Misleading conduct on construction loan and build contract; irresponsible lending
Text of the determination
Determination | Case number: 528147 Page 1 of 11
Determination
Case number: 528147 27 August 2019
1 Determination overview
1.1 Complaint
In April 2017, the financial firm (bank) provided three borrowers, Mr H, Mr A and Mr K
(collectively, the complainants), a $1,170,000 investment loan (loan) which:
refinanced $980,000 of existing debt, and
provided $150,000 additional lending.
The loan was secured by property W, an existing investment property (property). As
the complainants were intending to develop the property they also applied for a
construction loan (construction loan). The construction loan application was declined
because it did not meet the ba nk‟s lending criteria at the time.
The complainants say the bank:
did not lend responsibly when it provided the loan
misled them to believe the construction loan would be approved
misled them to sign a building contract with the builder
misled them by silence to believe they were able to demolish the existing dwelling
at the property, and
has caused them to incur a number of financial losses.
On 2 April 2019 the Australian Financial Complaints Authority (AFCA) case manager
provided the parties with a recommendation on the issues in dispute. The
recommendation was in favour of the complainant. A copy of the recommendation is
attached to this determination.
The recommendation was issued by FOS. The AFCA has replaced Financial
Ombudsman Service (FOS). AFCA is responsible for managing FOS complaints
lodged prior to 1 November 2018. While this determination is issued by AFCA we
have applied the FOS Terms of Reference.
Determination | Case number: 528147 Page 2 of 11
1.2 Issues and key findings
Were the findings contained in the recommendation correct?
Based on all the information, the findings contained in the recommendation were
correct and are adopted in this determination. Further submissions were provided by
both parties and have been considered in this determination.
Do the further submissions change the outcome of the complaint?
The further submissions do not provide basis to depart from the findings in the
recommendation. The surrounding circumstances of the complaint do not support a
view that the complainants were reasonably misled to believe a construction loan was
approved.
However, the other findings remain in the complainants‟ favour as they were misled to
sign the building contract and demolish the building . The complainants are entitled to
compensation for the first progress payment only, this is because:
it was not reasonable to make the second progress payment in the circumstances,
and
the complainants ‟ loss from having demolished the existing dwelling, if there is one,
has not crystallised or established.
What is the appropriate resolution to the complaint?
The bank should reduce the loan to the revised debt (set out below). The
complainants are also entitled to $83,000 compensation (accounting for the first
progress payment) and $18,000 non-financial loss compensation.
Determination | Case number: 528147 Page 3 of 11
1.3 Determination
This determination is in favour of the complainant. I agree with the reasons for the
recommendation and the recommended outcome.
If the complainants accept this determination within 30 days, then within 14 days of
the complainants accepting this determination the bank should:
reduce and split the loan into interest bearing and non-interest-bearing portions as
follows (revised debt):
‒ a non-interest-bearing portion of $682,569 , and
‒ an interest-bearing portion of $404,139 as at February 2019.
any repayments since February 2019 should go to the interest bearing portion of
the loan, including the payment of $60,000 on or about 21 May 2019
provide $83,000 compensation (accounting for the first progress payment) to an
account they nominate, and
provide $18,000 non-financial loss compensation to an account they nominate.
Within the same 14-day period, the following is to occur:
the complainants should provide details of their current financial position, together
with a reasonable repayment arrangement for the repayment of the revised debt
which may include time to sell
if the bank requires further information to make its assessment, it should write to
the complainants and identify the information required. The complainants should in
turn, co-operate with the banks reasonable requests for information
the bank must consider the complainants proposal, but it is not obligated to accept
it if the bank does not consider it to be reasonable, and
if the complainants are in financial difficulty and they believe the bank has not
given genuine consideration to a reasonable repayment arrangement for the
repayment of the revised debt, they may lodge a new dispute at AFCA about that
issue.
If the complainants do not accept this determination, then the bank is not required to
take the steps set out above.
Determination | Case number: 528147 Page 4 of 11
2 Reasons for determination
2.1 Were the findings contained in the recommendation correct?
The recommendation was generally accurate
I have decided this case on its merits, having regard to the relevant law, good industry
practice, codes of practice and previous AFCA decisions. I have taken into account all
the material submitted by the parties, both before and after the recommendation. I am
satisfied that the documentation I have relied on has been provided to both parties.
I am satisfied that the recommendation contains an accurate summary of the
complaint, the issues to be determined, any applicable paragraphs of the Rules and
any relevant law.
As I agree with the recommendation it is adopted into this decision and I will not
repeat its findings in this decision.
The parties have both provided reasons for rejecting the recommendation
On 10 May 2019, the bank rejected the recommendation including for the following
reasons:
it did not mislead the complainants to sign the building contract because, as per its
lending policy, it required a fully signed and executed build contract from a builder
prior to commissioning an “as if complete” property valuation
the complainants should be given time to sell the security property, rather than
enter into a repayment arrangement for the repayment of the revised debt, and
the recommendation did not specify the term of any repayment arrangement for the
repayment of the revised debt.
On 17 May 2019, the complainants provided a response to the recommendation as
follows:
the bank was aware of the existing $2,200,000 liability owing to another lender and
documentation confirming its existence was sent to the bank on 3 April 2017
the circumstances surrounding the construction loan application shows the bank
misled them to believe the construction loan would be approved
the bank should refund interest charges on the interest-bearing portion of the debt
because, had they not been misled about the approval of the construction loan,
they would have sold the property and no interest would have been payable
they have taken all possible steps to mitigate loss incurred from having demolished
the existing dwelling – they were unable to obtain finance from another financial
firm and steps were taken to reduce their existing debt, and
it was reasonable to make the $96,000 progress payment to the builder on 15
March 2018 because they were committed to make this payment under the
Determination | Case number: 528147 Page 5 of 11
executed building contract and non-payment would constitute a breach of the build
contract.
2.2 Do the further submissions change the outcome of the complaint?
The bank was on notice of the $2.2 million existing liability owing
In responding to the recommendation, the complainants say at the time of the loan
application, the bank was aware of the existing $2,200,000 liability owing to another
lender. The complainants say the bank was aware of this existing liability because
on:
13 March 2017 it was discussed in a face to face meeting with the bank , and
on 3 April 2017 a letter of confirmation of the OFI loan was sent to the bank.
On 29 March 2017, the loan application was submitted to the bank. On 3 April 2017
the complainants wrote to the bank as follows:
“…please find attached the details of commercial loan (this is under [Mr H’s & Mr
A’s] name).
The [property] loan will be under [Mr H 25%, Mr A 25% and Mr K 50%] the only
change is [Mr K] replacing another friend with 50% share currently.”
The complainants enclosed a letter from the OFI confirming an existing loan with a
$2,200,000 limit, and on 7 April 2017 the loan was approved. The bank was therefore
aware of OFI liability prior to approval and the bank ought to have included it in its
assessment of the loan. The recommendation found, even without the inclusion of
the $2,200,000 OFI loan, the approval of the loan created a monthly deficit of $1,508.
The finding that the bank was aware of the OFI loan, and ought to have included it in
its assessment, only increases the already existing deficit in the monthly servicing
position.
Despite the bank having been on notice of the other loan, this does not change the
finding that the loan was not affordable at the time of approval. The increase in the
monthly deficit does not provide a basis to increase the compensation the
recommendation awarded to the complainant for the bank not having lent responsibly.
AFCA will assess misleading conduct on the weight of the information
The recommendation found the bank did not mislead the complainants to believe the
construction loan would definitely be approved. This was on the basis that the bank ‟ s
2 June 2017 email (which advised the calculations/assessment of the construction
loan was in working order), could not be construed to be a conditional or
unconditional offer of credit.
Determination | Case number: 528147 Page 6 of 11
In rejecting the recommendation, the complainants say AFCA has not considered all
the surrounding circumstances, which if viewed, show they were reasonably misled to
believe the construction loan would be approved.
AFCA is not a court of law and does not have the power to take evidence on oath or
cross-examine witnesses. Instead AFCA considers all available documentation,
recollections of the parties and all relevant/surrounding circumstances. AFCA will
decide whether a breach or error is more likely than not to have occurred and give
more weight to written records.
The complainants were not reasonably misled about construction loan approval
The complainants say the circumstances surrounding the construction loan
application show the bank misled them because:
as early as 17 March 2017, even before the loan application was submitted, the
bank was aware they were seeking lending was for dual purposes (refinance
existing debt and to fund the construction)
they were told the lending would be provided in two parts; settle the refinance, and
the finalisation of the construction loan
given AFCA‟s finding they were misled to sign the build contract, it follows that they
were also reasonably misled to believe the construction loan would be approved,
and
a letter from the bank dated 16 February 2018, acknowledges the sole reason for
having refinanced to the bank was based on the indication a construction loan
would be approved.
The fact the 29 March 2017 loan application was ultimately for dual purposes (to
refinance existing debt and to fund the construction), does not in itself amount to
misleading conduct. Although the bank knew the decision to refinance the existing
debt over a property they already owned, was a step connected to the planned
property development venture, the approval of the refinance portion and release of
some funds, did not reasonably represent to the complainants that the second phase
construction loan would definitely be approved. The refinanced loan provided extra
funding for the complainants. The complainants knew the construction loan was a
separate loan with a separate loan assessment process and the approval of the
refinance was not conditional on the approval of the construction loan.
The recommendation found the complainants were misled to sign a binding build
contract. However this does not automatically mean the construction loan was
guaranteed to be approved. A lender‟s request to see a proposed contract with the
builder is generally to conduct valuations and preliminary matters, and the overall
sequence of events at the time cannot reasonably be construed as a formal offer of
credit to fund the construction. The complainants, one of whom had been a bank
employee, ought to have known no formal offer of credit had been made.
Determination | Case number: 528147 Page 7 of 11
Therefore, having considered all the surrounding circumstances of the complaint, and
on the information provided, the complainants were not misled to believe a
construction loan was guaranteed to be approved and ought reasonably to have
known it was yet to be assessed by the credit team.
The bank misled the complainants to sign the building contract
In rejecting the recommendation, the bank says:
under its construction lending policy, it requires a signed contract or tender from a
builder before it will order a valuation for its security assessment, and
its request to contract with the builder occurred in accordance with its lending
policy and was not misleading.
The bank‟s l ending policy states that sighting a build contract is required before it will
order a valuation. However it does not state that a fully executed and binding build
contract is required prior to formal approval. If the bank‟s lending policy does require
its customers to enter into binding third party build contracts before it is known
whether finance for its completion is approved, then the bank‟s lending policy is
inconsistent with good industry practice and compromises a potential borrower. A
bank should only require a binding build contract after the bank has presented an
unconditional letter of offer which has been accepted by a borrower - not before.
In this case, the build contract the complainants signed was not “ subject to finance ”
and the bank was aware the build contract was not “ subject to finance ” because:
on 7 June 2017, a full copy of the build contract was first exchanged with the bank
from 7 June 2017 onward, the bank ought to have been aware no “ subject to
finance ” clause existed in the build contract, and
on 28 June 2017, the bank instructed the complainants provide an amended
version of the build contract (because the initial contract omitted Mr K‟s signature)
which was signed on 4 July 2017.
Therefore, the bank instructed the complainants to sign a binding build contract which
they were unable to obtain finance to complete and did not provide adequate
disclosure of relevant information about the process. The bank made an error when it
requested the complainants sign the binding build contract on 17 May 2017 and again
on 28 June 2017.
The liability for progress payment two could have been reasonably avoided
The recommendation found:
it was reasonable for the complainants to have paid the first progress payment
under the build contract of $83,000
it was not reasonable to have made the second progress of $96,000 on 15 March
2018, and
Determination | Case number: 528147 Page 8 of 11
the complainants were also not entitled to compensation for the further $70,000
owing under the build contract (the outstanding portion of the second progress
payment).
The complainants say they were liable for progress payment two before the payment
was made on 15 March 2018. This is because the works associated with progress
payment two (i.e. slab, site fence and excavation) had already been completed by this
date. In other words, they say that although progress payment two was partially paid
on 15 March 2018, this related to works already completed to which they were liable
to pay under the build contract.
The recommendation found that by 17 August 2017, it ought to have been apparent to
the complainants that unconditional approval may not be provided, and they ought to
have instructed the builder to cease build works. It appears progress payment two
relates to works largely undertaken after 17 August 2017. This is because, an email
to the bank dated 26 July 2017, the complainants state:
…builder has progressed with demolition and will be at slab completion stage in
2- 3 weeks”.
The above indicates slab stage commenced between 9 August 2017 to 16 August
2017. Therefore, despite the complainants ‟ awareness on 17 August 2017 of
problems with the approval of the construction loan, the builder continued works for
some time after this date - to the point progress payment two works were complete.
In these circumstances, the complainants ought reasonably to have instructed the
builder to cease works immediately (before/shortly after the commencement of slab
stage). Had this occurred, it appears the complainants would not be liable for
progress payment two. Therefore, the complainants are not entitled to compensation
for the second progress payment totalling $166,000 because, based on the
information provided, it appears this cost could have been reasonably avoided.
Any loss in property value from demolition of the dwelling has not crystallised
The recommendation found the complainants were misled by silence to demolish the
existing dwelling. The complainants claim for loss in association with the demolition
of the dwelling is $260,000 (they say this is representative of the pre-demolition
property value versus the „ land only ‟ value). The recommendation found, in absence
of documentation to show the complainants formally applied with other financial firms
to fund the remaining construction costs, the complainants have not shown they
mitigated their loss.
In response to the recommendation, the complainants say they took steps to mitigate
their loss by:
having engaged two brokers, both of whom advised the construction loan
application did not pass a preliminary assessment
Determination | Case number: 528147 Page 9 of 11
selling a property in February 2018 to reduce existing debt (as well as making
other, yet unsuccessful, attempts to sell other investment properties), and
having made enquiries into the possibility/viability of selling the property “as is”.
The complainants say their ability to obtain finance from another financial firm was
improbable, and that this view is supported by AFCA‟s finding that the approval of the
loan created a monthly deficit of no less than $1,508 (excluding the $2,200,000 OFI
loan). I accept it is more likely than not that, even if the complainants had made a
formal application(s) with other financial firm(s), in the circumstances that existed at
the time, they would not have obtained an offer of credit to finance the remainder of
the construction costs from another financial firm.
However, it remains that the complainants are not entitled to any compensation from
demolishing the existing dwelling in accordance with their overall plans to build. This
is because the complainants may yet complete the building in which case the
demolition was a required step, or alternatively the complainants ‟ loss, if any, from
having demolished the existing dwelling will not have crystallised until the property is
sold and is yet to be established.
2.3 What is the appropriate resolution to the complaint?
The bank must split and reduce the loan to the revised debt amount
The bank did not lend responsibly when it provided the loan. The recommendation
found the bank ought to split the loan into interest bearing and non-interest-bearing
portions. The splitting of the loan accounts for the loan having been partially used to
refinance existing debt and partially treated as new money. The debt is to be treated
as partially interest bearing because , in so far as the refinanced debt is concerned,
the obligation to pay interest existed prior to the bank‟s irresponsible lending.
Therefore, the recommendation correctly found the complainants are liable for interest
payments on this portion of the debt.
The complainants say the bank should not be entitled to collect interest on the
interest-bearing portion of the debt because:
had they not been led to believe the construction loan would be approved, they
would have sold the property and repaid the debt, and
interest has accrued on the debt throughout the course of the AFCA complaint.
As outlined above, AFCA does not accept the complainants were misled to believe a
construction loan would be approved. Further, a bank is entitled to continue to charge
interest and fees to a loan even while there is a complaint on foot with AFCA. Since
the recommendation was issued, the complainants have cleared the loan arrears with
a $60,000 lump sum payment to the loan.
Determination | Case number: 528147 Page 10 of 11
That payment of $60,000 should be credited to the interest bearing portion of the
loan.
The parties can enter into an arrangement for the repayment of the revised debt
In rejecting the recommendation, the bank says the complainants should be
compelled to sell the property rather than an arrangement for the repayment of the
revised debt.
The recommendation correctly found AFCA will not compel the sale of the property if
the parties may otherwise agree to enter into a repayment arrangement for the
repayment of the revised debt. This is because the loan was not used to purchase
the property, rather, the complainants owned the property prior to the approval of the
loan. It would not be fair in all the circumstances to compel a borrower to sell a
property they owned prior to a bank‟s incorrect decision in lending. I note however
that in some circumstances, the sale of the property may be the only alternative
where the customer is in financial difficulty and a reasonable repayment arrangement
cannot be reached.
If the parties are unable to come to a reasonable arrangement, the complainants may
lodge another complainant with AFCA‟s concerning financial difficulty.
Determination | Case number: 528147 Page 11 of 11
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with Financial Ombudsman Service (FOS).
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
Determination | Case number: 528147 Page 1 of 21
Recommendation
Case number: 528147 2 April 2019
4 Overview
4.1 Complaint
In April 2017 the financial firm (bank) provided three borrowers, Mr H, Mr A and Mr K
(collectively, the complainants) a $1,170,000 investment loan (loan) which:
refinanced $980,000 existing debt, and
provided $150,000 additional lending.
The loan is secured by the investment property (property). As the complainants were
intending to develop the property and applied for a construction loan (construction
loan). The construction loan application was dec lined because it did not meet the
bank‟s lending criteria at the time.
The complainants say the bank:
did not lend responsibly when it provided the loan
misled them to believe the constriction loan would be approved
misled them to sign a building contract with the builder, which they are now in
breach of because the bank will not fund the construction
mislead them by silence to believe they were able to demolish the existing dwelling
at the property, and
have caused them to incur a number of losses.
4.2 Issues and key findings
Did the bank lend responsibly when it provided the loan?
The bank did not lend responsibly when it provided the loan. The loan was not
affordable at approval and created a monthly deficit of $1,508.
Did the bank’s lending decision cause any financial loss?
The complainants have incurred a financial loss as a result of the approval of the
loan. The loan provided a refinance to a higher interest rate, provided additional
lending, and due to the transfer of ownership, 50% of the existing loan should be
Recommendation | Case number: 528147 Page 2 of 21
treated as new money. The bank should reduce the balance of the loan to a revised
interest bearing and non-interest-bearing debt.
Did the bank engage in misleading conduct on the construction loan?
The bank misled the complainants to sign the build contract. The banks also misled
the complainants by silence to demolish the existing dwelling. The complainants
relied on the misleading conduct to sign the build contract and demolish the existing
dwelling.
Did the complainants rely on misleading conduct to incur a loss?
The bank should compensate for the first progress payment of $83,000, however it is
not required to compensate for the second progress payment. After having been
misled to believe they could demolish the existing dwelling, the complainants did not
take sufficient steps to mitigate their loss. The bank is not required to compensate for
lost value in the property. The complainants are entitled to $18,000 non-financial loss
compensation.
4.3 Recommendation
This recommendation is in favour of the complainants.
If both parties accept this recommendation, within 14 days of that acceptance the
bank should:
reduce and split the loan into interest bearing and non-interest-bearing portions as
follows;
‒ a non-interest-bearing portion of $682,569 , and
‒ an interest-bearing portion of $404,139 (revised debt)
provide $83,000 compensation (accounting for the first progress payment), and
provide $18,000 non-financial loss compensation.
Within the same 14-day period, the following is to occur:
the complainants should provide details of their current financial position, together
with a reasonable repayment arrangement acceptable to the bank for the
repayment of the revised debt
if the bank requires further information to make its assessment, it should write to
the complainants and identify the information required. The complainants should in
turn, co-operate with the banks reasonable requests for information, and
the bank must consider the complainants proposal, but it is not obligated to accept
it if the bank does not consider it to be reasonable.
Recommendation | Case number: 528147 Page 3 of 21
If a reasonable repayment arrangement is not agreed, the complainants should be
given three months from the date of the acceptance of this recommendation to:
repay or refinance the revised debt
obtain an unconditional contract of sale for the sale of the property whereby the
property is sold for fair market price acceptable to the bank. The sale must be at
an arm‟s length pf the purchaser, and
include a settlement period in the contract of no greater than 30 days.
If the complainants are unable to obtain an unconditional contract of sale within a
three-month period, the bank will be entitled to commence recovery action in order to
obtain possession of, and sell, the property (once the Australian Financial Complaints
Authority (AFCA) file is closed).
Recommendation | Case number: 528147 Page 4 of 21
5 Reasons for recommendation
5.1 Did the bank lend responsibly when it provided the loan?
The bank has an obligation to lend responsibly
A credit provider has an obligation to exercise the care and skill of a diligent and
prudent lender in assessment whether a customer has the ability to repay a loan. the
credit providers obligations are set out in the National Consumer Credit Protection Act
2009 (NCCP) and the Code of Banking Practice.
In the process of assessing lending, a credit provider should:
make reasonable enquiries about the customers‟ requirements and objectives in
relation to the credit contract
make reasonable enquiries about the customer capacity to repay, and
take reasonable steps to verify the customer‟s financial situation.
AFCA will also assess whether the credit provider should have provided the lending.
As part of our review, AFCA completed its own independent assessment to determine
whether the customer could afford to service a loan at the time it was provided.
The approval of the loan involved a 50% transfer of ownership of the property
The approval of the loan involved:
a $980,000 refinance the other financial firm (OFI)
$150,000 additional lending, and
a transfer of a 50% share of ownership of the property from one proprietor to
another.
Prior the transfer of ownership, Mr H and Mr A each owned a 25% share in the
property, the other 50% share of the property was owned by Mr & Mrs Z. Mr & Mrs
Z‟s 50% share was transferred to Mr K at the time of the loan. Mr & Mrs Z had
agreed to sell their 50% share in the property to Mr K. Mr H, Mr A and Mr K agreed to
jointly raise the $1,170,000 loan with the bank, $150,000 additional lending to be paid
to Mr & Mrs Z as consideration/payment for their equity in the property. Therefore:
Mr H, Mr A and Mr K raised a new loan to which they are jointly and severally liable
the loan refinanced Mr H and Mr A‟s share of the existing loan who each r etained
their 25% share of the property
Mr & Mrs Z received $150,000 cash payment for their 50% share of the property
(raised via the loan) and are no longer liable for 50% of the lending
Mr K was introduced as a new party to the transaction - he did not have any
existing liability prior to the refinance, and
Recommendation | Case number: 528147 Page 5 of 21
Mr K‟s 50% share of the refinanced loan is to be considered new money because
Mr K did not have any existing liability prior to the loan.
Although the loan was mostly to refinance $980,000 existing debt from an OFI, Mr K
was not party to the loan before the refinance. For this reason, AFCA‟s view is Mr K‟s
50% share of the refinanced liability ought to be treated as new money.
The bank was not on notice of a $2.2M existing liability owing to an OFI
The complainants say:
the bank did not lend responsibly when it provided the loan
the bank‟s assessment of the loan ought to have included another $2,200,000
liability that was owing to the OFI at the time, and
because this liability was not included in its assessment, the bank did not lend
responsibly.
The reason the complainants say the bank ought to have included the $2,200,000
liability in its assessment of the loan is because the bank and the OFI operate under
the same umbrella of companies. Although the bank and the OFI share ownership
they operate and function independently from each other. The customer financial
firm‟s databases are not shared, and customer information remains confidential.
This means the bank and the OFI do not cross-reference information when assessing
an application for credit. In the context of this complaint, unless the $2,200,000
liability was disclosed in the loan application, or there were otherwise red flags that
ought to have prompted the bank to make further enquiries, it would not have been
aware this liability was owing. The loan application shows the $2,200,000 loan was
not disclosed. Based on the information provided there is nothing which ought to
have raised a red flag with the bank and prompted it to make further enquiries into
other liabilities owing.
The bank did not make an error or breach an obligation when the $2,200,000 liability
was not included in its assessment and AFCA has also not included this liability in its
independent serviceability assessment.
The loan was not affordable at the time of approval
The approval of the loan has been independently reviewed by an AFCA banking
specialist. The AFCA banking specialist has extensive experience in the banking
industry and regularly provides AFCA advice about banking practices and policies.
AFCA‟s independent assessment of the loan is set out at section 3.1 of this
recommendation and provides an assessment of:
the three- borrower‟s individual income and expen ses, and
Recommendation | Case number: 528147 Page 6 of 21
the combine income of the three borrowers and joint expenses of the three
borrowers.
AFCA‟s assessment has been performed on the basis of the information which was
available to the bank at the time of approval, additional information provided and
principles of good industry practice. Mr H, Mr A and Mr K were earning a PAYG
income at the time of the loan. As Mr H was an employee of the bank at the time, the
bank had corporate knowledge of his salary. The bank received a copy of Mr A‟s
payslips a nd Mr K‟s tax return. The bank also obtained rental statements verifying
rental income Mr H and Mr A received for three investment properties (excluding
rental income previously received by the property). In accordance with good industry
practice, rental income has been reduced to 80% (to account for property related
expenses). Therefore, Mr H and Mr A were each receiving monthly rental income of
$3,259. With the inclusion of the Mr H, Mr A and Mr K individual living expenses, the
complainants had a combine monthly surplus figure is $22,010 for the assessment of
the loan.
The bank‟s credit assessment notes show it included an existing joint liability of
$2,365,000 (existing joint loan) in its assessment of the loan. There is no information
in relation to this existing joint loan. However, given the bank included this liability in
its assessment, AFCA has also included its monthly repayments in its independent
serviceability assessment. Therefore, with a combine monthly surplus figure of
$22,010 against:
monthly existing joint loan repayments of $15,734 (at an interest rate of 7%), and
monthly loan repayments of $7,784 (at an interest rate of 7%)
the approval of the loan created a monthly deficit of $1,508. Therefore, the loan was
not affordable at the time of approval. Had the additional $2,200,000 liability been
included in the servicing assessment, this would only increase the already existing
monthly deficit position. Therefore, the bank did not lend responsibly when it provided
the loan.
5.2 Did th e bank’s lending decision cause any financial loss?
The complainants refinanced the loan to a higher interest rate
When AFCA assesses loss incurred as a result of irresponsible lending, the purpose
of the loan will be relevant in determining our approach to the assessment of loss.
The loan comprised a $980,000 refinance of existing debt from an OFI.
Generally, in circumstances where loan funds were used to repay other debts which
were already owing before the financial firm provided the loan, the borrower will only
have suffered a loss if the refinance attracts a higher interest rate or fees than the
existing debt.
Recommendation | Case number: 528147 Page 7 of 21
At the time of the refinance the existing $980,000 OFI loan was attracting interest at
4.19% per annum. The bank refinanced this liability to an interest rate of 4.29% per
annum. Therefore, the debt was refinanced to a 0.10% higher interest rate. This
means and the complainants have incurred a financial loss on the $980,000 refinance
(as well as the $150,000 additional lending provided).
50% of the refinanced debt is treated as new money for the loss assessment
As outlined previously, AFCA‟s view is Mr K‟s 50% share of the $980,000 refinance
ought to be treated as new money. This means the loss incurred on this 50% portion
of the refinance (or $490,000) will not be limited to the 0.10% interest rate increase,
rather it will comprise full interest and fees charged on that 50% portion of the loan.
AFCA‟s assessment of loss has been performed on this basis.
The bank should reduce the loan to a revised debt
AFCA ‟s banking specialist has assessed the financial loss the complainants have
incurred as a result of the approval of the loan (see section 3.2 of this
recommendation).
The $150,000 additional lending as well as the 50% portion of the refinance ought to
be treated as new money. This portion of the loan should be split off into a non-
interest-bearing debt moving forward. The AFCA banking specialist has assessed the
loss the complainants have incurred on this “new money” portion of th e loan to arrive
at a revised non-interest-bearing debt of $682,569. This assessment accounts for the
interest charged on 50% “new money” portion of the refinance as well as interest
charged on the additional lending.
The complainants have also incurred loss on the other 50% portion of the refinance
because the loan was refinanced to a 0.10% higher interest rate. The AFCA banking
specialist has assessed the loss the complainants have incurred as a result of the
refinance to arrive at an interest bearing revised debt of $404,139. This portion of the
revised loan also accounts for costs the complainants incurred as a result of the
approval of the loan (such as stamp duty, land tax, legal costs, property holding costs,
other transaction costs, early repayment adjustment (ERA) fees and discharge fees).
5.3 Did the bank engage in misleading conduct on the construction loan?
The bank did not mislead about the approval of a construction loan
On 29 March 2017 the complainants applied to the bank for a construction loan. The
complainant‟s intention was to demolish the existing dwelling on the property and
obtain finance for the construction of a duplex. The bank ultimately declined the
construction loan as a result of its credit risk assessment. Among other things, the
complainants say they were misled to believe the construction loan would be
approved.
Recommendation | Case number: 528147 Page 8 of 21
The complainants and the bank have provided email correspondence showing all the
interactions between the parties which occurred from March 2017 to May 2018 (see
section 3.3 of this recommendation). The complainants say they were misled to
believe the construction loan would be approved because of an email received from
the lender on 2 June 2017. The bank‟s 2 June 2017 email s tates the following:
As discussed today, the loan for the duplex build should not be an issue – I have
done all the necessary calculations and everything is in working order
When AFCA considers a complaint of misleading conduct, it must be established:
the bank‟s conduct was in fact misleading
the complainants took reasonable steps in reliance on the misleading conduct, and
the complainants have incurred a loss in reliance on the bank‟s misrepresentation.
The 2 June 2017 email is not sufficient to establis h the complainants were misled to
believe the construction loan would be approved. This email cannot reasonably be
construed to be a conditional or unconditional offer of credit. The complainants, one
of whom being a bank employee, ought to have known such correspondence did not
constitute a formal approval. This is especially because, at this time, the bank was
yet to complete its full credit assessment including obtaining a property valuation.
Therefore, the complainants were not reasonably misled to believe the construction
loan would be approved.
The bank misled the complainants to sign the build contract
The complainants say, during the construction loan assessment process, the bank
misled them to sign a build contract and pay a deposit under the b uild contract. In
reliance on this misrepresentation the complainants say they signed the build contract
and paid a deposit to the builder. The correspondence shows on 17 May 2017 the
complainants wrote to the bank as follows:
“I have requested the trans fer waiting on solicitor to confirm stamp duty amount
and will get the transfer to yourself by Mon/Tue next week. Do you need anything
from us for the build loan contract?
The bank responded the same day as follows:
“just require signatures on the cont ract, but I can finalise this for you quickly. Just
to confirm the build is for a duplex”
In response, on 20 May 2017 the complainants signed the build contract. On 7 June
2017 the complainants sent a copy of the signed build contract to the bank. On 16
June 2017 the complainants paid a $41,500 deposit to the builder (comprising 5% of
the total $830,000 contract price) and on 22 June 2017 the bank requested a copy of
Recommendation | Case number: 528147 Page 9 of 21
the deposit receipt. Following this, on 28 June 2017 the bank wrote to the
complainant requesting an amended version of the build contract (because the initial
contract omitted Mr K‟s signature), the amended build contract was signed on 23
June 2017 and exchanged with the bank on 4 July 2017. Based on this sequence of
events, the bank not only requested the complainants contract with the builder, the
bank also requested confirmation by way of a copy of the signed build contract and
evidence of payment of the deposit.
The bank should not have requested the complainants contract with the builder at this
stage in its construction loan assessment process, this is because:
under the bank‟s construction loan policy, it does not require a signed build
contract prior to formal approval
generally, a bank should not advise its customers to sign third party documents
good industry practice would mean the bank should inform its customer of the
bank‟s requirements regarding third party documents, but it should not instruct its
customer to sign such documents, and
the complainants were not in a position to sign such an agreement until the bank
had presented them with an unconditional letter of offer.
Therefore, the bank misled the complainants to sign the build contract. As the
construction loan was declined, the complainants are now in breach of the build
contract to the extent works have already been completed.
The bank misled the complainants by silence to demolish the existing dwelling
The complainants say they were misled by silence to believe they were able to
demolish the existing dwelling on the property. The bank says:
no such assurance was provided, and
because the property was security for the loan, and complainants needed the
banks express authority before demolishing the dwelling.
AFCA can consider a complaint that a financial firm‟s silence, or failure to disclose
relevant information, amounts to misleading conduct; the outcome of this assessment
will depend on the financial firm‟s knowledge of its customers position. The email
correspondence shows, on 7 July 2017, after the e xecuted build contract was
exchanged with the bank, the complainants wrote to the bank as follows:
“As discussed, attached are two pieces (hopefully the last) of the puzzle…
FYI – demolition is booked in for early next week…”
On 7 July 2017, when the above email was sent to the bank, the bank was aware the
complainants had contracted with a builder and initial building works had commenced.
Recommendation | Case number: 528147 Page 10 of 21
Therefore, the bank was aware of the steps the complainants had taken to develop
the property, and especially with this knowledge, the bank ought to have responded to
the complainant‟s 7 July 2017 email to advise demolition should not proceed. Instead
the bank was silent, and no response ensured on the matter. On 26 July 2017 the
complainants sent an email to the bank saying:
“…builder ha[d] progressed with demolition and will be at slab completion stage in
2- 3 weeks”
The bank responded to this email on the 31 July 2017 without an acknowledgement
that demolition works had begun. The email correspondence the bank received from
the complainants ought to have:
put it on notice the complainants had commenced construction works without
formal loan approval, and
prompted the bank to contact the complainants and confirm funding had not been
conditionally or unconditionally approved and may not be approved at all.
The bank‟s silence after 7 July 2017 amounts to misleading conduct by silence.
5.4 Did the complainants rely on misleading conduct to incur a loss?
AFCA’s approach to assessing loss in relation to misleading conduct
When AFCA considers a complaint about misleading conduct, the outcome is not to
make the misrepresentation come true. Rather, we will consider what loss a
complainant had suffered as a result of relying on the financial firm‟s
misrepresentation. We will consider how much worse off a complainant is by
comparing the complainants current position with their likely position had there been
no misrepresentation.
In this case, the complainants say, had the misrepresentations not been made, they
would not have:
engaged a builder, or
demolished the existing property (but rather would have sold the property in 2017).
The complainants took steps in reliance on the banks misrepresentations
In reliance on the bank‟s misrepresentations the complainants:
signed a building contract on 4 July 2017
paid a $41,500 deposit on 16 June 2017 (comprising half of the first progress
payment totalling $83,000)
paid the remainder of the first progress payment of $41,500 on 5 August 2017, and
Recommendation | Case number: 528147 Page 11 of 21
paid a further $96,000 on 15 March 2018 (comprising a partial payment of the
second progress payment totalling $166,000).
The complainants have paid $179,000 in total to the builder and owe a further
$70,000 under the building contract for works rendered. The builder is pursuing the
complainants for the $70,000 outstanding under the building contract.
In reliance on the bank‟s silence, the complainants demolished the existing dwelling
and commenced early construction works. The complainants say this has decreased
the value in the property because the property is now a vacant lot with a partially
completed slab for the intended duplex build. The complainants say the value of the
property before demolition versus the current property value represents their financial
loss.
The complainants have incurred loss from having signed the build contract
The complainants paid $41,500 to the builder on 4 July 2017 and paid a further
$41,500 on 5 August 2017 (comprising the first progress payment). The
complainants were reasonably misled to make these payments. This is because the
bank had expressly asked for a copy of the receipt for the 4 July 2017 payment, and
from 4 July 2017 and 5 August 2015 (when the second payment was made), the bank
it did not tell the complainants funding had no t been unconditionally approved or that
approval may not be provided. Rather, on 31 July 2017 the bank wrote:
“I have spoken to [staff member], our business banker. He is going to assist with
the constriction loan. he is well aware of the situation and will be working together
with me to get this resolved and get the loan completed…”
Therefore, it was not unreasonable for the complainants to make these payments in
these circumstances. These payments represent a loss the complainants have
incurred. The complainants have not otherwise received the benefit of the works
undertaken as the build was never completed.
On 15 March 2018 the complainants made another payment of $96,000. It was not
reasonable for the complainants to make this payment to the builder in the
circumstances. This is because, before the $96,000 payment was made, the bank
had expressed concerns to the complainants that unconditional approval may not be
provided. On 17 August 2017 the bank wrote:
“…but as it stands right now, the deal is declined with [the bank] and will not be
accepted with [the OFI]”.
It was not reasonable for the complainants to take steps in reliance on the bank‟s
earlier misrepresentation beyond this point. On or around 17 August 2017 the
Recommendation | Case number: 528147 Page 12 of 21
complainants ought to have contacted the builder to advise him/her to stop building
works. This is because the complainants:
were on notice that unconditional loan approval may not be likely
the correspondence between the bank and the complainants that followed from this
time forward focused predominantly on the difficulties the bank was encountering
with its credit assessment, and
an „approval in principal‟ and having been on track to meet other conditions
discussed, did not constitute formal loan approval.
Therefore, the complainants did not reasonably incur loss in relation to the $96,000
payment. The complainants are also not entitled to compensation for the $70,000
outstanding payment owing to the builder in relation to progress payment two. The
complainants are entitled to $83,000 compensation for the first progress payment.
The complainants have not mitigated loss in relation to loss in property value
The complainants say in reliance on having been misled to believe they could
demolish the existing dwelling, they have inc urred loss in respect to the diminished
value in the property. The dwelling has been demolished and the property is now a
vacant lot. The complainants say, prior to demolition the property value was
$1,300,000 and as at June 2018 the land value was $1,040,000. Therefore, from
having demolished the property the complainants have incurred loss of approximately
$260,000.
When considering a claim for loss, AFCA will generally have regard to whether a
complainant has taken sufficient steps to mitigate their loss. This is based on the
principal that, generally, a party cannot recover damages for loss incurred which
could have been avoided had that party undertaken reasonable measures to minimise
their loss.
The complainants say they mitigated their loss in the following ways; by:
selling three investment properties to reduce existing debt and listing a fourth
investment property for sale
engaging a real estate agent to sell the property „as is‟
approaching brokers to obtain a construction loan from other financial firms, and
approaching another financial firm to conduct an „as if complete‟ valuation for the
property for a potential construction loan application.
The complainants did not formally apply with another lender to obtain finance to fund
the construction. Although the complainants approached a broker and were declined
in principal, no formal loan applications were submitted with any other financial firms.
Without having taken any formal steps to obtain finance elsewhere, AFCA cannot be
satisfied the complainants took sufficient steps to mitigate their loss in relation to the
Recommendation | Case number: 528147 Page 13 of 21
decrease in property value. Furthermore, the complainants claim for loss in relation
to the decreased property value will not have crystallised until the property is sold.
Therefore, the complainants are not entitled to any compensation in relation to the
decreased value of the property.
The complainants have four separate claims for non-financial loss
AFCA can award compensation for non-financial loss, which includes claims for
stress and inconvenience caused by a financial firm‟s error or breach of obligation.
AFCA can award up to a maximum amount of $3,000 non-financial loss
compensation per claim per complainant (at the time this complaint was lodged).
The bank made a number of errors in the circumstances of this complaint. The bank
made errors when it:
lent irresponsibly when it provided the loan
misled the complainants to sign the building contract and pay the deposit, and
misled the complainants, by silence, to believe they could demolish the existing
dwelling.
The above events each represent three separate claims for non-financial loss
compensation for each of the three complainants.
The complainants are entitled to $18,000 non-financial loss compensation
The complainants would have incurred stress and upset in relation to the approval of
the loan. However, because the approval of the loan primarily refinanced pre -existing
debt and only increased their joint liability by $150,000, the complainants stress a nd
upset would not have been severe. Therefore, for this, the bank should provide
$1,000 non-financial loss compensation to each complainant, totalling $3,000.
In relation to the having been misled into signing the build contract, the complainants
would have incurred severe stress, inconvenience and upset. This is especially
because:
this was an express instruction the bank provided the complainants
this occurred in breach of the banks own lending policy and in contravention to
good industry practice, and
this occurred without regard to whether the complainants could fulfil their
obligations under the build contract.
Therefore, for this, the bank should provide $3,000 non-financial loss compensation
per complainant totalling $9,000.
The complainants would have incurred stress, inconvenience and upset as a result of
having been misled to proceed with the demolition on the existing dwelling. However,
without having taken steps to mitigate their loss, and the fact their loss has not yet
Recommendation | Case number: 528147 Page 14 of 21
crystallised, the complainants stress and upset is reduced. Therefore, the bank
should provide $2,000 non-financial loss per complainant, totalling $6,000.
Recommendation | Case number: 528147 Page 15 of 21
6 Supporting information
6.1 Servicing assessment
Individual borrower assessment
Details Mr H Mr A Mr K
Salary/Wages (net) $13,127 $14,850 $9,149
Rent al income $3,259 $3,259 -
Total monthly income $16,386 $18,109 $9,149
l ess monthly expenses
Rent $2,903 $2,600 $2,500
Credit cards (@ 3% of limit) $120 $600 $600
Living expenses $4,697 $4,173 $3,441
Total monthly expenses $7,720 $7,373 $6,541
Individual surpluse s $8,666 $10,736 $2,608
Joint borrower assessment
Details Mr H, Mr A and Mr K
Combined surplus $22,010
less monthly joint expenses
Loan $7,784
Existing joint liabilities $15,734
Total joint expenses $23,518
Deficit - $1,508
6.2 Loss calculation - irresponsible lending
Date Description Amount
Recommendation | Case number: 528147 Page 16 of 21
Date Description Amount
June 2017 Loan approved $1,170,000
Less; 50% refinance $487,431
February 2019 Non - interest - bearing debt (new money) $6 82,569
February 2019 50% refinance $487,431
Less costs
Stamp duty $24,740
Land tax $4,740
Legal costs $1,130
Property holding costs (rates & insurance) $1,828
Trans action costs $1,255
OFI ERA cost $6,147
OFI discharge fee $350
Loan repayments $75,193
Total costs $115, 383
Plus ; AFCA interest on refinanc ed debt $32,091
Total interest - bearing debt (refinance) $ 404,139
6.3 Timeline of events / correspondence
Date Event / corre spondence
29 September 2015 Mr H, Mr A and Mr & Mrs Z receive approval for the purchase of the
property
January 2017 Council approval for demolition and construction of a duplex
2 February 2017 Mr H found Mr K to buy - out Mr & Mrs Z‟s 50% share of the property
13 March 2017 Complainants email to bank:
“in addition to this we are also looking at a new loan for the attached
property (a land with a potential subdivision) and would like to catch up to
Recommendation | Case number: 528147 Page 17 of 21
Date Event / corre spondence
understand:
1. Estimate on valuation (purchas e price will be $1.2M - $1. 26M)
2. Potential to have the loan under a trust structure”
Bank to complainants:
“Wil do a pre - estimate …”
18 April 2017 Complainants obtained a quote from the builder
Quote sent to bank
29 March 2017 Application submitted for loan (refinance application)
7 April 2017 Loan (refinance) approved
19 April 2017 Tender for build contract presented to complainants
- Anticipated construction period of 44 - 48 weeks
- Total cost of $830,000
16 May 2017 Bank email to complainant:
“[The OFI] are ready to settle – [the bank] cannot settle until the trans fer
has been rec eived”
17 May 2017 Complainants email to bank:
“…I have requested the transfer waiting on solicitor to confirm stamp duty
amount and will get th e transfer to yourself by Monday/Tuesday next week.
Do you need anything from us for the build loan contract?”
Banks email to complainants:
“Just require signatures on the cont ract, but I can finalise this for you
quickly. Just to confirm, the build is for a duplex?”
20 May 2017 Complainants singed the original build contract
2 June 2017 Complainants say a face to face meeting was held with the bank to provide
an email for the builder to organise home warranty and commence works.
Banks email to comp lainants:
“As discussed today, the loan for the duplex build should not be an issue – I
have done all the necessary calculations and everything is in working
order”.
Complainants email to builder:
“As discussed, all good from Bank‟s perspective for you to proceed with
home owner warranty process”.
7 June 2017 Complainants sent a copy of the signed build contract to the bank
8 June 2017 Settlement for loan (refinance)
16 June 2017 $41,500 deposit paid to builder
Recommendation | Case number: 528147 Page 18 of 21
Date Event / corre spondence
21 June 2017 Complainants SMS to builder:
“…are you waiting for something from us on the build loan? We have paid the
deposit to the builder and he has commenc ed initial works”
22 June 2017 Bank email to complainant:
“Can you please forward a copy of the deposit receipt”
Complainants e mail to bank:
“As requested, receipt from [building company] for $41,5000 – 5% paid
23 June 2017 Amended building contract signed to include Mr K‟s signature
28 June 2017 Bank email to complainant:
“Hi Mr H,
Just following up to see how you are going with the Contract for the
construction loan? Need this to finalise the loan please”.
4 July 2017 Amended and executed building contract exchanged with bank
Complainants email to bank:
“Attached is the builders contract update with [Mr K‟s] name”.
7 July 2017 Complainants email to bank:
“Hi [banker]
As discussed, attached are two pieces (hopefully the last) of the puzzle…
FYI – Demolition is booked in for Early next week…”
10 July 2017 Bank valuation for property - $1,650,000 (as if complete)
14 J uly 2017 Bank email to complainant:
“…if title was subdivided, the bank can value the individual duplex dwellings
at the valuation mentioned of $1,075,000 each ($2, 150,000 in total) … due
to the block still being registered as one title, the valuation can only be
taken into account as one title.
The valuation has been complet ed as land without a house on it, plus the
improvements of $830,000 which makes it $1,650,000. Once completed,
the individual block can be valued as per the sale you have shown…”
26 July 2017 Complainants email to bank:
“How does this solve it for us [banker]? Builder has progress with demolition
and will be at slap completion stage in 2 - 3 weeks…”
31 July 2017 Banks email to complainants:
“I have spoken to [another banker], our business banker that I deal with.
He is going to assist with the construction loan. He is well aware of the
situation and will be working together with me to get this resolved and get
the loan completed. The [othe r banker] has asked for the following
documentation.
Mr H, please can you forward you 2015 financials, both personal and
Recommendation | Case number: 528147 Page 19 of 21
Date Event / corre spondence
business. Will need updated payslips for both Mr H and Mr K…”
5 August 2017 $41,500 deposit paid to builder (remaining 50% of the fi rst progress
payment )
8 August 2017 Bank email to complainant:
“I have spoken to the credit team, I have tried different ideas with the
business banker to see if there are any other alternatives that can be issued
to help find a solution. I have got 2 other lenders involved wit h more than 2
years‟ experienc e from bot h of them.
Unfortunately, from our discussion to provide the funds that we can approve
for part of the construction can‟t be approved… is there any family
members or friends who can assist with this situation? With the
understanding that these funds can be obt ained once construction is
completed. I have exhausted all options…”
15 August 2017 Additional financial information provided to bank
Bank emails to complainants:
“I will forward to business banker. We may have the solution we have been
working for”.
Complainants email to bank:
“let‟s change the „may‟ to a „definite‟”.
Bank email to complainants:
“Can never guarantee anything in this role. The loan application is being
assessed by our most senior credit manager at the moment. I will update
you once I have some information”.
“I got an email late tonight. It‟s not good news and its gone from bad to
Worse. I will have to explained tomorrow the situation. But it‟s not good…”
Internal bank emails regarding discussing its credit assessment
16 August 2017 Banks email to complainant:
“The credit manager has gone through the whole application. She has
access to [the OFI] too. These are the main points to come from it:
…
3. a) conditions
i. disclose all liabilities
ii. unconditional sale of [another property]
Complainants email to bank:
“Hi [banker] – we have from day 1 disclose all liabilities and our full
situation. I don‟t understand why would this come as undisclosed liabilities?
This was all along taken int o consideration from the time we move our
mortgage from [OFI] to [the bank] and paid the break fees upon your
advic e.
Recommendation | Case number: 528147 Page 20 of 21
Date Event / corre spondence
This is very unacceptable outcome with us now given our builder a go
ahead and he has already knock down the house and commenced
constructions work, based on this attached email from yourself and
numerous conversation with both [Mr A] and myself.
There is no way we would have incurred break fees ($6,4496) and also
start paying higher rate (4.19% to 4.29%) on the loan if the build loan was
not possible.”
Banks email to complainant:
“Please can you confirm all personal liabilities. Do you have any more
personal debts other than what I have listed? I am not saying that not all
has been disclosed, bas ed on the l oans outside, I was under the impression
that the commercial lending was not under personal names, hence the non
inclusion on the application. However, from memory, the debt was only
$900K against [another property] at the time. Not $2.1M – can you also
c onfirm the repayments on the loan wit h [the OFI].
Email corres pondence bet ween bank and OFI about lending
Bank email to complaint:
“…As it stands right now, the deal is declined with [the bank] and will not be
accepted wit h [the OFI] … if you want to co me down this afternoon I can
have a quick chat with you in regards to all of this. And put pen to paper
and explain it more clearly. Will need to brainstorm for a solution”.
September 2017 –
November 2017
Email corres pondence bet ween complainant and bank regarding the credit
assessment
December 2017 –
January 2018
Email corres pondence bet ween complainant and bank regarding the credit
assessment/conditions
27 February 2018 Complainant email to bank:
“Please do note that:
There was not even a formal bank approval for us to move the loan
across but we acted upon it becaus e of the assistance provided by
[the banker]
We have probed [the banker] quite a lot on this loan and got a
confirmation from him that full loan will be pro vided including
construction
[the banker] knew that we are signing builder contract, paying deposit
and commencing construction – never at any point did he advise us to
hold - off and wait for formal approval. Instead he provided the email to
share with the builder (so builder can commence).
It has been always verbal/informal email exchanges for this loan and at no
point a formal approval letter from the bank was discussed as a
requirement …”
15 March 2018 Second progress payment paid to builder - $96,000
Ap ril 2018 – May Email corres pondence bet ween complainant and bank (and internal bank
Recommendation | Case number: 528147 Page 21 of 21
Date Event / corre spondence
2018 emails) concerning its credit assessment/lending scenarios.