. What is the proximate cause of the loss is the question of fact depending upon the circumstances of each case. It is well established that a proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss. If there are several causes operating contemporaneously, then each must be examined for the qualities of predominance and efficiency as the active efficient cause that sets a relevant train of events in motion. Courts have said that if one cause would have resulted in the harm in any case and the other would not have done so in the absence of the first, then the first is the proximate cause. Determination | Case number: 528590 Page 3 of 11 The mast was subject to previous dye penetrant testing The complainants tendered an expert report from shipwright (BT). In the report, BT says on 2 June 2016 he commenced maintenance work on the subject vessel. The report outlines the detailed works which BT carried out on the vessel. Relevantly to the complaint, the cold moulded heads and tip cups on each stay were inspected using Dye Penetrant Testing (DPT) on 8 June 2016. No visible defects were detected during this testing process. The complainants say the testing was undertaken in the D2 stay rod, the area which ultimately failed. BT says at the time of the dye test, a small section of aluminium covering performed bend in the rod showed considerable corrosion. Subsequently, BT sent the rod for further testing. An x-ray test was performed on the two stays where no defects were noted in the rod rigging beneath the aluminium section. BT asserts while the rigging was inspected, the mast and boom were re -sprayed and all fittings were installed using corrosion eliminating treatment. The panel notes this report was compiled post the loss outlining the maintenance works and due diligence checks on the racing vessel which was done approximately eight months prior to the loss. The complainants say in 2015 the rig testing was a pre-policy inception requirement; the complainants carried out testing and subsequently the insurer accepted insuring the vessel. The complainants say the insurer should cover the loss as they have fulfilled the policy condition. The complainants provided reports showing the mast was fully inspected in 2014 using DPT and tendered a tax invoice for the work carried out. The complainants say the test concluded there were no signs of corrosion or reportable defects. Having reviewed the invoice, the panel notes the dye test was conducted on ‘cracks’. Whilst the invoice outlines the work which was carried out, it does not report on the condition of the subject mast. Relevantly, BT says in June 2016 it tested the cold moulded heads and tip cups on the stay; there is no mention of the stays having been DPT tested. The complainants have provided the invoices for the work carried out. The vessel was subject to a standing ringing backstay failure in October 2016 The complainants say, on 20 October 2016 whilst under full racing load, the standing ringing backstay has failed suddenly. The complainants say this incident would have resulted in considerable shock loading to the mast standing rigging. The complainants did not proceed with their claim for the above incident as the resultant damage was less than the policy’s deductable. The panel no tes the Determination | Case number: 528590 Page 4 of 11 complainants tendered an invoice for repairs totalling $987.50, however, it is dated 2 October 2014, being approximately two years prior to this event. The panel notes the causation for this failure is unknown. Further, the complainants say such an event would have contributed to and caused the loss subject to this complaint. The complainants say the incident on 20 October 2016 induced severe stress into the port side D2 stay initiating a crack, which then failed, creating the sudden and unexpected failure in February 2017. The complainants did not provide any substantiation to their proposed theory. The insurer’s engineer establishes corrosion to be the proximate cause Following the loss, the insurer engaged a metallurgist (EC). In his metallurgy report EC says:  examination of the fracture surface revealed the presence of beachlines which extended to 20 percent of the stay  the origin of the beachlines was associated with a corrosion pit on the surface of the stay  the balance of the fracture was a fast fracture region. In addressing the beachlines, EC says it is a typical fatigue failure where it had initiated from a surface corrosion pit. Given the fatigue crack, the stay was no longer capable of withstanding the operating load, hence the rest of the fracture was fast in nature. Further, there is a secondary crack progressed the same distance into the section of the stay as was the depth of the beachlines on the main failure. In addressing the proximate cause of the damage, EC says the stay failed from fatigue initiated from a corrosion pit on the surface. The complainants say the rod was examined more than two weeks following its immersion into salt water and therefore the corrosion started following the incident, not before. Given the question of fact in this dispute is the proximate cause and whether it falls within a policy’s exclusion or not, AFCA requested further comments and clarification from EC regarding the delays in the assessment. In his exchanged response, EC says:  the two weeks in the assessment may have resulted in oxidation of the fractured surface after the failure, however, it did not result in the formation of the corrosion pit  the subject pit was present prior to the failure Determination | Case number: 528590 Page 5 of 11  the nitronic 50 material has good corrosion resistance and therefore being in the water for two weeks is not expected to have shown any significant level of corrosion  the failure was from a fatigue which was a progressive crack growth mechanism and requires a notch such as the corrosion pit to initiate  the fracture surface observed would not have occurred whilst the stay was in water for a period of two weeks as it would not have been under load. In addressing the nature of the corrosion as to whether it was gradual or sudden, EC says the corrosion pit would have occurred over a period of time until such point the size became sufficient for the fatigue crack to initiate. EC says it is possible the failure could have developed between when BT inspected the mast in 2016 and the date of the loss. Or conversely, the DPT testing done in 2016 was not done correctly and the subject testing did not detect the corrosion pit. The complainants refuted EC’s findings and say EC is not qualified to carry out the inspections and his opinion is questionable. In saying this, the complainants did not provide any expert report discrediting EC’s findings. In the absence of any other information, the panel is satisfied EC has established the mechanism of damage and the causation chain. The complainants say they were not provided with the tested sample In outlining the testing procedure, EC says microstructural examination was performed by sectioning with a water-cooled saw. The complainants say they were not given the opportunity to have their own suitably qualified expert to make an independent examination of the sectioned portion of the failed rod on which EC conducted the testing. It is not in dispute the insurer provided the damaged rod which was hand delivered to BT on 7 April 2017. In his report, EC says:  there was no 100-mm section of the mast stay supplied for testing  the microstructural specimen was returned with the stay  the specimens are not mounted. Further, EC says there are two fracture surfaces of the same failure and only one side needed to be investigated. The second fracture surface is saved for future investigations. The complainants further assert even if they were given the opportunity, it would be difficult to draw or reach a conclusion. The panel does not consider the complainants’ position was prejudiced for the following reasons: Determination | Case number: 528590 Page 6 of 11  there is no evidence to suggest the other end of the rod was not available  the photographic evidence included in EC’s initial reports shows the beachlines, corrosion pit and the secondary crack. Further, the complainants raised concerns regarding EC’s qu alifications. The complainants say EC is not NATA (National Association of Testing Authorities) accredited. In addressing the complainants’ concern, EC says NATA ensures organisations comply with relevant international and Australian standards. EC says no company holds NATA accreditation for failure analysis of the engineering component. Relevantly, BT who performed the dye testing, does not hold NATA accreditation. The panel does not accept such argument. The policy does not define corrosion In order to determine whether the relevant exclusion clauses are applicable, it is necessary to examine the intent and meaning of the clauses. The insurer is seeking to rely on a policy’s exclusion of any loss or damage, rust, corrosion, oxidation or gradual deterioration. The complainants say the policy does not define the word corrosion and therefore questions the intention of the word’s usage in the context of the exclusion the insurer seeks to rely on. AFCA will not apply overly technical or jargonistic interpretations of words and phrases, in contradiction to their standard and commonly understood meanings, unless there is good reason to do so. This approach is consistent with that of the courts. The policy does not define the word corrosion. Therefore, the expressions take its natural and ordinary meaning, considered in the context of the policy as a whole. The Macquarie dictionary (onli ne edition), defines the word to mean ‘ the act or process of corroding. Macquarie dictionary defines corrode as ‘ chemistry to eat away (gradually) the surface of a solid, especially of metals, by chemical action ’. The definition implies the process is gradual in nature and not sudden. ‘Corrosion’ in the context of the clause The meaning of ‘corrosion’ in the c lause cited by the insurer must be interpreted in the context of the clause. The expression appears in the middle of the clause, followed by ‘oxidation’ and ‘gradual deterioration’. The listed terms following corrosion all refer to damage that would be expected to accrue over time in the absence of any damage caused by extraordinary or unforeseen event. The term ’corrosion’ should be interpreted as referring to the same type of damage. Determination | Case number: 528590 Page 7 of 11 There is no evidence to show the damage to the complainants’ mast was caused by an external extraordinary and unforeseen event and is beyond the depreciation that would be expected to occur in the ordinary course of events. Given the definition above, the panel accepts the claimed damage falls within the ‘corrosion’ clause cited by the insurer. The insurer is entitled to rely on the policy’s exclusion The panel has carefully considered the arguments, exchanged information and expert reports. As outlined above, the panel is satisfied the complainants have established a valid claim given the policy’s scope of cover. The panel notes the complainants have provided the comprehensive history of all the testing and maintenance work they carried out to the vessel. In saying this, there is no dispute the vessel was neither not well maintained nor the complain ants’ failed to take reasonable care of it. Further, it is not in dispute nitronic 50 being the material of the subject mast is stress corrosion resistant. The panel accepts the failure of the mast was sudden and unforeseeable. Further, the panel considers the complainants made every reasonable effort to maintain the rig and eliminate any risk or possible damage. The panel notes the corrosion was only identified through a microscopic investigation. In saying this, the panel accepts EC has established the proximate cause of the failure, being the corrosion pit initiating the fatigue crack. The panel finds EC’s reports and comments logical, persuasive and conclusive. The panel notes the following:  the origin of the beachlines was associated with a corrosion pit on the surface of the stay  the beachlines are typical of a fatigue failure  a secondary crack observed associated with a corrosion pit  EC established the causation chain. Further, the panel accepts the corrosion occurred during its normal course of events, and it follows the resultant loss falls within the policy’s exclusion. The panel notes the complainants’ argument the events of 20 October 2016 might have contributed and jeopardised the integrity of the mast. In considering this argument, the panel does not accept such incident to be the proximate cause of the damage. Whilst the complainants do not accept the corrosion to be the proximate cause of the damage, they did not provide any expert evidence to refute EC’s findings. The complainants say EC did not date the fatigue crack and therefore EC’s argument should be disregarded. The panel does not consider such proposition as compelling. Whilst the exchanged information does not date the corrosion, the panel does not Determination | Case number: 528590 Page 8 of 11 consider it imperative. The panel, ho wever, notes EC described the crack as progressive. Relevantly, the complainants provided a comparative test to another rig where it has taken two years for the pit to form. Further, the complainants say it is highly improbable the corrosion pit would have been developed since the DPT was carried out. Conversely, the complainants say the corrosion on the rod would have developed in the delayed assessment two weeks period. The policy expressly excludes corrosion regardless of whether it was gradual or sudde n. In saying this, the panel accepts the corrosion could have developed following the DPT conducted in 2016. The panel accepts the insurer is entitled to deny the claim and is not required to take any further action. Determination | Case number: 528590 Page 9 of 11 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term a pplicant complainant financial services provider financial firm dispute complaint claim claim AFCA approach to this dispute We prioritised this dispute in line with the Operational Guidelines of our Terms of Reference because of the nature of this dispute. It has progressed directly to a determination by a panel, consisting of an Ombudsman, and advocates with extensive experience in consumer complaints, and insurance industry practice. We shared all information in this determination with the parties, and the parties had the opportunity to respond. We also reviewed all material supplied in response to make our determination. While the parties raised many issues, we have only commented on those directly relevant. We decided this dispute on its merits, considering the relevant law, good industry practice, codes of practice, and previous AFCA decisions where relevant. 3.2 Policy Wording This insurance does not cover: 1. Any loss or damage directly or indirectly caused by osmosis, blistering, fibreglass or surface coat blistering, electrolysis, rust, corrosion, oxidation, rot, fungus, mould, infestation, change of temperature or humidity, gradual deterioration or inhere nt vice;’ Determination | Case number: 528590 Page 10 of 11 3.3 Specific Terms Term Meaning Corrosion 1. the act or process of corroding. 2. corroded condition. 3. a product of corroding, as rust corrode 1. to eat away gradually as if by gnawing. 2. chemistry to eat away the surfac e of a solid, especially of metals, by chemical action. 3. to impair; deteriorate 4. to become corroded, as by oxidisation. 3.4 Key Documents Record Key points Financial Firm ’s metallurgist ( EC ) 31 - 03 - 2017  Examination of the fracture surface revealed the presence of beachlines which extended approximately 20 % across the section of the stay  No areas of mechanical damage were observed on the stay to suggest a prior incident had contributed to the failure  The balance of the fracture was a fast fracture region with a shear lip at the final fracture area  Examination of the fracture surface indicated the presence of beachlines which had originated from a corrosion pit on the surface and progressed approximately 20 % across the section of the stay  Beachlines are typical of a fatigue failure and in this case which had initiated from a surface corrosion pit  The balance of the fracture was fast fracture because of the fatigue crack having reached a critical size and th e stay no longer being capable of withstanding the operating loads. The final failure region of the fracture possessed a shear lip.  A secondary fatigue crack was observed below the fracture surface and was associated with a corrosion pit  The secondary crac k had progressed the same distance into the section of the stay as was the depth of the beachlines on the main failure  It was concluded that the stay had failed from fatigue initiated from a corrosion pit on the surface. Financial Firm’s M arine C onsultant (CMC) 04 - 04 - 2017  Bureau of Meteorology have verified ESE wind gusts of up to 26 knots (48 km/h) have been recorded in the area at the time of the loss on 10/02/17  M ast damage consistent with the mast having collapsed whilst the vessel was under sail  Base d on our on - site assessment, we can confirm that mast, some running rigging, standing rigging and associated wiring/electrics have all been damaged beyond repair  The vessel’s port side D2 stay wire swage has failed approximately 50 millimetres below the ri gging cup that connects to the mast just below the upper spreader bar  Further to the Insured’s above statement, the Insured has presented a report from BH dated 20/02/2017 that details the work scope carried out Determination | Case number: 528590 Page 11 of 11 Record Key points by their workshop in June 2016. We note that the report confirms that dye penetrant testing (DPT) was carried out to the failed D2 stay wire in the section that has since failed.  The corrosion detailed by EC is as either of two alternatives:  The corrosion was not detected by dye testing in June 2016 as the testing was not performed properly.  The corrosion has developed after June 2016 and the testing in June 2016 did not reveal corrosion as it was not prevalent at that time. Financial Firm ’s metallurgist (EC) Supplementary Comments 05 - 07 - 2018  The two weeks delay in the assessment may have resulted in oxidation of the fracture surface after the failure but did not result in the formation of the corrosion pit that was present prior to the failure  The failure was from fatigue which is a progressive crack growth mechanism and requires a notch (such as the corrosion pit) to comm ence initiation and propagation  The fracture surface observed would not have occurred whilst the stay was in the water for a period of two weeks because it would not have been u nder load nor would there have been any cy clic loading during this period  The cause of the failure is the corrosion pit the mode of failure is fatigue which initiated from the pit  I hold this view based on the fracture topography and the fact that the beac hlines which are a characteristic of fatigue failure have emanated from the corrosion pit which was present on the surface of the rod  The corrosion pit formation would have occurred over a period of time until such point that the size became sufficient for the fatigue crack to initiate  No as in 2016 the corrosion pit may have not been evident during the test and therefore not detected. It may have been shallow in depth at the time of the inspection and therefore would not have been detected  The failure was not sudden but had occurred over a period of time which cannot be determine accurately but would have between the time MIS inspected the stay and the failure, this is because it is a progressive failure mechanism which occurs in a cyclic manner

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.